CN110288316A - The method and terminal device of transforming plant primary equipment work card arrangement - Google Patents
The method and terminal device of transforming plant primary equipment work card arrangement Download PDFInfo
- Publication number
- CN110288316A CN110288316A CN201910537193.7A CN201910537193A CN110288316A CN 110288316 A CN110288316 A CN 110288316A CN 201910537193 A CN201910537193 A CN 201910537193A CN 110288316 A CN110288316 A CN 110288316A
- Authority
- CN
- China
- Prior art keywords
- listed
- equipment
- work card
- content
- substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The present invention is suitable for work card and technical field is arranged, and the method and terminal device of a kind of transforming plant primary equipment work card arrangement is provided, this method comprises: identifying to the content of the work ticket received, the listed content after being identified;Then according to the listed content, it is respectively provided with corresponding work card before equipment to be listed each of in each substation, the automatic arrangement and reclaimer operation of work card in substation is made it possible to achieve, is effectively saved the time, improves work efficiency.
Description
Technical field
The invention belongs to the sides of work card setting technical field more particularly to a kind of transforming plant primary equipment work card arrangement
Method and terminal device.
Background technique
Transforming plant primary equipment refers to the electrical equipment for directly participating in production, conveying and distribution electric energy, such as generator, transformation
Device, motor, breaker and fuse etc. equipment.Now after the primary equipment of substation breaks down, need to overhaul
Personnel overhaul, in order to reinforce overhaul of the equipments safety management, it is ensured that during overhaul of the equipments the person I go, need overhauling
It is listed according to job requirement to equipment before equipment.However manual operation is needed when being listed in the prior art to equipment, that is, it transports
Dimension personnel need to find suitable work card in the work card of a variety of types, then are suspended in corresponding equipment, due to substation
Occupied area is wide, and equipment is numerous, and this adds increased substation's operation maintenance personnel working strengths, causes working efficiency low.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of methods of transforming plant primary equipment work card arrangement and terminal to set
It is standby, it needs to find suitable work in the work card of a variety of types to solve operation maintenance personnel before overhaul of the equipments in the prior art
Board, then be suspended in corresponding equipment, since substation's occupied area is wide, equipment is numerous, and this adds increased substation's operation maintenance personnels
Working strength leads to ineffective problem.
The first aspect of the embodiment of the present invention provides a kind of method of transforming plant primary equipment work card arrangement, comprising:
The content of the work ticket received is identified, the listed content after being identified;
According to the listed content, corresponding work card is respectively provided with before equipment to be listed each of in each substation.
In one embodiment, the listed content includes label, equipment to be listed and the work to be hung of substation to be listed
Make board content;
It is described according to the listed content, be respectively provided with corresponding work before equipment to be listed each of in each substation
Board, comprising:
According to the label of the substation to be listed and the equipment to be listed, determines in each substation and set to listed
It is standby;
According to the equipment to be listed and the work card content to be hung, the corresponding work to be hung of each equipment to be listed is determined
Make board content;
To be respectively provided with the corresponding work card of the work card content to be hung before equipment to be listed each of in each substation.
In one embodiment, described for work card to be hung described in being respectively provided with before equipment be listed each of in each substation
The corresponding work card of content, comprising:
According to the equipment to be listed in determining each substation, the quantity of equipment to be listed in each substation is determined;
According to the quantity of the equipment to be listed, the smart machine of identical quantity in corresponding substation is determined;
It controls before each smart machine is moved to corresponding equipment to be listed, according to determining each equipment to be listed
Corresponding work card content to be hung shows the corresponding work card content to be hung of the equipment to be listed.
In one embodiment, described according to the listed content, each of in each substation before equipment to be listed
It is respectively provided with after corresponding work card, further includes:
Show the work card content being arranged in all listed equipment and the listed equipment.
In one embodiment, described according to the listed content, each of in each substation before equipment to be listed
It is respectively provided with before corresponding work card, further includes:
The background information for detecting the monitoring system of each substation is completed when determining to equipment operation to be listed in each substation
Later, work card placement operations are opened.
In one embodiment, the listed content further includes the working time;Described according to the listed content, each
It is respectively provided with after corresponding work card before equipment to be listed each of in substation, further includes:
When the end time reaches in the working time, the background information of the monitoring system of each substation is detected, when true
Surely after listed equipment state, the work card of arrangement is withdrawn.
The second aspect of the embodiment of the present invention provides a kind of device of transforming plant primary equipment work card arrangement, comprising:
Identification module identifies for the content to the work ticket received, the listed content after being identified;
Processing module is respectively provided with for according to the listed content before equipment to be listed each of in each substation
Corresponding work card.
In one embodiment, the listed content includes label, equipment to be listed and the work to be hung of substation to be listed
Make board content;
The processing module includes:
Determine submodule, label and the equipment to be listed for the substation to be listed according to determine each change
Equipment to be listed in power station;
The determining submodule is also used to be determined each according to the equipment to be listed and the work card content to be hung
The corresponding work card content to be hung of equipment to be listed;
Submodule is set, for described wait hang in work card to be respectively provided with before equipment to be listed each of in each substation
Hold corresponding work card.
The third aspect of the embodiment of the present invention provides a kind of terminal device, comprising: memory, processor and is stored in
In the memory and the computer program that can run on the processor, which is characterized in that described in the processor executes
The step as described in the method that above-mentioned transforming plant primary equipment work card is arranged is realized when computer program.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, comprising: the computer can
It reads storage medium and is stored with computer program, which is characterized in that realize when the computer program is executed by processor as above-mentioned
Step described in the method for transforming plant primary equipment work card arrangement.
Existing beneficial effect is the embodiment of the present invention compared with prior art: by the content to the work ticket received
It is identified, the listed content after being identified;Then according to the listed content, to listed each of in each substation
It is respectively provided with corresponding work card before equipment, makes it possible to achieve the automatic arrangement and reclaimer operation of work card in substation, effectively
The time has been saved, has been improved work efficiency.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process signal of the method for transforming plant primary equipment work card arrangement provided in an embodiment of the present invention
Figure;
Fig. 2 is to be respectively provided with corresponding work before equipment to be listed each of in each substation provided in an embodiment of the present invention
Make the flow diagram of board;
Fig. 3 is provided in an embodiment of the present invention described wait hang to be respectively provided with before equipment to be listed each of in each substation
The flow diagram of the corresponding work card of work card content;
Fig. 4 is the exemplary diagram of the device of transforming plant primary equipment work card arrangement provided by one embodiment of the present invention;
Fig. 5 is the schematic diagram of the device for the transforming plant primary equipment work card arrangement that another embodiment of the present invention provides;
Fig. 6 is the schematic diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Fig. 1 is the implementation process signal of the method for transforming plant primary equipment work card provided in an embodiment of the present invention arrangement
Figure, details are as follows.
Step 101, the content of the work ticket received is identified, the listed content after being identified.
Optionally, work bill system generates corresponding work ticket according to user demand, is then sent to hang tag system, is listed
After system receives, content recognition can be carried out to the work ticket received.Optionally, hang tag system can be to the work in work ticket
Make place, working time and listed information to be identified, for example, the label of the substation to be listed in identification work ticket, leads to
The label for crossing substation to be listed can determine corresponding substation to be listed, and identify the working time in work ticket, i.e., listed
Time and work ticket withdraw the time, and the listed information of identification may include equipment to be listed and work card content to be hung.
Step 102, it according to the listed content, is respectively provided with before equipment to be listed each of in each substation corresponding
Work card.
Optionally, it treats listed equipment to carry out needing to guarantee that equipment to be listed is cold standby state before being listed, to guarantee
The safety operation of staff.
Optionally, the listed content may include the working time, and the working time can recognize the date, work here
Time indicates that equipment to be listed needs the listed time, then the time for opening hang tag system needed earlier than this working time.
It optionally, can also include: the background information for detecting the monitoring system of each substation, when true before step 102
After the fixed completion to equipment operation to be listed in each substation, work card placement operations are opened.
Optionally, the background information of the monitoring system of substation may include the working condition letter of each equipment in substation
Breath.Equipment operation to be listed is completed to indicate that the state of equipment to be listed switchs to cold standby in each substation.
Optionally, the listed content includes the label of substation to be listed, equipment to be listed and wait hang in work card
Hold.
After opening work card placement operations, i.e., the operation of executable step 102.As shown in Fig. 2, in each substation
Being respectively provided with corresponding work card before each of interior equipment to be listed may comprise steps of.
Step 201, according to the label of the substation to be listed and the equipment to be listed, determine in each substation to
Listed equipment.
Optionally, if substation to be listed is relatively more, need to determine equipment to be listed in each substation first, with
Just the listed work of next step is carried out as unit of single substation.
Step 202, according to the equipment to be listed and the work card content to be hung, determine that each equipment to be listed is corresponding
Work card content to be hung.
Optionally, work card content to be hung may include " working herein ", " No switching on, someone's work ", " forbid closing
Lock, route someone work ", " from this disengaging " etc..
Optionally, the form of expression of the font and text that can also treat extension work card content is selected, such as right
The work card of quiescing class.
Step 203, corresponding to be respectively provided with the work card content to be hung before equipment to be listed each of in each substation
Work card.
Optionally, as shown in figure 3, to be respectively provided with the work card to be hung before equipment to be listed each of in each substation
The corresponding work card of content may comprise steps of.
Step 301, according to the equipment to be listed in determining each substation, equipment to be listed in each substation is determined
Quantity.
Step 302, according to the quantity of the equipment to be listed, determine that the intelligence of identical quantity in corresponding substation is set
It is standby.
Optionally, smart machine can be intelligent robot, and LED display is arranged on intelligent robot.
Step 303, control before each smart machine is moved to corresponding equipment to be listed, according to it is determining it is each to
The listed corresponding work card content to be hung of equipment shows the corresponding work card content to be hung of the equipment to be listed.
Optionally, smart machine and equipment to be listed correspond, and can show correspondence on the LED display of smart machine
The work card content that should hang of equipment to be listed.
Optionally, after corresponding work card content to be hung is arranged in control intelligent robot before equipment to be listed,
The work card content being arranged in all listed equipment and the listed equipment is shown in hang tag system, to ensure that work card is arranged
Correctness.
Optionally, after completing listing operation, when the end time reaches in the working time, each substation is detected
The background information of monitoring system withdraws the work card of arrangement after determining listed equipment state.Optionally, the monitoring of substation
When the background information of system determines that listed equipment has completed related service work, then it is recoverable to work card, opens correspondence and set
It is standby, so that the equipment can work normally.
The method of above-mentioned transforming plant primary equipment work card arrangement, is known by the content to the work ticket received
Not, the listed content after being identified;Then according to the listed content, each of in each substation before equipment to be listed
It is respectively provided with corresponding work card, the automatic arrangement and reclaimer operation of work card in substation is made it possible to achieve, is effectively saved
Time improves work efficiency, and the work card arranged can be shown in systems, markers work position, it is ensured that
The correctness of work card arrangement.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Corresponding to the method for the arrangement of transforming plant primary equipment work card described in foregoing embodiments, Fig. 4 shows the present invention
The exemplary diagram of the device for the transforming plant primary equipment work card arrangement that embodiment provides.As shown in figure 4, the apparatus may include:
Identification module 401 and processing module 402.
Identification module 401 identifies for the content to the work ticket received, the listed content after being identified;
Processing module 402 is all provided with for according to the listed content before equipment to be listed each of in each substation
Set corresponding work card.
Optionally, the listed content includes the label of substation to be listed, equipment to be listed and wait hang in work card
Hold;As shown in figure 5, the processing module 402 may include: determining submodule 4021 and setting submodule 4022.
Determine submodule 4021, label and the equipment to be listed for the substation to be listed according to determine each
Equipment to be listed in a substation;
The determining submodule 4021 is also used to be determined according to the equipment to be listed and the work card content to be hung
The corresponding work card content to be hung of each equipment to be listed;
Submodule 4022 is set, for for work to be hung described in being respectively provided with before equipment to be listed each of in each substation
The corresponding work card of board content.
Optionally, the setting submodule 4022 can be used for according to the equipment to be listed in determining each substation,
Determine the quantity of equipment to be listed in each substation;According to the quantity of the equipment to be listed, determine in corresponding substation
The smart machine of identical quantity;It controls before each smart machine is moved to corresponding equipment to be listed, according to determining each
The corresponding work card content to be hung of a equipment to be listed shows the corresponding work card content to be hung of the equipment to be listed.
Optionally, as shown in figure 5, the device of transforming plant primary equipment work card arrangement can also include display module
403。
After processing module 402 is respectively provided with corresponding work card before equipment to be listed each of in each substation,
Display module 403, for showing the work card content being arranged in all listed equipment and the listed equipment.
Optionally, the listed content can also include the working time;
The processing module 402 can be also used for: the background information of the monitoring system of each substation be detected, when determining to each
After equipment operation to be listed is completed in substation, work card placement operations are opened.
The processing module 402 can be also used for: when the end time reaches in the working time, detect each substation
The background information of monitoring system withdraw the work card of arrangement after determining listed equipment state.
The device of above-mentioned transforming plant primary equipment work card arrangement, the content by identification module to the work ticket received
It is identified, the listed content after being identified;Then according to the listed content, processing module is every in each substation
It is respectively provided with corresponding work card before a equipment to be listed, the automatic arrangement for making it possible to achieve work card in substation is grasped with recycling
Make, be effectively saved the time, improve work efficiency, and the work card arranged can be shown in systems, marks work
Make position, it is ensured that the correctness of work card arrangement.
Fig. 6 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in fig. 6, the terminal of the embodiment is set
Standby 600 include: processor 601, memory 602 and are stored in the memory 602 and can transport on the processor 601
Capable computer program 603, such as the program of transforming plant primary equipment work card arrangement.The processor 601 executes the meter
The step in the embodiment of the method for above-mentioned transforming plant primary equipment work card arrangement is realized when calculation machine program 603, such as shown in Fig. 1
Step 101 to 102 perhaps step 201 shown in Fig. 2 to step 203 or step 301 shown in Fig. 3 to step 303, institute
State the function that each module in above-mentioned each Installation practice is realized when processor 601 executes the computer program 603, such as Fig. 4
The function of shown module 401 to 402.
Illustratively, the computer program 603 can be divided into one or more program modules, it is one or
Multiple program modules are stored in the memory 602, and are executed by the processor 601, to complete the present invention.Described one
A or multiple program modules can be the series of computation machine program instruction section that can complete specific function, and the instruction segment is for retouching
State the computer program 603 holding in the device or terminal device 600 that the transforming plant primary equipment work card is arranged
Row process.For example, the computer program 603 can be divided into identification module 401 and processing module 402, each module is specific
Function is as shown in figure 4, this is no longer going to repeat them.
The terminal device 600 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device may include, but be not limited only to, processor 601, memory 602.It will be understood by those skilled in the art that
Fig. 6 is only the example of terminal device 600, does not constitute the restriction to terminal device 600, may include more or more than illustrating
Few component perhaps combines certain components or different components, such as the terminal device can also be set including input and output
Standby, network access equipment, bus etc..
Alleged processor 601 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 602 can be the internal storage unit of the terminal device 600, such as terminal device 600 is hard
Disk or memory.The memory 602 is also possible to the External memory equipment of the terminal device 600, such as the terminal device
The plug-in type hard disk being equipped on 600, intelligent memory card (Smart Media Card, SMC), secure digital (Secure
Digital, SD) card, flash card (Flash Card) etc..Further, the memory 602 can also both include the terminal
The internal storage unit of equipment 600 also includes External memory equipment.The memory 602 for store the computer program with
And other programs and data needed for the terminal device 600.The memory 602 can be also used for temporarily storing defeated
Out or the data that will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function
Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing
The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also
To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list
Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system
The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with
It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute
The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as
Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately
A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device
Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or
In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation
All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program
Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on
The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program
Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie
Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk,
Magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM,
Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described
The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice
Subtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictions
Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.
Claims (10)
1. a kind of method of transforming plant primary equipment work card arrangement characterized by comprising
The content of the work ticket received is identified, the listed content after being identified;
According to the listed content, corresponding work card is respectively provided with before equipment to be listed each of in each substation.
2. the method for transforming plant primary equipment work card arrangement as described in claim 1, which is characterized in that the listed content
Label, equipment to be listed and work card content to be hung including substation to be listed;
It is described that corresponding work card is respectively provided with before equipment to be listed each of in each substation according to the listed content,
Include:
According to the label of the substation to be listed and the equipment to be listed, equipment to be listed in each substation is determined;
According to the equipment to be listed and the work card content to be hung, the corresponding work card to be hung of each equipment to be listed is determined
Content;
To be respectively provided with the corresponding work card of the work card content to be hung before equipment to be listed each of in each substation.
3. the method for transforming plant primary equipment work card arrangement as claimed in claim 2, which is characterized in that described is each change
The corresponding work card of the work card content to be hung is respectively provided with each of in power station before equipment to be listed, comprising:
According to the equipment to be listed in determining each substation, the quantity of equipment to be listed in each substation is determined;
According to the quantity of the equipment to be listed, the smart machine of identical quantity in corresponding substation is determined;
It controls before each smart machine is moved to corresponding equipment to be listed, it is corresponding according to determining each equipment to be listed
Work card content to be hung show the corresponding work card content to be hung of the equipment to be listed.
4. the method for transforming plant primary equipment work card arrangement as claimed any one in claims 1 to 3, which is characterized in that
Described according to the listed content, be respectively provided with before equipment to be listed each of in each substation corresponding work card it
Afterwards, further includes:
Show the work card content being arranged in all listed equipment and the listed equipment.
5. the method for transforming plant primary equipment work card arrangement as claimed in claim 2, which is characterized in that described according to institute
Listed content is stated, is respectively provided with before corresponding work card before equipment to be listed each of in each substation, further includes:
The background information for detecting the monitoring system of each substation completes it to equipment operation to be listed in each substation when determining
Afterwards, work card placement operations are opened.
6. the method for transforming plant primary equipment work card arrangement as claimed in claim 4, which is characterized in that the listed content
It further include the working time;It is described described according to the listed content, each of in each substation before equipment to be listed
It is arranged after corresponding work card, further includes:
When the end time reaches in the working time, the background information of the monitoring system of each substation is detected, is hung when determining
After board equipment state, the work card of arrangement is withdrawn.
7. a kind of device of transforming plant primary equipment work card arrangement characterized by comprising
Identification module identifies for the content to the work ticket received, the listed content after being identified;
Processing module is respectively provided with correspondence before equipment to be listed each of in each substation for according to the listed content
Work card.
8. the device of transforming plant primary equipment work card arrangement as claimed in claim 7, which is characterized in that the listed content
Label, equipment to be listed and work card content to be hung including substation to be listed;
The processing module includes:
Determine submodule, label and the equipment to be listed for the substation to be listed according to determine each substation
Interior equipment to be listed;
The determining submodule is also used to be determined each wait hang according to the equipment to be listed and the work card content to be hung
The corresponding work card content to be hung of board equipment;
Submodule is set, for for work card content pair to be hung described in being respectively provided with before equipment to be listed each of in each substation
The work card answered.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 6 when executing the computer program
The step of any one the method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists
In when the computer program is executed by processor the step of any one of such as claim 1 to 6 of realization the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910537193.7A CN110288316A (en) | 2019-06-20 | 2019-06-20 | The method and terminal device of transforming plant primary equipment work card arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910537193.7A CN110288316A (en) | 2019-06-20 | 2019-06-20 | The method and terminal device of transforming plant primary equipment work card arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110288316A true CN110288316A (en) | 2019-09-27 |
Family
ID=68004772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910537193.7A Pending CN110288316A (en) | 2019-06-20 | 2019-06-20 | The method and terminal device of transforming plant primary equipment work card arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110288316A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111860420A (en) * | 2020-07-30 | 2020-10-30 | 广东电网有限责任公司 | Transformer substation safety signboard processing method and system, storage medium and computer equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106652808A (en) * | 2015-11-04 | 2017-05-10 | 国网山东高密市供电公司 | Intelligent substation signboard |
CN107526768A (en) * | 2017-07-04 | 2017-12-29 | 国网冀北电力有限公司 | A kind of listed assistance system of intelligence and implementation method |
CN107563520A (en) * | 2017-07-26 | 2018-01-09 | 国网安徽省电力公司 | A kind of intelligent substation secondary safety measure method for visualizing |
CN109038810A (en) * | 2018-06-26 | 2018-12-18 | 日照钢铁控股集团有限公司 | A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power |
CN208571709U (en) * | 2018-06-26 | 2019-03-01 | 日照钢铁控股集团有限公司 | A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power |
CN109508796A (en) * | 2018-11-23 | 2019-03-22 | 国网上海市电力公司 | A kind of Substation maintenance intelligent management apapratus |
CN109583830A (en) * | 2018-10-24 | 2019-04-05 | 国网河北省电力有限公司电力科学研究院 | A kind of power business handles method and device |
-
2019
- 2019-06-20 CN CN201910537193.7A patent/CN110288316A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106652808A (en) * | 2015-11-04 | 2017-05-10 | 国网山东高密市供电公司 | Intelligent substation signboard |
CN107526768A (en) * | 2017-07-04 | 2017-12-29 | 国网冀北电力有限公司 | A kind of listed assistance system of intelligence and implementation method |
CN107563520A (en) * | 2017-07-26 | 2018-01-09 | 国网安徽省电力公司 | A kind of intelligent substation secondary safety measure method for visualizing |
CN109038810A (en) * | 2018-06-26 | 2018-12-18 | 日照钢铁控股集团有限公司 | A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power |
CN208571709U (en) * | 2018-06-26 | 2019-03-01 | 日照钢铁控股集团有限公司 | A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power |
CN109583830A (en) * | 2018-10-24 | 2019-04-05 | 国网河北省电力有限公司电力科学研究院 | A kind of power business handles method and device |
CN109508796A (en) * | 2018-11-23 | 2019-03-22 | 国网上海市电力公司 | A kind of Substation maintenance intelligent management apapratus |
Non-Patent Citations (3)
Title |
---|
刘娜等: "核电数字化方案中挂牌功能的研究及改进", 《仪器仪表用户》 * |
李磊等: "发电厂空气开关停电闭锁装置", 《水利电力》 * |
杨东升等: "福清核电DCS系统挂牌功能设计", 《中国科技投资》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111860420A (en) * | 2020-07-30 | 2020-10-30 | 广东电网有限责任公司 | Transformer substation safety signboard processing method and system, storage medium and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109815657A (en) | A kind of identity identifying method and terminal device based on alliance's chain | |
CN108830110B (en) | Energy interaction device, energy internet system and interaction method based on block chain | |
CN108492195A (en) | Extensive method, equipment and storage medium are joined by a kind of entering for regulation engine packet | |
CN110221145A (en) | Fault Diagnosis for Electrical Equipment method, apparatus and terminal device | |
CN107438833A (en) | A kind of data-updating method, device, system and server | |
CN109684272A (en) | Document storage method, system and terminal device | |
CN107913854A (en) | A kind of Automated Sorting System | |
CN110502395A (en) | Equipment running status appraisal procedure, terminal device and storage medium based on cluster | |
CN107564204A (en) | A kind of wholesale withdrawal method and atm device | |
CN109871229A (en) | Management method, device, storage medium and the terminal device of code text | |
CN110232450A (en) | A kind of security control method of station, system and terminal device | |
CN109241357A (en) | Chain structure model and its construction method, system and terminal device | |
CN109782724A (en) | The control method and terminal device of anti-misoperation locking | |
CN108923957A (en) | A kind of method, apparatus and terminal device of distribution network terminal DTU troubleshooting | |
CN103019848B (en) | Method for realizing peripheral component interconnect (PCI) bus non-vector interrupt | |
CN109190776A (en) | Reinspection method, apparatus, terminal device and the storage medium of vehicle failure | |
CN110288316A (en) | The method and terminal device of transforming plant primary equipment work card arrangement | |
CN107864187A (en) | The online task executing method of terminal device and server | |
CN107783953A (en) | Information input method and terminal device | |
CN105279588A (en) | Power grid dispatching operation associated monitoring system | |
CN108830596A (en) | The acquisition device and terminal device of a kind of acquisition methods of information, information | |
CN108335434A (en) | A kind of finance device wholesale note output abnormality eliminating method, device and finance device | |
CN107993016A (en) | Take control management method and terminal device | |
CN107562558A (en) | The feedback method and system of a kind of error message | |
CN111651007A (en) | Server cabinet U bit management method and management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190927 |