CN110387890B - 一种水泥纤维结构防护材料施工的装置及方法 - Google Patents

一种水泥纤维结构防护材料施工的装置及方法 Download PDF

Info

Publication number
CN110387890B
CN110387890B CN201910532581.6A CN201910532581A CN110387890B CN 110387890 B CN110387890 B CN 110387890B CN 201910532581 A CN201910532581 A CN 201910532581A CN 110387890 B CN110387890 B CN 110387890B
Authority
CN
China
Prior art keywords
laying machine
machine frame
traction type
towed
traction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910532581.6A
Other languages
English (en)
Chinese (zh)
Other versions
CN110387890A (zh
Inventor
朱志根
赵省建
刘高飞
金志强
赵永锋
宋志刚
袁江磊
李舒云
阎朝雷
张钦
赵晓鹏
支义
韩亚军
赵雁强
刘天富
孙远超
李立文
李二翔
闵济新
王海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Changsheng Technology Co., Ltd
Taiyuan Design Institute of China Railway Engineering Design Consulting Group Co., Ltd
China Railway No 3 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
Shanxi Changsheng Technology Co Ltd
Taiyuan Design Institute Of China Railway Engineering Design Consulting Group Co Ltd
China Railway No 3 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Changsheng Technology Co Ltd, Taiyuan Design Institute Of China Railway Engineering Design Consulting Group Co Ltd, China Railway No 3 Engineering Group Co Ltd, Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical Shanxi Changsheng Technology Co Ltd
Priority to CN201910532581.6A priority Critical patent/CN110387890B/zh
Publication of CN110387890A publication Critical patent/CN110387890A/zh
Priority to PCT/CN2020/095438 priority patent/WO2020253598A1/zh
Priority to JP2020573433A priority patent/JP7011088B2/ja
Application granted granted Critical
Publication of CN110387890B publication Critical patent/CN110387890B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Road Paving Structures (AREA)
  • Revetment (AREA)
CN201910532581.6A 2019-06-19 2019-06-19 一种水泥纤维结构防护材料施工的装置及方法 Active CN110387890B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201910532581.6A CN110387890B (zh) 2019-06-19 2019-06-19 一种水泥纤维结构防护材料施工的装置及方法
PCT/CN2020/095438 WO2020253598A1 (zh) 2019-06-19 2020-06-10 一种水泥纤维结构边坡防护材料及其施工的装置和方法
JP2020573433A JP7011088B2 (ja) 2019-06-19 2020-06-10 繊維構造のセメント保護材料の施工装置および施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910532581.6A CN110387890B (zh) 2019-06-19 2019-06-19 一种水泥纤维结构防护材料施工的装置及方法

Publications (2)

Publication Number Publication Date
CN110387890A CN110387890A (zh) 2019-10-29
CN110387890B true CN110387890B (zh) 2021-02-19

Family

ID=68285548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910532581.6A Active CN110387890B (zh) 2019-06-19 2019-06-19 一种水泥纤维结构防护材料施工的装置及方法

Country Status (3)

Country Link
JP (1) JP7011088B2 (ja)
CN (1) CN110387890B (ja)
WO (1) WO2020253598A1 (ja)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387890B (zh) * 2019-06-19 2021-02-19 中铁三局集团有限公司 一种水泥纤维结构防护材料施工的装置及方法
CN111809636B (zh) * 2020-09-04 2020-12-04 沈阳建筑大学 一种可自动调节加固强度的土木工程用边坡加固装置
CN113417480A (zh) * 2021-06-03 2021-09-21 中国水利水电第十二工程局有限公司 一种陡倾角高边坡心墙盖板混凝土养护装置及其使用方法
CN114651679A (zh) * 2022-05-05 2022-06-24 李健 一种废弃矿山生态修复方法

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0841880A (ja) * 1994-07-29 1996-02-13 Oyo Kikaku:Kk 盛土法面の植生方法
JP4051743B2 (ja) * 1997-12-26 2008-02-27 株式会社大林組 遮水シート被覆法面の緑化構造
JP2003055970A (ja) * 2001-08-09 2003-02-26 Houkou:Kk 法面工事用装置
JP2004244880A (ja) * 2003-02-13 2004-09-02 Okabe Co Ltd 法面の緑化方法及びこれに用いる法枠用網型枠
ES2618345T3 (es) * 2006-06-12 2017-06-21 Concrete Canvas Technology Ltd Tela impregnada
US7476059B1 (en) * 2006-11-20 2009-01-13 Gregory Paul Holland Erosion control and stabilization blanket stapling apparatus
EP2213777A1 (en) * 2009-01-29 2010-08-04 Concrete Canvas Limited Impregnated cloth
ZA201106718B (en) * 2010-09-16 2012-05-30 Wepex Cc Laying of sheet material
CN102926502B (zh) * 2012-11-01 2014-12-24 中国人民解放军总后勤部建筑工程研究所 一种三维间隔织物增强水泥基复合材料布及其制备方法和施工方法
JP5864709B1 (ja) * 2014-11-19 2016-02-17 岡本 俊仁 法枠用作業車
CN204266206U (zh) * 2014-11-30 2015-04-15 三峡大学 一种边坡喷射施工用滑车
CN207986477U (zh) * 2017-07-06 2018-10-19 中交路桥建设有限公司 一种边坡防护施工用物料运输系统
CN207361656U (zh) * 2017-11-07 2018-05-15 中铁三局集团有限公司 高填方路基边坡附属材料运输装置
CN108656645B (zh) * 2018-08-14 2023-11-10 北京邦固得建筑材料技术有限公司 生态水泥布
CN210151760U (zh) * 2019-06-19 2020-03-17 中铁三局集团有限公司 一种水泥纤维结构防护材料的施工装置
CN110387890B (zh) * 2019-06-19 2021-02-19 中铁三局集团有限公司 一种水泥纤维结构防护材料施工的装置及方法

Also Published As

Publication number Publication date
WO2020253598A1 (zh) 2020-12-24
JP7011088B2 (ja) 2022-01-26
CN110387890A (zh) 2019-10-29
JP2021524549A (ja) 2021-09-13

Similar Documents

Publication Publication Date Title
CN110387890B (zh) 一种水泥纤维结构防护材料施工的装置及方法
CN106907159B (zh) 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法
CN104695289B (zh) 一种用于中低速磁悬浮交通工程填方地段的低置线路结构
CN207987983U (zh) 一种用于地下工程主体施工缝及后浇带的防水结构
CN105672067A (zh) 一种中低速磁悬浮交通工程承轨梁低置线路与高架桥过渡段结构
CN102562077B (zh) 一种下穿特殊构筑物框架隧道开挖施工方法
CN104481552B (zh) 特大溶洞洞顶落石防护施工方法
CN108797249A (zh) 软土路基高填方陡坡路段泡沫轻质土的施工方法
CN107675628A (zh) 城市道路框架桥上穿运营地铁下穿运营铁路顶进施工方法
CN206553868U (zh) 一种透水路缘石
CN105274922A (zh) 一种修复塌方路基的抗滑键-钢管桩复合结构及方法
CN105862928A (zh) 一种后浇带外墙超前止水处理结构及其施工工艺
CN109236322A (zh) 一种防止软岩巷道底鼓的人工底板及其构筑和维修方法
CN106869145A (zh) 基于废旧轮胎的公路路堤局部坍塌快速抢修方法
CN114876117A (zh) 一种多坡度种植屋面构造及其施工方法
CN209145323U (zh) 既有建筑的低能耗改造阳台
CN210151760U (zh) 一种水泥纤维结构防护材料的施工装置
CN211646413U (zh) 一种组合式格构钢架喷锚支护结构
CN206457838U (zh) 一种用于输电塔的装配式基础
CN215563901U (zh) 一种自粘卷材及非固化橡胶沥青种植屋面后浇带防水结构
CN114215112B (zh) 一种管廊外墙防水保护装置及其施工方法
CN214366089U (zh) 一种跨越特大型溶洞的斜拉桥式隧道结构
CN112855168B (zh) 一种跨越特大型溶洞的悬索桥式隧道施工方法
CN205530334U (zh) 一种中低速磁浮低置线路既有挡墙微扰动加固结构
CN212294202U (zh) 一种膨胀土场坪路堤填筑结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Zhigen

Inventor after: Zhang Qin

Inventor after: Zhao Xiaopeng

Inventor after: Zhi Yi

Inventor after: Han Yajun

Inventor after: Zhao Yanqiang

Inventor after: Liu Tianfu

Inventor after: Sun Yuanchao

Inventor after: Li Liwen

Inventor after: Li Erxiang

Inventor after: Min Jixin

Inventor after: Zhao Shengjian

Inventor after: Wang Haibo

Inventor after: Liu Gaofei

Inventor after: Jin Zhiqiang

Inventor after: Zhao Yongfeng

Inventor after: Song Zhigang

Inventor after: Yuan Jianglei

Inventor after: Li Shuyun

Inventor after: Yan Chaolei

Inventor before: Zhu Zhigen

Inventor before: Liu Tianfu

Inventor before: Sun Yuanchao

Inventor before: Li Liwen

Inventor before: Li Erxiang

Inventor before: Zhao Shengjian

Inventor before: Jin Zhiqiang

Inventor before: Zhao Yongfeng

Inventor before: Yuan Jianglei

Inventor before: Yan Chaolei

Inventor before: Zhang Qin

Inventor before: Han Yajun

Inventor before: Zhao Yanqiang

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200722

Address after: 030001 Yingze street, Shanxi, No. 269, No.

Applicant after: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd.

Applicant after: NO.3 ENGINEERING CO., LTD. OF CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd.

Applicant after: Taiyuan Design Institute of China Railway Engineering Design Consulting Group Co., Ltd

Applicant after: Shanxi Changsheng Technology Co., Ltd

Address before: 030001 Yingze street, Shanxi, No. 269, No.

Applicant before: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd.

Applicant before: NO.3 ENGINEERING CO., LTD. OF CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd.

GR01 Patent grant
GR01 Patent grant