CN106869317B - The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube - Google Patents

The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube Download PDF

Info

Publication number
CN106869317B
CN106869317B CN201710143676.XA CN201710143676A CN106869317B CN 106869317 B CN106869317 B CN 106869317B CN 201710143676 A CN201710143676 A CN 201710143676A CN 106869317 B CN106869317 B CN 106869317B
Authority
CN
China
Prior art keywords
node
concrete
column
steel
wing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710143676.XA
Other languages
Chinese (zh)
Other versions
CN106869317A (en
Inventor
计静
徐智超
张文福
张云峰
卢召红
刘迎春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Shuoguo Digital Technology Co ltd
Original Assignee
Northeast Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Petroleum University filed Critical Northeast Petroleum University
Priority to CN201710143676.XA priority Critical patent/CN106869317B/en
Publication of CN106869317A publication Critical patent/CN106869317A/en
Application granted granted Critical
Publication of CN106869317B publication Critical patent/CN106869317B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to group frame systems and construction method that the beam column edge of a wing is concrete-filled rectangular steel tube, this beam column edge of a wing is that the group frame system of concrete-filled rectangular steel tube is connected and composed by coupled column and combination beam by node, combination beam is horizontally set between coupled column, node is concrete filled steel tube monoblock type node, and coupled column is the cross or I-shaped coupled column that the edge of a wing is concrete-filled rectangular steel tube;Combination beam is the I-shaped Honeycomb Beam that the edge of a wing is concrete-filled rectangular steel tube;Node is fixedly connected at respective connecting plate by high-strength bolt with coupled column, and node is fixedly connected at respective connecting plate also by high-strength bolt with combination beam.The present invention solves that the construction of existing steel-concrete combined structure is cumbersome, the poor problem of the connection and stability between composite structure.

Description

The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube
Technical field
The present invention relates to the house frame structures in civil engineering structure field, and in particular to the beam column edge of a wing is rectangular steel pipe The group frame system and construction method of concrete.
Background technique
Conventional building frame construction is mostly cast in situs welded reinforcement concrete frame or steel frame, long in time limit, by ring Border is affected, and achievable span is smaller, and element bearing capacity is lower, and application has great limitation in practical projects Property.In recent years with building to faster, higher, span is bigger develops with the stronger direction of bearing capacity, conventional structure system and Construction method is faced with new challenges.People start to construct more convenient, the stronger structural system of bearing capacity of constructing.Steel framework is set up It is set to dismountable structure, and different piece is attached with bolt, the work compound under load action, it is whole to form frame Body, intensity is higher, easy for construction, and can reuse, and compensates for the defect and deficiency of conventional frame structure, exists for the moment It is widely used in workshop building.But steel construction rigidity is smaller to be easy to happen overall collapse or local buckling, and Steel construction is made of the thin fashioned iron of wall and slender rod piece, complex-shaped, and node is easy to happen stress and concentrates together When there is eccentric gravity, so enhancing the overall stability of steel frame to improve the rigidity of frame, by steel frame and concrete The advantages of connected applications, both performances.But when concrete and steel construction collective effect, the connection and steel-between steel construction are mixed Coagulate soil connection and bean column node design all there is a problem of it is more, and different cross section form steel-concrete combination tie The construction of structure be also it is very difficult and complicated, under severe earthquake action, bean column node is easily destroyed, therefore constructs new structure System simultaneously determines that suitable construction method is extremely urgent.
Summary of the invention
It is an object of the present invention to provide the group frame system that the beam column edge of a wing is concrete-filled rectangular steel tube, this beam columns The edge of a wing is the group frame system of concrete-filled rectangular steel tube for solving cumbersome, the group of existing steel-concrete combined structure construction The connection and the poor problem of stability between structure are closed, is square it is a further object to provide this beam column edge of a wing The construction method of the group frame system of shape concrete filled steel tube.
The technical solution adopted by the present invention to solve the technical problems is: this beam column edge of a wing is concrete-filled rectangular steel tube Group frame system is connected and composed by coupled column and combination beam by node, and combination beam is horizontally set between coupled column, node For concrete filled steel tube monoblock type node, concrete filled steel tube monoblock type node is the I-shaped node by upper lower flange for rectangular steel pipe End carriage and the edge of a wing are that the node newel post of rectangular steel pipe is integrally welded, the rectangle of I-shaped node end carriage and node newel post junction It is communicated between steel pipe, formation steel pipe monoblock type node, the other end welded connecting plate of I-shaped node end carriage, the two of node newel post Connecting plate, casting concrete in steel pipe monoblock type node is respectively welded in end;Coupled column is ten that the edge of a wing is concrete-filled rectangular steel tube The connecting plate of prepared screw-bolt hole is respectively welded in font or I-shaped coupled column, the both ends of coupled column edge of a wing rectangular steel pipe, forms section Segmentation steel column is fixedly connected with after-pouring concrete by connecting plate between sectional type steel column and forms coupled column;Combination beam is the wing Edge is the I-shaped Honeycomb Beam of concrete-filled rectangular steel tube, combines the connection that prepared screw-bolt hole is welded on the both ends steel pipe of flange of beam Plate forms sectional type girder steel, is fixedly connected with after-pouring concrete by connecting plate between sectional type girder steel and forms combination beam;Section Point is fixedly connected at respective connecting plate by high-strength bolt with coupled column, and node and combination beam are at respective connecting plate It is fixedly connected by high-strength bolt.
It is the I-shaped coupled column of concrete-filled rectangular steel tube that coupled column, which is the edge of a wing, in above scheme, and node is T-type monoblock type section The I-shaped node newel post that I-shaped node end carriage that upper lower flange is rectangular steel pipe and the edge of a wing are rectangular steel pipe is welded by point One is fixedly connected with common I-shaped node side beam by high-strength bolt on node side column web, forms T-type monoblock type section Point.
Sectional type steel column is prefabricated in the factory in above scheme, and connecting plate and rectangular steel pipe weld, and passes through cross-shaped steel abdomen Plate and rectangular steel pipe weld the sectional type steel column to form that the edge of a wing is rectangular steel pipe, arrive joint connection in site after-pouring concrete.
Sectional type girder steel is prefabricated in the factory in above scheme, and connecting plate and rectangular steel pipe weld, and passes through i shaped steel abdomen Plate and rectangular steel pipe weld the sectional type girder steel to form that the edge of a wing is rectangular steel pipe, arrive joint connection in site after-pouring concrete.
Prestressing with bond steel wire is arranged in above scheme in the steel pipe of combination beam lower flange, in the concrete-filled rectangular steel tube of node Tensioning hole is reserved on the inside of the edge of a wing, is realized the tensioning and anchoring of compressor wire, can be reduced the amount of deflection of beam.
Transverse stiffener is arranged on the I-shaped web of combination beam in above scheme, can increase the stability of web.
Arrangement prestress muscle in the steel pipe of combination beam lower flange, node reserves tensioning hole, presstressed reinforcing steel pass through in above scheme The tensioning hole of node web and node reserves on the outside of node stretch-draw anchor, it can be achieved that beam relatively large span.
It is arranged symmetrically vertical ribbed stiffener between the rectangular steel pipe edge of a wing of above scheme interior joint newel post, the node edge of a wing can be prevented Moderate finite deformation occurs.
Concrete uses self-compaction pea gravel concreten, after having poured concrete, beam, column and monoblock type node in above scheme Concrete all penetrate through, form one with steel pipe after maintenance.
The above-mentioned beam column edge of a wing is the construction method of the group frame system of concrete-filled rectangular steel tube:
Be prefabricated in the factory institute's steel member in need first, including one end is welded with connecting plate, the other end is embedded in basis Coupled column outer steel pipe short column, steel pipe monoblock type node, sectional type steel column, sectional type girder steel;Connecting plate will be welded with, the other end buries In in basis coupled column outer steel pipe short column lower part and basis realize it is affixed, top is higher by basic 0.5m or so, then by this portion Divide casting concrete close at connecting plate, sectional type steel column lower part is passed through outside corresponding connecting plate and coupled column above ground level Steel pipe short column connects, and after all sectional type steel columns connect, casting concrete forms ten that the edge of a wing is concrete-filled rectangular steel tube Font combines bottom column;Steel pipe monoblock type node is installed, is realized by the connecting plate of node newel post with the cross bottom column that combines It is reliably connected, is connected sectional type girder steel with steel pipe monoblock type node by high-strength bolt, while being installed other sectional types Girder steel, casting concrete, it is ensured that fill up concrete in sectional type steel column, sectional type girder steel and steel pipe monoblock type node, and guarantee The connectivity of concrete forms bottom group frame system after maintenance, second layer group frame system of then constructing successively, until Top layer group frame system.
The invention has the following advantages:
1, the present invention is made of concrete filled steel tubular member, and without commonly vertical muscle and stirrup, work progress is simple, greatly reduces Labour reduces overall cost.
2, the axle power that the present invention can be born is bigger, and compared with conventional steel structure column, the section ruler of column can be obviously reduced It is very little, avoid the fat column for occurring excessively too fat to move in frame system.
3, the steel member of steel pipe monoblock type node of the present invention, sectional type steel column, sectional type girder steel etc. can be prefabricated in the factory, existing Cast-in-place concrete after the installation of field, greatly reduces workload, shortens construction period, and structure overall coherence is good.
4, achievable span is big.Different mounting means can be used in prestressing force in combination beam, is suitable for tripe systems appearance The building of formula and different scales.Presstressed reinforcing steel is dissolved into combination beam, and beam can be made to generate antiarch in construction process, made The deformation of combination beam can be reduced by forming one with stage and concrete filled steel tube, and the increasing layer greatly across, heavy duty and existing building is suitble to change It makes in engineering.
5, the mechanical property that can not only give full play to steel, the fashioned iron in Ultimate Loads lower section can total cross-section Into surrender, compression area edge concrete reaches capacity compressive strain, gives full play to the maximum efficiency of steel, moreover it is possible to by concrete The big advantage of rigidity improves the stability of frame structure.
6, vertical ribbed stiffener, which is arranged, not only in the present invention on the outside of presstressed reinforcing steel can be improved the anti-flexion capabilities of pillar, moreover it is possible to Play the role of protecting deformed bar, guarantees the overall stability and working performance of frame structure.
7, frame system of the invention has good ductility, and system wind resistance, good seismic performance are suitble in earthquake territory etc. It is applied under complex environment.
8, it uses the edge of a wing to punch on web in combination beam of the present invention for the I-shaped Honeycomb Beam of concrete filled steel tube, cuts Face can be round, hexagon or octagon, not only can reduce the self weight of beam, stress is avoided to concentrate, while saving steel, construct When wirerope may pass through, be easy to lift.
9, the present invention uses self-compaction pea gravel concreten, and when carrying out filling concrete, working performance is preferable, not only improves Construction efficiency, also improves construction quality.
10, frame system does not need formwork in the construction process, not only saves mould material, and construct not by routine The limitation constructed layer by layer can be constructed simultaneously with multilayer.
11, frame system is light-weight, and foundation cost is lower.
12, the beam column edge of a wing steel pipe that uses of the present invention is not easy buckling by Concrete Filled, and rigidity is larger, stability bearing capacity compared with It is high.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is floor plan of the invention;
Fig. 3 is the schematic diagram of coupled column and node in the present invention;
Fig. 4 is the structural schematic diagram of cross coupled column in the present invention;
Fig. 5 is the structural schematic diagram of cross steel pipe monoblock type node in the present invention;
Fig. 6 is the layout drawing of presstressed reinforcing steel and longitudinal stiffener in the present invention;
Fig. 7 is interior joint of the present invention partial sectional view at node end carriage;
Fig. 8 is interior joint of the present invention partial sectional view at concrete-filled rectangular steel tube;
Fig. 9 is 1-1 sectional view in Fig. 6;
Figure 10 is 2-2 sectional view in Fig. 6;
Figure 11 is the structural schematic diagram of the embodiment of the present invention 2;
Figure 12 is the structural schematic diagram of I-shaped coupled column in invention;
Figure 13 is the structural schematic diagram of T font steel pipe monoblock type node in the present invention.
In figure: 1 coupled column, 2 combination beam, 3 node, 4 node end carriage, 5 node newel post, 6 connecting plate, 7 coupled column outer steel pipe 11 high-strength bolt of short column 8 rectangular steel pipe, 9 cross-shaped steel web, 10 concrete, 13 presstressed reinforcing steel, 14 vertical ribbed stiffeners 15 are pre- It boxes out 16 anchorage, 17 anchor plate, 18 i shaped steel web, 19 bolt hole.
Specific embodiment
The present invention will be further described below with reference to the drawings:
Embodiment 1:
As shown in Figure 1, Figure 2, this beam column edge of a wing is the group frame system of concrete-filled rectangular steel tube by 1 He of coupled column Combination beam 2 is connected and composed by node 3, and combination beam 2 is horizontally set between coupled column 1, and node 3 is concrete filled steel tube monoblock type Node, it is the I-shaped node end carriage 4 of rectangular steel pipe that concrete filled steel tube monoblock type node, which is by upper lower flange, and the edge of a wing is rectangle The node newel post 5 of steel pipe is integrally welded, communicates between I-shaped node end carriage 4 and the rectangular steel pipe of node newel post 5 junction, Form cross steel pipe monoblock type node, the other end welded connecting plate 6 of I-shaped node end carriage 4, the both ends point of node newel post 5 Other welded connecting plate 6 can be connected by high-strength bolt 11 with I-shaped combination beam and cross coupled column, in steel pipe entirety At formula node into beam column and node 3 casting concrete 10, formed concrete filled steel tube monoblock type node;Coupled column 1 is that the edge of a wing is The connecting plate 6 of prepared screw-bolt hole 19 is respectively welded in the both ends of the cross coupled column of concrete-filled rectangular steel tube, 1 edge of a wing of coupled column, Sectional type steel column is formed, after-pouring concrete is fixedly connected with by connecting plate 6 between sectional type steel column and forms coupled column 1;Group Closing beam 2 is the I-shaped Honeycomb Beam that the edge of a wing is concrete-filled rectangular steel tube, and reserved bolt is welded on the both ends steel pipe on 2 edge of a wing of combination beam The connecting plate 6 in hole 19 forms sectional type girder steel, is fixedly connected with after-pouring concrete by connecting plate 6 between sectional type girder steel Form combination beam 2;Node 3 and coupled column 1 are fixedly connected at respective connecting plate 6 by high-strength bolt 11, node 3 with combine Beam 2 is fixedly connected at respective connecting plate 6 also by high-strength bolt 11.
Sectional type steel column is prefabricated in the factory, and connecting plate 6 and rectangular steel pipe 8 weld, and passes through cross-shaped steel web 9 and rectangle Steel pipe 8 welds the sectional type steel column for forming that the edge of a wing is rectangular steel pipe, arrives joint connection in site after-pouring concrete 10.
Sectional type girder steel is prefabricated in the factory, and connecting plate 6 and rectangular steel pipe 8 weld, and passes through i shaped steel web 18 and square Shape steel pipe 8 welds the sectional type girder steel for forming that the edge of a wing is rectangular steel pipe, arrives joint connection in site after-pouring concrete 10.
Sectional type girder steel improves traditional steel I-beam, the form of the rectangular steel pipe in the edge of a wing, in the beam both ends wing The connecting plate 6 that prepared screw-bolt hole 19 is welded on balsh pipe forms the I-shaped sectional type girder steel that the edge of a wing is rectangular steel pipe, to scene It is reliably connected afterwards with node end carriage 4 by the realization of high-strength bolt 11, then casting concrete 10.Upper lower flange steel pipe can be symmetrical , it is also possible to asymmetrical.
Concrete 10 uses self-compaction pea gravel concreten, after having poured concrete 10, the coagulation of beam, column and monoblock type node Soil all penetrates through, and forms one with steel pipe after maintenance.
The above-mentioned beam column edge of a wing is the construction method of the group frame system of concrete-filled rectangular steel tube:
Be prefabricated in the factory institute's steel member in need first, including one end is welded with connecting plate 6, the other end is embedded in basis Coupled column outer steel pipe short column 7, steel pipe monoblock type node, sectional type steel column, sectional type girder steel;Connecting plate 6, the other end will be welded with 7 lower part of coupled column outer steel pipe short column and basis realization being embedded in basis are affixed, and top is higher by basic 0.5m or so, then by this Part casting concrete passes through corresponding connecting plate 6 and combination above ground level close at connecting plate 6, by sectional type steel column lower part Column outer steel pipe short column 7 connects, and after all sectional type steel columns connect, it is mixed for rectangular steel pipe to form the edge of a wing for casting concrete 10 Coagulate the cross combination bottom column of soil;Steel pipe monoblock type node is installed, connecting plate 6 and cross combination by node newel post 5 Bottom column realization is reliably connected, and is connected sectional type girder steel with steel pipe monoblock type node by high-strength bolt 11, is installed simultaneously At other sectional type girder steels, casting concrete 10, it is ensured that filled up in sectional type steel column, sectional type girder steel and steel pipe monoblock type node Concrete, and guarantee the connectivity of concrete, bottom group frame system is formed after maintenance, then construction second layer combination successively Frame system, until top layer group frame system.This construction method is known as layer-by-layer construction method.The construction method is not related to reinforcing bar Binding, steel member whole prefabrication, poured in place concrete 10 greatly reduces labour, not only shortens construction period, and And it can guarantee the globality of structure, while overall cost is lower.
Embodiment 2:
This beam column edge of a wing is that the group frame system of concrete-filled rectangular steel tube passes through node 3 by coupled column 1 and combination beam 2 It connects and composes, combination beam 2 is horizontally set between coupled column 1, and node 3 is concrete filled steel tube monoblock type node, concrete filled steel tube Monoblock type node is by upper lower flange be rectangular steel pipe I-shaped node end carriage and the edge of a wing be rectangular steel pipe node newel post weldering It is connected into one, is communicated between I-shaped node end carriage and the rectangular steel pipe of node newel post 5 junction, it can be with by high-strength bolt 11 I-shaped combination beam and I-shaped coupled column connect, at steel pipe monoblock type node into beam column and node casting concrete 10, form concrete filled steel tube monoblock type node;The other end welded connecting plate 6 of I-shaped node end carriage, the both ends of node newel post 5 Connecting plate 6, casting concrete 10 in steel pipe monoblock type node is respectively welded;Coupled column 1 is that the edge of a wing is concrete-filled rectangular steel tube The connecting plate 6 of prepared screw-bolt hole 19 is respectively welded in I-shaped coupled column, the both ends on 1 edge of a wing of coupled column, forms sectional type steel column, section After-pouring concrete 10 is fixedly connected with by connecting plate 6 between segmentation steel column and forms coupled column 1;Combination beam 2 is that the edge of a wing is square The I-shaped Honeycomb Beam of shape concrete filled steel tube welds the connecting plate 6 of prepared screw-bolt hole 19 on the both ends steel pipe on 2 edge of a wing of combination beam, Sectional type girder steel is formed, after-pouring concrete 10 is fixedly connected with by connecting plate 6 between sectional type girder steel and forms combination beam 2; Node 3 is fixedly connected at respective connecting plate 6 by high-strength bolt 11 with coupled column 1, and node 3 is with combination beam 2 respective It is fixedly connected at connecting plate 6 also by high-strength bolt 11.
Coupled column 1 is that the edge of a wing is the I-shaped coupled column of concrete-filled rectangular steel tube, and node 3 is T-type monoblock type node, will be upper and lower The edge of a wing be rectangular steel pipe I-shaped node end carriage and the edge of a wing be rectangular steel pipe I-shaped node newel post it is integrally welded, saving It is fixedly connected by high-strength bolt 11 with common I-shaped node side beam on point 5 i shaped steel web 18 of newel post, it is whole to form T-type Formula node.
Sectional type steel column is prefabricated in the factory, and connecting plate 6 and rectangular steel pipe 8 weld, and passes through cross-shaped steel web 9 and rectangle Steel pipe 8 welds the sectional type steel column for forming that the edge of a wing is rectangular steel pipe, arrives joint connection in site after-pouring concrete 10.
Sectional type girder steel is prefabricated in the factory, and connecting plate 6 and rectangular steel pipe 8 weld, and passes through i shaped steel web 18 and square Shape steel pipe 8 welds the sectional type girder steel for forming that the edge of a wing is rectangular steel pipe, arrives joint connection in site after-pouring concrete 10.To traditional Steel I-beam improves, the form of the rectangular steel pipe in the edge of a wing, and prepared screw-bolt hole 19 is welded on the steel pipe of the beam both ends edge of a wing Connecting plate 6 forms the I-shaped sectional type girder steel that the edge of a wing is rectangular steel pipe, to scene after with node end carriage 4 pass through high-strength bolt 11 realizations are reliably connected, then casting concrete 10.For the amount of deflection for reducing beam, prestressing with bond can be arranged in the steel pipe of lower flange Steel wire, upper reserved tensioning hole, realizes the tensioning and anchoring of compressor wire on the inside of the node concrete-filled rectangular steel tube edge of a wing.To increase The stability for adding web, arranges transverse stiffener on web.Upper lower flange steel pipe can be symmetrically, be also possible to asymmetric 's.
Arrangement prestress muscle 13 in the steel pipe of combination beam lower flange, node reserves tensioning hole, presstressed reinforcing steel 13 pass through node abdomen The tensioning hole of plate and node reserves on the outside of node by anchorage 16 and 17 stretch-draw anchor of anchor plate, it can be achieved that beam it is larger across Degree.When beam span is larger, in the steel pipe of lower flange can arrangement prestress muscle 13, since the jack for tensioning is larger, nothing Method realizes tensioning on the inside of the node concrete-filled rectangular steel tube edge of a wing, and it is real on the outside of monoblock type node that presstressed reinforcing steel 13 needs guiding through web Existing stretch-draw anchor, therefore the position that presstressed reinforcing steel 13 passes through the concrete-filled rectangular steel tube edge of a wing at node need to reserve tensioning hole.For It prevents the node edge of a wing from moderate finite deformation occurs, vertical ribbed stiffener 14 is arranged symmetrically between the node concrete-filled rectangular steel tube edge of a wing.When When both direction requires tensioned prestressing bar, two dimension prestressing muscle will meet at node, the presstressed reinforcing steel of both direction 13 should be staggered up and down, and such edge of a wing concrete filled steel tube forms eccentric component.It, will be two-way perpendicular in monoblock type node manufacturing process It is welded to ribbed stiffener, punches on web, edge of a wing rectangular steel pipe and ribbed stiffener, being formed and sharing the edge of a wing of 16 holes is rectangle steel The monolithic porous node of pipe.
Concrete 10 uses self-compaction pea gravel concreten, after having poured concrete, the concrete of beam, column and monoblock type node It all penetrates through, forms one with steel pipe after maintenance.
The above-mentioned beam column edge of a wing is the construction method of the group frame system of concrete-filled rectangular steel tube:
First by design in factory's blanking, weld prefabricated institute's steel member in need, including one end be welded with connecting plate 6, The other end is embedded in the coupled column outer steel pipe short column 7 in basis, and both ends weld the coupled column rectangle steel tubing string of connecting plate 6, both ends weldering I-shaped Honeycomb Beam and monolithic porous node of the edge of a wing of good connecting plate 6 for rectangular steel pipe.By all companies of welding of frame system 7 lower part of coupled column outer steel pipe short column of fishplate bar 6 and basis realization are affixed, and top is higher by basic 0.5m or so, then will be in steel pipe Casting concrete is close at connecting plate 6.The coupled column rectangular steel pipe lower part that both ends weld connecting plate 6 is passed through into connecting plate 6 and height The coupled column outer steel pipe short column 7 on ground connects out, and after all coupled column rectangular steel pipes connect, casting concrete 10 is formed The edge of a wing is the I-shaped combination bottom column of concrete-filled rectangular steel tube.Monolithic porous node is installed, the connection of node newel post 5 is passed through The realization of plate 6 and bottom column is reliably connected, by high-strength bolt 11 by I-shaped Honeycomb Beam that the edge of a wing is steel pipe and monolithic porous Node connection, carries out welding appropriate to junction after connection, is installed other Vierendeel girders successively, while by rectangle in beam The unbonded prestressing tendon arranged in steel pipe is put into steel pipe.Then the connection of two layers of steel member is equally completed with bottom.The bottom of to Presstressed reinforcing steel 13 in layer beam carries out stretching tensioning, and anchoring temporarily is on the node rectangular steel pipe edge of a wing, and then casting concrete is extremely Two layers of capital, it is ensured that fill up concrete 10 in column, beam and node, and guarantee the connectivity of concrete.Then construction upwards successively, Complete three layers of connection.The unbonded prestressing tendon being arranged in two layers of beam rectangular steel pipe is arranged and is stretched tensioning, then Two layer concretes are poured to three layers of capital, are sequentially completed the construction of top layer, bottom-up every layer of tensioning is pre- after concrete curing Stress rib 13, it is reliable to anchor, the pre-stress construction of general frame is completed, this construction method is known as whole post stretching.Frame shape At post-stress muscle 13, as conventional prestressed concrete frame, it is ensured that whole stress.Advantage is to construct layer by layer Uninterruptedly, short construction period.
Embodiment 3:
Coupled column is the cross coupled column that the edge of a wing is concrete-filled rectangular steel tube in the present embodiment, and node is cross steel pipe Monoblock type node, it is other same as Example 2.
The above-mentioned beam column edge of a wing is the construction method of the group frame system of concrete-filled rectangular steel tube:
First by design in factory's blanking, weld prefabricated institute's steel member in need, including one end be welded with connecting plate 6, The other end is embedded in the coupled column outer steel pipe short column 7 in basis, and both ends weld the coupled column rectangle steel tubing string of connecting plate 6, both ends weldering I-shaped Honeycomb Beam and monolithic porous node of the edge of a wing of good connecting plate 6 for rectangular steel pipe.By all companies of welding of frame system 7 lower part of coupled column outer steel pipe short column of fishplate bar 6 and basis realization are affixed, and top is higher by basic 0.5m or so, then will be in steel pipe Casting concrete is close at connecting plate.The coupled column rectangular steel pipe lower part that both ends weld connecting plate 6 is passed through connecting plate 6 and is higher by The coupled column outer steel pipe short column 7 on ground connects, and after all coupled column rectangular steel pipes connect, casting concrete 10 forms the wing Edge is the cross or I-shaped combination bottom column of concrete-filled rectangular steel tube.Monolithic porous node is installed, node side is passed through The realization of the connecting plate 6 of column 5 and bottom column is reliably connected, by high-strength bolt 11 by I-shaped Honeycomb Beam that the edge of a wing is steel pipe and whole The connection of body formula node, carries out welding appropriate to junction after connection, is installed other Vierendeel girders successively, while will be in beam The prestressing without bondn steel wire arranged in rectangular steel pipe is put into steel pipe.Then the company of two layers of steel member is equally completed with bottom It connects.Stretch tensioning to the compressor wire in bottom-layer beam, anchoring temporarily on the inside of the node rectangular steel pipe edge of a wing on, then pour Concrete is built to two layers of capital, it is ensured that fill up concrete in column, beam and node, and guarantee the connectivity of concrete, maintenance reaches Two times tensioning is carried out to compressor wire after some strength and reaches control stress for prestressing.Form bottom prestressing combination frame body System.Then the construction second layer will ensure that this layer of steel construction has connected in tensioning lower layer compressor wire, really to top layer successively During stretch-draw prestressing force steel wire biggish deformation does not occur for guarantor's system.This construction method is known as two layers of methods.This is applied Work method is not related to the binding of reinforcing bar, steel member whole prefabrication, and construction has good continuity and continuity, significantly Shorten construction period.When span is larger, need tensioned prestressing bar 13 in fine strain of millet, in this way due to the jack for tensioning compared with Greatly, tensioning can not be realized on the inside of the node concrete-filled rectangular steel tube edge of a wing, presstressed reinforcing steel 13 needs guiding through web in monoblock type node Realize stretch-draw anchor in outside.When both direction requires tensioned prestressing bar, presstressed reinforcing steel 13 will arrange in advance, upper layer steel After frame is formed, presstressed reinforcing steel 13 is stretched in interim tensioning, pours this layer concrete 10, and maintenance carries out this layer after reaching some strength The two times tensioning of presstressed reinforcing steel 13.

Claims (9)

1. the group frame system that a kind of beam column edge of a wing is concrete-filled rectangular steel tube, it is characterised in that: this beam column edge of a wing is square The group frame system of shape concrete filled steel tube is connected and composed by coupled column (1) and combination beam (2) by node (3), combination beam (2) It is horizontally set between coupled column (1), node (3) is concrete filled steel tube monoblock type node, and concrete filled steel tube monoblock type node is Node newel post (5) that I-shaped node end carriage that upper lower flange is rectangular steel pipe and the edge of a wing are rectangular steel pipe is integrally welded, It is communicated between I-shaped node end carriage and the rectangular steel pipe of node newel post (5) junction, forms steel pipe monoblock type node, it is I-shaped The other end welded connecting plate (6) of node end carriage, the both ends of node newel post (5) are respectively welded connecting plate (6), steel pipe monoblock type section Casting concrete (10) in point;Coupled column (1) is the cross or I-shaped coupled column that the edge of a wing is concrete-filled rectangular steel tube, combination The connecting plate (6) of prepared screw-bolt hole (19) is respectively welded in the both ends of column edge of a wing rectangular steel pipe, forms sectional type steel column, sectional type steel After-pouring concrete is fixedly connected with by connecting plate (6) between column and forms coupled column (1);Combination beam (2) is that the edge of a wing is rectangle The I-shaped Honeycomb Beam of concrete filled steel tube combines the connecting plate (6) that prepared screw-bolt hole (19) are welded on the both ends steel pipe of flange of beam, Sectional type girder steel is formed, after-pouring concrete is fixedly connected with by connecting plate (6) between sectional type girder steel and forms combination beam (2);Node (3) is fixedly connected at respective connecting plate (6) by high-strength bolt (11) with coupled column (1), node (3) and group Beam (2) are closed to be fixedly connected at respective connecting plate (6) also by high-strength bolt (11);Combination beam, coupled column and steel pipe are whole The concrete of formula node is perforation.
2. the group frame system that the beam column edge of a wing according to claim 1 is concrete-filled rectangular steel tube, it is characterised in that: institute The sectional type steel column stated is prefabricated in the factory, and connecting plate (6) and rectangular steel pipe weld, and passes through cross-shaped steel web (9) and rectangle Steel-pipe welding forms the sectional type steel column that the edge of a wing is rectangular steel pipe, arrives joint connection in site after-pouring concrete (10).
3. the group frame system that the beam column edge of a wing according to claim 2 is concrete-filled rectangular steel tube, it is characterised in that: institute The sectional type girder steel stated is prefabricated in the factory, and connecting plate (6) and rectangular steel pipe weld, and passes through i shaped steel web (18) and rectangle Steel-pipe welding forms the sectional type girder steel that the edge of a wing is rectangular steel pipe, arrives joint connection in site after-pouring concrete (10).
4. the group frame system that the beam column edge of a wing according to claim 3 is concrete-filled rectangular steel tube, it is characterised in that: institute Prestressing with bond steel wire is arranged in the combination beam lower flange steel pipe stated, it is upper reserved on the inside of the concrete-filled rectangular steel tube edge of a wing of node The tensioning and anchoring of compressor wire are realized in tensioning hole.
5. the group frame system that the beam column edge of a wing according to claim 4 is concrete-filled rectangular steel tube, it is characterised in that: institute Transverse stiffener is arranged on the i shaped steel web (18) for the combination beam (2) stated.
6. the group frame system that the beam column edge of a wing according to claim 5 is concrete-filled rectangular steel tube, it is characterised in that: institute Arrangement prestress muscle (13) in the combination beam lower flange steel pipe stated, node reserves tensioning hole, presstressed reinforcing steel (13) pass through node abdomen The tensioning hole of plate and node reserves stretch-draw anchor on the outside of node.
7. the group frame system that the beam column edge of a wing according to claim 6 is concrete-filled rectangular steel tube, it is characterised in that: institute Vertical ribbed stiffener (14) are arranged symmetrically between the rectangular steel pipe edge of a wing of the node newel post (5) stated.
8. the group frame system that the beam column edge of a wing according to claim 7 is concrete-filled rectangular steel tube, it is characterised in that: institute The coupled column (1) stated is that the edge of a wing is the I-shaped coupled column of concrete-filled rectangular steel tube, and node (3) is T-type monoblock type node, will be upper and lower The edge of a wing be rectangular steel pipe I-shaped node end carriage and the edge of a wing be rectangular steel pipe I-shaped node newel post it is integrally welded, saving It is fixedly connected by high-strength bolt (11) with common I-shaped node side beam on point newel post's web, forms T-type monoblock type node.
9. a kind of beam column edge of a wing as claimed in claim 3 is the construction method of the group frame system of concrete-filled rectangular steel tube, Be characterized in that: be prefabricated in the factory institute's steel member in need first, including one end is welded with connecting plate (6), the other end is embedded in base Coupled column outer steel pipe short column (7), steel pipe monoblock type node, sectional type steel column, sectional type girder steel in plinth;Connecting plate will be welded with (6) coupled column outer steel pipe short column (7) lower part and basis realization are affixed, and top is higher by basic 0.5m or so, then by this part Casting concrete passes through corresponding connecting plate (6) and coupled column above ground level close at connecting plate, by sectional type steel column lower part Outer steel pipe short column (7) connects, and after all sectional type steel columns connect, casting concrete (10), forming the edge of a wing is rectangular steel pipe The cross combination bottom column of concrete;Steel pipe monoblock type node is installed, the connecting plate (6) and cross of node newel post (5) are passed through Type combination bottom column realization is reliably connected, and is connected sectional type girder steel with steel pipe monoblock type node by high-strength bolt (11), together When be installed other sectional type girder steels, casting concrete (10), it is ensured that sectional type steel column, sectional type girder steel and steel pipe monoblock type Concrete is filled up in node, and guarantees the connectivity of concrete, is formed bottom group frame system after maintenance, is then constructed successively Second layer group frame system, until top layer group frame system.
CN201710143676.XA 2017-03-12 2017-03-12 The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube Expired - Fee Related CN106869317B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710143676.XA CN106869317B (en) 2017-03-12 2017-03-12 The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710143676.XA CN106869317B (en) 2017-03-12 2017-03-12 The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube

Publications (2)

Publication Number Publication Date
CN106869317A CN106869317A (en) 2017-06-20
CN106869317B true CN106869317B (en) 2019-04-02

Family

ID=59170754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710143676.XA Expired - Fee Related CN106869317B (en) 2017-03-12 2017-03-12 The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube

Country Status (1)

Country Link
CN (1) CN106869317B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193782A (en) * 2018-02-02 2018-06-22 青岛理工大学 A kind of prefabricated assembled modular frame node and its assembly method
CN111364680A (en) * 2020-04-29 2020-07-03 中国建筑第七工程局有限公司 Preformed column for reserved steel bars
CN113123452A (en) * 2021-03-06 2021-07-16 河北工业大学 Double-herringbone-shaped supporting energy dissipation structure, assembly type supporting frame system and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673783A (en) * 1992-08-25 1994-03-15 Kawasaki Steel Corp Construction of steel framed reinforced concrete column and steel beam
CN101565969A (en) * 2009-05-27 2009-10-28 天津大学 Indirect assembly concrete-filled steel tube combined special-shaped column and production method thereof
CN202202412U (en) * 2011-07-22 2012-04-25 西安建筑科技大学 Rectangular steel pipe concrete special-shaped column-steel beam framework middle node
CN102747781A (en) * 2012-07-31 2012-10-24 东北石油大学 Fiber reinforce plastic (FRP) combination structure frame where integral type node is adopted and construction method thereof
CN204418389U (en) * 2015-01-05 2015-06-24 重庆大学 A kind of concrete-filled steel square tubular column and i shaped steel beam end plate embedded connecting structure
CN205189143U (en) * 2015-11-02 2016-04-27 山东科技大学 Muscle formula node is worn with girder steel to " Z " shaped steel connection type rectangle steel core concrete column
CN106121043A (en) * 2016-08-25 2016-11-16 中冶建筑研究总院有限公司 A kind of two-tube coupled column with energy-dissipating and shock-absorbing effect and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673783A (en) * 1992-08-25 1994-03-15 Kawasaki Steel Corp Construction of steel framed reinforced concrete column and steel beam
CN101565969A (en) * 2009-05-27 2009-10-28 天津大学 Indirect assembly concrete-filled steel tube combined special-shaped column and production method thereof
CN202202412U (en) * 2011-07-22 2012-04-25 西安建筑科技大学 Rectangular steel pipe concrete special-shaped column-steel beam framework middle node
CN102747781A (en) * 2012-07-31 2012-10-24 东北石油大学 Fiber reinforce plastic (FRP) combination structure frame where integral type node is adopted and construction method thereof
CN204418389U (en) * 2015-01-05 2015-06-24 重庆大学 A kind of concrete-filled steel square tubular column and i shaped steel beam end plate embedded connecting structure
CN205189143U (en) * 2015-11-02 2016-04-27 山东科技大学 Muscle formula node is worn with girder steel to " Z " shaped steel connection type rectangle steel core concrete column
CN106121043A (en) * 2016-08-25 2016-11-16 中冶建筑研究总院有限公司 A kind of two-tube coupled column with energy-dissipating and shock-absorbing effect and construction method

Also Published As

Publication number Publication date
CN106869317A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN106869316B (en) The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube
EP3181755B1 (en) Construction method for a prefabricated pier column member with steel-concrete composite structure
CN105735469B (en) A kind of part adhesive precast prestressed concrete frame structure
CN109469202A (en) Prestressed assembly integral concrete frame structure system and construction method thereof
CN107227808A (en) A kind of buckling-restrained steel plate shear force wall system of full assembled
CN206090996U (en) Connected node of whole thick precast floor plank unit of assembled and floor unit thereof
CN106351374A (en) Connecting node of assembled whole thick prefabricated slab unit and slab unit thereof
KR20100054889A (en) Development of fabricated internally confined hollow concrete filled tube using corrugated tube
CN106869317B (en) The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube
CN107246109B (en) The frame and its construction method that real compound concrete filled steel tube coupled column combination beam is constituted
CN212773147U (en) Prefabricated assembly part outsourcing honeycomb steel-concrete combination beam
CN106869326A (en) Frame system and construction method that hollow steel tube concrete integral node is constituted
CN106948486A (en) Steel tubes Combined concrete frame system and construction method
CN113062476B (en) Heavy-load large-span combined beam-column structure and construction method
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
CN210597882U (en) Lattice type steel reinforced concrete combined column beam column node
CN106948476A (en) Framework and its construction method that prestressing with bond combination beam is constituted
CN111155714A (en) Prefabricated steel pipe bundle part prestressed concrete beam and construction method thereof
CN206554385U (en) Combining structure for assembled architecture
CN102828503A (en) H-shaped supporting pile made of prefabricated reinforced concrete
CN106869320B (en) The frame and its construction method that coupled column combination beam is constituted
CN109914616A (en) A kind of dry construction connection structure of assembling frame structural construction corner post and beam
CN212506737U (en) Assembled beam column node
CN113106846A (en) Assembled type reinforced concrete-filled steel tube composite beam and construction method thereof
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211227

Address after: 518000 room 2011-2015, building C1, 1983 creative Town, No. 15, Nanxin Road, Nanling village community, Nanwan street, Longgang District, Shenzhen, Guangdong

Patentee after: Shenzhen Chengze Information Technology Co.,Ltd.

Address before: 163319 development road 199, Daqing high tech Development Zone, Heilongjiang

Patentee before: NORTHEAST PETROLEUM University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220113

Address after: 315000 No. 777 Zhongguanxi Road, Zhuangshi Street, Zhenhai District, Ningbo City, Zhejiang Province

Patentee after: Ningbo shuoguo Digital Technology Co.,Ltd.

Address before: 518000 room 2011-2015, building C1, 1983 creative Town, No. 15, Nanxin Road, Nanling village community, Nanwan street, Longgang District, Shenzhen, Guangdong

Patentee before: Shenzhen Chengze Information Technology Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402