CN103343543A - Foundation pit dewatering well pressure-reduction-type plugging method - Google Patents

Foundation pit dewatering well pressure-reduction-type plugging method Download PDF

Info

Publication number
CN103343543A
CN103343543A CN2013102860455A CN201310286045A CN103343543A CN 103343543 A CN103343543 A CN 103343543A CN 2013102860455 A CN2013102860455 A CN 2013102860455A CN 201310286045 A CN201310286045 A CN 201310286045A CN 103343543 A CN103343543 A CN 103343543A
Authority
CN
China
Prior art keywords
well
well casing
floral tube
water
precipitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102860455A
Other languages
Chinese (zh)
Other versions
CN103343543B (en
Inventor
黎明中
王健
罗劲
吴宗庆
吴林华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201310286045.5A priority Critical patent/CN103343543B/en
Publication of CN103343543A publication Critical patent/CN103343543A/en
Application granted granted Critical
Publication of CN103343543B publication Critical patent/CN103343543B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention provides a foundation pit dewatering well pressure-reduction-type plugging method. The method comprises the following steps that (1) at least one water stop ring is arranged on the outer wall of a dewatering well pipe; (2) bottom plate concrete is poured on the outer wall of the well pipe; (3) after the bottom plate concrete of a basement reaches certain strength, unnecessary well pipes on the surface of a bottom plate are cut off, and a drainage floral tube is inserted in the lower portion of a well pipe; (4) when the well is plugged, a water pump in the dewatering well pipe is lifted out, a drainage pump is started to drain water, and well plugging materials are then filled in the dewatering pipe sequentially; (5) the drainage pump stops working, and a small amount of gushing water flows out of the floral tube by itself; (6) a mud jacking pump is started to press curing agents in the dewatering well pipe; (7) the opening of the well pipe is plugged through a cover plate, the periphery of the well pipe is plugged through high-strength concrete, and dewatering well plugging is finished. The foundation pit dewatering well pressure-reduction-type plugging method is particularly suitable for engineering such as a basement which is high in underground water level, large in the amount of gushing water and high in water-proof requirements, very wide in application range, high in construction efficiency, convenient to operate and good in water plugging effect, and ensures that a later-period is hardly affected.

Description

A kind of foundation pit dewatering well decompression type method for blocking
Technical field
The present invention relates to the foundation pit construction in the structure foundation Foundation Design, relate in particular to a kind of foundation pit dewatering well decompression type method for blocking.
Background technology
At present, the super dark foundation ditch of some super larges has underground water and rivers water system and contacts abundant, precipitation well kick and go into characteristics such as the water yield is big, speed is fast, and shutoff is bad very easily to produce piping or quicksand at the place, well point, and foundation ditch is produced destructive harm.And existing precipitation well method for blocking is generally pushed down underground water burst head by the mode of medium coarse sand, clay ball, dry cement back pressure, be difficult to guarantee under sole plate keeps dry the prerequisite of environment, carry out shutoff, big at groundwater run off, shove fireballing area then difficulty finish shut-in well.
Prior art is generally determined different method for blocking according to the size of groundwater run off, and underground water hour can be after the foundation pad construction, a shutoff part before the construction of waterproof layer, the part of shutoff remainder again during the sole plate concreting.When the underground water yield was big, then continuous pumpage when the sole plate concreting can be selected different method for blocking at this moment as the case may be.Method for blocking commonly used at present is after underplate concrete has been constructed, suction pump in the precipitation well is proposed, rapid back-filling in layers medium coarse sand, clay ball etc., underground flood peak is pushed down, after the unnecessary well casing that and then will be higher than base plate cuts off, with dry cement back pressure well casing, use steel plate soldering and sealing well casing again, and adopt high-strength grout to be filled to the base plate face.Complicated loaded down with trivial details, the length that expends time in this method practical operation, particularly for the groundwater table height, the amount of gushing is big, the fireballing Project Realization plugging effect that shoves is bad, the later stage, this place's base plate often had seepage problem to handle.
Under such hydrogeological conditions, must create the shut-in well of finishing that a kind of distinctive shutoff way guarantees precipitation well high-quality and high-efficiency.
Summary of the invention
The technical problem to be solved in the present invention is: a kind of foundation pit dewatering well decompression type method for blocking of finishing shut-in well that can guarantee precipitation well high-quality and high-efficiency is provided.
The present invention solves the problems of the technologies described above the technical scheme of taking to be:
A kind of foundation pit dewatering well decompression type method for blocking is characterized in that it may further comprise the steps:
1) at precipitation well well casing outer wall at least one seal ring is set, described well casing is fixed;
2) at described well casing outer wall bottom board concrete;
3) treat that the basement bottom board concrete reaches intensity after, cut off unnecessary well casing on the backplate surface, and insert a drainage floral tube to the well casing bottom, offer a plurality of through holes on the bottom sidewall of described drainage floral tube, the top of described drainage floral tube communicates with aqueduct, described aqueduct is connected with drainage pump, and the top of described drainage floral tube is provided with stop valve;
4) treat that concrete strength reaches more than 70% and foundation ditch internal construction construction is satisfied and begun shut-in well when stopping precipitation condition, suction pump in the precipitation well well casing is proposed, start described drainage pump draining, the material of will shunting in a well is again inserted successively to precipitation well well casing, then the base plate bottom is filled up with dry cement and pea gravel concreten successively to well casing mouth of pipe position;
5) water yield in well casing more and more hour can stop drainage pump work, allows a spot of water burst flow out voluntarily from floral tube;
6) start mudjack curing compound is pressed in the precipitation well well casing by described drainage floral tube, curing compound is infiltrated in the fill material to the precipitation well, make this place's well head not have till the infiltration;
7) cut off at the position of the drainage floral tube being exposed backplate surface, with cover plate the well casing mouth is shut, and uses around the high-strength concrete shutoff well casing again, so far finishes the shutoff of precipitation well.
In the such scheme, the shut-in well material in the described step 4) insert order for inserting thick material earlier, insert thin material again, insert clay ball then bottom the base plate.
Compared with prior art, the technique effect obtained of the present invention is:
1, the present invention adopts special-purpose precipitation well plugging device, can effectively remain on the construction of shunting in a well under the drying condition.
2, the present invention is not only applicable to the construction of general underground structure, is specially adapted to groundwater table height, water yield is big, water proofing property is had relatively high expectations engineerings such as basement, and range of application is very extensive.
3, compare with shut-in well mode in the past, the efficiency of construction height, easy to operate, water sealing effect is good, and the later stage influence is little.
Description of drawings
The structural representation of the foundation pit dewatering well decompression type plugging device that Fig. 1 provides for the embodiment of the invention.
Fig. 2 is the sectional view of the cover plate among Fig. 1.
Fig. 3 is the vertical view of the cover plate among Fig. 1.
Fig. 4 is the process schematic diagram of the foundation pit dewatering well decompression type method for blocking that provides of the embodiment of the invention.
Fig. 5 is the process schematic diagram of the foundation pit dewatering well decompression type method for blocking that provides of the embodiment of the invention.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples, and certain following embodiment should not be construed as limitation of the present invention.
Precipitation well well casing in the present embodiment is steel pipe.
As shown in Figure 1 to Figure 3, a kind of foundation pit dewatering well decompression type plugging device that it provides for present embodiment, it comprises drainage floral tube 1, the aqueduct 2 that communicates with drainage floral tube 1 top, the cover plate 3 that is sheathed on drainage floral tube 1 outer wall.The top of drainage floral tube 1 is provided with stop valve 4.Offer a plurality of through holes 5 on the bottom sidewall of drainage floral tube 1.Drainage floral tube 1 is inserted into precipitation well well casing bottom.Cover plate 3 is used for shutoff precipitation Jing Jingguankou.In the present embodiment, this plugging device also comprises drainage pump 11 or the mudjack 12 that links to each other with aqueduct 2.
To shown in Figure 5, the present invention also provides a kind of foundation pit dewatering well decompression type method for blocking as Fig. 4, and it may further comprise the steps:
1) at two seal ring 8 of precipitation well well casing 6 outer walls welding, reinforcing bar and the steel well casing 6 of base arrangement colligation are overlapped, and around well casing 6, reserve a groove 9, as the operating space of well casing shutoff, when underplate concrete is built well casing 6 outer walls are shut;
2) at described well casing 6 outer wall bottom board concrete sevens;
3) treat that the basement bottom board concrete seven reaches intensity after, cut off the above unnecessary well casing in groove 9 bottom surfaces, and insert a drainage floral tube 1 to well casing 6 bottoms, offer a plurality of through holes 5 on the bottom sidewall of drainage floral tube 1, the top of drainage floral tube 1 communicates with aqueduct 2.The top of drainage floral tube 1 is provided with stop valve 4;
4) treat that concrete strength reaches more than 70% and foundation ditch internal construction construction is satisfied and begun shut-in well when stopping precipitation condition, suction pump (not shown) in the precipitation well well casing 6 is proposed, starting described drainage pump 11(uses when the water yield is big) draining, the water of swarming in the pipe is in time drained, the material of will shunting in a well is again inserted successively to precipitation well well casing, insert thick material 13 earlier, insert thin material 14 again, insert the clay ball 15 of 2 meters left and right thicknesses subsequently to base plate 7 bottoms, insert pea gravel concreten 17 again after at last base plate 7 bottoms to the mouth of pipe being inserted dry cement 16 earlier;
5) water yield in well casing more and more hour can stop drainage pump 11 work, allows a spot of water burst flow out voluntarily from drainage floral tube 1;
6) close the stop valve 4 on drainage floral tube 1 top, aqueduct 2 is inserted mudjacks 12.Open stop valve, can start mudjack 12 is pressed into curing compound such as cement grout, water glass liquid in the precipitation well well casing 6 by drainage floral tube 1, curing compound is penetrated in the material slit of filling in the precipitation well, to reach the closely knit effect of shut-in well, guarantee the water resistance of underground structure;
7) cut off at the position 18 of drainage floral tube 1 being exposed bottom plate groove ground, and the consolidation liquid at cleaning mouth of pipe place is used the cover plate 3 with well casing corresponding specification size, and the welding of well casing mouth is shut.With the bottom plate groove of reserving around the high-strength concrete 19 shutoff well casings 9, so far finish the shutoff (as shown in Figure 5) of steel well casing precipitation well again.
Need to prove that those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement technical scheme of the present invention, and do not break away from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (2)

1. foundation pit dewatering well decompression type method for blocking is characterized in that it may further comprise the steps:
1) at precipitation well well casing outer wall at least one seal ring is set, described well casing is fixed;
2) at described well casing outer wall bottom board concrete;
3) treat that the basement bottom board concrete reaches intensity after, cut off unnecessary well casing on the backplate surface, and insert a drainage floral tube to the well casing bottom, offer a plurality of through holes on the bottom sidewall of described drainage floral tube, the top of described drainage floral tube communicates with aqueduct, described aqueduct is connected with drainage pump, and the top of described drainage floral tube is provided with stop valve;
4) treat that concrete strength reaches more than 70% and foundation ditch internal construction construction is satisfied and begun shut-in well when stopping precipitation condition, suction pump in the precipitation well well casing is proposed, start described drainage pump draining, the material of will shunting in a well is again inserted successively to precipitation well well casing, then the base plate bottom is filled up with dry cement and pea gravel concreten successively to well casing mouth of pipe position;
5) water yield in well casing more and more hour can stop drainage pump work, allows a spot of water burst flow out voluntarily from floral tube;
6) start mudjack curing compound is pressed in the precipitation well well casing by described drainage floral tube, curing compound is infiltrated in the fill material to the precipitation well;
7) cut off at the position of the drainage floral tube being exposed backplate surface, with cover plate the well casing mouth is shut, and uses around the high-strength concrete shutoff well casing again, so far finishes the shutoff of precipitation well.
2. method for blocking as claimed in claim 1 is characterized in that, the shut-in well material in the described step 4) insert order for inserting thick material earlier, insert thin material again, insert clay ball then bottom the base plate.
CN201310286045.5A 2013-07-09 2013-07-09 Foundation pit dewatering well pressure-reduction-type plugging method Active CN103343543B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310286045.5A CN103343543B (en) 2013-07-09 2013-07-09 Foundation pit dewatering well pressure-reduction-type plugging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310286045.5A CN103343543B (en) 2013-07-09 2013-07-09 Foundation pit dewatering well pressure-reduction-type plugging method

Publications (2)

Publication Number Publication Date
CN103343543A true CN103343543A (en) 2013-10-09
CN103343543B CN103343543B (en) 2015-06-24

Family

ID=49278368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310286045.5A Active CN103343543B (en) 2013-07-09 2013-07-09 Foundation pit dewatering well pressure-reduction-type plugging method

Country Status (1)

Country Link
CN (1) CN103343543B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334443A (en) * 2013-06-27 2013-10-02 中建七局安装工程有限公司 Mud cement pebble layer composite geological impacting hole forming dewatering well construction method
CN103526766A (en) * 2013-10-12 2014-01-22 中建八局第三建设有限公司 Method for plugging relief well of deep foundation pit
CN103967028A (en) * 2014-05-27 2014-08-06 江苏南通三建集团有限公司 Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN104631477A (en) * 2014-12-23 2015-05-20 中建四局第六建筑工程有限公司 Device installing and plugging method for lowering water in foundation pit
CN104711994A (en) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 Foundation pit deep well rainfall and plugging construction method
CN105178342A (en) * 2015-08-10 2015-12-23 中建八局第三建设有限公司 Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN105625482A (en) * 2016-03-21 2016-06-01 上海长凯岩土工程有限公司 Hole arrangement way for foundation slab of underground construction and application thereof
CN105735331A (en) * 2016-03-21 2016-07-06 上海长凯岩土工程有限公司 Grouting reinforcement construction method for underground engineering
CN105780792A (en) * 2016-04-12 2016-07-20 中南勘察设计院(湖北)有限责任公司 Well plugging method and well plugging structure of high water head relief dewatering well in foundation pit
CN105804124A (en) * 2016-03-21 2016-07-27 上海长凯岩土工程有限公司 Sudden-surging-prevention water pressure control method used for underground engineering
CN106013265A (en) * 2016-07-15 2016-10-12 宁波建工工程集团有限公司 Emergency basement anti-floating structure and construction method thereof
CN106677198A (en) * 2017-01-20 2017-05-17 上海长凯岩土工程有限公司 Well plugging method under dynamic water level state
CN106812117A (en) * 2017-03-16 2017-06-09 中国水电建设集团十五工程局有限公司 Dam reverse drainage plugging device and method
CN109882113A (en) * 2019-03-07 2019-06-14 东北大学 A kind of plugging dewatering well structure and its construction method
CN109930614A (en) * 2019-04-12 2019-06-25 中亿丰建设集团股份有限公司 Deep basal pit pipe well runs the not damaged construction method of closed bottom structure
CN110258660A (en) * 2019-06-18 2019-09-20 广东龙越建筑工程有限公司 The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating
CN110318409A (en) * 2019-06-27 2019-10-11 联建建设工程有限公司 A kind of deep basal pit artesian water is prominent to gush decompressor
CN110331732A (en) * 2019-07-30 2019-10-15 杭州江润科技有限公司 Foundation pit Dewatering by pressure reduction system and construction method
CN110925018A (en) * 2019-12-02 2020-03-27 河南科技大学 Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN113216198A (en) * 2021-06-02 2021-08-06 上海兴怡基础工程有限公司 Well sealing method for relief well of foundation pit large bottom plate
CN113969597A (en) * 2020-07-23 2022-01-25 万堡营造股份有限公司 Pressure reducing pipe and water level balance pressure reducing structure for preventing water leakage of basement of building
CN114482105A (en) * 2022-03-18 2022-05-13 中铁一局集团有限公司 Construction method for plugging dewatering well group with strong pressure water after ultra-deep subway station is sealed

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007012340A1 (en) * 2005-07-26 2007-02-01 Edi Exploration Drilling International Gmbh Sealing material used for building wells and filling underground hollow spaces, especially deep boreholes
CN201172828Y (en) * 2008-03-19 2008-12-31 山西第六建筑有限公司 Well-covering device for dewatering well
CN202047416U (en) * 2011-03-15 2011-11-23 北京中关村开发建设股份有限公司 Well sealing device of pressure-reducing and dewatering well at elevator well pit
CN202809629U (en) * 2012-08-29 2013-03-20 上海长凯岩土工程有限公司 Pressure-reduction and dewatering supplementary well completion structure in disturbance stratum inside foundation pit
CN202809665U (en) * 2012-07-02 2013-03-20 上海长凯岩土工程有限公司 Blocking device for relief well of micro artesian water in foundation pit
CN202925558U (en) * 2012-07-31 2013-05-08 中天建设集团有限公司天津分公司 Enclosed structure of dewatering well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007012340A1 (en) * 2005-07-26 2007-02-01 Edi Exploration Drilling International Gmbh Sealing material used for building wells and filling underground hollow spaces, especially deep boreholes
CN201172828Y (en) * 2008-03-19 2008-12-31 山西第六建筑有限公司 Well-covering device for dewatering well
CN202047416U (en) * 2011-03-15 2011-11-23 北京中关村开发建设股份有限公司 Well sealing device of pressure-reducing and dewatering well at elevator well pit
CN202809665U (en) * 2012-07-02 2013-03-20 上海长凯岩土工程有限公司 Blocking device for relief well of micro artesian water in foundation pit
CN202925558U (en) * 2012-07-31 2013-05-08 中天建设集团有限公司天津分公司 Enclosed structure of dewatering well
CN202809629U (en) * 2012-08-29 2013-03-20 上海长凯岩土工程有限公司 Pressure-reduction and dewatering supplementary well completion structure in disturbance stratum inside foundation pit

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334443A (en) * 2013-06-27 2013-10-02 中建七局安装工程有限公司 Mud cement pebble layer composite geological impacting hole forming dewatering well construction method
CN103526766A (en) * 2013-10-12 2014-01-22 中建八局第三建设有限公司 Method for plugging relief well of deep foundation pit
CN103526766B (en) * 2013-10-12 2015-06-03 中建八局第三建设有限公司 Method for plugging relief well of deep foundation pit
CN103967028A (en) * 2014-05-27 2014-08-06 江苏南通三建集团有限公司 Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN104631477A (en) * 2014-12-23 2015-05-20 中建四局第六建筑工程有限公司 Device installing and plugging method for lowering water in foundation pit
CN104711994A (en) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 Foundation pit deep well rainfall and plugging construction method
CN105178342B (en) * 2015-08-10 2017-03-22 中建八局第三建设有限公司 Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN105178342A (en) * 2015-08-10 2015-12-23 中建八局第三建设有限公司 Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN105625482A (en) * 2016-03-21 2016-06-01 上海长凯岩土工程有限公司 Hole arrangement way for foundation slab of underground construction and application thereof
CN105735331A (en) * 2016-03-21 2016-07-06 上海长凯岩土工程有限公司 Grouting reinforcement construction method for underground engineering
CN105804124A (en) * 2016-03-21 2016-07-27 上海长凯岩土工程有限公司 Sudden-surging-prevention water pressure control method used for underground engineering
CN105804124B (en) * 2016-03-21 2018-02-23 上海长凯岩土工程有限公司 Underground engineering gushes hydraulic pressure control method with protrusion-dispelling
CN105625482B (en) * 2016-03-21 2017-11-21 上海长凯岩土工程有限公司 Pattern and its application on underground engineering sole plate
CN105735331B (en) * 2016-03-21 2018-02-23 上海长凯岩土工程有限公司 A kind of underground engineering construction method for grouting reinforcement
CN105780792A (en) * 2016-04-12 2016-07-20 中南勘察设计院(湖北)有限责任公司 Well plugging method and well plugging structure of high water head relief dewatering well in foundation pit
CN106013265A (en) * 2016-07-15 2016-10-12 宁波建工工程集团有限公司 Emergency basement anti-floating structure and construction method thereof
CN106677198A (en) * 2017-01-20 2017-05-17 上海长凯岩土工程有限公司 Well plugging method under dynamic water level state
CN106812117A (en) * 2017-03-16 2017-06-09 中国水电建设集团十五工程局有限公司 Dam reverse drainage plugging device and method
CN109882113B (en) * 2019-03-07 2020-12-01 东北大学 Construction method of dewatering well plugging structure
CN109882113A (en) * 2019-03-07 2019-06-14 东北大学 A kind of plugging dewatering well structure and its construction method
CN109930614A (en) * 2019-04-12 2019-06-25 中亿丰建设集团股份有限公司 Deep basal pit pipe well runs the not damaged construction method of closed bottom structure
CN109930614B (en) * 2019-04-12 2024-05-17 中亿丰建设集团股份有限公司 Nondestructive construction method for deep foundation pit tube well operation closed bottom plate structure
CN110258660A (en) * 2019-06-18 2019-09-20 广东龙越建筑工程有限公司 The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating
CN110318409A (en) * 2019-06-27 2019-10-11 联建建设工程有限公司 A kind of deep basal pit artesian water is prominent to gush decompressor
CN110318409B (en) * 2019-06-27 2021-04-06 联建建设工程有限公司 Deep basal pit confined water gushes pressure relief device suddenly
CN110331732A (en) * 2019-07-30 2019-10-15 杭州江润科技有限公司 Foundation pit Dewatering by pressure reduction system and construction method
CN110925018A (en) * 2019-12-02 2020-03-27 河南科技大学 Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN113969597A (en) * 2020-07-23 2022-01-25 万堡营造股份有限公司 Pressure reducing pipe and water level balance pressure reducing structure for preventing water leakage of basement of building
CN113216198A (en) * 2021-06-02 2021-08-06 上海兴怡基础工程有限公司 Well sealing method for relief well of foundation pit large bottom plate
CN114482105A (en) * 2022-03-18 2022-05-13 中铁一局集团有限公司 Construction method for plugging dewatering well group with strong pressure water after ultra-deep subway station is sealed
CN114482105B (en) * 2022-03-18 2024-04-16 中铁一局集团有限公司 Precipitation well group plugging construction method with strong pressurized water after ultra-deep subway station is closed

Also Published As

Publication number Publication date
CN103343543B (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN103334444B (en) A kind of method for blocking of foundation pit dewatering well pressure release type
CN203429649U (en) Pressure reducing type blocking device of foundation pit dewatering well
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN100547178C (en) Bridge foundation construction method in the water
CN202450536U (en) Shallow dewatering and plugging construction device in foundation pit
CN202047416U (en) Well sealing device of pressure-reducing and dewatering well at elevator well pit
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN205077461U (en) Absorption basin protects anti - drainage structures of straining of smooth bottom plate
CN204530732U (en) A kind of structure of the precipitation based on basement elevator shaft plash
CN101713197A (en) Method for sealing foundation pit pressure reduction well
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN103498486B (en) A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well
CN203530996U (en) Multi-well-point combined type precipitation facility
CN106320353A (en) Basement construction dewatering and drainage device and construction method thereof
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN113957913A (en) Construction method of film bag sand filling combined steel sheet pile cofferdam
CN103061351B (en) Prevent the device that basement bottom board swells, seeps water
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN103174154A (en) Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device
CN104060622A (en) Method for discharging water in pint through steel bucket in pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant