CN110331732A - Foundation pit Dewatering by pressure reduction system and construction method - Google Patents

Foundation pit Dewatering by pressure reduction system and construction method Download PDF

Info

Publication number
CN110331732A
CN110331732A CN201910693491.5A CN201910693491A CN110331732A CN 110331732 A CN110331732 A CN 110331732A CN 201910693491 A CN201910693491 A CN 201910693491A CN 110331732 A CN110331732 A CN 110331732A
Authority
CN
China
Prior art keywords
plate
pipe
water
connection
drinking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910693491.5A
Other languages
Chinese (zh)
Other versions
CN110331732B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201910693491.5A priority Critical patent/CN110331732B/en
Publication of CN110331732A publication Critical patent/CN110331732A/en
Application granted granted Critical
Publication of CN110331732B publication Critical patent/CN110331732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Abstract

The present invention relates to foundation pit Dewatering by pressure reduction system and construction methods, hang hoop using guiding cuff, well casing and control sinking direction and the rate of position cable control downcast well pipe;The dirt of downcast well pipe side wall is recycled by collecting the channel space that trough floor and collecting tank sidewall enclose;Block vertical plate and the annular conduit laid of flexible block are formed on sliding slot bottom plate using sliding slot vertical plate;School position cuff and pipe side school position body are set on the outside of drinking-water pipe, are provided with rigid connection pipe, flexible steel in flat section tubing and connection vertical bar in drinking-water pipe connecting part;On the outside of downcast well pipe and top is respectively provided with the first enclosure pouches and the second enclosure pouches;The plate and second that intercepts water of setting first intercepts water plate in the first bottling body, and can apply lateral pressure on top surface to third water-stop sheet and water proof side plate by intumescent filler body.The present invention can promote the laying quality of downcast well pipe and pipe side obturator, reduce downcast well pipe remove contamination and draw water construction difficulty, improve the globality of plugging structure.

Description

Foundation pit Dewatering by pressure reduction system and construction method
Technical field
The invention belongs to base pit engineering fields, are related to a kind of laying matter that can promote downcast well pipe and pipe side obturator Amount, reduce downcast well pipe remove contamination and draw water construction difficulty, improve plugging structure globality foundation pit Dewatering by pressure reduction system and apply Work method is suitable for foundation pit Dewatering by pressure reduction construction work.
Background technique
During excavation, the water level of foundation pit inner side and outer side is often the main points of base pit stability control.It is real When border is constructed, Dewatering by pressure reduction well is generallyd use to control the water level in influence of foundation excavation region, the construction quality of dewatering well It would generally be significant to engineering dewatering influential effect with efficiency.
The prior art has a kind of foundation pit high water head Dewatering by pressure reduction well shut-in well structure, including protruding into drawing in dewatering well well casing Flow steel pipe and the water-stopping steel ring flat-plate in dewatering well well casing;It drains steel pipe and steel pipe and lower part drainage steel pipe is drained by top At top drains steel pipe and lower part drainage steel pipe is flexibly connected by screw thread;Lower part water-stopping steel ring flat-plate and top water-stopping steel ring flat-plate Steel pipe is drained with lower part by welding to connect;Lower part drains steel pipe top and is equipped with plug, and plug and lower part drainage steel pipe top are logical Cross thread seal connection;Be successively arranged from the bottom up between lower part water-stopping steel ring flat-plate and top water-stopping steel ring flat-plate clay layers of balls with Concrete layer one;Concrete layer two is equipped with above the seal ring steel plate of top.Though the constructing structure can solve foundation pit high water head pressure-bearing Water draws water problem, however, place can be promoted by remaining in terms of promoting dewatering well construction efficiency, improving.
Shown in sum up, existing construction technology achieves preferable construction effect under suitable operating condition, but is improving precipitation The laying quality of well casing and pipe side obturator reduces downcast well pipe and removes contamination and draw water the construction technologies such as difficulty of construction, and mentioning Deficiency is remained in terms of the globality for rising plugging structure.
Summary of the invention
The purpose of the present invention is to provide a kind of laying quality that can not only promote downcast well pipe and pipe side obturator, and And downcast well pipe can be reduced and removed contamination and draw water the difficulty of construction, the foundation pit Dewatering by pressure reduction of plugging structure globality can also be improved System and construction method.
To realize the above-mentioned technical purpose, the present invention provides a kind of construction method of foundation pit Dewatering by pressure reduction system, including following Construction procedure: 1) preparation of construction;2) downcast well pipe is hung;3) pipe side obturator filling construction;4) downcast well pipe is removed contamination construction;5) The setting of downcast well pipe enclosing;6) well extracardiac pumping device is laid;7) water plug is laid in well;8) dewatering well closure construction.
Another invention according to the present invention, a foundation pit foundation pit Dewatering by pressure reduction system of the invention, according to the construction mentioned thereon Method constructs to obtain.
The present invention has the characteristics that following and beneficial effect
(1) present invention limits the sinking direction of downcast well pipe by guiding cuff flexibility, and hangs hoop and control position by well casing Drag-line dynamic controls the fall rate of downcast well pipe, improves the accuracy of downcast well pipe sinking control.
(2) tube top cap of the present invention is connect with downcast well pipe by cap side lantern ring, and drop guide funnel passes through close with the periphery soil body Close gasket ring connection, the synchronous stability by balance hoist enhancing structure, can effective lift structure self-stable ability.
(3) present invention can control the connection of frid squeegee and downcast well pipe by squeegee control position bolt, and can lead to The dirt for collecting the flute profile cavity recycling downcast well pipe side wall that trough floor and collecting tank sidewall enclose is crossed, dirt removal is promoted Efficiency and quality.
(4) present invention is by sliding slot vertical plate in the conduit that sliding slot bottom plate forms block vertical plate and flexible block annular is laid, drop The difficulty that low downcast well pipe enclosing is laid;Strip light band is circumferentially set on the outside of block vertical plate and flexible block, it can be into one Step improves the effect of security protection.
(5) pipe side stay frame and pipe side school position body is arranged in the present invention on the outside of drinking-water pipe, and accurate control position can be carried out to drinking-water pipe; Meanwhile it being provided with rigid connection pipe, flexible steel in flat section tubing and connection vertical bar in drinking-water pipe connecting part, it can effectively reduce drinking-water pipe company The difficulty connect;Water plug can move together with mobile dagger, reduce the difficulty that water plug installation is laid.
(6) it is connected between the closed capping of the present invention and downcast well pipe by the convex falcon in base and base closed loop, drop can be reduced The difficulty that well pipe is laid;The present invention is on the outside of downcast well pipe simultaneously and top is respectively provided with the first enclosure pouches and the second envelope Pouch is closed, and can realize quick, the dual-seal to downcast well pipe by force (forcing) pump.
(7) present invention setting first in the first bottling body plate and second that intercepts water intercepts water plate, and makes second to intercept water plate and folder Muscle interlayer is connected, and can effectively promote the globality of the first bottling body;Meanwhile the present invention passes through intumescent filler body to third water-stop sheet And water proof side plate applies lateral pressure on top surface, and the vertical deformation of the second bottling body can be controlled by prestressing force pressing plate, it can be further Improve the water proof effect of structure.
Detailed description of the invention
Fig. 1 is foundation pit Dewatering by pressure reduction system construction process figure of the present invention;
Fig. 2 is that Fig. 1 downcast well pipe hangs constructing structure schematic diagram;
Fig. 3 is Fig. 2 guiding cuff and downcast well pipe attachment structure schematic diagram;
Fig. 4 is Fig. 1 pipe side obturator filling constructing structure schematic diagram;
Fig. 5 is that Fig. 1 downcast well pipe is removed contamination constructing structure schematic diagram;
Fig. 6 is Fig. 5 cell wall squeegee structural facades schematic diagram;
Fig. 7 is Fig. 5 cell wall squeegee structure transverse face schematic diagram;
Fig. 8 is Fig. 1 dewatering well enclosing structural plan layout drawing;
Fig. 9 is Fig. 8 block vertical plate and sliding slot connecting structure of bottom plate schematic diagram;
Figure 10 is Fig. 1 well extracardiac pumping device layout diagram;
Figure 11 is Figure 10 pipe side school position body and pipe side stay frame connecting structure schematic diagram;
Figure 12 is water plug layout stracture schematic diagram in Fig. 1 well;
Figure 13 is Fig. 1 dewatering well closure construction structural schematic diagram;
Figure 14 is Figure 13 the first bottling body constructing structure schematic diagram;
Figure 15 is that Figure 13 and Figure 14 first intercepts water plate auxiliary locator schematic diagram.
In figure: 1- downcast well pipe;2- precipitation pit shaft;The periphery the 3- soil body;4- controls position bottom plate;5- controls position dagger;6- controls position support Plate;7- is oriented to cuff;8- well casing hangs hoop;9- controls position drag-line;10- drag-line pulling machine;11- connection hanging ring;12- tube top cap;13- Drop guide funnel;14- cap side lantern ring;The closed gasket ring of 15-;16- balances hoist;17- filler filling pipe;18- pipe side obturator;19- Lift sunpender;20- collects trough floor;21- cell wall squeegee;22- squeegee control position bolt;23- collecting tank sidewall;24- cell wall row Water hole;25- squeegee shaft;26- sliding slot bottom plate;27- block vertical plate;28- flexibility block;29- sliding slot vertical plate;30- vertical plate connects Bar;31- strip light band;32- drinking-water pipe;The school 33- position cuff;34- pipe side school position body;35- moves dagger;36- column bottom cross plate; The capital 37- transverse slat;38- shifting roller;39- absolute altitude adjusts body;40- rigid connection pipe;41- flexible steel in flat section tubing;42- fastening hoop Ring;43- immersible pump;44- water pump hanging ring;45- water pump hoist cable;The first enclosure pouches of 46-;The closed capping of 47-;48- second is closed Pouch;The convex falcon in the base 49-;The base 50- closed loop;51- caping ballast body;52- first intercepts water plate;Slot is hung in 53- connection;54- is rigid Property sunpender;55- auxiliary positioning pipe;56- geotechnique's interlayer;57- reinforcement interlayer;58- second intercepts water plate;The first bottling body of 59-;60- Third intercepts water plate;The second bottling body of 61-;62- prestressing force pressing plate;The capping of 63- tube bottom;64- connection anchor pier;65- rigidity cuff; 66- flexibility cuff;67- rigid flight;68- flexibility connecting plate;The school 69- position screw rod;The school 70- position bolt;The school 71- position support;The school 72- Position shaft;73- support bottom plate;74- support upright bar;75- support diagonal brace;76- water plug;77- draws water connecting tube;78- second Connect transverse slat;The connection transverse slat of 79- first;80- connection vertical bar;81- link rotatable hinge;82- compressed air line;83- force (forcing) pump;84- Hang slot connecting rod;85- connection flexural pivot;86- water proof side plate;87- plate top connecting plate;88- board bottom connecting plate;89- permeates connecting hole; 90- intumescent filler body;91- pier top crossbeam;92- pressurization bolt;93- well side obturator;94- funnel connecting rod;95- well casing passes through Hole;96- guide blot;97- controller perturbation bar.
Specific embodiment
Downcast well pipe makes construction technical requirement, on-site hoisting construction technical requirement, rolling of sectional iron and welding procedure technology It is required that, bolt fastening construction technical requirement etc., repeated no more in present embodiment, emphasis illustrates that the present invention relates to the implementations of method Mode.
Fig. 1 is foundation pit Dewatering by pressure reduction system construction process figure of the present invention, referring to Fig.1 shown in, foundation pit Dewatering by pressure reduction system and Construction method, including following construction procedure:
1) preparation of construction: the review of downcast well pipe (1) field position determines concrete mix and on-site construction processes, quasi- The material and device that standby construction needs;
2) downcast well pipe is hung: setting control position bottom plate (4) and control position on the periphery soil body (3) on the outside of precipitation pit shaft (2) Dagger (5), control position dagger (5) are placed in control position bottom plate (4), in the top of control position dagger (5) setting control position fagging (6);It will drop Well pipe (1) is lifted to the top of precipitation pit shaft (2), and downcast well pipe (1) is made to pass through the guiding cuff on the inside of control position dagger (5) (7) after, well casing is set on the side wall of downcast well pipe (1) and hangs hoop (8), make to control position drag-line (9) one end and control on position fagging (6) Drag-line pulling machine (10) is connected, and the other end hangs the connection hanging ring (11) on hoop (8) side wall with well casing and connects, by controlling position drag-line (9) the decentralization height of downcast well pipe (1) is controlled;
3) pipe side obturator filling construction: after the completion of downcast well pipe (1) sinking, by tube top cap (12) and drop guide funnel (13) it connects integral;So that the cap side lantern ring (14) of tube top cap (12) bottom end is connected firmly with downcast well pipe (1), makes guide The closed gasket ring (15) of funnel (13) bottom end is completely embedded with the periphery soil body (3);In drop guide funnel (13) and tube top cap (12) Between be arranged funnel connecting rod (22), balance hoist (16) be connected to funnel connecting rod (22), pass through balance hoist (16) control The stability of drop guide funnel (13) and tube top cap (12) fills pipe (17) to the cavity on the outside of downcast well pipe (1) by filler Interior filling pipe side obturator (18);
4) downcast well pipe is removed contamination construction: make to lift sunpender (19) bottom end and is connected with trough floor (20) are collected, lifting sunpender (19) squeegee control position bolt (22) are set between side wall and cell wall squeegee (21), collect trough floor (20) and collecting tank sidewall (23) it connects, cell wall squeegee (21) rotation is connected to collecting tank sidewall (23), and cell wall is arranged on collecting tank sidewall (23) and arranges Water hole (24) and squeegee shaft (25), make squeegee shaft (25) be connected with cell wall squeegee (21);
5) downcast well pipe enclosing is arranged: being orderly arranged outside each block vertical plate (27) and sliding slot bottom plate in downcast well pipe (1) (26), block the flexible block (28) of setting between vertical plate (27), make to block vertical plate (27) and flexible block (28) together along the chute The sliding slot vertical plate (29) of bottom plate (26) upper surface slides, and block vertical plate (27) and sliding slot vertical plate (29) is made to pass through vertical plate connecting rod (30) Connection;Circumferentially strip light band (31) are set on the outside of block vertical plate (27) and flexible block (28);
6) well extracardiac pumping device is laid: the inner wall of well side obturator (93) and downcast well pipe (1) on the outside of downcast well pipe (1) It removes contamination after the completion of construction, drinking-water pipe (32) is inserted to the top of tube bottom capping (63), high-ranking officers' position cuff (33) is set to drinking-water pipe (32) outside, and by the lateral position of pipe side school position body (34) control drinking-water pipe (32), wherein pipe side school position body (34) is set In on the periphery soil body (3) and being located at precipitation pit shaft two sides, the both ends of mobile dagger (35) respectively with column bottom cross plate (36) and capital After transverse slat (37) is connected firmly, mobile dagger (35) are moved to setting by the shifting roller (38) for first passing through column bottom cross plate (36) lower part Position, then the flatness by absolute altitude adjusting body (39) adjustment column bottom cross plate (36) under column bottom cross plate (36);Drinking-water pipe (32) The rigid connection pipe (40) and flexible steel in flat section tubing (41) being connected to each other is arranged in outside, and makes rigid connection pipe (40) and drinking-water pipe (32) it is welded to connect, connect flexible steel in flat section tubing (41) by fastening garter spring (42) with connecting tube of drawing water (77);
7) water plug is laid in well: insertion drinking-water pipe (32) and immersible pump (43) inside downcast well pipe (1), and makes to take out Water pipe (32) is completely embedded with immersible pump (43);Make the water pump hanging ring (44) of immersible pump (43) two sides and water pump hoist cable (45) phase Even, water pump hoist cable (45) is placed in the closed capping (47) on the periphery soil body (3);In the outside of drinking-water pipe (32), the first envelope is set Pouch (46) are closed, the second enclosure pouches are set between closed capping (47) and well side obturator (93) and the periphery soil body (3) (48),;The convex falcon in base (49) are set in closed capping (47) lower surface, base closed loop is set with downcast well pipe (1) joint (50);In the upper surface of closed capping (47), caping ballast body (51) are set;It draws water when constructing, by force (forcing) pump (83) to first Enclosure pouches (46) and the second enclosure pouches (48) pressurization promote the air-tightness of downcast well pipe (1), then are taken out by immersible pump (43) Water;
8) dewatering well closure construction: make first to intercept water the inside of plate (52) and connection is hung after slot (53) is connected firmly, pass through Rigid hanger (54) intercepts water first in plate (52) the indentation periphery soil body (3), and slot is hung in the rotary-top connection that slot (53) is hung in connection Connecting rod (84), opposite slot connecting rod (84) rotation of hanging of mirror image connect rigid hanger (54);The outside of auxiliary positioning pipe (55) according to The geotechnological interlayer (56) of secondary setting and reinforcement interlayer (57), lateral wall and second intercept water plate (58) be welded to connect;First by the first perfusion Body (59) perfusion intercept water to second plate (58) top after, then auxiliary positioning pipe (55) are taken out, then third intercept water plate (60) it is placed in setting position;The second bottling body (61) pouring construction is first carried out, and is filled by prestressing force pressing plate (62) control second The deformation of injection body (61).
In step 2), the bottom end setting tube bottom of downcast well pipe (1) side wall covers (63), and water seepage hole is arranged in side wall;Guiding Cuff (7) is spliced by rigid cuff (65) and flexible cuff (66) to be formed, and rigid cuff (65) and guide blot (96) is made to hang down Directly connect;Guide blot (96) is formed by screw rod and bolt combination, and the screw rod of bolt two sides is that hand of spiral is opposite;Control position support Plate (6) is formed using steel plate rolling, and drag-line pulling machine (10) are arranged thereon, and well casing through hole (95) are arranged in intermediate position.
In step 3), tube top cap (12) is in cone, bottom end and cap side lantern ring (14) vertical connection;Cap side lantern ring (14) internal diameter is identical as the outer diameter of downcast well pipe (1), is formed using steel plate rolling;Drop guide funnel (13) is in truncated cone-shaped, and top Circular diameter is greater than bottom circular diameter, and bottom circular diameter is identical as the outer diameter of pipe side obturator (18), in drop guide funnel (13) and pipe Funnel connecting rod (94) are set between overhead guard cap (12);Closed gasket ring (15) uses rubber slab or plastic plate, is in circular ring shape, and with Drop guide funnel (13) pastes connection.
In step 4), cell wall squeegee (21) is made of rigid flight (67) and flexible connecting plate (68);Rigid flight (67) fan-shaped, it is formed using steel plate rolling;Flexible connecting plate (68) is triangular in shape or fan-shaped, pastes and connects with rigid flight (67) Or it is connected by holdfast;Squeegee control position bolt (22) is using spring or the assembly of screw rod and bolt, when using screw rod and bolt When assembly, the screw rod of bolt two sides is that hand of spiral is opposite.
In step 5), flexibility block (28) and block vertical plate (27) are by pasting connection or being connected by holdfast.Bar shaped Light belt (31) uses the LED light strip of sparkling.
In step 6), pipe side school position body (34) You Jiaowei screw rod (69) He Jiaowei bolt (70) is formed, and makes school position spiral shell The school position screw rod (69) of bolt (70) two sides is connect with school position cuff (33) He Jiaowei support (71) by school position shaft (72) respectively; The screw threads for fastening of the school position screw rod (69) of school position bolt (70) two sides is contrary;School position support (71) is set to the periphery soil body (3) On, it is made of support bottom plate (73) and support upright bar (74), support diagonal brace is set between support beam bottom plate and support upright bar (74) (75);Column bottom cross plate (36) cross section is rectangle, and two mobile daggers (35) are arranged on every piece of column bottom cross plate (36);Capital is horizontal Water plug (76) and connecting tube of drawing water (77) are set on plate (37);Connecting tube of drawing water (77) and drinking-water pipe (32) use diameter phase Same steel pipe, is arranged the second connection transverse slat (78) on connecting tube of drawing water (77), and the first connection cross is arranged on drinking-water pipe (32) Plate (79), and setting connection vertical bar (80) between the second connection transverse slat (78) and the first connection transverse slat (79);Connect vertical bar (80) it connect transverse slat (79) with first by link rotatable hinge (81) connection, connect transverse slat (78) with second and is bolted; Rigid connection pipe (40) and flexible steel in flat section tubing (41) paste connection, and internal diameter is identical as drinking-water pipe (32) outer diameter.
In step 7), the first enclosure pouches (46) and the second enclosure pouches (48) are all made of sheet rubber and suture;The One enclosure pouches (46) cross section is in circular ring shape, and round paste with drinking-water pipe (32) in inside connects, top and compressed air line (82) Connection;Second enclosure pouches (48) cross section is rounded or rectangle, side are connected to compressed air line (82);Compressed air line (82) is adopted With steel pipe or pvc pipe, it is connected with force (forcing) pump (83);Force (forcing) pump (83) uses water pump or compression pump.
In step 8), first intercepts water plate (52) plane in circular ring shape, is formed using stainless-steel sheet or the copperplate rolling;Even It connects and hangs slot (53) width and intercept water compared with first 1~3cm of plate (52) thickness;The both ends for hanging slot connecting rod (84) pass through connection flexural pivot (85) respectively Slot (53) is hung with connection and rigid hanger (54) is connect;Setting controller perturbation bar between slot (53) is hung in the opposite connection of mirror image (97);Second plate (58) that intercepts water is formed using steel plate rolling, is connected with auxiliary positioning pipe (55) by screw;Third intercepts water plate (60) plane is in circular ring shape, and circumferentially water proof side plate (86) are arranged in outside;It intercepts water the upper table of plate (60) intermediate gaps in third Plate top connecting plate (87) and board bottom connecting plate (88) is respectively set in face and lower surface, and infiltration is arranged on plate top connecting plate (87) Connecting hole (89);It intercepts water setting in cavity that plate (60) encloses in plate top connecting plate (87), board bottom connecting plate (88) and third Intumescent filler body (90);Intumescent filler body (90) uses the waterglass or cement of water-swellable;Prestressing force pressing plate (62) and pier top Crossbeam (91) is connected by pressurization bolt (92), and the position of prestressing force pressing plate (62) can be controlled by pressurization bolt (92);Pier It is connected between head piece (91) and the periphery soil body (3) by connecting anchor pier (64), passes through screw connection with pressurization bolt (92).
Referring to shown in Fig. 2~Figure 15, foundation pit Dewatering by pressure reduction system and construction method hang hoop using guiding cuff (7), well casing (8) and control position drag-line (9) control downcast well pipe (1) sinking direction and rate;By collecting trough floor (20) and collecting tank side The dirt of flute profile cavity recycling downcast well pipe (1) side wall that wall (23) encloses;Using sliding slot vertical plate (29) in sliding slot bottom plate (26) block vertical plate (27) and the annular conduit laid of flexible block (28) are formed;The setting school position cuff on the outside of drinking-water pipe (32) (33) and pipe side school position body (34), drinking-water pipe (32) connecting part be provided with rigid connection pipe (40), flexible steel in flat section tubing (41) With connection vertical bar (80);On the outside of downcast well pipe (1) and top is respectively provided with the first enclosure pouches (46) and the second closing capsule Bag (48);The plate (52) and second that intercepts water of setting first intercepts water plate (58) in the first bottling body (59), and can pass through intumescent filler Body (90) applies lateral pressure on top surface to third water-stop sheet and water proof side plate (86).
Downcast well pipe (1) well depth 30m, is made of Φ 273 × 3mm steel pipe.Precipitation pit shaft (2) is drilled using drilling machine It forms, a diameter of 50cm.The periphery soil body (3) is the cohesive soil of hard plastic state.Position bottom plate (4) are controlled using the steel with a thickness of 10mm Plate rolls.Control position dagger (5) use specification for 200 × 200 × 8 × 12 H profile steel.Control position fagging (6) using with a thickness of The steel plate of 4mm is made.Guiding cuff (7) is composed of two pieces of rigid cuffs (65) and two pieces of flexible cuffs (66), and height is For 20cm, formed wherein the arc chord angle of rigidity cuff (65) uses for 150 ° with a thickness of the steel plate rolling of 2mm;Flexible cuff (66) Using the rubber slab with a thickness of 2mm, with rigid cuff (65) by pasting connection.Well casing hangs hoop (8) using the steel with a thickness of 2mm Plate rolls.Control the wirerope that position drag-line (9) use diameter 10mm.Drag-line pulling machine (10) uses electrical hoist.Connection Hanging ring (11) is made of the plain bar of diameter 10mm, is hung hoop (8) with well casing and is welded to connect.Tube top cap (12), guide leakage Bucket (13) and cap side lantern ring (14) are all made of and form with a thickness of the steel plate rolling of 1mm, and tube top cap (12) cross section is in isosceles Triangle, the angle with horizontal plane are 60 °;The angle of drop guide funnel (13) and horizontal plane is 60 °.Closed gasket ring (15) is using thick Degree is that the rubber slab of 2mm is cut.Hoist (16) are balanced using the sand pocket of weight 20kg.Filler filling pipe (17) use diameter for The tube material of 20cm is made.Pipe side obturator (18) uses close-graded medium coarse sand material.It lifts sunpender (19) and uses diameter The steel pipe of 60mm is made.It collects trough floor (20) and collecting tank sidewall (23) is all made of and cuts with a thickness of the steel plate of 2mm.Slot Wall squeegee (21) is made of rigid flight (67) and flexible connecting plate (68);Wherein rigid flight (67) is fan-shaped, using thickness It is formed for the steel plate rolling of 2mm;Flexible connecting plate (68) uses and is made with a thickness of the rubber slab material of 2mm;Rigid flight (67) and Flexible connecting plate (68) pastes connection.Squeegee control position bolt (22) uses diameter to be composed slot for the screw rod of 22mm and bolt Wall drainage hole (24) width is 1cm, is highly 3cm.Squeegee shaft (25) uses diameter for the stainless rotating steel shaft of 10mm.Sliding slot Bottom plate (26) is used and is made with a thickness of the steel plate of 2mm.Vertical plate (27) are blocked using the steel plate with a thickness of 10mm, height is 50cm.Flexibility block (28) uses rope mesh grid, connects with block vertical plate (27) binding.Sliding slot vertical plate (29) uses thickness The steel plate of 2mm is made, and is highly 20cm, connect with sliding slot bottom plate (26) vertical welding.Vertical plate connecting rod (30) uses diameter 22mm Screw rod and bolt form.Strip light band (31) uses the LED light strip of sparkling.Drinking-water pipe (32) and connecting tube of drawing water (77) are equal Using the steel pipe of 10cm.School position cuff (33) is used and is formed with a thickness of the steel plate rolling of 1mm.Pipe side school position body (34) You Jiaowei spiral shell Bar (69) He Jiaowei bolt (70) composition;Its lieutenant colonel position screw rod (69) uses the stainless steel screw rod of diameter 30mm;School position bolt (70) stainless steel bolt of internal diameter 30mm, and the screw threads for fastening direction phase of school position bolt (70) two sides school position screw rod (69) are used Instead.The school position shaft (72) of school position screw rod (69) end uses the stainless rotating steel shaft of diameter 30mm.Mobile dagger (35) are using straight Diameter 100mm, thickness 2mm steel pipe be made.Column bottom cross plate (36) and capital transverse slat (37) using the steel plate rolling with a thickness of 2mm and At.Shifting roller (38) uses 6 cun of rigid plastics wheel.Absolute altitude adjusts the bolt and screw combinations that body (39) use diameter 30mm It forms.Rigid connection pipe (40) is placed on the top of drinking-water pipe (32), and is welded to connect with drinking-water pipe (32).Flexible steel in flat section tubing (41) Using rubber hose, pastes and connect with rigid connection pipe (40).Fastening garter spring (42) uses width for the hose clamp of 2cm.Immersible pump (43) use 220v motor lift for the sewage type water pump of 60m.Water pump hanging ring (44) is rolled using the reinforcing bar of diameter 10mm. Water pump hoist cable (45) uses the wirerope of diameter 10mm.First enclosure pouches (46) and the second enclosure pouches (48) are all made of thickness It is sutured for the sheet rubber of 0.2mm.Closed capping (47) is using the concrete slab with a thickness of 100mm.The convex falcon in base (49) is horizontal Section is in isosceles trapezoid, is highly 5cm, top width 30cm.Base closed loop (50) is using the rubber slab material system with a thickness of 1cm At.Caping ballast body (51) uses weight for the precast concrete block of 50kg.First intercepts water plate (52) plane in circular ring shape, uses It is rolled with a thickness of the stainless-steel sheet of 2mm.Connection hangs slot (53) clear span and intercepts water compared with first plate (52) big 2cm, using thickness It is formed for steel plate rolling, groove depth 5cm, plane is arc-shaped, and central angle is 60 °;It is axially and symmetrically set along auxiliary positioning pipe (55) Set two pieces.Rigid hanger (54) is made of the tube material of diameter 60mm.Auxiliary positioning pipe (55) uses diameter for 30cm's Tube material is made, and is connected through a screw thread with second plate (58) that intercepts water.Geotechnological interlayer (56) uses non-woven geotextile material.Reinforcement Interlayer (57) uses steel wire net materials.Second intercepts water plate (58) using the steel plate rolling with a thickness of 10mm, with auxiliary positioning pipe (55) connection screw thread is arranged in joint.First bottling body (59) uses strength grade for the pea gravel concreten of C35.Third intercepts water plate (60) plane is in circular ring shape, is rolled using with a thickness of the stainless-steel sheet of 5mm.Second bottling body (61) uses strength grade The impervious concrete for being P6 for C40, antiseepage grade.Prestressing force pressing plate (62) is used and is formed with a thickness of the steel plate rolling of 10mm.Pipe Underseal lid (63) is used and is formed with a thickness of the steel plate rolling of 2mm.Connection anchor pier (64) is made of the steel pipe of diameter 60mm.School position Support (71) is set on the periphery soil body (3), is made of support bottom plate (73) and support upright bar (74);Its intermediate support frame bottom plate (73) is adopted Formed with a thickness of the steel plate rolling of 10mm, support upright bar (74) use specification for 100 × 100 × 6 × 8 H profile steel.Support is oblique Support (75) is made of the spiral of diameter 25mm.Water plug (76) uses the suction pump of voltage 220v, lift 60m.The Two connections transverse slat (78) and the first connection transverse slat (79) are all made of and are made with a thickness of the steel plate of 2mm.Vertical bar (80) are connected using straight The stainless steel screw rod of diameter 30mm.Link rotatable is cut with scissors (81) and is cut with scissors using the directional rotating of diameter 30mm.Compressed air line (82) is using straight The steel pipe of diameter 20mm.Force (forcing) pump (83) uses compression pump.Slot connecting rod (84) are hung to form using the steel pipe rolling of diameter 30mm.Connection Flexural pivot (85) is cut with scissors using the directional rotating of diameter 30mm.Water proof side plate (86) is used and is rolled with a thickness of the rubber slab of 2mm.Plate Top connecting plate (87) and board bottom connecting plate (88) are all made of and cut with a thickness of the rubber slab of 2mm, intercept water plate (60) with third Joint is using stickup connection.Infiltration connecting hole (89) diameter is 10mm.Intumescent filler body (90) uses the water glass of water-swellable Glass.Pier top crossbeam (91) is highly width 20cm, 5cm using forming with a thickness of the steel plate rolling of 2mm.Pressurization bolt (92) Use diameter for the stainless steel bolt of 30mm.Well side obturator (93) uses the grit material of uniform grading.Funnel connecting rod (94) it is rolled using the reinforcing bar of diameter 25mm.Well casing through hole (95) diameter is compared with downcast well pipe (1) big 20mm.Guide blot (96) it is formed by the screw rod and bolt combination of diameter 30mm, and the screw rod of bolt two sides is that hand of spiral is opposite.Controller perturbation bar (97) spring material of diameter 2cm is used.

Claims (9)

1. the construction method of foundation pit Dewatering by pressure reduction system, it is characterised in that including following construction procedure:
1) preparation of construction: the review of downcast well pipe (1) field position determines concrete mix and on-site construction processes, prepares to apply The material and device that work needs;
2) downcast well pipe is hung: setting control position bottom plate (4) and control position dagger on the periphery soil body (3) on the outside of precipitation pit shaft (2) (5), control position dagger (5) is placed in control position bottom plate (4), in the top of control position dagger (5) setting control position fagging (6);By dewatering well The top of (1) lifting to precipitation pit shaft (2) is managed, and downcast well pipe (1) is made to pass through the guiding cuff (7) on the inside of control position dagger (5) Afterwards, well casing is set on the side wall of downcast well pipe (1) and hangs hoop (8), make to control position drag-line (9) one end and controls the drawing on position fagging (6) Rope pulling machine (10) is connected, and the other end hangs the connection hanging ring (11) on hoop (8) side wall with well casing and connects, by controlling position drag-line (9) Control the decentralization height of downcast well pipe (1);
3) pipe side obturator filling construction: after the completion of downcast well pipe (1) sinking, even by tube top cap (12) and drop guide funnel (13) It connects integral;So that the cap side lantern ring (14) of tube top cap (12) bottom end is connected firmly with downcast well pipe (1), makes drop guide funnel (13) the closed gasket ring (15) with the periphery soil body (3) of bottom end are completely embedded;Between drop guide funnel (13) and tube top cap (12) It is arranged funnel connecting rod (22), balance hoist (16) is connected to funnel connecting rod (22), controls guide by balance hoist (16) The stability of funnel (13) and tube top cap (12) is filled pipe (17) by filler and is filled out into the cavity on the outside of downcast well pipe (1) Fill pipe side obturator (18);
4) downcast well pipe is removed contamination construction: being made to lift sunpender (19) bottom end and is connected with trough floor (20) are collected, lifts sunpender (19) Squeegee control position bolt (22) are set between side wall and cell wall squeegee (21), collect trough floor (20) and collecting tank sidewall (23) even It connects, cell wall squeegee (21) rotation is connected to collecting tank sidewall (23), and cell wall drainage hole is arranged on collecting tank sidewall (23) (24) and squeegee shaft (25), squeegee shaft (25) is made to be connected with cell wall squeegee (21);
5) downcast well pipe enclosing is arranged: being orderly arranged outside each block vertical plate (27) and sliding slot bottom plate (26) in downcast well pipe (1), blocks Flexible block (28) is set between net vertical plate (27), makes to block vertical plate (27) and flexible block (28) bottom plate (26) along the chute together The sliding slot vertical plate (29) of upper surface slides, and connect block vertical plate (27) by vertical plate connecting rod (30) with sliding slot vertical plate (29);? It blocks vertical plate (27) and circumferentially strip light band (31) is arranged in flexible block (28) outside;
6) well extracardiac pumping device is laid: the inner wall of well side obturator (93) and downcast well pipe (1) on the outside of downcast well pipe (1) is removed contamination After the completion of construction, drinking-water pipe (32) is inserted to the top of tube bottom capping (63), high-ranking officers' position cuff (33) is set to drinking-water pipe (32) Outside, and by the lateral position of pipe side school position body (34) control drinking-water pipe (32), wherein pipe side school position body (34) is placed in periphery On the soil body (3) and be located at precipitation pit shaft two sides, the both ends of mobile dagger (35) respectively with column bottom cross plate (36) and capital transverse slat (37) after being connected firmly, mobile dagger (35) are moved to setting position by the shifting roller (38) for first passing through column bottom cross plate (36) lower part It sets, then adjusts the flatness of body (39) adjustment column bottom cross plate (36) by the absolute altitude under column bottom cross plate (36);Drinking-water pipe (32) is outside The rigid connection pipe (40) and flexible steel in flat section tubing (41) being connected to each other is arranged in side, and makes rigid connection pipe (40) and drinking-water pipe (32) Connection connect flexible steel in flat section tubing (41) by fastening garter spring (42) with connecting tube of drawing water (77);
7) water plug is laid in well: insertion drinking-water pipe (32) and immersible pump (43) inside downcast well pipe (1), and makes drinking-water pipe (32) it is connect with immersible pump (43);The water pump hanging ring (44) of immersible pump (43) two sides is set to be connected with water pump hoist cable (45), water pump is hung Rope (45) is placed in the closed capping (47) on the periphery soil body (3);In the outside of drinking-water pipe (32), the first enclosure pouches are set (46), the second enclosure pouches (48) are set between closed capping (47) and well side obturator (93) and the periphery soil body (3),;? The convex falcon in base (49) are arranged in closed capping (47) lower surface, and base closed loop (50) are arranged with downcast well pipe (1) joint;Close Close upper surface setting caping ballast body (51) of capping (47);It draws water when constructing, by force (forcing) pump (83) to the first enclosure pouches (46) it pressurizes with the second enclosure pouches (48), then is drawn water by immersible pump (43);
8) dewatering well closure construction: make first to intercept water the inside of plate (52) and connection is hung after slot (53) is connected firmly, pass through rigidity Sunpender (54) intercepts water first in plate (52) the indentation periphery soil body (3), and slot connecting rod is hung in the rotary-top connection that slot (53) is hung in connection (84), what mirror image was opposite hangs slot connecting rod (84) rotation connection rigid hanger (54);It is successively set in the outside of auxiliary positioning pipe (55) Set geotechnological interlayer (56) and reinforcement interlayer (57), lateral wall and second are intercepted water plate (58) welded connecting;First by the first bottling body (59) after the top for plate (58) of intercepting water to second is perfused, then by auxiliary positioning pipe (55) taking-up, third is then intercepted water into plate (60) It is placed in setting position;The second bottling body (61) pouring construction is first carried out, and controls the second bottling body by prestressing force pressing plate (62) (61) deformation.
2. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 2), dewatering well The bottom end setting tube bottom for managing (1) side wall covers (63), and water seepage hole is arranged in side wall;Cuff (7) are oriented to by rigid cuff (65) and soft Property cuff (66) splice composition, and make rigid cuff (65) and guide blot (96) vertical connection;Guide blot (96) is by screw rod It is formed with bolt combination, and the screw rod of bolt two sides is that hand of spiral is opposite;Control position fagging (6) is formed using steel plate rolling, Well casing through hole (95) are arranged in upper setting drag-line pulling machine (10), intermediate position.
3. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 3), tube top cover In cone, bottom end connects cap (12) with cap side lantern ring (14);The outer diameter phase of cap side lantern ring (14) internal diameter and downcast well pipe (1) Together;Drop guide funnel (13) is in truncated cone-shaped, and top circular diameter is greater than bottom circular diameter, bottom circular diameter and pipe side obturator (18) Outer diameter it is identical, between drop guide funnel (13) and tube top cap (12) be arranged funnel connecting rod (94);Closed gasket ring (15) is in Circular ring shape, and connect with drop guide funnel (13).
4. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 4), cell wall is scraped Pulpboard (21) is made of rigid flight (67) and flexible connecting plate (68);Rigid flight (67) is in fan;Flexible connecting plate (68) is in triangle Shape or sector are pasted connection with rigid flight (67) or are connected by holdfast;Squeegee control position bolt (22) uses spring or screw rod With the assembly of bolt, when using screw rod and bolt combination body, the screw rod of bolt two sides is that hand of spiral is opposite.
5. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 5), flexible blocking By pasting connection or being connected by holdfast, strip light band (31) uses the LED light of sparkling for net (28) and block vertical plate (27) Band.
6. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 6), pipe side school Position body (34) You Jiaowei screw rod (69) He Jiaowei bolt (70) forms, and makes the school position screw rod (69) point of school position bolt (70) two sides It is not connect with school position cuff (33) He Jiaowei support (71) by school position shaft (72);The school position screw rod of school position bolt (70) two sides (69) screw threads for fastening is contrary;School position support (71) is set on the periphery soil body (3), by support bottom plate (73) and support upright bar (74) it forms, support diagonal brace (75) is set between support beam bottom plate and support upright bar (74);Column bottom cross plate (36) cross section is in length It is rectangular, two mobile daggers (35) are set on every piece of column bottom cross plate (36);On capital transverse slat (37) be arranged water plug (76) and Connecting tube of drawing water (77);Connecting tube of drawing water (77) and drinking-water pipe (32) use the identical steel pipe of diameter, in connecting tube of drawing water (77) Upper the second connection transverse slat (78) of setting, is arranged the first connection transverse slat (79), and connect transverse slat second on drinking-water pipe (32) (78) setting connection vertical bar (80) between the first connection transverse slat (79);Connection vertical bar (80) connect transverse slat (79) with first and passes through Link rotatable cuts with scissors (81) connection, connect transverse slat (78) with second and is bolted;Rigid connection pipe (40) and flexible steel in flat section tubing (41) connection is pasted, internal diameter is identical as drinking-water pipe (32) outer diameter.
7. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 7), the first envelope Pouch (46) cross section is closed in circular ring shape, inside circle is connect with drinking-water pipe (32), and top is connected to compressed air line (82);Second Enclosure pouches (48) cross section is rounded or rectangle, side are connected to compressed air line (82);Compressed air line (82) using steel pipe or Pvc pipe is connected with force (forcing) pump (83);Force (forcing) pump (83) uses water pump or compression pump.
8. the construction method of foundation pit Dewatering by pressure reduction system according to claim 1, it is characterised in that: in step 8), first section Water plate (52) plane is in circular ring shape, is formed using stainless-steel sheet or the copperplate rolling;Connection hangs slot (53) width and intercepts water compared with first Plate (52) is thick;The both ends for hanging slot connecting rod (84) pass through connection flexural pivot (85) respectively and connection hangs slot (53) and rigid hanger (54) even It connects;Setting controller perturbation bar (97) between slot (53) is hung in the opposite connection of mirror image;Second intercepts water plate (58) and auxiliary positioning pipe (55) it is connected by screw;Third intercepts water plate (60) plane in circular ring shape, and circumferentially water proof side plate (86) are arranged in outside;? Plate top connecting plate (87) and board bottom connecting plate (88) is respectively set in three upper and lower surfaces for intercepting water plate (60) intermediate gaps, and Setting infiltration connecting hole (89) on plate top connecting plate (87);It is cut in plate top connecting plate (87), board bottom connecting plate (88) and third Intumescent filler body (90) are set in the cavity that water plate (60) encloses;Intumescent filler body (90) using water-swellable waterglass or Cement;Prestressing force pressing plate (62) is connect with pier top crossbeam (91) by pressurization bolt (92), and can be controlled by pressurization bolt (92) The position of prestressing force pressing plate (62) processed;It is connected between pier top crossbeam (91) and the periphery soil body (3) by connecting anchor pier (64), and is added Press bolt (92) connection.
9. a kind of foundation pit Dewatering by pressure reduction system, which is characterized in that by any foundation pit Dewatering by pressure reduction body of claims 1 to 8 The construction method of system constructs to obtain.
CN201910693491.5A 2019-07-30 2019-07-30 Foundation pit pressure reduction dewatering system and construction method Active CN110331732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910693491.5A CN110331732B (en) 2019-07-30 2019-07-30 Foundation pit pressure reduction dewatering system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910693491.5A CN110331732B (en) 2019-07-30 2019-07-30 Foundation pit pressure reduction dewatering system and construction method

Publications (2)

Publication Number Publication Date
CN110331732A true CN110331732A (en) 2019-10-15
CN110331732B CN110331732B (en) 2020-11-10

Family

ID=68148079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910693491.5A Active CN110331732B (en) 2019-07-30 2019-07-30 Foundation pit pressure reduction dewatering system and construction method

Country Status (1)

Country Link
CN (1) CN110331732B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148884A (en) * 2007-10-30 2008-03-26 山东天齐置业集团股份有限公司 Waterproof and plugging construction method for precipitation well in foundation pit
CN101761087A (en) * 2009-12-29 2010-06-30 中国建筑第二工程局有限公司 Rapid low-cost water level lowering well sealing device and construction method thereof
CN103343543A (en) * 2013-07-09 2013-10-09 中国一冶集团有限公司 Foundation pit dewatering well pressure-reduction-type plugging method
CN103866778A (en) * 2012-12-10 2014-06-18 贵阳铝镁设计研究院有限公司 Soft soil foundation deep foundation pit dewatering treatment method and structure
CN106400822A (en) * 2016-09-23 2017-02-15 山东金城建设有限公司 Construction method for shutting deep foundation pit precipitation well
CN206581279U (en) * 2017-03-13 2017-10-24 青岛建设集团有限公司 A kind of foundation ditch pressure release type dewatering well and its plugging structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148884A (en) * 2007-10-30 2008-03-26 山东天齐置业集团股份有限公司 Waterproof and plugging construction method for precipitation well in foundation pit
CN101761087A (en) * 2009-12-29 2010-06-30 中国建筑第二工程局有限公司 Rapid low-cost water level lowering well sealing device and construction method thereof
CN103866778A (en) * 2012-12-10 2014-06-18 贵阳铝镁设计研究院有限公司 Soft soil foundation deep foundation pit dewatering treatment method and structure
CN103343543A (en) * 2013-07-09 2013-10-09 中国一冶集团有限公司 Foundation pit dewatering well pressure-reduction-type plugging method
CN106400822A (en) * 2016-09-23 2017-02-15 山东金城建设有限公司 Construction method for shutting deep foundation pit precipitation well
CN206581279U (en) * 2017-03-13 2017-10-24 青岛建设集团有限公司 A kind of foundation ditch pressure release type dewatering well and its plugging structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system
CN110804948B (en) * 2019-10-31 2021-05-11 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system

Also Published As

Publication number Publication date
CN110331732B (en) 2020-11-10

Similar Documents

Publication Publication Date Title
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN109538295B (en) Underground reservoir system for sealed mining area
CN206706791U (en) Base pit dewatering well plugging structure
CN110185119A (en) Rain sewage pipe Combined type interface and construction method
CN205714215U (en) Tunnel-liner decompression section of jurisdiction and pipe-plate lining structure
CN203462463U (en) Construction device of pile-peripheral cemented-soil cast-in-situ stiffening core pile
CN110331732A (en) Foundation pit Dewatering by pressure reduction system and construction method
CN102367735B (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN204152530U (en) Water burst tunnel tunnel face seepproof screen
CN212506349U (en) Water-logging well sealing device for water-lowering zone of ultra-deep foundation pit pipe well
CN109137986A (en) Urban road inspection shaft walling crib green promotes reinforced construction method
CN116733022A (en) Waterproof structure of underground diaphragm wall and construction method thereof
CN216892566U (en) Underground utility tunnel movement joint leak stoppage structure
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
CN206189430U (en) A escape canal for deep overburden ground
CN212223899U (en) Strong permeable stratum bottom sealing concrete separate-bin pouring structure
CN108547286A (en) A kind of prefabricated guide groove structure of concrete cut and guide groove installation method
CN209687506U (en) Wear river shallow buried covered excavation electric power tunnel constructing structure
CN211547782U (en) Pipe well sealing device for high-pressure water head of sand layer deep foundation pit
CN107816059A (en) Sunk type basement constructs
CN207314371U (en) Use the foundation trench structure of cylinder caisson
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method
CN207111174U (en) A kind of built-in pump room structure of shield tunnel
CN112227395A (en) Well sealing device and method for large-water-pressure-drop well in building raft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant