CN110288316A - The method and terminal device of transforming plant primary equipment work card arrangement - Google Patents

The method and terminal device of transforming plant primary equipment work card arrangement Download PDF

Info

Publication number
CN110288316A
CN110288316A CN201910537193.7A CN201910537193A CN110288316A CN 110288316 A CN110288316 A CN 110288316A CN 201910537193 A CN201910537193 A CN 201910537193A CN 110288316 A CN110288316 A CN 110288316A
Authority
CN
China
Prior art keywords
listed
equipment
work card
content
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910537193.7A
Other languages
Chinese (zh)
Inventor
张裕
岳洋
王东辉
张云
张玉亮
姚会宾
侯志伟
张静
张雨卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910537193.7A priority Critical patent/CN110288316A/en
Publication of CN110288316A publication Critical patent/CN110288316A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The present invention is suitable for work card and technical field is arranged, and the method and terminal device of a kind of transforming plant primary equipment work card arrangement is provided, this method comprises: identifying to the content of the work ticket received, the listed content after being identified;Then according to the listed content, it is respectively provided with corresponding work card before equipment to be listed each of in each substation, the automatic arrangement and reclaimer operation of work card in substation is made it possible to achieve, is effectively saved the time, improves work efficiency.

Description

The method and terminal device of transforming plant primary equipment work card arrangement
Technical field
The invention belongs to the sides of work card setting technical field more particularly to a kind of transforming plant primary equipment work card arrangement Method and terminal device.
Background technique
Transforming plant primary equipment refers to the electrical equipment for directly participating in production, conveying and distribution electric energy, such as generator, transformation Device, motor, breaker and fuse etc. equipment.Now after the primary equipment of substation breaks down, need to overhaul Personnel overhaul, in order to reinforce overhaul of the equipments safety management, it is ensured that during overhaul of the equipments the person I go, need overhauling It is listed according to job requirement to equipment before equipment.However manual operation is needed when being listed in the prior art to equipment, that is, it transports Dimension personnel need to find suitable work card in the work card of a variety of types, then are suspended in corresponding equipment, due to substation Occupied area is wide, and equipment is numerous, and this adds increased substation's operation maintenance personnel working strengths, causes working efficiency low.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of methods of transforming plant primary equipment work card arrangement and terminal to set It is standby, it needs to find suitable work in the work card of a variety of types to solve operation maintenance personnel before overhaul of the equipments in the prior art Board, then be suspended in corresponding equipment, since substation's occupied area is wide, equipment is numerous, and this adds increased substation's operation maintenance personnels Working strength leads to ineffective problem.
The first aspect of the embodiment of the present invention provides a kind of method of transforming plant primary equipment work card arrangement, comprising:
The content of the work ticket received is identified, the listed content after being identified;
According to the listed content, corresponding work card is respectively provided with before equipment to be listed each of in each substation.
In one embodiment, the listed content includes label, equipment to be listed and the work to be hung of substation to be listed Make board content;
It is described according to the listed content, be respectively provided with corresponding work before equipment to be listed each of in each substation Board, comprising:
According to the label of the substation to be listed and the equipment to be listed, determines in each substation and set to listed It is standby;
According to the equipment to be listed and the work card content to be hung, the corresponding work to be hung of each equipment to be listed is determined Make board content;
To be respectively provided with the corresponding work card of the work card content to be hung before equipment to be listed each of in each substation.
In one embodiment, described for work card to be hung described in being respectively provided with before equipment be listed each of in each substation The corresponding work card of content, comprising:
According to the equipment to be listed in determining each substation, the quantity of equipment to be listed in each substation is determined;
According to the quantity of the equipment to be listed, the smart machine of identical quantity in corresponding substation is determined;
It controls before each smart machine is moved to corresponding equipment to be listed, according to determining each equipment to be listed Corresponding work card content to be hung shows the corresponding work card content to be hung of the equipment to be listed.
In one embodiment, described according to the listed content, each of in each substation before equipment to be listed It is respectively provided with after corresponding work card, further includes:
Show the work card content being arranged in all listed equipment and the listed equipment.
In one embodiment, described according to the listed content, each of in each substation before equipment to be listed It is respectively provided with before corresponding work card, further includes:
The background information for detecting the monitoring system of each substation is completed when determining to equipment operation to be listed in each substation Later, work card placement operations are opened.
In one embodiment, the listed content further includes the working time;Described according to the listed content, each It is respectively provided with after corresponding work card before equipment to be listed each of in substation, further includes:
When the end time reaches in the working time, the background information of the monitoring system of each substation is detected, when true Surely after listed equipment state, the work card of arrangement is withdrawn.
The second aspect of the embodiment of the present invention provides a kind of device of transforming plant primary equipment work card arrangement, comprising:
Identification module identifies for the content to the work ticket received, the listed content after being identified;
Processing module is respectively provided with for according to the listed content before equipment to be listed each of in each substation Corresponding work card.
In one embodiment, the listed content includes label, equipment to be listed and the work to be hung of substation to be listed Make board content;
The processing module includes:
Determine submodule, label and the equipment to be listed for the substation to be listed according to determine each change Equipment to be listed in power station;
The determining submodule is also used to be determined each according to the equipment to be listed and the work card content to be hung The corresponding work card content to be hung of equipment to be listed;
Submodule is set, for described wait hang in work card to be respectively provided with before equipment to be listed each of in each substation Hold corresponding work card.
The third aspect of the embodiment of the present invention provides a kind of terminal device, comprising: memory, processor and is stored in In the memory and the computer program that can run on the processor, which is characterized in that described in the processor executes The step as described in the method that above-mentioned transforming plant primary equipment work card is arranged is realized when computer program.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, comprising: the computer can It reads storage medium and is stored with computer program, which is characterized in that realize when the computer program is executed by processor as above-mentioned Step described in the method for transforming plant primary equipment work card arrangement.
Existing beneficial effect is the embodiment of the present invention compared with prior art: by the content to the work ticket received It is identified, the listed content after being identified;Then according to the listed content, to listed each of in each substation It is respectively provided with corresponding work card before equipment, makes it possible to achieve the automatic arrangement and reclaimer operation of work card in substation, effectively The time has been saved, has been improved work efficiency.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process signal of the method for transforming plant primary equipment work card arrangement provided in an embodiment of the present invention Figure;
Fig. 2 is to be respectively provided with corresponding work before equipment to be listed each of in each substation provided in an embodiment of the present invention Make the flow diagram of board;
Fig. 3 is provided in an embodiment of the present invention described wait hang to be respectively provided with before equipment to be listed each of in each substation The flow diagram of the corresponding work card of work card content;
Fig. 4 is the exemplary diagram of the device of transforming plant primary equipment work card arrangement provided by one embodiment of the present invention;
Fig. 5 is the schematic diagram of the device for the transforming plant primary equipment work card arrangement that another embodiment of the present invention provides;
Fig. 6 is the schematic diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Fig. 1 is the implementation process signal of the method for transforming plant primary equipment work card provided in an embodiment of the present invention arrangement Figure, details are as follows.
Step 101, the content of the work ticket received is identified, the listed content after being identified.
Optionally, work bill system generates corresponding work ticket according to user demand, is then sent to hang tag system, is listed After system receives, content recognition can be carried out to the work ticket received.Optionally, hang tag system can be to the work in work ticket Make place, working time and listed information to be identified, for example, the label of the substation to be listed in identification work ticket, leads to The label for crossing substation to be listed can determine corresponding substation to be listed, and identify the working time in work ticket, i.e., listed Time and work ticket withdraw the time, and the listed information of identification may include equipment to be listed and work card content to be hung.
Step 102, it according to the listed content, is respectively provided with before equipment to be listed each of in each substation corresponding Work card.
Optionally, it treats listed equipment to carry out needing to guarantee that equipment to be listed is cold standby state before being listed, to guarantee The safety operation of staff.
Optionally, the listed content may include the working time, and the working time can recognize the date, work here Time indicates that equipment to be listed needs the listed time, then the time for opening hang tag system needed earlier than this working time.
It optionally, can also include: the background information for detecting the monitoring system of each substation, when true before step 102 After the fixed completion to equipment operation to be listed in each substation, work card placement operations are opened.
Optionally, the background information of the monitoring system of substation may include the working condition letter of each equipment in substation Breath.Equipment operation to be listed is completed to indicate that the state of equipment to be listed switchs to cold standby in each substation.
Optionally, the listed content includes the label of substation to be listed, equipment to be listed and wait hang in work card Hold.
After opening work card placement operations, i.e., the operation of executable step 102.As shown in Fig. 2, in each substation Being respectively provided with corresponding work card before each of interior equipment to be listed may comprise steps of.
Step 201, according to the label of the substation to be listed and the equipment to be listed, determine in each substation to Listed equipment.
Optionally, if substation to be listed is relatively more, need to determine equipment to be listed in each substation first, with Just the listed work of next step is carried out as unit of single substation.
Step 202, according to the equipment to be listed and the work card content to be hung, determine that each equipment to be listed is corresponding Work card content to be hung.
Optionally, work card content to be hung may include " working herein ", " No switching on, someone's work ", " forbid closing Lock, route someone work ", " from this disengaging " etc..
Optionally, the form of expression of the font and text that can also treat extension work card content is selected, such as right The work card of quiescing class.
Step 203, corresponding to be respectively provided with the work card content to be hung before equipment to be listed each of in each substation Work card.
Optionally, as shown in figure 3, to be respectively provided with the work card to be hung before equipment to be listed each of in each substation The corresponding work card of content may comprise steps of.
Step 301, according to the equipment to be listed in determining each substation, equipment to be listed in each substation is determined Quantity.
Step 302, according to the quantity of the equipment to be listed, determine that the intelligence of identical quantity in corresponding substation is set It is standby.
Optionally, smart machine can be intelligent robot, and LED display is arranged on intelligent robot.
Step 303, control before each smart machine is moved to corresponding equipment to be listed, according to it is determining it is each to The listed corresponding work card content to be hung of equipment shows the corresponding work card content to be hung of the equipment to be listed.
Optionally, smart machine and equipment to be listed correspond, and can show correspondence on the LED display of smart machine The work card content that should hang of equipment to be listed.
Optionally, after corresponding work card content to be hung is arranged in control intelligent robot before equipment to be listed, The work card content being arranged in all listed equipment and the listed equipment is shown in hang tag system, to ensure that work card is arranged Correctness.
Optionally, after completing listing operation, when the end time reaches in the working time, each substation is detected The background information of monitoring system withdraws the work card of arrangement after determining listed equipment state.Optionally, the monitoring of substation When the background information of system determines that listed equipment has completed related service work, then it is recoverable to work card, opens correspondence and set It is standby, so that the equipment can work normally.
The method of above-mentioned transforming plant primary equipment work card arrangement, is known by the content to the work ticket received Not, the listed content after being identified;Then according to the listed content, each of in each substation before equipment to be listed It is respectively provided with corresponding work card, the automatic arrangement and reclaimer operation of work card in substation is made it possible to achieve, is effectively saved Time improves work efficiency, and the work card arranged can be shown in systems, markers work position, it is ensured that The correctness of work card arrangement.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Corresponding to the method for the arrangement of transforming plant primary equipment work card described in foregoing embodiments, Fig. 4 shows the present invention The exemplary diagram of the device for the transforming plant primary equipment work card arrangement that embodiment provides.As shown in figure 4, the apparatus may include: Identification module 401 and processing module 402.
Identification module 401 identifies for the content to the work ticket received, the listed content after being identified;
Processing module 402 is all provided with for according to the listed content before equipment to be listed each of in each substation Set corresponding work card.
Optionally, the listed content includes the label of substation to be listed, equipment to be listed and wait hang in work card Hold;As shown in figure 5, the processing module 402 may include: determining submodule 4021 and setting submodule 4022.
Determine submodule 4021, label and the equipment to be listed for the substation to be listed according to determine each Equipment to be listed in a substation;
The determining submodule 4021 is also used to be determined according to the equipment to be listed and the work card content to be hung The corresponding work card content to be hung of each equipment to be listed;
Submodule 4022 is set, for for work to be hung described in being respectively provided with before equipment to be listed each of in each substation The corresponding work card of board content.
Optionally, the setting submodule 4022 can be used for according to the equipment to be listed in determining each substation, Determine the quantity of equipment to be listed in each substation;According to the quantity of the equipment to be listed, determine in corresponding substation The smart machine of identical quantity;It controls before each smart machine is moved to corresponding equipment to be listed, according to determining each The corresponding work card content to be hung of a equipment to be listed shows the corresponding work card content to be hung of the equipment to be listed.
Optionally, as shown in figure 5, the device of transforming plant primary equipment work card arrangement can also include display module 403。
After processing module 402 is respectively provided with corresponding work card before equipment to be listed each of in each substation, Display module 403, for showing the work card content being arranged in all listed equipment and the listed equipment.
Optionally, the listed content can also include the working time;
The processing module 402 can be also used for: the background information of the monitoring system of each substation be detected, when determining to each After equipment operation to be listed is completed in substation, work card placement operations are opened.
The processing module 402 can be also used for: when the end time reaches in the working time, detect each substation The background information of monitoring system withdraw the work card of arrangement after determining listed equipment state.
The device of above-mentioned transforming plant primary equipment work card arrangement, the content by identification module to the work ticket received It is identified, the listed content after being identified;Then according to the listed content, processing module is every in each substation It is respectively provided with corresponding work card before a equipment to be listed, the automatic arrangement for making it possible to achieve work card in substation is grasped with recycling Make, be effectively saved the time, improve work efficiency, and the work card arranged can be shown in systems, marks work Make position, it is ensured that the correctness of work card arrangement.
Fig. 6 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in fig. 6, the terminal of the embodiment is set Standby 600 include: processor 601, memory 602 and are stored in the memory 602 and can transport on the processor 601 Capable computer program 603, such as the program of transforming plant primary equipment work card arrangement.The processor 601 executes the meter The step in the embodiment of the method for above-mentioned transforming plant primary equipment work card arrangement is realized when calculation machine program 603, such as shown in Fig. 1 Step 101 to 102 perhaps step 201 shown in Fig. 2 to step 203 or step 301 shown in Fig. 3 to step 303, institute State the function that each module in above-mentioned each Installation practice is realized when processor 601 executes the computer program 603, such as Fig. 4 The function of shown module 401 to 402.
Illustratively, the computer program 603 can be divided into one or more program modules, it is one or Multiple program modules are stored in the memory 602, and are executed by the processor 601, to complete the present invention.Described one A or multiple program modules can be the series of computation machine program instruction section that can complete specific function, and the instruction segment is for retouching State the computer program 603 holding in the device or terminal device 600 that the transforming plant primary equipment work card is arranged Row process.For example, the computer program 603 can be divided into identification module 401 and processing module 402, each module is specific Function is as shown in figure 4, this is no longer going to repeat them.
The terminal device 600 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The terminal device may include, but be not limited only to, processor 601, memory 602.It will be understood by those skilled in the art that Fig. 6 is only the example of terminal device 600, does not constitute the restriction to terminal device 600, may include more or more than illustrating Few component perhaps combines certain components or different components, such as the terminal device can also be set including input and output Standby, network access equipment, bus etc..
Alleged processor 601 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 602 can be the internal storage unit of the terminal device 600, such as terminal device 600 is hard Disk or memory.The memory 602 is also possible to the External memory equipment of the terminal device 600, such as the terminal device The plug-in type hard disk being equipped on 600, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the memory 602 can also both include the terminal The internal storage unit of equipment 600 also includes External memory equipment.The memory 602 for store the computer program with And other programs and data needed for the terminal device 600.The memory 602 can be also used for temporarily storing defeated Out or the data that will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, Magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice Subtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictions Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of method of transforming plant primary equipment work card arrangement characterized by comprising
The content of the work ticket received is identified, the listed content after being identified;
According to the listed content, corresponding work card is respectively provided with before equipment to be listed each of in each substation.
2. the method for transforming plant primary equipment work card arrangement as described in claim 1, which is characterized in that the listed content Label, equipment to be listed and work card content to be hung including substation to be listed;
It is described that corresponding work card is respectively provided with before equipment to be listed each of in each substation according to the listed content, Include:
According to the label of the substation to be listed and the equipment to be listed, equipment to be listed in each substation is determined;
According to the equipment to be listed and the work card content to be hung, the corresponding work card to be hung of each equipment to be listed is determined Content;
To be respectively provided with the corresponding work card of the work card content to be hung before equipment to be listed each of in each substation.
3. the method for transforming plant primary equipment work card arrangement as claimed in claim 2, which is characterized in that described is each change The corresponding work card of the work card content to be hung is respectively provided with each of in power station before equipment to be listed, comprising:
According to the equipment to be listed in determining each substation, the quantity of equipment to be listed in each substation is determined;
According to the quantity of the equipment to be listed, the smart machine of identical quantity in corresponding substation is determined;
It controls before each smart machine is moved to corresponding equipment to be listed, it is corresponding according to determining each equipment to be listed Work card content to be hung show the corresponding work card content to be hung of the equipment to be listed.
4. the method for transforming plant primary equipment work card arrangement as claimed any one in claims 1 to 3, which is characterized in that Described according to the listed content, be respectively provided with before equipment to be listed each of in each substation corresponding work card it Afterwards, further includes:
Show the work card content being arranged in all listed equipment and the listed equipment.
5. the method for transforming plant primary equipment work card arrangement as claimed in claim 2, which is characterized in that described according to institute Listed content is stated, is respectively provided with before corresponding work card before equipment to be listed each of in each substation, further includes:
The background information for detecting the monitoring system of each substation completes it to equipment operation to be listed in each substation when determining Afterwards, work card placement operations are opened.
6. the method for transforming plant primary equipment work card arrangement as claimed in claim 4, which is characterized in that the listed content It further include the working time;It is described described according to the listed content, each of in each substation before equipment to be listed It is arranged after corresponding work card, further includes:
When the end time reaches in the working time, the background information of the monitoring system of each substation is detected, is hung when determining After board equipment state, the work card of arrangement is withdrawn.
7. a kind of device of transforming plant primary equipment work card arrangement characterized by comprising
Identification module identifies for the content to the work ticket received, the listed content after being identified;
Processing module is respectively provided with correspondence before equipment to be listed each of in each substation for according to the listed content Work card.
8. the device of transforming plant primary equipment work card arrangement as claimed in claim 7, which is characterized in that the listed content Label, equipment to be listed and work card content to be hung including substation to be listed;
The processing module includes:
Determine submodule, label and the equipment to be listed for the substation to be listed according to determine each substation Interior equipment to be listed;
The determining submodule is also used to be determined each wait hang according to the equipment to be listed and the work card content to be hung The corresponding work card content to be hung of board equipment;
Submodule is set, for for work card content pair to be hung described in being respectively provided with before equipment to be listed each of in each substation The work card answered.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 6 when executing the computer program The step of any one the method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of any one of such as claim 1 to 6 of realization the method.
CN201910537193.7A 2019-06-20 2019-06-20 The method and terminal device of transforming plant primary equipment work card arrangement Pending CN110288316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910537193.7A CN110288316A (en) 2019-06-20 2019-06-20 The method and terminal device of transforming plant primary equipment work card arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910537193.7A CN110288316A (en) 2019-06-20 2019-06-20 The method and terminal device of transforming plant primary equipment work card arrangement

Publications (1)

Publication Number Publication Date
CN110288316A true CN110288316A (en) 2019-09-27

Family

ID=68004772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910537193.7A Pending CN110288316A (en) 2019-06-20 2019-06-20 The method and terminal device of transforming plant primary equipment work card arrangement

Country Status (1)

Country Link
CN (1) CN110288316A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111860420A (en) * 2020-07-30 2020-10-30 广东电网有限责任公司 Transformer substation safety signboard processing method and system, storage medium and computer equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106652808A (en) * 2015-11-04 2017-05-10 国网山东高密市供电公司 Intelligent substation signboard
CN107526768A (en) * 2017-07-04 2017-12-29 国网冀北电力有限公司 A kind of listed assistance system of intelligence and implementation method
CN107563520A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of intelligent substation secondary safety measure method for visualizing
CN109038810A (en) * 2018-06-26 2018-12-18 日照钢铁控股集团有限公司 A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power
CN208571709U (en) * 2018-06-26 2019-03-01 日照钢铁控股集团有限公司 A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power
CN109508796A (en) * 2018-11-23 2019-03-22 国网上海市电力公司 A kind of Substation maintenance intelligent management apapratus
CN109583830A (en) * 2018-10-24 2019-04-05 国网河北省电力有限公司电力科学研究院 A kind of power business handles method and device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106652808A (en) * 2015-11-04 2017-05-10 国网山东高密市供电公司 Intelligent substation signboard
CN107526768A (en) * 2017-07-04 2017-12-29 国网冀北电力有限公司 A kind of listed assistance system of intelligence and implementation method
CN107563520A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of intelligent substation secondary safety measure method for visualizing
CN109038810A (en) * 2018-06-26 2018-12-18 日照钢铁控股集团有限公司 A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power
CN208571709U (en) * 2018-06-26 2019-03-01 日照钢铁控股集团有限公司 A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power
CN109583830A (en) * 2018-10-24 2019-04-05 国网河北省电力有限公司电力科学研究院 A kind of power business handles method and device
CN109508796A (en) * 2018-11-23 2019-03-22 国网上海市电力公司 A kind of Substation maintenance intelligent management apapratus

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘娜等: "核电数字化方案中挂牌功能的研究及改进", 《仪器仪表用户》 *
李磊等: "发电厂空气开关停电闭锁装置", 《水利电力》 *
杨东升等: "福清核电DCS系统挂牌功能设计", 《中国科技投资》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111860420A (en) * 2020-07-30 2020-10-30 广东电网有限责任公司 Transformer substation safety signboard processing method and system, storage medium and computer equipment

Similar Documents

Publication Publication Date Title
CN109815657A (en) A kind of identity identifying method and terminal device based on alliance's chain
CN108830110B (en) Energy interaction device, energy internet system and interaction method based on block chain
CN108492195A (en) Extensive method, equipment and storage medium are joined by a kind of entering for regulation engine packet
CN110221145A (en) Fault Diagnosis for Electrical Equipment method, apparatus and terminal device
CN107438833A (en) A kind of data-updating method, device, system and server
CN109684272A (en) Document storage method, system and terminal device
CN107913854A (en) A kind of Automated Sorting System
CN110502395A (en) Equipment running status appraisal procedure, terminal device and storage medium based on cluster
CN107564204A (en) A kind of wholesale withdrawal method and atm device
CN109871229A (en) Management method, device, storage medium and the terminal device of code text
CN110232450A (en) A kind of security control method of station, system and terminal device
CN109241357A (en) Chain structure model and its construction method, system and terminal device
CN109782724A (en) The control method and terminal device of anti-misoperation locking
CN108923957A (en) A kind of method, apparatus and terminal device of distribution network terminal DTU troubleshooting
CN103019848B (en) Method for realizing peripheral component interconnect (PCI) bus non-vector interrupt
CN109190776A (en) Reinspection method, apparatus, terminal device and the storage medium of vehicle failure
CN110288316A (en) The method and terminal device of transforming plant primary equipment work card arrangement
CN107864187A (en) The online task executing method of terminal device and server
CN107783953A (en) Information input method and terminal device
CN105279588A (en) Power grid dispatching operation associated monitoring system
CN108830596A (en) The acquisition device and terminal device of a kind of acquisition methods of information, information
CN108335434A (en) A kind of finance device wholesale note output abnormality eliminating method, device and finance device
CN107993016A (en) Take control management method and terminal device
CN107562558A (en) The feedback method and system of a kind of error message
CN111651007A (en) Server cabinet U bit management method and management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927