CN207620108U - PC fabricated construction dry type column foot connecting structures - Google Patents

PC fabricated construction dry type column foot connecting structures Download PDF

Info

Publication number
CN207620108U
CN207620108U CN201721263620.XU CN201721263620U CN207620108U CN 207620108 U CN207620108 U CN 207620108U CN 201721263620 U CN201721263620 U CN 201721263620U CN 207620108 U CN207620108 U CN 207620108U
Authority
CN
China
Prior art keywords
prefabricated
column
suspension column
plate
dry type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721263620.XU
Other languages
Chinese (zh)
Inventor
王双双
李松涛
何成均
罗琛
韩芝瑜
刘福山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Become Capital Electricity Power Engineering Design Co Ltd
Original Assignee
Become Capital Electricity Power Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Become Capital Electricity Power Engineering Design Co Ltd filed Critical Become Capital Electricity Power Engineering Design Co Ltd
Priority to CN201721263620.XU priority Critical patent/CN207620108U/en
Application granted granted Critical
Publication of CN207620108U publication Critical patent/CN207620108U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of PC fabricated constructions dry type column foot connecting structure, which includes the prefabricated suspension column of steel structure type and prefabricated foundation, and the prefabricated suspension column of steel structure type is connected with prefabricated foundation by welding manner;The prefabricated suspension column of steel structure type includes prefabricated suspension column gusset plate dowel, prefabricated suspension column gusset plate and suspension column armored concrete ontology, and prefabricated suspension column gusset plate and whole pour of suspension column ontology are linked together by prefabricated suspension column gusset plate dowel.The utility model has the advantages that being not necessarily to secondary whole pouring concrete, installing quick and convenient, while ensureing joints reliability.

Description

PC fabricated construction dry type column foot connecting structures
Technical field
The utility model is related to assembled architecture fields, connect and tie more particularly, to a kind of PC fabricated constructions dry type suspension column Structure.
Background technology
Currently, country just widelys popularize PC(Armored concrete)Prefabricated construction.The column of PC assembling frame structures Foot connection is mainly wet type connection.Wet type connection needs secondary cast-in-place concrete connection, and complicated construction technique is cumbersome, construction Need maintenance to desired strength can bearing load after complete.
Utility model content
The purpose of this utility model is that:In view of the problems of the existing technology, a kind of PC fabricated constructions dry type is provided Column foot connecting structure solves the problems, such as existing wet type connection construction complex process, cumbersome.
The purpose of this utility model is achieved through the following technical solutions:
A kind of PC fabricated constructions dry type column foot connecting structure, which is characterized in that the structure includes steel structure type prefabricated post Foot and prefabricated foundation, the prefabricated suspension column of steel structure type are connected with prefabricated foundation by welding manner.
Preferably, the prefabricated suspension column of the steel structure type includes prefabricated suspension column gusset plate dowel, prefabricated suspension column gusset plate and column Script body is linked together prefabricated suspension column gusset plate and whole pour of suspension column ontology by prefabricated suspension column gusset plate dowel.
Preferably, suspension column stiffened steel plates are welded on the outside of the prefabricated suspension column gusset plate.
Preferably, the prefabricated foundation includes basic short column, column root-plate, pedestal anchor bolt gasket, pedestal anchor bolt and shearing resistance Part, the basis short column, column root-plate, pedestal anchor bolt gasket, together with pedestal anchor bolt and shearing-resistant member one-piece casting.
Preferably, the column root-plate should use solder design with shearing-resistant member.
Compared with prior art, by steel frame suspension column, node connects the utility model applied to PC fabricated construction suspension columns in succession It connects, designs a kind of improved steel plate+concrete suspension column dry type node, have and be not necessarily to secondary whole pouring concrete, quick and convenient is installed, Ensure joints reliability simultaneously.
Description of the drawings
Fig. 1 is prefabricated suspension column planar structure schematic diagram;
Fig. 2 is prefabricated suspension column schematic view of facade structure;
Fig. 3 is prefabricated suspension column superstructure schematic diagram;
Based on Fig. 4 with column root-plate,
Wherein, the prefabricated suspension column stiffener of 1- pedestal anchor bolts gasket, 2-, 3- column root-plates, the bases 4- short column, the prefabricated suspension columns of 5- The prefabricated suspension column gusset plate dowel of gusset plate, 6- shearing-resistant members, 7-, 8- pedestal anchor bolts, 9- prefabricated assembling type reinforced concretes column, 10- 45 ° of hf1,11- hf2,12- hf3,13- pedestal anchor bolts(Foundation bolt).
Specific implementation mode
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
Embodiment
The utility model application steel construction suspension column catenation principle, using be prefabricated in the factory PC columns when, while by suspension column Make steel construction suspension column form, column root-plate and basis be whole to pour together, using weld seam by the prefabricated suspension column gusset plate in top, suspension column Stiffened steel plates are connect with column root-plate.Suspension column can be made according to project situation and just connect suspension column or hinged column base, this programme is just to connect For suspension column.
As shown in Fig. 1 ~ Fig. 4, the utility model structure includes that the prefabricated suspension column of steel structure type and prefabricated foundation, steel structure type are pre- Suspension column processed is connected with prefabricated foundation by welding manner.The prefabricated suspension column of steel structure type includes prefabricated suspension column gusset plate dowel, prefabricated Prefabricated suspension column gusset plate is connect by foot joint plate and suspension column ontology by prefabricated suspension column gusset plate dowel with whole pour of suspension column ontology Together.It is welded with suspension column stiffened steel plates on the outside of prefabricated suspension column gusset plate.Prefabricated foundation include basic short column, column root-plate, Pedestal anchor bolt gasket, pedestal anchor bolt and shearing-resistant member, basic short column, column root-plate, pedestal anchor bolt gasket, pedestal anchor bolt and shearing-resistant member One-piece casting is together.Column root-plate should use solder design with shearing-resistant member.
The technical principle of the utility model:
(1)Prefabricated suspension column:When factory process prefabricated reinforced concrete column, by dowel by prefabricated suspension column gusset plate(Steel plate) It links together with whole pour of suspension column, makes gusset plate and armored concrete suspension column total tune stress;Using solder design by suspension column Stiffener is welded with prefabricated suspension column gusset plate.As the foot joint in steel construction, by perpendicular between stiffener and gusset plate Suspension column load is transferred to column root-plate and basis to weld seam.Gusset plate plate thickness and height, dowel size spacing and stiffener Size and plate thickness calculate gained according to suspension column stressing conditions.
(2)Basis and column root-plate:When cast-in-place basis, by column root-plate(Steel plate), shearing-resistant member, foundation bolt and basis it is whole It pours just together, column root-plate should use solder design with shearing-resistant member.Lower part node side passes through height with the pre-buried vertical steel plate in soffit of girder portion Strength bolt or solder design, it is main to transmit node shearing.Column root-plate(Steel plate)Size and plate thickness, foundation bolt model quantity, Shearing-resistant member model length calculates gained according to suspension column stressing conditions.
It, will be by column root-plate according to aforesaid way when using prefabricated foundation(Steel plate), shearing-resistant member, foundation bolt with basis It is integral prefabricated.
(3)The stiffener of the prefabricated suspension column in top and lower part column root-plate are used solder design by in-site installation.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, and should refer to Go out, all any modification, equivalent and improvement made within the spirit and principle of the present invention etc. should all include It is within the protection scope of the utility model.

Claims (5)

1. a kind of PC fabricated constructions dry type column foot connecting structure, which is characterized in that the structure includes the prefabricated suspension column of steel structure type And prefabricated foundation, the prefabricated suspension column of steel structure type are connected with prefabricated foundation by welding manner.
2. a kind of PC fabricated constructions dry type column foot connecting structure according to claim 1, which is characterized in that the steel knot The prefabricated suspension column of structure formula includes prefabricated suspension column gusset plate dowel, prefabricated suspension column gusset plate and suspension column armored concrete ontology, by pre- Foot joint plate dowel processed links together prefabricated suspension column gusset plate and whole pour of suspension column ontology.
3. a kind of PC fabricated constructions dry type column foot connecting structure according to claim 2, which is characterized in that described prefabricated Suspension column stiffened steel plates are welded on the outside of foot joint plate.
4. a kind of PC fabricated constructions dry type column foot connecting structure according to claim 1, which is characterized in that described prefabricated Basis includes basic short column, column root-plate, pedestal anchor bolt gasket, pedestal anchor bolt and shearing-resistant member, the basis short column, suspension column bottom Together with plate, pedestal anchor bolt gasket, pedestal anchor bolt and shearing-resistant member one-piece casting.
5. a kind of PC fabricated constructions dry type column foot connecting structure according to claim 4, which is characterized in that the suspension column Bottom plate should use solder design with shearing-resistant member.
CN201721263620.XU 2017-09-29 2017-09-29 PC fabricated construction dry type column foot connecting structures Active CN207620108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721263620.XU CN207620108U (en) 2017-09-29 2017-09-29 PC fabricated construction dry type column foot connecting structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721263620.XU CN207620108U (en) 2017-09-29 2017-09-29 PC fabricated construction dry type column foot connecting structures

Publications (1)

Publication Number Publication Date
CN207620108U true CN207620108U (en) 2018-07-17

Family

ID=62825896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721263620.XU Active CN207620108U (en) 2017-09-29 2017-09-29 PC fabricated construction dry type column foot connecting structures

Country Status (1)

Country Link
CN (1) CN207620108U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447858A (en) * 2017-09-29 2017-12-08 成都城电电力工程设计有限公司 PC fabricated construction dry type column foot connecting structures
CN112195961A (en) * 2020-09-29 2021-01-08 中国建筑一局(集团)有限公司 Supporting foundation conversion structure in limited space and construction method
CN115749415A (en) * 2022-12-12 2023-03-07 中国电力工程顾问集团西南电力设计院有限公司 Embedded type dodecahedron spiral tower foot structure and pulling design method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447858A (en) * 2017-09-29 2017-12-08 成都城电电力工程设计有限公司 PC fabricated construction dry type column foot connecting structures
CN112195961A (en) * 2020-09-29 2021-01-08 中国建筑一局(集团)有限公司 Supporting foundation conversion structure in limited space and construction method
CN115749415A (en) * 2022-12-12 2023-03-07 中国电力工程顾问集团西南电力设计院有限公司 Embedded type dodecahedron spiral tower foot structure and pulling design method thereof
CN115749415B (en) * 2022-12-12 2024-05-10 中国电力工程顾问集团西南电力设计院有限公司 Embedded type dodder spiral shell tower foot structure and pull-up design method thereof

Similar Documents

Publication Publication Date Title
CN101818478B (en) Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN107447858A (en) PC fabricated construction dry type column foot connecting structures
CN109339229B (en) Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor
CN207620108U (en) PC fabricated construction dry type column foot connecting structures
CN106567458B (en) Assembled steel-is mixed to combine Beam-post Frame Structure system
CN105201071A (en) Totally-prefabricated concrete structure
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN205205646U (en) Structure of reinforcing prefabricated segment formula concrete bridge intersegmental connection of festival
CN207296182U (en) Assembled architecture skeleton reinforcing steel bar concrete column
CN209907570U (en) Assembled frame beam column node that steel sheet and reinforcement are connected
CN103938730A (en) Combination node for connecting concrete beam with round steel tube concrete column through unbonded prestressed ribs and ordinary steel bars
CN203440993U (en) Connection joint of prefabricated reinforced concrete beam
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
KR101429527B1 (en) Joint structure of Composite Girder
CN107574923A (en) A kind of prefabricated assembled concrete framework connected using steel joint
CN203514528U (en) Composite connection structure of concrete filled steel tubular column and thin steel plate shear wall
CN211621953U (en) Prefabricated beam column connected node structure
CN209040861U (en) A kind of steel reinforced concrete connection structure of assembled inverted arch combination arch wall injection concrete-steel
CN111021553A (en) Precast concrete post and girder steel connected node of baffle in area
CN206554385U (en) Combining structure for assembled architecture
CN110820976A (en) Assembly structure and method of damping damper, prefabricated pier joist and assembly type building
CN212506737U (en) Assembled beam column node
CN209799001U (en) High-strength ductile assembled connecting joint utilizing T-shaped steel
CN209742074U (en) assembled frame beam column connected node
CN209636617U (en) A kind of Composite Steel-Concrete Bridges with novel deck structrue

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant