CN205077461U - Absorption basin protects anti - drainage structures of straining of smooth bottom plate - Google Patents

Absorption basin protects anti - drainage structures of straining of smooth bottom plate Download PDF

Info

Publication number
CN205077461U
CN205077461U CN201520822297.XU CN201520822297U CN205077461U CN 205077461 U CN205077461 U CN 205077461U CN 201520822297 U CN201520822297 U CN 201520822297U CN 205077461 U CN205077461 U CN 205077461U
Authority
CN
China
Prior art keywords
concrete
layer
absorption basin
pervious concrete
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520822297.XU
Other languages
Chinese (zh)
Inventor
王�锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201520822297.XU priority Critical patent/CN205077461U/en
Application granted granted Critical
Publication of CN205077461U publication Critical patent/CN205077461U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to an absorption basin protects anti - drainage structures of straining of smooth bottom plate is applicable to hydraulic and hydroelectric engineering. The utility model discloses a basis overburden, the upper surface of basic overburden is equipped with the concrete layer that permeates water. The utility model discloses the utilization is permeated water concrete layer and is replaced loaded filter and wash port, has both reliably realized the anti - drainage function of straining, makes the concrete strength property that permeates water effectively exert again, has simplified the construction process and the degree of difficulty of being under construction, has improved construction quality. The concrete layer upper surface that permeates water still can set up the concrete supporting course as required, the layer is ground to anti the dashing of concrete for absorption basin protects smooth bottom plate and has better intensity, can adopt the prefabricated concrete column that permeates water to replace the wash port simultaneously, and feasible construction is more simple and convenient, and is efficient, can not block up, and intensity is higher, and it is favourable to wear -resistant to the bottom plate.

Description

Absorption basin protection-apron base plate anti-filter discharge structure
Technical field
The utility model relates to a kind of absorption basin protection-apron base plate anti-filter discharge structure, is applicable to Hydraulic and Hydro-Power Engineering.
Background technology
In hydroelectric project, for reducing absorption basin protection-apron uplift pressure, needing to arrange draining at absorption basin protection-apron base plate, meanwhile, in order to avoid covering layer generation seepage failure in basis during draining, also needing to arrange loaded filter under absorption basin protection-apron base plate.Usual way arranges one deck loaded filter bottom absorption basin protection-apron base plate, then on absorption basin protection-apron base plate, arranges vertical drainage hole, in hole can filled plastics gutter in case drain hole blocking.Loaded filter is generally the grit material according to the preparation of design grating, and under needing during absorption basin protection-apron construction of bottom plates, dig certain depth, basis often exists infiltration, and this brings difficulty to loaded filter construction, and quality also not easily ensures.In addition, on base plate vertical drainage hole mostly be the later stage boring or bottom slab concreting before pipe laying, build front pipe laying due to underplate concrete and there is vertical built-in pipe both fixing difficulties, affect again concrete warehousing, pave, vibrate, therefore many employing later stage boring, and later stage drillman work amount is large, especially thicker (the 3m of base plate, even more than 3m) time, also likely block reinforcing bar, unfavorable to structure stress.
Utility model content
Technical problem to be solved in the utility model is: the absorption basin protection-apron base plate anti-filter discharge structure providing a kind of easy construction, does not affect by infiltration, can ensure construction quality simultaneously.
The technical scheme adopted for solving the problems of the technologies described above the utility model is: absorption basin protection-apron base plate anti-filter discharge structure, comprise basic covering layer, basic tectal upper surface is provided with pervious concrete layer.
Further: the upper surface of pervious concrete layer is provided with concrete anti-abrasion layer, and concrete anti-abrasion layer is provided with drain hole.
Further: the upper surface of pervious concrete layer is provided with concrete anti-abrasion layer, in pervious concrete layer, be provided with prefabricated pervious concrete post, and make the outer end of prefabricated pervious concrete post through concrete anti-abrasion layer.
Further: the upper surface of pervious concrete layer is provided with concrete bearing stratum, concrete anti-abrasion layer outward successively by interior, and concrete bearing stratum, concrete anti-abrasion layer are provided with the drain hole be connected.
Further: the upper surface of pervious concrete layer is provided with concrete bearing stratum, concrete anti-abrasion layer outward successively by interior, be provided with prefabricated pervious concrete post in pervious concrete layer, and make the outer end of prefabricated pervious concrete post through concrete bearing stratum, concrete anti-abrasion layer.
The beneficial effects of the utility model are: utilize pervious concrete layer to replace loaded filter of the prior art and drain hole, both anti-filter drain function of the prior art had reliably been achieved, pervious concrete strength characteristics is made again effectively to play, simplify working procedure and difficulty of construction, improve construction quality.
Accompanying drawing explanation
Fig. 1 is structural representation one of the present utility model;
Fig. 2 is structural representation two of the present utility model;
Fig. 3 is structural representation three of the present utility model;
Mark in figure: 1-basis covering layer, 2-pervious concrete layer, 3-concrete anti-abrasion layer, the prefabricated pervious concrete post of 4-, 5-concrete bearing stratum, 6-drain hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, Figure 2, Figure 3 shows, the utility model comprises basic covering layer 1, and the upper surface of basic covering layer 1 is provided with pervious concrete layer 2.
Rational pervious concrete water permeability and intensity can be selected as required during enforcement, determine suitable concrete grit level parameter.Seep water construct in foundation ditch time, pervious concrete construction is relative to anti-filter grit material decking and rolling, and easier, the workmanship of constructing easily ensures.Meanwhile, pervious concrete has general concrete intensity, and allow leakage slope to be far longer than grit filter material, infiltration safety is more secure.The utility model utilizes pervious concrete layer to replace loaded filter of the prior art and drain hole, both anti-filter drain function of the prior art had reliably been achieved, make again pervious concrete strength characteristics effectively play, simplify working procedure and difficulty of construction, improve construction quality.
Preferably, the upper surface of pervious concrete layer 2 is provided with concrete anti-abrasion layer 3, and concrete anti-abrasion layer 3 is provided with drain hole 6.Pervious concrete intensity is generally C15 ~ C30, when resistant abrasion requires higher, can arrange concrete anti-abrasion layer 3 at the upper surface of pervious concrete layer 2.Drain hole 6 is preferably vertical setting.
Preferably, the upper surface of pervious concrete layer 2 is provided with concrete anti-abrasion layer 3, is provided with prefabricated pervious concrete post 4 in pervious concrete layer 2, and makes the outer end of prefabricated pervious concrete post 4 through concrete anti-abrasion layer 3.Adopt prefabricated pervious concrete post 4 alternative drain hole 6, construct easier, efficiency is high, can not block, and intensity is higher simultaneously, wear-resistant favourable to base plate.Prefabricated pervious concrete post 4 is preferably vertical setting.
Preferably, the upper surface of pervious concrete layer 2 is provided with concrete bearing stratum 5, concrete anti-abrasion layer 3 outward successively by interior, and concrete bearing stratum 5, concrete anti-abrasion layer 3 are provided with the drain hole be connected.Concrete bearing stratum 5, concrete anti-abrasion layer 3 are set simultaneously, make absorption basin protection-apron base plate have better intensity.
Preferably, the upper surface of pervious concrete layer 2 is provided with concrete bearing stratum 5, concrete anti-abrasion layer 3 outward successively by interior, be provided with prefabricated pervious concrete post 4 in pervious concrete layer 2, and make the outer end of prefabricated pervious concrete post 4 through concrete bearing stratum 5, concrete anti-abrasion layer 3.Adopt prefabricated pervious concrete post 4 alternative drain hole 6, construct easier, efficiency is high, can not block, and intensity is higher simultaneously, wear-resistant favourable to base plate.Prefabricated pervious concrete post 4 is preferably vertical setting.

Claims (5)

1. absorption basin protection-apron base plate anti-filter discharge structure, comprises basic covering layer (1), it is characterized in that: the upper surface of described basic covering layer (1) is provided with pervious concrete layer (2).
2. absorption basin protection-apron base plate anti-filter discharge structure as claimed in claim 1, it is characterized in that: the upper surface of described pervious concrete layer (2) is provided with concrete anti-abrasion layer (3), described concrete anti-abrasion layer (3) is provided with drain hole (6).
3. absorption basin protection-apron base plate anti-filter discharge structure as claimed in claim 1, it is characterized in that: the upper surface of described pervious concrete layer (2) is provided with concrete anti-abrasion layer (3), be provided with prefabricated pervious concrete post (4) in described pervious concrete layer (2), and make the outer end of prefabricated pervious concrete post (4) through concrete anti-abrasion layer (3).
4. absorption basin protection-apron base plate anti-filter discharge structure as claimed in claim 1, it is characterized in that: the upper surface of described pervious concrete layer (2) is provided with concrete bearing stratum (5), concrete anti-abrasion layer (3) outward successively by interior, and described concrete bearing stratum (5), concrete anti-abrasion layer (3) are provided with the drain hole (6) be connected.
5. absorption basin protection-apron base plate anti-filter discharge structure as claimed in claim 1, it is characterized in that: the upper surface of described pervious concrete layer (2) is provided with concrete bearing stratum (5), concrete anti-abrasion layer (3) outward successively by interior, be provided with prefabricated pervious concrete post (4) in described pervious concrete layer (2), and make the outer end of prefabricated pervious concrete post (4) through concrete bearing stratum (5), concrete anti-abrasion layer (3).
CN201520822297.XU 2015-10-21 2015-10-21 Absorption basin protects anti - drainage structures of straining of smooth bottom plate Active CN205077461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520822297.XU CN205077461U (en) 2015-10-21 2015-10-21 Absorption basin protects anti - drainage structures of straining of smooth bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520822297.XU CN205077461U (en) 2015-10-21 2015-10-21 Absorption basin protects anti - drainage structures of straining of smooth bottom plate

Publications (1)

Publication Number Publication Date
CN205077461U true CN205077461U (en) 2016-03-09

Family

ID=55429876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520822297.XU Active CN205077461U (en) 2015-10-21 2015-10-21 Absorption basin protects anti - drainage structures of straining of smooth bottom plate

Country Status (1)

Country Link
CN (1) CN205077461U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951690A (en) * 2016-06-28 2016-09-21 山东省水利科学研究院 Apron foundation protecting drain body
CN110374068A (en) * 2019-07-24 2019-10-25 广东省水利电力勘测设计研究院 A kind of sluice force reduction pool bottom draining hole construction method preventing blocking
CN111197302A (en) * 2020-01-11 2020-05-26 河南华北水利水电勘察设计有限公司 Energy dissipation structure of water delivery hole
CN111548180A (en) * 2020-05-29 2020-08-18 广东省水利水电科学研究院 Fish nest type organic fiber macroporous concrete retaining wall and construction method thereof
CN111663501A (en) * 2020-05-29 2020-09-15 广东省水利水电科学研究院 Sluice downstream energy dissipation structure with anti-clogging and anti-filtering functions and construction method thereof
CN112144479A (en) * 2020-09-28 2020-12-29 中国电建集团贵阳勘测设计研究院有限公司 Arch-tooth type inverted arch plunge pool and construction method
CN113266043A (en) * 2021-06-09 2021-08-17 广东省水利水电第三工程局有限公司 Bottom sealing method for rock foundation pressure-bearing fracture water

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951690A (en) * 2016-06-28 2016-09-21 山东省水利科学研究院 Apron foundation protecting drain body
CN110374068A (en) * 2019-07-24 2019-10-25 广东省水利电力勘测设计研究院 A kind of sluice force reduction pool bottom draining hole construction method preventing blocking
CN111197302A (en) * 2020-01-11 2020-05-26 河南华北水利水电勘察设计有限公司 Energy dissipation structure of water delivery hole
CN111548180A (en) * 2020-05-29 2020-08-18 广东省水利水电科学研究院 Fish nest type organic fiber macroporous concrete retaining wall and construction method thereof
CN111663501A (en) * 2020-05-29 2020-09-15 广东省水利水电科学研究院 Sluice downstream energy dissipation structure with anti-clogging and anti-filtering functions and construction method thereof
CN112144479A (en) * 2020-09-28 2020-12-29 中国电建集团贵阳勘测设计研究院有限公司 Arch-tooth type inverted arch plunge pool and construction method
CN113266043A (en) * 2021-06-09 2021-08-17 广东省水利水电第三工程局有限公司 Bottom sealing method for rock foundation pressure-bearing fracture water
CN113266043B (en) * 2021-06-09 2022-04-29 广东省水利水电第三工程局有限公司 Bottom sealing method for rock foundation pressure-bearing fracture water

Similar Documents

Publication Publication Date Title
CN205077461U (en) Absorption basin protects anti - drainage structures of straining of smooth bottom plate
CN101768976B (en) Base pit dewatering and water saving device and construction method thereof
CN101096852B (en) Method for anti-floating of underground building
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN103343543A (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN203530996U (en) Multi-well-point combined type precipitation facility
CN111236284A (en) Basement bottom and periphery underground water drainage method and structure
CN110847199A (en) Construction method for drainage of underground water of deep foundation pit
CN201567582U (en) Rainwater saving device of foundation pit
CN103882889A (en) Bottom plate waterproofing system of foundation of building
CN203049630U (en) Building foundation slab waterproof system
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN103061351B (en) Prevent the device that basement bottom board swells, seeps water
CN104196046A (en) Water resisting and draining system for lowering underground anti-floating water level
CN203320576U (en) Waterproof and drainage system for basement external wall of super high-rise buildings
CN110185051A (en) Deep narrow excavation water discharge method
CN203188226U (en) Device used for preventing bottom plate of basement from heave and water leakage
CN214993978U (en) Quick drainage system of deep foundation pit
CN201598645U (en) Advanced water stop post-pouring belt for base soleplate
CN204023593U (en) Reduce the water proof drainage system of underground hydrostatic water table
CN210140780U (en) Anti-clogging ecological permeable box culvert
CN206477347U (en) The water storage structure of basement
CN111962632A (en) Rainwater sewer and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant