CN110350655B - Programming order issuing system for operation ticket of distribution network - Google Patents

Programming order issuing system for operation ticket of distribution network Download PDF

Info

Publication number
CN110350655B
CN110350655B CN201910458038.6A CN201910458038A CN110350655B CN 110350655 B CN110350655 B CN 110350655B CN 201910458038 A CN201910458038 A CN 201910458038A CN 110350655 B CN110350655 B CN 110350655B
Authority
CN
China
Prior art keywords
ticket
module
operation ticket
group
operation command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910458038.6A
Other languages
Chinese (zh)
Other versions
CN110350655A (en
Inventor
张欢欢
阮志杰
白一鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201910458038.6A priority Critical patent/CN110350655B/en
Publication of CN110350655A publication Critical patent/CN110350655A/en
Application granted granted Critical
Publication of CN110350655B publication Critical patent/CN110350655B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a programmed order issuing system of a distribution network operation ticket, which comprises an operation ticket input module, an operation ticket auditing module, a programmed order issuing module and a field order receiving module; the operation ticket input module is used for writing the operation ticket; the operation ticket auditing module is used for a guardian to initially audit the operation ticket and an on-duty responsible person to review the operation ticket; the programmed issuing module is used for performing programmed operation on the operation ticket which is checked; the on-site command receiving module is used for checking the checked operation ticket by an on-site operator. The invention realizes the programmed execution in the operation process of dispatching the operation ticket by the distribution network, effectively realizes the dispatching 'no-delay' reply to the field operation terminal, avoids unnecessary waiting on the field, improves the field operation efficiency and ensures the successful development of a series of subsequent works.

Description

Programming order issuing system for operation ticket of distribution network
Technical Field
The invention relates to the field of electric power, in particular to a distribution network operation ticket programming order issuing system.
Background
With the continuous improvement of the operation management requirements of the distribution network, the power supply reliability is continuously improved, the distribution network overhaul is increasingly refined and fragmented, and the geometric type increase of the distribution network overhaul quantity is also directly caused. With this, there is also a consequent dramatic increase in the number of scheduled power down operations.
The gradual delivery of the distribution network technical platform and the network command brings obvious effects to the intensification of the operation of the distribution network dispatching end and the improvement of the operation efficiency, but the bottleneck effect of the outage and recombination operation of the distribution network dispatching end still exists under the influence of the configuration and overhaul workload of distribution network dispatching personnel. The current network issuing module of the distribution network technical platform can complete the whole process of the whole network operation and operation reporting by the interaction of 8 links including ' network issuing, dispatching issuing, site repeating, dispatching confirming, site reporting, dispatching repeating, site confirming and executing finishing ', wherein ' 5 links including ' network issuing, dispatching confirming, dispatching repeating and executing finishing ' currently need dispatching to be manually completed. In the whole operation process, the operation ticket cannot be followed at the first time due to other services processed by a dispatcher in each link in the operation process under the influence of other dispatching real-time work, so that the operation efficiency of the site is affected, unnecessary waiting of the site is caused, and even the progress of a subsequent series of work is affected.
Disclosure of Invention
In order to solve the defect of low efficiency caused by manual cooperation of part links in the operation management process of the distribution network in the prior art, the invention provides a programmed ordering system of a distribution network operation ticket.
In order to solve the technical problems, the technical scheme of the invention is as follows:
the system comprises an operation ticket input module, an operation ticket auditing module, a programmed issuing module and a site issuing module;
the operation ticket input module is used for an operator to write the operation ticket;
the operation ticket auditing module is used for a guardian to initially audit the operation ticket and an on-duty responsible person to review the operation ticket;
the programming issuing module is used for performing programming operation on the operation ticket subjected to review;
the on-site order receiving module is used for enabling on-site operators to check the operation ticket which is subjected to review.
Preferably, in the operation ticket input module, the operation ticket is written by an operator according to the power outage range content of the maintenance application form of the distribution network equipment, and the operation ticket is submitted to the operation ticket auditing module after the writing is finished.
Preferably, in the operation ticket auditing module, if the guardian or the responsible person on duty finds that the operation ticket is unqualified, the operation ticket is returned to the operation ticket input module, the operation ticket is modified by the operator through the operation ticket input module, and the operation ticket is submitted to the operation ticket auditing module after the modification is finished.
Preferably, the specific steps of the programmed command module are as follows:
step S1: after the network dispatcher completes the network command issuing link of the first group of dispatching operation command items manually, the programmed command issuing module is started at the moment;
step S2: the system judges whether the network signaling link of the group of dispatching operation command items is completed, if yes, the system automatically issues the dispatching signaling of the group of dispatching operation command items to the on-site signaling module, and step S3 is executed; if not, executing the step S2.1;
step S2.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S2;
step S3: after the "dispatch and order" link of the group of dispatch operation command items is completed, the site operator can manually confirm and complete the "site repeating" link of the group of dispatch operation command items through the site order receiving module, and execute the step S4; if not, executing the step S3.1;
step S3.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S3;
step S4: the system judges whether the 'site repeating' link of the group of dispatching operation command items is finished, if yes, the system automatically finishes the 'dispatching confirmation' link of the group of dispatching operation command items and executes step S5; if not, executing the step S4.1;
step S4.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S4;
step S5: after the "dispatch confirmation" link of the group of dispatch operation command items is completed, the field operator can start the field operation, and after the field operator completes the execution of the group of dispatch operation command items and confirms that the dispatch operation command items are correct, the field receiving module is used for manually confirming the completion of the "field report" link of the group of dispatch operation command items, and the step S6 is executed;
step S6: the system judges whether the field report of the group of dispatching operation command items is finished, if yes, the system automatically completes the dispatching repeating link of the group of dispatching operation command items and executes step S7, if not, the system executes step S6.1;
step S6.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing step S6;
step S7: after the scheduling repeating of the group of scheduling operation command items is finished, the field operator confirms the group of scheduling operation command items again, completes the field confirmation link of the group of scheduling operation command items through the field command receiving module after the group of scheduling operation command items are executed, and executes the step S8; if not, executing the step S7.1;
step S8: the system judges whether the field confirmation of the set of dispatching operation command items is finished, if yes, the system automatically completes the execution completion link of the set of dispatching operation command items and executes step S9; if not, executing the step S8.1;
step S8.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing step S8;
step S9: judging whether the execution of the scheduling operation command items is finished or not, if yes, judging whether all the operation tickets are finished, if not, automatically issuing a network command link of the scheduling operation command items of the second group by the system, and returning to the step S2; if the execution is finished, the sound and light reminding the current value dispatcher to manually confirm the completion condition and file the operation ticket.
Preferably, the programmed issuing module and the on-site command receiving module have an emergency pause function, after the function is started, all the ordered persons of all the ordered units of the operation ticket have audible and visual alarms, any ordered person on site needs to pause operation after receiving the paused audible and visual alarms, and when the value schedule inquires the pause reason according to the ordered person sent by the audible and visual alarms, further measures are taken to terminate the programmed issuing or release the pause to continue the programmed issuing.
Preferably, one or more of the set of scheduling operation command items of the same commanded or same state transition are a set; the state transition comprises the operation to hot standby, the operation to cold standby, the operation to overhauling, the hot standby to cold standby, the hot standby to overhauling, the cold standby to overhauling the method comprises the steps of changing a cold standby from overhauling into a hot standby from overhauling, changing the cold standby into the hot standby from overhauling into running, changing the cold standby into running and changing the hot standby into running; the same recipient is a recipient of the associated set of scheduled operation command items.
Compared with the prior art, the technical scheme of the invention has the beneficial effects that:
the invention realizes the programmed execution in the operation process of dispatching the operation ticket by the distribution network, effectively realizes the dispatching 'no-delay' reply to the field operation terminal, avoids unnecessary waiting time on the field caused by manual cooperation and order, improves the field operation efficiency and ensures the successful development of a series of subsequent works.
Drawings
Fig. 1 is a block diagram of the present system.
Detailed Description
The drawings are for illustrative purposes only and are not to be construed as limiting the present patent;
for the purpose of better illustrating the embodiments, certain elements of the drawings may be omitted, enlarged or reduced and do not represent the actual product dimensions;
it will be appreciated by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted.
The technical scheme of the invention is further described below with reference to the accompanying drawings and examples.
Example 1
As shown in fig. 1, a system for ordering operation tickets in a distribution network comprises an operation ticket input module, an operation ticket auditing module, a programmed ordering module and a field command receiving module;
the operation ticket input module is used for a guardian to write the operation ticket;
the operation ticket auditing module is used for a guardian to initially audit the operation ticket and an on-duty responsible person to review the operation ticket;
the programming issuing module is used for performing programming operation on the operation ticket subjected to review;
the on-site order receiving module is used for an operator to check the operation ticket which is subjected to review.
In an embodiment, in the operation ticket recording module, the operation ticket is written by an operator according to the power outage range content of the distribution network equipment maintenance application form, and the operation ticket is submitted to the operation ticket auditing module after the writing is finished.
In the operation ticket auditing module, if the guardian or the responsible person on duty finds that the operation ticket is unqualified, the operation ticket is returned to the operation ticket input module, the operation ticket is modified by the operation ticket input module, and the operation ticket is submitted to the operation ticket auditing module after the modification is finished.
As a preferred embodiment, the programmed order module and the on-site order module have an emergency pause function, after the function is started, all the ordered persons of all the ordered units of the operation ticket have audible and visual alarms, any ordered person on site needs to pause operation after receiving the paused audible and visual alarms, and when the value schedule inquires the pause reason according to the ordered persons sent by the audible and visual alarms, further measures are taken to stop the programmed order or release the pause to continue the programmed order.
As a preferred embodiment, one or more of the set of scheduling operation command items of the same commanded or same state transition are grouped together; the state transition comprises the operation to hot standby, the operation to cold standby, the operation to overhauling, the hot standby to cold standby, the hot standby to overhauling, the cold standby to overhauling the method comprises the steps of changing a cold standby from overhauling into a hot standby from overhauling, changing the cold standby into the hot standby from overhauling into running, changing the cold standby into running and changing the hot standby into running; the same recipient is a recipient of the associated set of scheduled operation command items.
Example 2
As shown in fig. 1, the specific steps of the programmed command module are as follows:
step S1: after the network dispatcher completes the network command issuing link of the first group of dispatching operation command items manually, the programmed command issuing module is started at the moment;
step S2: the system judges whether the network signaling link of the group of dispatching operation command items is completed, if yes, the system automatically issues the dispatching signaling of the group of dispatching operation command items to the on-site signaling module, and step S3 is executed; if not, executing the step S2.1;
step S2.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S2;
step S3: after the "dispatch and order" link of the group of dispatch operation command items is completed, the site operator can manually confirm and complete the "site repeating" link of the group of dispatch operation command items through the site order receiving module, and execute the step S4; if not, executing the step S3.1;
step S3.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S3;
step S4: the system judges whether the 'site repeating' link of the group of dispatching operation command items is finished, if yes, the system automatically finishes the 'dispatching confirmation' link of the group of dispatching operation command items and executes step S5; if not, executing the step S4.1;
step S4.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S4;
step S5: after the "dispatch confirmation" link of the group of dispatch operation command items is completed, the field operator can start the field operation, and after the field operator completes the execution of the group of dispatch operation command items and confirms that the dispatch operation command items are correct, the field receiving module is used for manually confirming the completion of the "field report" link of the group of dispatch operation command items, and the step S6 is executed;
step S6: the system judges whether the field report of the group of dispatching operation command items is finished, if yes, the system automatically completes the dispatching repeating link of the group of dispatching operation command items and executes step S7, if not, the system executes step S6.1;
step S6.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing step S6;
step S7: after the scheduling repeating of the group of scheduling operation command items is finished, the field operator confirms the group of scheduling operation command items again, completes the field confirmation link of the group of scheduling operation command items through the field command receiving module after the group of scheduling operation command items are executed, and executes the step S8; if not, executing the step S7.1;
step S8: the system judges whether the field confirmation of the set of dispatching operation command items is finished, if yes, the system automatically completes the execution completion link of the set of dispatching operation command items and executes step S9; if not, executing the step S8.1;
step S8.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing step S8;
step S9: judging whether the execution of the scheduling operation command items is finished or not, if yes, judging whether all the operation tickets are finished, if not, automatically issuing a network command link of the scheduling operation command items of the second group by the system, and returning to the step S2; if the execution is finished, the sound and light reminding the current value dispatcher to manually confirm the completion condition and file the operation ticket.
Example 3
The process comparison of the present invention with the prior art is shown in the following table:
Figure BDA0002077200890000061
Figure BDA0002077200890000071
it can be seen that the invention is automatically completed by adopting system operation in the links of network signaling, scheduling confirmation, scheduling recitation and execution completion. Avoiding the situation that the dispatcher can not follow up the operation ticket for the first time due to other business processing in the whole operation process, thereby influencing the on-site operation efficiency,
the same or similar reference numerals correspond to the same or similar components;
the terms describing the positional relationship in the drawings are merely illustrative, and are not to be construed as limiting the present patent;
it is to be understood that the above examples of the present invention are provided by way of illustration only and not by way of limitation of the embodiments of the present invention. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. Any modification, equivalent replacement, improvement, etc. which come within the spirit and principles of the invention are desired to be protected by the following claims.

Claims (5)

1. The operation ticket programming and issuing system for the distribution network is characterized by comprising an operation ticket input module, an operation ticket auditing module, a programming and issuing module and a site command receiving module;
the operation ticket input module is used for an operator to write the operation ticket;
the operation ticket auditing module is used for a guardian to initially audit the operation ticket and an on-duty responsible person to review the operation ticket;
the programming issuing module is used for performing programming operation on the operation ticket subjected to review;
the on-site order receiving module is used for enabling on-site operators to check the operation ticket which is subjected to review;
the specific steps of the programming order module are as follows:
step S1: after the network dispatcher completes the network command issuing link of the first group of dispatching operation command items manually, the programmed command issuing module is started at the moment;
step S2: the system judges whether the network signaling link of the group of dispatching operation command items is completed, if yes, the system automatically issues the dispatching signaling of the group of dispatching operation command items to the on-site signaling module, and step S3 is executed; if not, executing the step S2.1;
step S2.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S2;
step S3: after the "dispatch and order" link of the group of dispatch operation command items is completed, the site operator can manually confirm and complete the "site repeating" link of the group of dispatch operation command items through the site order receiving module, and execute the step S4; if not, executing the step S3.1;
step S3.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S3;
step S4: the system judges whether the 'site repeating' link of the group of dispatching operation command items is finished, if yes, the system automatically finishes the 'dispatching confirmation' link of the group of dispatching operation command items and executes step S5; if not, executing the step S4.1;
step S4.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S4;
step S5: after the "dispatch confirmation" link of the group of dispatch operation command items is completed, the field operator can start the field operation, and after the field operator completes the execution of the group of dispatch operation command items and confirms that the dispatch operation command items are correct, the field receiving module is used for manually confirming the completion of the "field report" link of the group of dispatch operation command items, and the step S6 is executed;
step S6: the system judges whether the field report of the group of dispatching operation command items is finished, if yes, the system automatically completes the dispatching repeating link of the group of dispatching operation command items and executes step S7, if not, the system executes step S6.1;
step S6.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing step S6;
step S7: after the scheduling repeating of the group of scheduling operation command items is finished, the field operator confirms the group of scheduling operation command items again, completes the field confirmation link of the group of scheduling operation command items through the field command receiving module after the group of scheduling operation command items are executed, and executes the step S8; if not, executing the step S7.1;
step S7.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing the step S7;
step S8: the system judges whether the field confirmation of the set of dispatching operation command items is finished, if yes, the system automatically completes the execution completion link of the set of dispatching operation command items and executes step S9; if not, executing the step S8.1;
step S8.1: the system judges whether a distribution network dispatcher or a field personnel starts an emergency pause function, if yes, the system pauses programmed ordering, and all ordered units of the operation ticket have audible and visual alarms; if not, executing step S8;
step S9: judging whether the execution of the scheduling operation command items is finished or not, if yes, judging whether all the operation tickets are finished, if not, automatically issuing a network command link of the scheduling operation command items of the second group by the system, and returning to the step S2; if the execution is finished, the sound and light reminding the current value dispatcher to manually confirm the completion condition and file the operation ticket.
2. The system for ordering operation ticket programming of distribution network according to claim 1, wherein in the operation ticket input module, the operation ticket is written by an operator according to the power outage range content of the maintenance application form of the distribution network equipment, and the operation ticket is submitted to the operation ticket auditing module after the writing is finished.
3. The system according to claim 2, wherein in the ticket auditing module, if the guardian or the responsible person on duty finds that the ticket is not qualified, the ticket is returned to the ticket input module, and the operator modifies the ticket by the ticket input module, and the ticket is submitted to the ticket auditing module after the modification.
4. A system for programming a distribution network operation ticket according to claim 1, wherein the programming issuing module and the on-site receiving module have an emergency pause function, after the function is started, all the received persons of all the received units of the operation ticket have audible and visual alarms, any on-site received person needs to pause operation after receiving the paused audible and visual alarms, when the value schedule inquires the cause of pause according to the received person sent by the audible and visual alarms and take further measures to terminate the programming issuing or release the pause to continue the programming issuing.
5. A distribution network operation ticket programmed issuing system according to claim 4, wherein one or more of the set of scheduling operation command items are grouped together by the same ordered or same state transition; the state transition comprises the operation to hot standby, the operation to cold standby, the operation to overhauling, the hot standby to cold standby, the hot standby to overhauling, the cold standby to overhauling the method comprises the steps of changing a cold standby from overhauling into a hot standby from overhauling, changing the cold standby into the hot standby from overhauling into running, changing the cold standby into running and changing the hot standby into running; the same recipient is a recipient of the associated set of scheduled operation command items.
CN201910458038.6A 2019-05-29 2019-05-29 Programming order issuing system for operation ticket of distribution network Active CN110350655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910458038.6A CN110350655B (en) 2019-05-29 2019-05-29 Programming order issuing system for operation ticket of distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910458038.6A CN110350655B (en) 2019-05-29 2019-05-29 Programming order issuing system for operation ticket of distribution network

Publications (2)

Publication Number Publication Date
CN110350655A CN110350655A (en) 2019-10-18
CN110350655B true CN110350655B (en) 2023-05-02

Family

ID=68174651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910458038.6A Active CN110350655B (en) 2019-05-29 2019-05-29 Programming order issuing system for operation ticket of distribution network

Country Status (1)

Country Link
CN (1) CN110350655B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111932053B (en) * 2020-06-11 2022-08-09 南京南瑞信息通信科技有限公司 Intelligent sequencing method, device and system for distribution network scheduling operation instruction tickets
CN112366823B (en) * 2020-11-11 2023-01-20 国网山东省电力公司泰安供电公司 Distribution network power cut and supply automatic regulation and control system and method
CN112463221A (en) * 2020-12-10 2021-03-09 国网浙江省电力有限公司金华供电公司 Asynchronous intelligent online linkage scheduling instruction interaction method
CN113537949A (en) * 2021-08-16 2021-10-22 中国南方电网有限责任公司 Operation control method and device and computer equipment
CN114094702B (en) * 2021-11-16 2024-03-08 国网福建省电力有限公司 One-key execution method for whole scene of power grid dispatching instruction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104376440A (en) * 2014-12-12 2015-02-25 广西电网有限责任公司 Automatic power grid dispatching electronic token confirming method based on network token issuing
CN106685085A (en) * 2017-01-04 2017-05-17 广东电网有限责任公司东莞供电局 Remote programmed operation system for power grid dispatching
CN109034659A (en) * 2018-08-22 2018-12-18 广东电网有限责任公司 A kind of grid dispatching management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104376440A (en) * 2014-12-12 2015-02-25 广西电网有限责任公司 Automatic power grid dispatching electronic token confirming method based on network token issuing
CN106685085A (en) * 2017-01-04 2017-05-17 广东电网有限责任公司东莞供电局 Remote programmed operation system for power grid dispatching
CN109034659A (en) * 2018-08-22 2018-12-18 广东电网有限责任公司 A kind of grid dispatching management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"智能调度监控票系统的研究与应用";朱卓文;《中国优秀硕士学位论文全文数据库》;20190515;第1-67页 *

Also Published As

Publication number Publication date
CN110350655A (en) 2019-10-18

Similar Documents

Publication Publication Date Title
CN110350655B (en) Programming order issuing system for operation ticket of distribution network
CN110349049B (en) Automatic work permission system and method for distribution network overhaul
CN102682361A (en) Elevator maintenance managing system and method
CN113258669B (en) Networked intelligent scheduling method and terminal based on distribution network maintenance
CN102496088A (en) Method for improving executive force of power communication overhaul core flow
CN109840696B (en) Scheduling work whole process control method and system based on closed-loop management
CN110969341A (en) Intelligent maintenance method, device and system for power distribution terminal
CN111582695A (en) Dispatching operation robot device for automatically commanding power equipment to stop and recover power
CN110705808A (en) Power transmission network planning scheme generation system and method considering maintenance under new energy access
CN105116847A (en) Airport boarding bridge, ground air-conditioning and power supply set operation scheduling monitoring system
CN102937789B (en) A kind of power scheduling programmed control system and method
CN111612293A (en) Scheduling method and equipment based on MES system
CN102111508A (en) Fault processing method and system as well as fault scheduling equipment
CN105741051A (en) Method and system for intelligently generating operation tickets
CN102868226A (en) Implementation method for electronic command distribution between electric power dispatching and monitoring
CN113537837A (en) Automatic sorting method and device and computer equipment
CN110378503A (en) The method and apparatus for predicting multilayer shuttle shelf production capacity
CN110049047A (en) A kind of power communication maintenance is self-service to permit to handle system
CN113675945B (en) Misoperation-preventive locking method for operation execution and overhaul flow of centralized control center of hydropower station
CN107122834B (en) Intelligent order dispatching system and method
CN101546394A (en) Method for maintaining and dispatching facilities and equipment
CN115760047A (en) Equipment operation and maintenance management method based on building intellectualization
US20190050772A1 (en) Schedule arbitration system
CN115826507A (en) Automatic yard dispatching system for container terminal and operation method applying automatic yard dispatching system
CN111027880A (en) Method and system for configuring dispatching personnel of full-automatic operation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant