JPH10102410A - Web-plate mounting construction for steel joint in highway bridge - Google Patents
Web-plate mounting construction for steel joint in highway bridgeInfo
- Publication number
- JPH10102410A JPH10102410A JP25346096A JP25346096A JPH10102410A JP H10102410 A JPH10102410 A JP H10102410A JP 25346096 A JP25346096 A JP 25346096A JP 25346096 A JP25346096 A JP 25346096A JP H10102410 A JPH10102410 A JP H10102410A
- Authority
- JP
- Japan
- Prior art keywords
- steel joint
- plate
- steel
- plates
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Structures (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、主として高架の高
速道路等の道路橋の夏期や冬期等の気温差による道路の
長さ方向の伸び縮みを適宜に吸収する道路橋の鋼製ジョ
イントの腹板取付構造に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an antinode of a steel joint of a road bridge, which appropriately absorbs expansion and contraction of a road bridge such as an elevated highway in the length direction of the road due to a temperature difference in summer or winter. It relates to a plate mounting structure.
【0002】[0002]
【従来の技術】従来、上記のごとく夏期と冬期との気温
差による道路の長さ方向の伸び縮みを吸収するために道
路橋上に設けられる鋼製ジョイントとしては、図7及び
図8に示すごとく、矢印Hで示す山部と矢印Vで示す谷
部とからなる歯形を有する一対の鋼製のフェースプレー
ト1を、それぞれ相対応する山部Hと谷部Vとが、上記
の道路の長さ方向の伸び縮みを吸収できる適宜な遊間D
を保持して配設している道路橋用の鋼製ジョイント2が
使用されている。2. Description of the Related Art Conventionally, as described above, as a steel joint provided on a road bridge to absorb expansion and contraction in the longitudinal direction of a road due to a temperature difference between summer and winter, as shown in FIGS. , A pair of steel face plates 1 each having a tooth profile composed of a peak portion indicated by an arrow H and a valley portion indicated by an arrow V, and the corresponding peak portions H and valleys V respectively corresponding to the length of the road. Suitable play space D that can absorb expansion and contraction in the direction
And a steel joint 2 for a road bridge, which is arranged while holding the steel sheet.
【0003】上記フェースプレート1の各底面には、こ
の道路橋の幅方向にそれぞれ竪方向の腹板3が図6の矢
印Wで示すごとく溶接で取付けられており、このフェー
スプレート1の下面と腹板3との内側には適宜な間隔で
プレート孔4を有するリブプレート5′が矢印Wで示す
ごとく溶接で取付けられ、さらに図8で示すようにフェ
ースプレート1の下面にアンカープレート6が、そして
腹板3の内側にアンカーバー7がそれぞれ取り付けら
れ、図6に示すごとく、これらアンカープレート6やア
ンカーバー7を補強鉄筋と連絡して鋼製ジョイント2に
接続するコンクリート8が打設されている。[0003] On each bottom surface of the face plate 1, a vertical abdominal plate 3 is attached by welding as shown by an arrow W in Fig. 6 in the width direction of the road bridge. A rib plate 5 ′ having plate holes 4 at appropriate intervals is attached by welding to the inside of the plate 3 as shown by an arrow W, and an anchor plate 6 is provided on the lower surface of the face plate 1 as shown in FIG. Anchor bars 7 are attached to the inside of the abdominal plate 3, respectively. As shown in FIG. 6, concrete 8 is cast to connect the anchor plates 6 and the anchor bars 7 to the reinforcing steel bars and connect them to the steel joint 2. .
【0004】しかしながら、従来の鋼製ジョイント2に
おいては、図6及び図7(a)に示すごとく上記フェー
スプレート1の谷部Vと山部Hとからなる歯形の谷部V
の外側に腹板3が溶接Wで取り付けられているのが通常
であり、この場合、この鋼製ジョイント2上を走行する
車両の車荷重Pがフェースプレート1の歯形の特に山部
Hのフィンガー部の先端に繰り返し加えられる。図6に
おいてフェースプレート1及び腹板3に矢印Mで示すよ
うに大きなモーメントがかかることになり、そのためフ
ェースプレート1の厚さを大きくしたり、フェースプレ
ート1の支持部材構造が複雑になるという問題がある。However, in the conventional steel joint 2, as shown in FIGS. 6 and 7A, a tooth-shaped valley V composed of the valley V and the ridge H of the face plate 1 is provided.
Is usually attached to the outside of the steel plate 2 by welding W. In this case, the vehicle load P of the vehicle running on the steel joint 2 is reduced by the finger of the tooth shape of the face plate 1, particularly the finger of the peak H. It is repeatedly added to the tip of the part. In FIG. 6, a large moment is applied to the face plate 1 and the abdominal plate 3 as shown by an arrow M, and thus the thickness of the face plate 1 is increased and the structure of the support member of the face plate 1 is complicated. There is.
【0005】また、図6のごとく、フェースプレート1
の下面と腹板3の内側に鋼製ジョイント2に接続したコ
ンクリート8を打設する際、送り込まれたコンクリート
8内に混入する空気の抜け道がないので、充填されたコ
ンクリート8内に気泡が混在したままの状態で固化し、
その結果、フェースプレート1の下部にコンクリート8
が完全に充填されていない空洞部ができ、強固なコンク
リート8の打設が行なわれないので、鋼製ジョイント2
の歯形の山部Hのフィンガー上を繰り返し走行する車両
の重荷重や振動により、鋼製ジョイント2部分の損傷が
容易に発生するという問題がある。[0005] As shown in FIG.
When the concrete 8 connected to the steel joint 2 is poured into the lower surface and inside the abdominal plate 3, air bubbles are mixed in the filled concrete 8 because there is no way for air to be mixed in the concrete 8 sent in. Solidified as it is,
As a result, concrete 8
Is not completely filled, and strong concrete 8 is not poured.
There is a problem that the heavy load and vibration of the vehicle that repeatedly travels on the finger of the toothed peak portion H easily damages the steel joint 2 portion.
【0006】また、上記のごとき一対の鋼製のフェース
プレート1の下面に取付けた各腹板3の間は、各フェー
スプレート1の歯形の遊間Dから雨水が落下することに
なるが、道路橋の場合、上記の雨水は適宜なゴム樋など
で収集して排水する必要があり、この場合、腹板3に対
するゴム樋の取付部の止水を完全に行なって道路橋の鋼
製ジョイント2の下部から雨水が地上に落下することを
防止する。Between the belly plates 3 attached to the lower surfaces of the pair of steel face plates 1 as described above, rainwater falls from the tooth gaps D of the face plates 1. In the case of the above, it is necessary to collect and drain the above-mentioned rainwater with a suitable rubber gutter or the like. Prevent rainwater from falling from below to the ground.
【0007】[0007]
【発明が解決しようとする課題】本発明は、山部と谷部
とからなる歯形を有する一対の鋼製のフェースプレート
を適宜な遊間を保持して配設している鋼製ジョイントの
フェースプレートと腹板とにかかるモーメントを少なく
することにより、その構造を簡単にでき、しかも鋼製ジ
ョイントのフェースプレートに接続して打設するコンク
リート中に気泡の混在を防止し、かつコンクリートの充
填を完全に行なうことのできる道路橋の鋼製ジョイント
の腹板取付構造を提供する。SUMMARY OF THE INVENTION The present invention relates to a steel joint face plate in which a pair of steel face plates each having a tooth profile including a peak portion and a valley portion are disposed while maintaining an appropriate play. The structure can be simplified by reducing the moment applied to the abdomen and the abdominal plate.Also, it is possible to prevent air bubbles from being mixed in the concrete that is connected to the steel joint face plate and cast, and to completely fill the concrete. Provided is a bridge joint mounting structure of a steel joint of a road bridge that can be performed.
【0008】[0008]
【課題を解決するための手段】本発明の鋼製ジョイント
の腹板取付構造は、山部と谷部とからなる歯形を有する
一対の鋼製のフェースプレートを相対応する山部と谷部
とが適宜な遊間を保持して配設している道路橋の鋼製ジ
ョイントであって、上記各フェースプレートの底面に道
路橋の幅方向に取付ける各腹板を、上記フェースプレー
トの歯形の谷部より内側に取付けることからなり、また
上記一対の鋼製のフェースプレートの底面にそれぞれ取
付けた各腹板の間に配設されるゴム樋の両側端部を各腹
板の取付け面に沿って複数の止水用棒状ゴムを介在して
固着した道路橋の鋼製ジョイントの腹板取付構造からな
る。SUMMARY OF THE INVENTION According to the present invention, there is provided a bellows plate mounting structure for a steel joint, comprising a pair of steel face plates each having a tooth profile including a peak and a valley. Is a steel joint of a road bridge which is disposed while holding an appropriate play space, wherein each abdominal plate attached to a bottom surface of each of the face plates in a width direction of the road bridge is provided with a tooth-shaped valley portion of the face plate. More specifically, the rubber gutter provided between the belly plates attached to the bottom surfaces of the pair of steel face plates is provided with a plurality of stoppers along the mounting surface of each belly plate. It consists of an abdominal plate mounting structure of a steel bridge joint of a road bridge fixed with a rubber rod-shaped rubber for water.
【0009】[0009]
【発明の実施の形態】以下図面を参照して本発明の道路
橋の鋼製ジョイントの腹板取付構造の一実施形態につき
説明するが、まず本発明の鋼製ジョイント2は、図1に
示すように、矢印Hで示す山部と矢印Vで示す谷部とか
らなる歯形を有する一対の鋼製のフェースプレート1を
それぞれ相対応する山部Hと谷部Vとが図1に示すよう
に適宜な遊間D(例えばこの実施形態ではD=45mm)
を保持して配設され、これにより道路橋の鋼製ジョイン
ト2を構成している。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a steel joint of a road bridge according to an embodiment of the present invention; FIG. As shown in FIG. 1, a pair of steel face plates 1 each having a tooth profile composed of a peak portion indicated by an arrow H and a valley portion indicated by an arrow V correspond to the corresponding peak portions H and valley portions V as shown in FIG. Appropriate play space D (for example, D = 45 mm in this embodiment)
, Thereby forming the steel joint 2 of the road bridge.
【0010】これらの各フェースプレート1の底面に
は、この道路橋の幅方向に取付ける各腹板3が図3で矢
印Wで示すごとく溶接により取付けられているが、それ
らの腹板3の取付位置が、図1、図2及び図3に示すご
とく各フェースプレート1の歯形の谷部Vより内側に取
付けられている。すなわち図1及び図2(a)の各斜視
図において、フェースプレート1と腹板3との取付状態
において歯形の各谷部Vと腹板3との取付部には15で
示すような台形状の穴部ができることになる。On the bottom surface of each of the face plates 1, abdominal plates 3 attached in the width direction of the road bridge are attached by welding as shown by arrows W in FIG. As shown in FIGS. 1, 2 and 3, each of the face plates 1 is mounted inside the tooth-shaped valley V. In other words, in each of the perspective views of FIGS. 1 and 2 (a), a trapezoidal hole indicated by 15 is formed in the mounting portion between each tooth-shaped valley V and the abdominal plate 3 when the face plate 1 and the abdominal plate 3 are mounted. Department will be able to do.
【0011】また、図1や図5に示すごとく、フェース
プレート1と腹板3との取付部には道路橋の幅方向に適
宜な間隔で、プレート孔4を有するアンカーリブプレー
ト5が矢印Wで示すように溶接で取付けられており、さ
らに図5に示すコンクリート8を打設時の鋼製ジョイン
ト2とコンクリート8との接続部の補強用部材として機
能する。As shown in FIGS. 1 and 5, an anchor rib plate 5 having a plate hole 4 is provided by an arrow W at an appropriate interval in the width direction of the road bridge at an attachment portion between the face plate 1 and the abdominal plate 3. It is attached by welding as shown, and further functions as a member for reinforcing the connection between the steel joint 2 and the concrete 8 when the concrete 8 shown in FIG.
【0012】なお、図2(a)は図1のフェースプレー
ト1の歯形同志の遊間Dをさらに拡げて、フェースプレ
ート1と腹板との取付位置関係を示すための便宜上の斜
視図である。以上のごとく、腹板3の取付け位置をフェ
ースプレート1の歯形の谷部Vより内側に取り付けるこ
とにより、図5においてこの鋼製ジョイント2上を走行
する車荷重Pが歯形の山部Hに作用された時、腹板3と
フェースプレート1のフィンガー部にかかるモーメント
Mが、図6に示す従来例に比べて小さくなり、その分こ
の鋼製ジョイント2の構造が簡単になる。FIG. 2 (a) is a perspective view for the sake of convenience, showing the mounting positional relationship between the face plate 1 and the abdominal plate by further expanding the play D between the tooth profiles of the face plate 1 of FIG. As described above, the mounting position of the abdominal plate 3 is mounted inside the toothed valley V of the face plate 1 so that the vehicle load P running on the steel joint 2 acts on the toothed peak H in FIG. When this is done, the moment M applied to the finger portions of the abdominal plate 3 and the face plate 1 becomes smaller than that of the conventional example shown in FIG. 6, and the structure of the steel joint 2 is simplified accordingly.
【0013】また、腹板3がフェースプレート1の歯形
の谷部Vより内側にあることにより、図5の寸法Lが大
きくなり、アンカーリブプレート5の矢印Wで示す溶接
の長さが大きくなり、それだけモーメントMに抵抗する
強度が増加する。さらに、図5のごとく、フェースプレ
ート1及び腹板3などからなるこの鋼製ジョイント2に
接続してコンクリート8を打設する場合、フェースプレ
ート1の裏面に打設されるコンクリート8中に混在する
空気が、フェースプレート1の谷部Vと腹板3との間に
形成された穴部15から容易に排出され、打設されるコ
ンクリート中に気泡が残存することがなく、しかもコン
クリート8の打設時に充填されたコンクリートがこの穴
部15からはみ出すことによりコンクリート8がフェー
スプレート1の底面の腹板3上部まで充満したことを容
易に確認でき、良好でかつ強固なコンクリート8を打設
することができる。Further, since the abdominal plate 3 is located inside the valley V of the tooth profile of the face plate 1, the dimension L in FIG. 5 increases, and the welding length of the anchor rib plate 5 indicated by the arrow W increases. , The strength for resisting the moment M increases accordingly. Further, as shown in FIG. 5, when concrete 8 is cast by connecting to the steel joint 2 including the face plate 1 and the belly plate 3, the concrete 8 is mixed in the concrete 8 cast on the back surface of the face plate 1. Air is easily discharged from the hole 15 formed between the valley V of the face plate 1 and the abdominal plate 3, so that no air bubbles remain in the concrete to be poured, and the concrete 8 is poured. Since the sometimes filled concrete protrudes from the hole 15, it can be easily confirmed that the concrete 8 has been filled up to the upper part of the abdominal plate 3 on the bottom surface of the face plate 1, and a good and strong concrete 8 can be poured. it can.
【0014】次に、図3に示すごとく、一対の鋼製のフ
ェースプレート1の底面にそれぞれ取付けた各腹板3の
間にはゴム樋9がこの道路橋の幅方向に配設されるが、
本発明においては、ゴム樋9の両側端部を各腹板3の取
付け面に沿って複数、例えばこの実施形態のごとく2本
の止水用の棒状ゴム10を介在して、塔て金12にボル
ト14及びナット13を用いて固着している。Next, as shown in FIG. 3, rubber gutters 9 are arranged in the width direction of the road bridge between the belly plates 3 attached to the bottom surfaces of the pair of steel face plates 1, respectively. ,
In the present invention, both end portions of the rubber gutter 9 are provided along the mounting surface of each abdominal plate 3 with a plurality of, for example, two water-stopping rubber rods 10 interposed therebetween, as in the present embodiment, and a tower metal 12 is provided. Are fixed using bolts 14 and nuts 13.
【0015】この場合、図4のごとく腹板3の取付け面
に半円断面の溝を設けておき、この溝内に接着材を塗布
の上棒状ゴム10を仮固定し、ゴム樋9をボルト14及
びナット13で腹板3側に締め付けにより固着すれば、
ゴム樋9の取付け面での止水をはかる上で極めて効果が
あることを実験で確認ずみである。なお、図2(b)
は、図2(a)の要部、つまり本発明のフェースプレー
ト1の谷部の内側に腹板3を取付けた谷部と腹板との取
付位置関係を示す要部平面図を示し、図7(b)は、図
7(a)の要部、つまり従来のフェースプレート1の谷
部の外側に腹板3を取付けた谷部と腹部との取付位置関
係を示す要部平面図を示しているから、これらの図から
本発明と従来のものとのフェースプレート1に対する腹
板3の位置のちがいは明らかである。In this case, as shown in FIG. 4, a groove having a semicircular cross section is provided on the mounting surface of the abdominal plate 3, and an adhesive is applied in this groove, and the bar-like rubber 10 is temporarily fixed, and the rubber gutter 9 is bolted. If it is fixed to the abdominal plate 3 side by tightening with 14 and nut 13,
It has been confirmed by an experiment that it is extremely effective in stopping water on the mounting surface of the rubber gutter 9. FIG. 2 (b)
FIG. 7A is a plan view of a main part of FIG. 2A, that is, a main part showing an attachment positional relationship between a valley where the abdominal plate 3 is mounted inside the valley of the face plate 1 of the present invention and the abdominal plate. 7B is a plan view of a main part of FIG. 7A, that is, a main part showing an attachment positional relationship between a valley where the abdominal plate 3 is mounted outside the valley of the conventional face plate 1 and the abdomen. Therefore, it is apparent from these figures that the position of the abdominal plate 3 with respect to the face plate 1 of the present invention and the conventional one is different.
【0016】[0016]
【発明の効果】以上に説明した本発明の道路橋の鋼製ジ
ョイントの腹板取付構造によれば、山部と谷部とからな
る歯形を有する一対の鋼製のフェースプレートをその歯
形間で適宜な遊間を保持して配設している鋼製ジョイン
トのフェースプレートと腹板とにかかるモーメントを小
さくすることができ、それだけその鋼製ジョイントの構
造を簡単にすることができ、しかもこの鋼製ジョイント
のフェースプレートに接続して打設するコンクリート中
に気泡が残存することを防止し、かつコンクリートの充
填を容易に確認できるので、鋼製ジョイントに接続する
コンクリートの強度向上をはかることがでく。According to the above-described structure for mounting a steel joint on a road bridge according to the present invention described above, a pair of steel face plates each having a tooth shape including a peak portion and a valley portion are provided between the tooth shapes. It is possible to reduce the moment applied to the face plate and the abdominal plate of the steel joint which is disposed while maintaining an appropriate play, so that the structure of the steel joint can be simplified. It prevents bubbles from remaining in the concrete that is connected to the face plate of the joint and casts it, and it is easy to check the filling of the concrete, so it is possible to improve the strength of the concrete connected to the steel joint. .
【0017】また、上記一対のフェースプレートの下面
に取付けた各腹板の間に取付けるゴム樋の腹板の取付面
での止水が完全に行なわれるので、道路橋の鋼製ジョイ
ントの下部から雨水などが地上に落下するのを防止でき
る。Further, since water is completely stopped at the mounting surface of the rubber gutter attached between the bellows attached to the lower surfaces of the pair of face plates, rainwater or the like is formed from the lower part of the steel joint of the road bridge. Can be prevented from falling to the ground.
【図1】本発明の一実施形態における道路橋の鋼製ジョ
イントの腹板取付構造を示す要部斜視図である。FIG. 1 is a perspective view showing a main part of a steel plate joint structure for a steel joint of a road bridge according to an embodiment of the present invention.
【図2】(a)は、フェースプレートと腹板との取付位
置を説明するため便宜上各フェースプレートを離した状
態の要部斜視図、(b)は、(a)の要部平面図であ
る。FIG. 2A is a perspective view of a main part in a state where each face plate is separated for convenience of explanation of a mounting position of the face plate and the abdominal plate, and FIG. 2B is a plan view of a main part of FIG. .
【図3】図1の各腹板間にゴム樋を取付けた状態を示す
要部側面図である。FIG. 3 is a side view of a main part showing a state in which a rubber gutter is attached between each abdominal plate of FIG. 1;
【図4】図3の腹板に止水用棒状ゴムを介在してゴム樋
を固着する説明用の要部側面図である。FIG. 4 is a side view for explaining a main part for fixing a rubber gutter to the belly plate of FIG. 3 with a water-stopping rod-shaped rubber interposed therebetween.
【図5】図3の鋼製ジョイントのフェースプレートの山
部に車荷重が載荷された時のモーメントを示す説明用の
要部側面図である。FIG. 5 is a side view of a principal part for explanation showing a moment when a vehicle load is applied to a mountain portion of the face plate of the steel joint of FIG. 3;
【図6】従来の鋼製ジョイントの山部に車荷重が載荷さ
れた時のモーメントを示す説明用の要部側面図である。FIG. 6 is a side view for explaining an essential part showing a moment when a vehicle load is loaded on a mountain portion of a conventional steel joint.
【図7】(a)は、図6の鋼製ジョイントのフェースプ
レートと腹板との位置関係を示す要部斜視図、(b)
は、(a)の要部平面図である。7A is a perspective view of a main part showing a positional relationship between a face plate and an abdominal plate of the steel joint of FIG. 6, and FIG.
2 is a plan view of a main part of FIG.
【図8】図7の従来の鋼製ジョイントの全体組付け状態
を示す要部斜視図である。FIG. 8 is a perspective view of a main part showing an entire assembled state of the conventional steel joint of FIG. 7;
【符号の説明】 1 フェースプレート 2 鋼製ジョイント 3 腹板 9 ゴム樋 10 棒状ゴム D 遊間 11 山部 V 谷部[Description of Signs] 1 face plate 2 steel joint 3 belly plate 9 rubber gutter 10 rod-shaped rubber D play space 11 peak V trough
Claims (2)
の鋼製のフェースプレートを相対応する山部と谷部とが
適宜な遊間を保持して配設する道路橋の鋼製ジョイント
であって、上記各フェースプレートの底面に、道路橋の
幅方向に取付ける各腹板を、上記フェースプレートの歯
形の谷部より内側に取付けた道路橋の鋼製ジョイントの
腹板取付構造。1. A steel joint for a road bridge in which a pair of steel face plates having a tooth profile consisting of a peak and a valley are disposed while the corresponding ridges and valleys maintain an appropriate clearance. An abdominal plate mounting structure for a steel joint of a road bridge, wherein each abdominal plate attached in the width direction of the road bridge is mounted on a bottom surface of each of the face plates inside a toothed valley of the face plate.
それぞれ取付けた各腹板の間に配設されるゴム樋の両側
端部を、各腹板の取付け面に沿って複数の止水用棒状ゴ
ムを介在して固着した請求項1記載の道路橋の鋼製ジョ
イントの腹板取付構造。2. A plurality of water-stopping rod-like rubbers are provided along both sides of a rubber gutter provided between respective belly plates attached to the bottom surfaces of a pair of steel face plates along the mounting surfaces of the respective belly plates. The abdominal plate mounting structure for a steel joint of a road bridge according to claim 1, wherein the steel plate joint is fixed with an interposition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25346096A JPH10102410A (en) | 1996-09-25 | 1996-09-25 | Web-plate mounting construction for steel joint in highway bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25346096A JPH10102410A (en) | 1996-09-25 | 1996-09-25 | Web-plate mounting construction for steel joint in highway bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10102410A true JPH10102410A (en) | 1998-04-21 |
Family
ID=17251705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP25346096A Pending JPH10102410A (en) | 1996-09-25 | 1996-09-25 | Web-plate mounting construction for steel joint in highway bridge |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10102410A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010236225A (en) * | 2009-03-31 | 2010-10-21 | Kfc Ltd | Fire-protection structure of bridge |
JP2012241470A (en) * | 2011-05-23 | 2012-12-10 | Sho-Bond Corp | Expansion device for installation within pavement height |
JP2014105524A (en) * | 2012-11-29 | 2014-06-09 | Yokogawa Sumikin Bridge Corp | Expansion device using fatigue resistance steel |
CN110306737A (en) * | 2019-07-09 | 2019-10-08 | 周丽博 | A kind of precast bridge concreting rain-proof constructing device |
KR102300099B1 (en) * | 2021-03-25 | 2021-09-08 | 대창이엔지 주식회사 | Expansion joint device for integrated bridge that prevents damage caused by load |
CN113584982A (en) * | 2021-08-25 | 2021-11-02 | 中冶南方城市建设工程技术有限公司 | Assembly type continuous reinforced concrete pavement and construction method thereof |
-
1996
- 1996-09-25 JP JP25346096A patent/JPH10102410A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010236225A (en) * | 2009-03-31 | 2010-10-21 | Kfc Ltd | Fire-protection structure of bridge |
JP2012241470A (en) * | 2011-05-23 | 2012-12-10 | Sho-Bond Corp | Expansion device for installation within pavement height |
JP2014105524A (en) * | 2012-11-29 | 2014-06-09 | Yokogawa Sumikin Bridge Corp | Expansion device using fatigue resistance steel |
CN110306737A (en) * | 2019-07-09 | 2019-10-08 | 周丽博 | A kind of precast bridge concreting rain-proof constructing device |
KR102300099B1 (en) * | 2021-03-25 | 2021-09-08 | 대창이엔지 주식회사 | Expansion joint device for integrated bridge that prevents damage caused by load |
CN113584982A (en) * | 2021-08-25 | 2021-11-02 | 中冶南方城市建设工程技术有限公司 | Assembly type continuous reinforced concrete pavement and construction method thereof |
CN113584982B (en) * | 2021-08-25 | 2022-11-11 | 中冶南方城市建设工程技术有限公司 | Assembly type continuous reinforced concrete pavement and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0211443Y2 (en) | ||
JP2003306986A (en) | Sandwiched floor slab composed of corrugated plate and upper and lower surface plates | |
JPH10102410A (en) | Web-plate mounting construction for steel joint in highway bridge | |
JP2001049618A (en) | Felloe guard unit for expanding road width of highway bridge and method for setting the same | |
JPH0759803B2 (en) | Interconnection device for two road members separated by expansion joint | |
KR0140845Y1 (en) | Expansion joint for road and bridge | |
KR100622008B1 (en) | Composition structure of integral abutment bridge | |
JP2004116139A (en) | Reinforcement method for main girder of existing bridge | |
JP3731779B2 (en) | Bridge support structure | |
JP3912493B2 (en) | Road bridge telescopic device | |
JPS61274002A (en) | Method for continuously paving surface of bridge | |
CN215758510U (en) | Prestressed anchorage type bridge expansion device convenient to maintain | |
JPS625044Y2 (en) | ||
JPS5925922Y2 (en) | Road joint expansion device | |
JP3086202B2 (en) | Elastic railway track with gravel retaining members | |
JPS5938487Y2 (en) | Water stop structure at road joints | |
JPS6141764Y2 (en) | ||
JP4689371B2 (en) | Bridge expansion joint | |
CN211645814U (en) | Road and bridge section with sectional gap filling material | |
JPH1121815A (en) | Bridge structure by composite steel floor board | |
KR100493447B1 (en) | Expansion joint for a bridge | |
JPH0230492Y2 (en) | ||
KR100742222B1 (en) | Temporary bridge without deck plate of bridge | |
JPS597365Y2 (en) | Edge structure of concrete slab at road joint | |
JPH0728178Y2 (en) | Reinforced structure of concrete floor slab |