CN110306737A - A kind of precast bridge concreting rain-proof constructing device - Google Patents

A kind of precast bridge concreting rain-proof constructing device Download PDF

Info

Publication number
CN110306737A
CN110306737A CN201910616355.6A CN201910616355A CN110306737A CN 110306737 A CN110306737 A CN 110306737A CN 201910616355 A CN201910616355 A CN 201910616355A CN 110306737 A CN110306737 A CN 110306737A
Authority
CN
China
Prior art keywords
rain
rain shade
pulling plate
slot
concreting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910616355.6A
Other languages
Chinese (zh)
Other versions
CN110306737B (en
Inventor
周丽博
张志刚
肖峰
王恬
程玉营
唐鹏杰
赵婷
伦理
马思翀
郑明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910616355.6A priority Critical patent/CN110306737B/en
Publication of CN110306737A publication Critical patent/CN110306737A/en
Application granted granted Critical
Publication of CN110306737B publication Critical patent/CN110306737B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/064Gutters
    • E04D13/072Hanging means
    • E04D13/0722Hanging means extending mainly under the gutter
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Abstract

The present invention provides a kind of precast bridge concreting rain-proof constructing device, including the second pulling plate and rain shade;The top center of the I-shaped support column is connected with connection ring, and tension spring is fixed in connection ring, the two sides lower end of the rain shade is equipped with diversion trench, and the bottom end of diversion trench snaps onto the rain shade card slot at I-shaped support column top both ends, the tension spring of I-shaped support column upper end connection is hooked into the connection ring of rain shade bottom side one end.Assembly is attached to two groups of rain shades by arc clamp structure, it is hooked on using tension spring in the connection ring of rain shade bottom side, rain shade is carried out to socket fixation, two groups of I-shaped support columns can be carried out with assembled connection, it can be spliced according to the width of concreting, to enable the rain shade after assembly and the length and width of concreting to adapt to, rainwater can be flowed out along diversion trench to the both ends of rain-proof structure, and finally carry out rationalizing in example 2 being atomized depositing dust application.

Description

A kind of precast bridge concreting rain-proof constructing device
Technical field
The invention belongs to concreting waterproof technology fields, more specifically, in particular to a kind of precast bridge coagulation Soil pours rain-proof constructing device.
Background technique
Precast concrete is cast elsewhere rather than in last construction site.Different sizes, shape precast concrete all Toughness after its reliability of fiber reinforcement and cracking can be used.In recent years, precast concrete is with its cheap cost, outstanding property Can, become the new lover of construction industry.Numerous patterns, weight add outstanding flexural strength and performance, make it in roadblock, water storage Pond, exterior wall, building and furnishing fields are used widely.
Such as application No. is: in the patent of CN201721890323.8, disclose a kind of concreting rain-proof canopy, including Three row's rain-proof brackets, respectively intermediate rain-proof bracket and two side rain-proof brackets, intermediate rain-proof support height are anti-greater than side Rain support height, is connected with oblique rain-proof bracket between intermediate rain-proof bracket and two sides rain-proof bracket, every row's rain-proof bracket by Several rain-proof carrier units composition, rain-proof carrier unit includes bracket base and bracket frame body, and bracket base is by two transverse directions Transverse steel disposed in parallel and two longitudinal direction longitudinal reinforcements disposed in parallel are welded, and oblique rain-proof bracket includes several oblique To rain-proof carrier unit, oblique rain-proof carrier unit is formed by four steel pipes by reinforcement welding, steel pipe one end and side rain-proof Connection at the top of carrier unit connects at the top of unit, three row's rain-proof brackets and oblique rain-proof bracket between the other end and intermediate rain-proof Upper end is equipped with Tarpauling, has many advantages, such as that structure is simple, easy to install and use, rainproof effect is good.
Currently, the area of concreting is not fixed, when to casting concrete rain-proof, need according to concreting Area changes, and the structure of present concreting rain insensitive device is relatively simple, cannot be according to the length and width of concreting Degree is adjusted, secondly, rainwater is arbitrarily flowed down along rain shade in rain cover structure, water flow easy to form causes concreting Impact.
And after concrete pouring construction, the lime for being largely not easy rapid descent can be formed in rain insensitive device pouring Property the dust or the same dust of cement foam, only landing naturally close to them is not achieved the purpose of quick depositing dust, and by a large amount of Tap water spray injection equipment to the mode of dust depositing dust in rain cover device, waste water source.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of precast bridge concreting rain-proof constructing device, with Solution must not be adjusted according to the length and width of concreting, and rainwater is arbitrarily along rain shade stream in rain cover structure Under, water flow easy to form causes to impact to concreting, and after concrete pouring construction, can pour in rain insensitive device Formation is largely not easy the calcareous dust of rapid descent or the dust that cement foam is the same, only lands close to them naturally and is not achieved The purpose of quick depositing dust, and in such a way that a large amount of tap water spray injection equipment is to dust depositing dust in rain cover device, The problem of wasting water source.
The purpose and effect of precast bridge concreting rain-proof constructing device of the present invention, and can solve above-mentioned background skill Two problems that art is mentioned are allowed them in such a way that two way of example are explained respectively using reasonable particular technique Means are reached:
A kind of precast bridge concreting rain-proof constructing device, including I-shaped support column, lower inserting block, underthrust are loaded Slot, rain shade card slot, connection ring, tension spring, insertion tube, inserting hole, the first pulling plate, fixation hole, bolt, link block, slot, second draws Plate, rain shade, arc connection snap-gauge, diversion trench, water conservancy diversion frame, drip hole, recovery tube, recycling bin, the first drainage seat, high-order notch, Second drainage seat, small pump, jet pipe, bump joint, spray head and pull rod;The both ends of the lower end strut of the I-shaped support column It is respectively equipped with lower inserting block and underthrust is loaded slot, and lower inserting block and the underthrust slot that is loaded can be embedded in, the I-shaped support column Top center is connected with connection ring, and tension spring is fixed in connection ring, and the rain shade is semi-circular cylindrical structure, and rain shade Inside both ends be also respectively equipped with connection ring, the two sides lower end of the rain shade is equipped with diversion trench, and the bottom end of diversion trench In the rain shade card slot for snapping onto I-shaped support column top both ends, the tension spring of I-shaped support column upper end connection is hooked into In the connection ring of rain shade bottom side one end.
From power embodiment one:
Further, the upper end side of the I-shaped support column is additionally provided with insertion tube, and insertion tube is equipped with vertical direction Inserting hole.
Further, one end of first pulling plate is inserted into insertion tube, and on the fixation hole and insertion tube on the first pulling plate Inserting hole be located on same vertical direction.
Further, the upper end of the bolt be square structure and the fixation hole that is inserted on inserting hole and the first pulling plate with And it is pierced by the bottom end of insertion tube and the first pulling plate, insertion tube links together.
Further, it is also connected with connection ring and tension spring on the other end of first pulling plate and is inserted on the inside of link block 1/2 at.
Further, the side of the link block offers slot, and the length of slot is connect block length 1/2.
Further, connection ring and tension spring, and the two of the second pulling plate are also connected separately on the both ends of second pulling plate End is snapped onto link block by slot respectively.
Further, the tension spring on first pulling plate and the second pulling plate to upper hook the rain shade bottom side other end company It connects on ring.
Further, arc connection snap-gauge is connected separately on the internal and external cambered surface of the one end of the rain shade.
From power embodiment two:
Further, the both ends of the outermost two articles of diversion trenches of rain shade can be fixed with screw at adjacent two One drainage seat, and the high-order notch of rectangular slot mouth structure is offered on this first drainage seat.
Further, common also pipe is worn and is welded with V-shaped chute at one on the inside of first drainage seat end at adjacent two The water conservancy diversion frame of structure, and the drip hole of circular through hole structure is offered downwards in their V-shaped groove bottom ends, and is passed through in the bottom end of drip hole A piece recovery tube of welding also hangs drawing and is connected with recycling bin at one.
Further, mutually also solderable close to the end of two diversion trenches of docking on the inside of the rain shade at adjacent two There is the second drainage seat of a quarter bend header structure, and is also equipped with small pump at one on the top surface of the second drainage seat, and The upper hose of small pump realizes that pipeline is connect with the recycling bin at adjacent bottom side position.
Further, at adjacent two the arc inner cavity top surface of the rain shade also to being vertically installed with a pull rod, and Hanging drawing by the upward hanging shape of annular pull ring of these pull rod bottom ends has jet pipe, and is additionally provided in the inner end of jet pipe for making it Lengthen the bump joint of docking.
It further, is in extend out eight shape patterns to have also extended through two rows of atomizers on the bottom side tube wall of the jet pipe, These jet pipes with atomizer are in the pattern being distributed two-by-two, in the arc cover chamber of rain shade.
The present invention is include at least the following beneficial effects:
Embodiment one embody it is following the utility model has the advantages that
Due to rain shade one end arc connect clamp structure, can by arc clamp structure to two groups of rain shades into Row connection is assembled, can be spliced, and rain shade is snapped into rain shade card slot according to the length of concreting, utilize I-shaped Tension spring on type support column, the first pulling plate and the second pulling plate is hooked in the connection ring of rain shade bottom side, is carried out to rain shade Socket fixation.
Secondly as the inserted block and notch at I-shaped support column bottom both ends, therefore can be to two groups of I-shaped supports Column carries out assembled connection, can be spliced according to the width of concreting, to enable the rain shade after assembly and coagulation The length and width that soil pours adapts to.
Secondly as guide trough structure on the two sides of rain shade bottom end, therefore can be along when rainwater drops on rain shade Rain shade is flowed into diversion trench, and can along diversion trench to the both ends of rain cover flow out, rainwater catchment can be made, prevent rainwater from It is arbitrarily flowed down on rain shade and concreting is caused to impact.
In conjunction with the beneficial embodiment of above-described embodiment one, by embodiment two embody it is following the utility model has the advantages that
There is guide trough structure on rain shade bottom end two sides due to illustrating the design in embodiment one, rain can be carried out Water water conservancy diversion simultaneously flows out, exactly because and in example 2, this rainwater diversion slot knot is utilized in this point, the design well Structure, and the head of the left and right ends after they are applied in combination can be used to be respectively mounted the pattern of V-arrangement guide trough structure lead Frame is flowed, can be used to pick up the rainwater picked up in all diversion trenches disclosed in embodiment one, and the rainwater-collecting that will be picked up It is vertically hung to two sides in the collecting vessel at trombone slide, and be mounted with small pump on the diversion seat that diversion trench both ends are installed, by After external existing electrically-controlled component control, the rainwater collected in collecting vessel can be raised up into rain shade on the jet pipe of hung drawing, it can To be formed by air cement or calcareous dust is atomized to after construction in rain shade bottom space region just now Depositing dust enables the rainwater picked up preferably to utilize.
Detailed description of the invention
Fig. 1 to Fig. 9 is the Detailed description of the invention of embodiment one:
Fig. 1 is the structural schematic diagram after of the invention be applied in combination.
Fig. 2 is enlarged structure schematic diagram at A of the invention.
Fig. 3 is that structural schematic diagram is faced upward in side of the invention.
Fig. 4 is enlarged structure schematic diagram at B of the invention.
Fig. 5 is enlarged structure schematic diagram at C of the invention.
Fig. 6 is the structural schematic diagram that rain shade combines after removing in the present invention.
Fig. 7 is the structural schematic diagram in the present invention after rain shade Combinatorial resolution.
Fig. 8 is the structural schematic diagram after the second pull rod is split out out of link block in the present invention.
Fig. 9 is structural schematic diagram of first pull rod after splitting out in insertion tube in the present invention.
Figure 10 to Figure 15 is the Detailed description of the invention of embodiment two:
Figure 10 is the overall structure diagram of embodiment two.
Figure 11 is the partial structural diagram drawn by Figure 10.
Figure 12 is by the schematic diagram at the bottom upward visual angle drawn Figure 10.
Figure 13 is jet pipe distributed architecture schematic diagram when removing the one section of rain shade in front side in implementation column two.
Figure 14 is the partial structural diagram for implementing two.
Figure 15 is the left view planar structure schematic diagram of embodiment two.
In one figure of embodiment, the corresponding relationship of component names and accompanying drawing number are as follows:
1, I-shaped support column;101, lower inserting block;102, underthrust is loaded slot;103, rain shade card slot;2, connection ring;3, Tension spring;4, insertion tube;401, inserting hole;5, the first pulling plate;501, fixation hole;6, bolt;7, link block;701, slot;8, second Pulling plate;9, rain shade;901, arc connects snap-gauge;902, diversion trench.
In two figure of embodiment, the corresponding relationship of component names and accompanying drawing number are as follows:
10, water conservancy diversion frame;1001, drip hole;11, recovery tube;12, recycling bin;13, the first drainage seat;1301, high-order notch; 14, the second drainage seat;15, small pump;16, jet pipe;1601, bump joint;17, spray head;18, pull rod.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for Illustrate the present invention, but cannot be used to limit the scope of the invention.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ", The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
As shown in attached drawing 1 to attached drawing 15:
The present invention provides a kind of precast bridge concreting rain-proof constructing device, including I-shaped support column 1, lower inserting Block 101, underthrust are loaded slot 102, rain shade card slot 103, connection ring 2, tension spring 3, insertion tube 4, inserting hole 401, the first pulling plate 5, Gu Determine hole 501, bolt 6, link block 7, slot 701, the second pulling plate 8, rain shade 9, arc connects snap-gauge 901, and diversion trench 902 is led Frame 10 is flowed, drip hole 1001, recovery tube 11, recycling bin 12, the first drainage seat 13, high-order notch 1301, second drains seat 14, small-sized Water pump 15, jet pipe 16, bump joint 1601, spray head 17 and pull rod 18;The both ends of the lower end strut of the I-shaped support column 1 point Not She You lower inserting block 101 and underthrust be loaded slot 102, and lower inserting block 101 and the underthrust slot 102 that is loaded can be embedded in, the I-shaped The top center of type support column 1 is connected with connection ring 2, and tension spring 3 is fixed in connection ring 2, and the rain shade 9 is semicircular cylinder Shape structure, and the inside both ends of rain shade 9 are also respectively equipped with connection ring 2, the two sides lower end of the rain shade 9 is equipped with diversion trench 902, and the bottom end of diversion trench 902 snaps onto the rain shade card slot 103 at 1 top both ends of I-shaped support column, the work The tension spring 3 of 1 upper end of font support column connection is hooked into the connection ring 2 of 9 bottom side one end of rain shade.
From power embodiment one:
Wherein, the upper end side of the I-shaped support column 1 is additionally provided with insertion tube 4, and insertion tube 4 is equipped with wearing for vertical direction Jack 401 convenient for one end of the first pulling plate 5 to be inserted into insertion tube 4, and carries out detent to the first pulling plate 5 using inserting hole 401 It is fixed.
Wherein, one end of first pulling plate 5 is inserted into insertion tube 4, and the fixation hole 501 on the first pulling plate 5 and insertion tube 4 On inserting hole 401 be located on same vertical direction, convenient for by bolt 6 can smoothly be inserted downwardly into inserting hole 401 with First pulling plate 5, insertion tube 4 are linked together in fixation hole 501.
Wherein, the upper end of the bolt 6 is square structure and the fixation hole that is inserted on inserting hole 401 and the first pulling plate 5 It 501 and is pierced by the bottom end of insertion tube 4 the first pulling plate 5, insertion tube 4 links together, convenient for palm is inserted into 6 upper end of bolt Square structure in, the convenient operation to bolt 6.
Wherein, it is also connected with connection ring 2 and tension spring 3 on the other end of first pulling plate 5 and is inserted into 7 inside of link block 1/2 at, the connection ring 2 on the 9 bottom side other end of rain shade is linked up with using the tension spring 3 on the first pulling plate 5, to rain shade 9 Draw solid.
Wherein, the side of the link block 7 offers slot 701, and the length of slot 701 is the 1/ of 7 length of link block 2, facilitate the second pulling plate 8 to be smoothly inserted into link block 7 by slot 701, and connect with the first pulling plate 5 by link block 7 To together.
Wherein, connection ring 2 and tension spring 3, and the two of the second pulling plate 8 are also connected separately on the both ends of second pulling plate 8 End is snapped onto link block 7 by slot 701 respectively, and the tension spring 3 that can also be used on the second pulling plate 8 is linked up in 9 bottom side of rain shade On connection ring 2, rain shade 9 draw solid.
Wherein, the tension spring 3 on first pulling plate 5 and the second pulling plate 8 to upper hook the 9 bottom side other end of rain shade company It connects on ring 2, is installed on I-shaped support after rain shade 9 to be installed on to two groups of I-shaped support columns 1 or rain shade 9 by combination When on column 1, through the hook of tension spring 3 in the connection ring 2 of 9 bottom side of rain shade, rain shade 9 draw admittedly, rain shade 9 is prevented Both ends or middle section are detached from I-shaped support column 1.
Wherein, arc connection snap-gauge 901 is connected separately on the internal and external cambered surface of the one end of the rain shade 9, it is available Arc connection snap-gauge 901 snaps on another group of rain shade 9, can be according to concrete so as to splice two groups of rain shades 9 Change is adjusted in the length poured.
The specifically used mode and effect of the present embodiment one:
In the present invention, I-shaped support column 1 is put respectively according to the length of concreting and is fixed on concreting Both ends, then the first pulling plate 5 is inserted into insertion tube 4, inserting hole 401 and fixation hole 501 is inserted into using bolt 6 and is pierced by First pulling plate 5, insertion tube 4 are linked together to the bottom end of insertion tube 4, one end of link block 7 is inserted into the first pulling plate 5 later The other end, and the first pulling plate 5 is made to be inserted into 1/2 position in link block 7, the both ends of the second pulling plate 8 are then passed through into slot respectively 701 snap onto link block 7, snap onto another group using the arc connection snap-gauge 901 on the one end internal and external cambered surface of rain shade 9 On rain shade 9, rain shade 9 is spliced, then spliced rain shade 9 is snapped into the screening on I-shaped support column 1 respectively In canopy card slot 103, exist being utilized respectively I-shaped support column 1, the first pulling plate 5, the hook of tension spring 3 connected on the second pulling plate 8 In the connection ring 2 of 9 bottom side of rain shade, rain shade 9 draw admittedly, later according to the width of concreting successively to both ends I-shaped support column 1 carries out assembled connection and fixes, and the whole transverse width of the I-shaped support column 1 after making connection is greater than concrete The width poured, and be sequentially connected and fix the first pulling plate 5 and the second pulling plate 8, and the company by the hook of tension spring 3 in 9 bottom side of rain shade It connects on ring 2, it, can be along rain shade 9 when rainwater drops on rain shade 9 so as to carry out rain cover to the whole of concreting It is flowed into diversion trench 902, and can be flowed out along diversion trench 902 to the both ends of rain cover 9, rainwater catchment can be made, prevent rainwater It is arbitrarily flowed down from rain shade 9 and concreting is caused to impact.
From power embodiment two:
Wherein, the both ends of 9 outermost two articles of diversion trenches 902 of rain shade can be fixed with screw at adjacent two One drainage seat 13, and the high-order notch 1301 of rectangular slot mouth structure, the first drainage seat 13 are offered on this first drainage seat 13 The length of outermost two diversion trenches 902 is increased outward, and draws the rainwater picked up outward, and passes through rectangle notch The high-order notch 1301 of structure downwards leaks out rainwater.
Wherein, common also pipe is worn and is welded with V-shaped chute knot at one on the inside of first drainage, 13 end of seat at adjacent two The water conservancy diversion frame 10 of structure, and the drip hole 1001 of circular through hole structure is offered downwards in their V-shaped groove bottom ends, and in drip hole 1001 Bottom end also hangs drawing and is connected with recycling bin 12 at one by a recovery tube 11 of welding, just draws at above-mentioned adjacent two first The rainwater that stream seat 13 is drawn outward is collected, and finally falls into the rainwater of collection in recycling bin 12 so as to standby by drip hole 1001 With.
Wherein, 9 inside of rain shade is mutually also solderable close to the end of two diversion trenches 902 of docking at adjacent two There is the second drainage seat 14 of a quarter bend header structure, the second drainage seat 14 is equally by inside mutually close to two diversion trenches of docking 902 rainwater collected are introduced downwardly into recycling bin 12 in the same way so as to spare, and in the top surface of the second drainage seat 14 On be also equipped with small pump 15 at one, and the upper hose of small pump 15 is real with the recycling bin 12 at adjacent bottom side position Existing pipeline connection, small pump 15 and external existing mating electric cabinet realize that electrically control connects, can will be in recycling bin 12 The rainwater of collection rises out upwards.
Wherein, the arc inner cavity top surface of the rain shade 9 is and logical also to being vertically installed with a pull rod 18 at adjacent two The upward hanging shape of annular pull ring for crossing these 18 bottom ends of pull rod, which hangs drawing, jet pipe 16, and is additionally provided with and is used in the inner end of jet pipe 16 It is set to lengthen the bump joint 1601 of docking, and the outermost end of jet pipe 16 also going out by pipeline and above-mentioned small pump 15 The mouth of a river is connected, that is to say, that above-mentioned small pump 15 out of recycling bin 12 to the rainwater to raise up out by pipeline can be injected to In corresponding jet pipe 16, and the bump joint 1601 of jet pipe 16 is equally hung inside rain shade 9 after length direction docks for docking The jet pipe 16 of extension.
It wherein, is in extend out eight shape patterns to have also extended through two rows of atomizers 17 on the bottom side tube wall of the jet pipe 16, These jet pipes 16 with atomizer 17 are in the pattern being distributed two-by-two, in the arc cover chamber of rain shade 9, form one Water spraying mechanism inside rain shade 9, above-mentioned small pump 15 enter in jet pipe 16 from recycling bin 12 to the rainwater to raise up out, And by eight shape arrangement can large area atomizing spray atomizer 17 outward spray, original cement is poured in operation process Canopy formula rain shade 9 as rain cover has carried out function intensified, makes to be located in 9 interior zone of rain shade after operation and produces in air Raw cement soil dust carries out atomized dust settling processing, sends out rainwater second is that rainwater can be collected first is that embodying and can be used to rain cover Wave maximum utility value, environmental protection and energy saving.
The specifically used mode and effect of the present embodiment two:
In conjunction with the embodiments one, the present embodiment second is that its rain cover functional structure, carried out it is further function intensified, by its benefit V has been carried out with the 902 end position of diversion trench that the functional characteristic of 9 rain cover of rain shade and 9 two sides of rain shade are used as water conservancy diversion rainwater The installation of the water conservancy diversion frame 10 of shape frame structure picks up the rainwater of the final outlet of diversion trench 902 all downwards in water conservancy diversion frame 10, leads to Ground V-shaped groove cavity configuration, is collected into the recycling bin 12 of bottom, due to being mounted with to use at 902 regional location of diversion trench of inside It, can be from returning in the small pump 15 for the effect of pumping up water, therefore under control of the small pump 15 by external existing power control cabinet internal component It receives and enters in jet pipe 16 in bucket 12 to the rainwater to raise up out, and the jet pipe 16 by being lifted in rain shade 9, arranged using eight shape Column can large area atomizing spray atomizer 17 outward by rainwater be atomized spray, original cement is poured in operation process and is used as The canopy formula rain shade 9 of rain cover has carried out function intensified, makes to be located at after operation and generates in air in 9 interior zone of rain shade Cement soil dust carries out atomized dust settling processing, performs to rainwater second is that rainwater can be collected first is that embodying and can be used to rain cover Maximum utility value, environmental protection and energy saving.
The embodiment of the present invention is given for the purpose of illustration and description, and is not exhaustively or by this to send out It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing Selecting and describe embodiment is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application It will be appreciated that the present invention is to design various embodiments suitable for specific applications with various modifications.

Claims (9)

1. a kind of precast bridge concreting rain-proof constructing device, it is characterised in that: including I-shaped support column (1), underthrust It fills block (101), underthrust is loaded slot (102), rain shade card slot (103), connection ring (2), tension spring (3), insertion tube (4), inserting hole (401), the first pulling plate (5), fixation hole (501), bolt (6), link block (7), slot (701), the second pulling plate (8), rain shade (9), arc connection snap-gauge (901), diversion trench (902), water conservancy diversion frame (10), drip hole (1001), recovery tube (11), recycling bin (12), the first drainage seat (13), high-order notch (1301), the second drainage seat (14), small pump (15), jet pipe (16), flange Connector (1601), spray head (17) and pull rod (18);The both ends of the lower end strut of the I-shaped support column (1) are respectively equipped with underthrust Dress block (101) and underthrust are loaded slot (102), and lower inserting block (101) and the underthrust slot (102) that is loaded can be embedded in, described I-shaped The top center of support column (1) is connected with connection ring (2), and tension spring (3) are fixed in connection ring (2), the rain shade (9) It is also respectively equipped with connection ring (2) for the inside both ends of semi-circular cylindrical structure, and rain shade (9), under the two sides of the rain shade (9) End is equipped with diversion trench (902), and the bottom end of diversion trench (902) snaps onto the rain cover at both ends at the top of I-shaped support column (1) In cover card slot (103), the tension spring (3) of I-shaped support column (1) the upper end connection is hooked into the company of rain shade (9) bottom side one end It connects on ring (2).
2. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: the I-shaped support The upper end side of column (1) is additionally provided with insertion tube (4), and insertion tube (4) is equipped with the inserting hole (401) of vertical direction.
3. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: first pulling plate (5) one end is inserted into insertion tube (4), and the fixation hole (501) on the first pulling plate (5) and the inserting hole (401) on insertion tube (4) On same vertical direction;It is also connected with connection ring (2) and tension spring (3) on the other end of first pulling plate (5) and is inserted into On the inside of to link block (7) 1/2 at;Tension spring (3) on first pulling plate (5) and the second pulling plate (8) is to upper hook in rain cover In the connection ring (2) for covering (9) bottom side other end.
4. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: the bolt (6) Square structure and the fixation hole (501) being inserted on inserting hole (401) and the first pulling plate (5) is in upper end and are pierced by insertion tube (4) bottom end links together the first pulling plate (5), insertion tube (4).
5. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: the link block (7) Side offer slot (701), and the length of slot (701) be link block (7) length 1/2.
6. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: second pulling plate (8) connection ring (2) and tension spring (3) are also connected separately on both ends, and the both ends of the second pulling plate (8) pass through slot respectively (701) it snaps onto link block (7).
7. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: the rain shade (9) One end internal and external cambered surface on be connected separately with arc connection snap-gauge (901);The rain shade (9) is outermost at adjacent two The both ends of two diversion trenches (902) can be fixed with the first drainage seat (13) with screw, and open up in this first drainage seat (13) There is the high-order notch (1301) of rectangular slot mouth structure;It is mutually led close to two of docking on the inside of the rain shade (9) at adjacent two Also solderable the second drainage seat (14) for being connected to a quarter bend header structure in the end of chute (902), and seat (14) are drained second Top surface on be also equipped with small pump at one (15), and the upper hose of small pump (15) is and at adjacent bottom side position Recycling bin (12) realizes pipeline connection;The arc inner cavity top surface of the rain shade (9) is also to being vertically installed with one at adjacent two Root pull rod (18), and drawing is hung by the upward hanging shape of annular pull ring of these pull rod (18) bottom ends have jet pipe (16), and in jet pipe (16) inner end is additionally provided with the bump joint (1601) for making it lengthen docking.
8. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: described at adjacent two Common also pipe wears the water conservancy diversion frame (10) for being welded with V-shaped groove structure at one on the inside of one drainage seat (13) end, and in their V-arrangements Slot bottom end offers downwards the drip hole (1001) of circular through hole structure, and is returned in the bottom end of drip hole (1001) by one of welding Closed tube (11) also hangs drawing and is connected with recycling bin at one (12).
9. precast bridge concreting rain-proof constructing device as described in claim 1, it is characterised in that: the jet pipe (16) It is in extend out eight shape patterns to have also extended through two rows of atomizers (17) on the tube wall of bottom side, these have the sprays of atomizer (17) Pipe (16) is in the pattern being distributed two-by-two, is located in the arc cover chamber of rain shade (9).
CN201910616355.6A 2019-07-09 2019-07-09 Prefabricated bridge concrete placement rain-proof construction equipment Active CN110306737B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910616355.6A CN110306737B (en) 2019-07-09 2019-07-09 Prefabricated bridge concrete placement rain-proof construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910616355.6A CN110306737B (en) 2019-07-09 2019-07-09 Prefabricated bridge concrete placement rain-proof construction equipment

Publications (2)

Publication Number Publication Date
CN110306737A true CN110306737A (en) 2019-10-08
CN110306737B CN110306737B (en) 2020-08-11

Family

ID=68079788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910616355.6A Active CN110306737B (en) 2019-07-09 2019-07-09 Prefabricated bridge concrete placement rain-proof construction equipment

Country Status (1)

Country Link
CN (1) CN110306737B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108472A (en) * 2021-11-02 2022-03-01 江苏省交通工程集团有限公司 Rainproof construction method and device for pouring concrete of bridge
CN114906547A (en) * 2022-05-27 2022-08-16 安徽华宏机械设备有限公司 Combined rain cover for conveyor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10102410A (en) * 1996-09-25 1998-04-21 Minoru Kusaba Web-plate mounting construction for steel joint in highway bridge
CN103302741A (en) * 2013-07-05 2013-09-18 中铁三局集团有限公司 Prefabricated bridge concrete rainproof mobile pouring trolley
CN103306209A (en) * 2013-07-05 2013-09-18 中铁三局集团有限公司 Prefabricated bridge concrete pouring rainproof construction method and device thereof
CN104060860A (en) * 2014-06-30 2014-09-24 中铁七局集团第一工程有限公司 Sectional telescopic rainproof shed and application method for prefabricating concrete T beam
CN207841756U (en) * 2017-12-23 2018-09-11 山东瑞鸿重工机械有限公司 A kind of precast bridge concreting rain-proof constructing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10102410A (en) * 1996-09-25 1998-04-21 Minoru Kusaba Web-plate mounting construction for steel joint in highway bridge
CN103302741A (en) * 2013-07-05 2013-09-18 中铁三局集团有限公司 Prefabricated bridge concrete rainproof mobile pouring trolley
CN103306209A (en) * 2013-07-05 2013-09-18 中铁三局集团有限公司 Prefabricated bridge concrete pouring rainproof construction method and device thereof
CN104060860A (en) * 2014-06-30 2014-09-24 中铁七局集团第一工程有限公司 Sectional telescopic rainproof shed and application method for prefabricating concrete T beam
CN207841756U (en) * 2017-12-23 2018-09-11 山东瑞鸿重工机械有限公司 A kind of precast bridge concreting rain-proof constructing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108472A (en) * 2021-11-02 2022-03-01 江苏省交通工程集团有限公司 Rainproof construction method and device for pouring concrete of bridge
CN114108472B (en) * 2021-11-02 2024-02-27 江苏省交通工程集团有限公司 Bridge concrete pouring rainproof construction method and device thereof
CN114906547A (en) * 2022-05-27 2022-08-16 安徽华宏机械设备有限公司 Combined rain cover for conveyor
CN114906547B (en) * 2022-05-27 2024-03-15 安徽华宏机械设备有限公司 Combined rain cover for conveyor

Also Published As

Publication number Publication date
CN110306737B (en) 2020-08-11

Similar Documents

Publication Publication Date Title
CN110306737A (en) A kind of precast bridge concreting rain-proof constructing device
CN201695334U (en) Bridge deck siphon drainage system
CN104278739B (en) Prefabricated pumping station system
CN204571433U (en) Fluid erosion prevention sulfuric acid tank
CN207583349U (en) A kind of well-flushing sand pumping device and Groundwater Monitoring system
CN109914804A (en) A kind of assembled architecture top grouting process
CN208312207U (en) A kind of municipal administration energy-saving type vertical greening street lamp
CN209429049U (en) A kind of intake sewage blocking device
CN205832696U (en) A kind of mobile sedimentation tank device
CN213144370U (en) Foundation pit support bored pile construction equipment
CN209686551U (en) A kind of engineering drainage pipe underground mounting structure
CN210892765U (en) Novel power plant circulating water system
CN209025478U (en) A kind of safety pounding-proof canopy for construction site protective
CN206219981U (en) A kind of Selection of Urban Pedestrian Overpass water guide discharge structure
CN208250909U (en) A kind of drainage arrangement of viaduct
CN209025043U (en) A kind of water conservancy ecosystem wall
CN208743171U (en) A kind of recyclable metal surface water washing device
CN215758705U (en) Energy-saving greening city zinc steel guardrail
CN208831962U (en) A kind of novel cities and towns heat supply network directly buried pipeline steam trap connection
CN108187372A (en) A kind of High-efficient Water dirt piece-rate system for underground mine
CN214143746U (en) Protection slope for strengthening water and soil conservation
CN110004864A (en) A kind of foundation pit dust pelletizing system
CN110316924A (en) A kind of newcooperative medical system excrement process system and its application method
CN208830401U (en) A kind of pumping plant water system
CN109881852A (en) A kind of collection rainwater green awning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant