Prior art keywords
signboard
overhauled
strategy
working
display content
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010749065.1A
Other languages
Chinese (zh)
Inventor
钟健樑
冯镇生
宋晓越
蒋惠中
姜美玲
刘健
蔡珍珍
张姣
陈柏全
陈泽淮
郭修杰
马献乐
何健明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Guangdong Power Grid Co Ltd
Priority to CN202010749065.1A priority Critical patent/CN111860420A/en
Publication of CN111860420A publication Critical patent/CN111860420A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V30/00Character recognition; Recognising digital ink; Document-oriented image-based pattern recognition
    • G06V30/40Document-oriented image-based pattern recognition
    • G06V30/41Analysis of document content
    • G06V30/413Classification of content, e.g. text, photographs or tables
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/30Administration of product recycling or disposal
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V30/00Character recognition; Recognising digital ink; Document-oriented image-based pattern recognition
    • G06V30/10Character recognition
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W90/00Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Artificial Intelligence (AREA)
  • Multimedia (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a processing method and a system for a safety signboard of a transformer substation, a storage medium and computer equipment, which comprises the following steps: extracting key words from the text of the work ticket; matching a corresponding signboard strategy according to the keyword; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions; and according to the signboard strategy, an LED display pasting screen is used as a signboard to mark the display content and the preset work number.

Description

Transformer substation safety signboard processing method and system, storage medium and computer equipment
Technical Field
The invention relates to the technical field of transformer substation equipment operation inspection, in particular to a transformer substation safety signboard processing method and system, a storage medium and computer equipment.
Background
The main equipment in the transformer substation can be divided into primary equipment and secondary equipment, wherein the primary equipment is a circuit breaker, a disconnecting link, a main transformer, a reactor bank and a capacitor bank, and the secondary equipment is a relay protection device. Before the equipment replacement and maintenance work is carried out, the corresponding equipment needs to be powered off, and after the power failure, safety measures need to be arranged at a working place according to the working content of a working ticket, wherein one item is a suspension nameplate. The nameplates are generally hung on door handles of an equipment mechanism box, a terminal box and a protection screen and can be divided into a prompting type and a warning type, the prompting type nameplates are in work and in operation, the warning type nameplates are in switching-on prohibition, working by people, stopping, high-voltage danger and climbing prohibition and high-voltage danger, and the stopping and high-voltage danger nameplates are attached to the safety fence and do not need to be hung independently. The tablet is marked to present transformer substation for opaque plastic slab, and one of them one side of board is printed with suggestion or warning sentence and pattern, hangs on equipment box handle through the rope. Personnel in the transformer substation need carry a large amount of signboards to hang to the workplace when arranging safety measures, need all retrieve the signboards that mark that this work corresponds after finishing work.
However, as published at 2017.03.08, application No.: chinese patent CN 201610834551.7: as shown in an automatic arrangement method of safety measures of an automatic arrangement system of safety measures, the existing processing method still has the following problems: when a plurality of works are carried out in the same working place, the starting time and the ending time of different work items are inconsistent, the phenomenon of mistaken collection and missed collection easily occurs when the nameplates are recovered by personnel in a transformer substation, the nameplates cannot play a role in prompting and warning, the personnel are likely to mistakenly enter an electrified range, and the personal risk and the equipment risk are increased.
Disclosure of Invention
Aiming at the limitation of the prior art, the invention provides a processing method, a system, a storage medium and computer equipment for a safety signboard of a transformer substation, and the technical scheme of the method is as follows:
a processing method of a safety signboard of a transformer substation comprises the following steps:
extracting key words from the text of the work ticket;
matching a corresponding signboard strategy according to the keyword; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions;
and according to the signboard strategy, an LED display pasting screen is used as a signboard to mark the display content and the preset work number.
Compared with the prior art, the scheme has clear indication, can automatically number the work content according to the sequence of work development, can clearly identify the work places of different works by substation personnel and workers, can not receive the nameplates by mistake or neglect, and greatly reduces the personal and equipment risks; in the scheme, the LED display pasting screen is used as the signboard to replace the original hanging mode, the trouble that the rope is easy to break is avoided, and meanwhile, the signboard is not easy to fall off, so that the warning and prompting effects are effectively achieved; the hands of the transformer substation personnel are successfully liberated, the transformer substation operation personnel concentrate on arrangement of safety measures, the working efficiency is improved, and the safety during working is guaranteed.
In an alternative scheme, the nameplate strategy for the maintenance work of the circuit breaker is as follows: the method comprises the steps that nameplates with display contents of 'forbidding switching-on and working' are arranged at the positions of a circuit breaker to be overhauled and knife switches on two sides of the circuit breaker to be overhauled, and nameplates with display contents of 'working at the moment' are arranged at the positions of the circuit breaker to be overhauled.
In an alternative scheme, the nameplate strategy for the maintenance work of the disconnecting link is as follows: the method comprises the steps that a signboard with display content of 'switch-on forbidding and working' is arranged at the position of a disconnecting link to be overhauled and a breaker adjacent to the disconnecting link to be overhauled in a loop of the disconnecting link to be overhauled and at the position of other disconnecting links, a signboard with display content of 'working here' is arranged at the position of the disconnecting link to be overhauled, and signboards with display content of 'climbing forbidding and high-voltage danger' are arranged at the position of other disconnecting links adjacent to the disconnecting link to be overhauled in the loop of the disconnecting link to be overhauled and at the position of disconnecting links adjacent to the disconnecting link to be overhauled in other loops.
In an alternative scheme, the nameplate strategy for the maintenance work of the transformer is as follows: the method comprises the steps that nameplates with display contents of 'forbidding switching on and working' are arranged at the positions of circuit breakers and disconnecting links on three sides of a transformer to be overhauled, and nameplates with display contents of 'working at the position' are arranged at the positions of the transformer to be overhauled.
In an alternative solution, the nameplate strategy for capacitor bank maintenance work is: and arranging a signboard with the display content of ' switching on forbidden and working ' at the position of a breaker and a disconnecting link in a loop of the capacitor bank to be overhauled, and arranging a signboard with the display content of ' working at the position of the capacitor bank to be overhauled.
In an alternative solution, the nameplate strategy for the reactor group maintenance work is: and arranging a signboard with the display content of 'forbidding switching on and working' at the position of a breaker and a disconnecting link in a loop of the reactor group to be overhauled, and arranging a signboard with the display content of 'working at the position of the reactor group to be overhauled'.
In an optional scheme, the nameplate policy for the maintenance work of the relay protection device is as follows: the method comprises the steps that a signboard with display content of ' switching on forbidden and working ' is arranged at the position of a breaker and a disconnecting link related to a relay protection device to be overhauled, a signboard with display content of ' working at the position of a secondary screen cabinet where the relay protection device to be overhauled is arranged, and a signboard with display content of ' running ' is arranged at the position of an adjacent secondary screen cabinet of the relay protection device to be overhauled.
The present invention also provides the following:
a substation security signboard processing system, comprising:
the keyword extraction module is used for extracting keywords from the task name of the work ticket;
the nameplate strategy matching module is used for matching a corresponding nameplate strategy according to the keyword; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions;
and the nameplate marking module is used for utilizing an LED display pasting screen to mark the display content and the preset work serial number according to the nameplate strategy.
A storage medium having stored thereon a computer program which, when executed by a processor, carries out the steps of the substation security signboard processing method as set forth above.
A computer device comprising a storage medium, a processor and a computer program stored in the storage medium and executable by the processor, the computer program, when executed by the processor, implementing the steps of the substation security signboard processing method as described above.
Drawings
Fig. 1 is a flowchart of a processing method for a substation security signboard according to an embodiment of the present invention;
FIG. 2 is a typical wiring diagram of a substation;
fig. 3 is a schematic diagram of a substation security signboard processing system according to an embodiment of the present invention.
Detailed Description
The drawings are for illustrative purposes only and are not to be construed as limiting the patent;
it should be understood that the embodiments described are only some embodiments of the present application, and not all embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without any creative effort belong to the protection scope of the embodiments in the present application.
The terminology used in the embodiments of the present application is for the purpose of describing particular embodiments only and is not intended to be limiting of the embodiments of the present application. As used in the examples of this application and the appended claims, the singular forms "a", "an", and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It should also be understood that the term "and/or" as used herein refers to and encompasses any and all possible combinations of one or more of the associated listed items.
When the following description refers to the accompanying drawings, like numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present application. Rather, they are merely examples of apparatus and methods consistent with certain aspects of the application, as detailed in the appended claims. In the description of the present application, it is to be understood that the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not necessarily used to describe a particular order or sequence, nor are they to be construed as indicating or implying relative importance. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
Further, in the description of the present application, "a plurality" means two or more unless otherwise specified. "and/or" describes the association relationship of the associated objects, meaning that there may be three relationships, e.g., a and/or B, which may mean: a exists alone, A and B exist simultaneously, and B exists alone. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship. The invention is further illustrated below with reference to the figures and examples.
In order to solve the limitation of the prior art, the present embodiment provides a technical solution, and the technical solution of the present invention is further described below with reference to the accompanying drawings and embodiments.
A method for processing a security signboard of a transformer substation, please refer to fig. 1, comprising the following steps:
s01, extracting keywords from the text of the work ticket;
s02, matching the corresponding signboard strategy according to the keywords; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions;
and S03, according to the signboard strategy, using an LED display pasting screen as a signboard to mark the display content and the preset work number.
Compared with the prior art, the scheme has clear indication, can automatically number the work content according to the sequence of work development, can clearly identify the work places of different works by substation personnel and workers, can not receive the nameplates by mistake or neglect, and greatly reduces the personal and equipment risks; in the scheme, the LED display pasting screen is used as the signboard to replace the original hanging mode, the trouble that the rope is easy to break is avoided, and meanwhile, the signboard is not easy to fall off, so that the warning and prompting effects are effectively achieved; the hands of the transformer substation personnel are successfully liberated, the transformer substation operation personnel concentrate on arrangement of safety measures, the working efficiency is improved, and the safety during working is guaranteed.
Specifically, the keywords include a device name and a work type. In an alternative embodiment, step S01 is to extract keywords from the task name of the work ticket.
In step S02, a corresponding nameplate policy may be matched in the work ticket nameplate cloud database according to the keyword; the work ticket nameplate cloud database comprises key-value pairs which are generated by extracting key words from historical information of work ticket work contents and nameplate hanging positions of the substation equipment and are related to the work contents and the hanging nameplate positions; for the temporary work tasks which are not available in the cloud database, personnel in the transformer substation can manually input the corresponding work tasks and set the nameplates, and the nameplates are stored in the cloud database for standby.
After matching the corresponding signboard strategy in step S02, the operator can determine whether the signboard strategy meets the working requirement, and if the signboard strategy meets the working requirement, the operator can directly perform step S03, or manually change the actually executed signboard strategy first if the signboard strategy does not meet the working requirement, and then perform step S03 after adding or deleting the signboard or changing the layout position.
The LED display pasting screen can be pasted on the mechanism box, the terminal box and the secondary screen cabinet through magnetic attraction or other modes.
In step S03, in addition to the display content, a preset job number is also marked; by numbering each work, the effective distinguishing of different work contents in the same place is realized; after each work is finished, the operator can cancel the nameplate or the serial number corresponding to the work by one key, and the nameplate can be received and not received by mistake. For example, if A, B, C jobs are simultaneously carried out on a certain circuit breaker to be overhauled, the LED display sticker screen on the circuit breaker will display "work at work (ABC)", and when the a job is finished, the LED display sticker screen will display "work at work (BC)".
In an alternative embodiment, the nameplate strategy for circuit breaker service work is: the method comprises the steps that nameplates with display contents of 'forbidding switching-on and working' are arranged at the positions of a circuit breaker to be overhauled and knife switches on two sides of the circuit breaker to be overhauled, and nameplates with display contents of 'working at the moment' are arranged at the positions of the circuit breaker to be overhauled.
Referring to fig. 2, for example, when the breaker a2 is overhauled, the nameplate policy of the corresponding breaker overhaul operation is as follows: a signboard whose display content is "closing prohibition and operation presence" is arranged at the position of the disconnecting link a8 and the disconnecting link a7 on both sides of the circuit breaker a2 and the circuit breaker a2, and a signboard whose display content is "operation at this point" is arranged at the position of the circuit breaker a 2.
In an alternative embodiment, the nameplate strategy for the service work of the disconnecting link is as follows: the method comprises the steps that a signboard with display content of 'switch-on forbidding and working' is arranged at the position of a disconnecting link to be overhauled and a breaker adjacent to the disconnecting link to be overhauled in a loop of the disconnecting link to be overhauled and at the position of other disconnecting links, a signboard with display content of 'working here' is arranged at the position of the disconnecting link to be overhauled, and signboards with display content of 'climbing forbidding and high-voltage danger' are arranged at the position of other disconnecting links adjacent to the disconnecting link to be overhauled in the loop of the disconnecting link to be overhauled and at the position of disconnecting links adjacent to the disconnecting link to be overhauled in other loops.
Referring to fig. 2, for example, when the disconnecting link a7 is repaired, the nameplate policy of the corresponding disconnecting link repair work is as follows: a signboard with display content of 'closing prohibition and working existence' is arranged at the positions of the knife switch a7, the breaker a1, the breaker a2, the knife switch a8, the knife switch a9 and the knife switch a10, a signboard with display content of 'working here' is arranged at the position of the knife switch a7, and a signboard with display content of 'climbing prohibition and high-voltage danger' is arranged at the positions of the knife switch a8, the knife switch a9, the knife switch a10 and the knife switch a17 adjacent to the geographical position of the knife switch a 7.
In an alternative embodiment, the nameplate policy for the transformer overhaul work is: the method comprises the steps that nameplates with display contents of 'forbidding switching on and working' are arranged at the positions of circuit breakers and disconnecting links on three sides of a transformer to be overhauled, and nameplates with display contents of 'working at the position' are arranged at the positions of the transformer to be overhauled.
Referring to fig. 2, for example, when the transformer is overhauled, the nameplate policy of the corresponding transformer overhaul work is as follows: the method comprises the steps that nameplates with display contents of 'switching on forbidden and working' are arranged at the positions of a breaker a1, a breaker a2, a breaker a3, a breaker a4, a disconnecting link a10, a disconnecting link a13 and a disconnecting link a14 on three sides of a transformer to be overhauled, and nameplates with display contents of 'working at the position' are arranged at the positions of the transformer to be overhauled.
In an alternative embodiment, the nameplate strategy for capacitor bank servicing is: and arranging a signboard with the display content of ' switching on forbidden and working ' at the position of a breaker and a disconnecting link in a loop of the capacitor bank to be overhauled, and arranging a signboard with the display content of ' working at the position of the capacitor bank to be overhauled.
Referring to fig. 2, for example, when the capacitor bank is overhauled, the nameplate policy of the corresponding capacitor bank overhaul work is as follows: the method comprises the steps that signboards with display contents of 'switching on forbidden and working' are arranged at the positions of a breaker a5 and a disconnecting link a15 in a loop where a capacitor bank to be overhauled is located, and signboards with display contents of 'working at the position' are arranged at the positions of the capacitor bank to be overhauled.
In an alternative embodiment, the nameplate strategy for reactor group servicing is: and arranging a signboard with the display content of 'forbidding switching on and working' at the position of a breaker and a disconnecting link in a loop of the reactor group to be overhauled, and arranging a signboard with the display content of 'working at the position of the reactor group to be overhauled'.
Referring to fig. 2, for example, when the maintenance work is performed on the reactor group, the nameplate policy of the corresponding maintenance work on the reactor group is as follows: the method comprises the steps that signboards with display contents of 'switching on forbidding and working with people' are arranged at the positions of a breaker a6 and a disconnecting link a16 in a loop where a reactor group to be overhauled is located, and signboards with display contents of 'working at the position' are arranged at the positions of the reactor group to be overhauled.
In an alternative embodiment, the nameplate policy for the maintenance work of the relay protection device is as follows: the method comprises the steps that a signboard with display content of ' switching on forbidden and working ' is arranged at the position of a breaker and a disconnecting link related to a relay protection device to be overhauled, a signboard with display content of ' working at the position of a secondary screen cabinet where the relay protection device to be overhauled is arranged, and a signboard with display content of ' running ' is arranged at the position of an adjacent secondary screen cabinet of the relay protection device to be overhauled.
Referring to fig. 2, for example, when the relay protection device of the circuit breaker a2 is overhauled, the nameplate policy of the corresponding overhaul of the relay protection device is as follows: the method comprises the steps that signboards with display contents of 'switching on forbidding and working' are arranged at the positions of a breaker a2, a disconnecting link a7 and a disconnecting link a8 related to a relay protection device of a breaker a2, signboards with display contents of 'working at the position' are arranged at the position of a secondary screen cabinet where the relay protection device of the breaker a2 is located, and signboards with display contents of 'running' are arranged at the position of a secondary screen cabinet where the relay protection device of the breaker a2 is adjacent.
The present invention also provides the following:
a substation security signboard processing system, comprising:
the keyword extraction module 1 is used for extracting keywords from task names of the work tickets;
the nameplate strategy matching module 2 is used for matching a corresponding nameplate strategy according to the keyword; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions;
and the nameplate marking module 3 is used for utilizing an LED display pasting screen to mark the display content and the preset work serial number according to the nameplate strategy.
A storage medium having stored thereon a computer program which, when executed by a processor, carries out the steps of the substation security signboard processing method as set forth above.
A computer device comprising a storage medium, a processor and a computer program stored in the storage medium and executable by the processor, the computer program, when executed by the processor, implementing the steps of the substation security signboard processing method as described above.
It should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. A processing method of a safety signboard of a transformer substation is characterized by comprising the following steps:
extracting key words from the text of the work ticket;
matching a corresponding signboard strategy according to the keyword; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions;
and according to the signboard strategy, an LED display pasting screen is used as a signboard to mark the display content and the preset work number.
2. The substation safety signboard processing method according to claim 1, wherein the signboard strategy for breaker maintenance work is: the method comprises the steps that nameplates with display contents of 'forbidding switching-on and working' are arranged at the positions of a circuit breaker to be overhauled and knife switches on two sides of the circuit breaker to be overhauled, and nameplates with display contents of 'working at the moment' are arranged at the positions of the circuit breaker to be overhauled.
3. The substation safety signboard processing method according to claim 1, wherein the signboard strategy for the disconnecting link overhaul work is as follows: the method comprises the steps that a signboard with display content of 'switch-on forbidding and working' is arranged at the position of a disconnecting link to be overhauled and a breaker adjacent to the disconnecting link to be overhauled in a loop of the disconnecting link to be overhauled and at the position of other disconnecting links, a signboard with display content of 'working here' is arranged at the position of the disconnecting link to be overhauled, and signboards with display content of 'climbing forbidding and high-voltage danger' are arranged at the position of other disconnecting links adjacent to the disconnecting link to be overhauled in the loop of the disconnecting link to be overhauled and at the position of disconnecting links adjacent to the disconnecting link to be overhauled in other loops.
4. The substation safety signboard processing method according to claim 1, wherein the signboard strategy for the transformer overhaul work is as follows: the method comprises the steps that nameplates with display contents of 'forbidding switching on and working' are arranged at the positions of circuit breakers and disconnecting links on three sides of a transformer to be overhauled, and nameplates with display contents of 'working at the position' are arranged at the positions of the transformer to be overhauled.
5. The substation safety signboard processing method according to claim 1, wherein the signboard strategy for capacitor bank maintenance work is: and arranging a signboard with the display content of ' switching on forbidden and working ' at the position of a breaker and a disconnecting link in a loop of the capacitor bank to be overhauled, and arranging a signboard with the display content of ' working at the position of the capacitor bank to be overhauled.
6. The substation safety signboard processing method according to claim 1, wherein the signboard strategy for reactor group maintenance work is: and arranging a signboard with the display content of 'forbidding switching on and working' at the position of a breaker and a disconnecting link in a loop of the reactor group to be overhauled, and arranging a signboard with the display content of 'working at the position of the reactor group to be overhauled'.
7. The substation safety signboard processing method according to claim 1, wherein the signboard strategy for the relay protection device overhaul work is as follows: the method comprises the steps that a signboard with display content of ' switching on forbidden and working ' is arranged at the position of a breaker and a disconnecting link related to a relay protection device to be overhauled, a signboard with display content of ' working at the position of a secondary screen cabinet where the relay protection device to be overhauled is arranged, and a signboard with display content of ' running ' is arranged at the position of an adjacent secondary screen cabinet of the relay protection device to be overhauled.
8. The utility model provides a board processing system is marked in transformer substation's safety which characterized in that includes:
the keyword extraction module is used for extracting keywords from the task name of the work ticket;
the nameplate strategy matching module is used for matching a corresponding nameplate strategy according to the keyword; the nameplate strategy comprises the positions where the nameplates are arranged and the display contents of the nameplates corresponding to the positions;
and the nameplate marking module is used for utilizing an LED display pasting screen to mark the display content and the preset work serial number according to the nameplate strategy.
9. A storage medium having a computer program stored thereon, the computer program comprising: the computer program realizing the steps of the substation security signboard processing method according to any one of claims 1 to 7 when being executed by a processor.
10. A computer device, characterized by: comprising a storage medium, a processor and a computer program stored in the storage medium and executable by the processor, which computer program, when executed by the processor, carries out the steps of the substation security signboard processing method according to any one of claims 1 to 7.
CN202010749065.1A 2020-07-30 2020-07-30 Transformer substation safety signboard processing method and system, storage medium and computer equipment Pending CN111860420A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010749065.1A CN111860420A (en) 2020-07-30 2020-07-30 Transformer substation safety signboard processing method and system, storage medium and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010749065.1A CN111860420A (en) 2020-07-30 2020-07-30 Transformer substation safety signboard processing method and system, storage medium and computer equipment

Publications (1)

Publication Number Publication Date
CN111860420A true CN111860420A (en) 2020-10-30

Family

ID=72946233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010749065.1A Pending CN111860420A (en) 2020-07-30 2020-07-30 Transformer substation safety signboard processing method and system, storage medium and computer equipment

Country Status (1)

Country Link
CN (1) CN111860420A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113077137A (en) * 2021-03-30 2021-07-06 广东电网有限责任公司 Sign board intelligent management device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103729731A (en) * 2013-12-16 2014-04-16 北京能源投资(集团)有限公司 Sign management method and device
CN205722641U (en) * 2016-05-03 2016-11-23 国网山东省电力公司莱西市供电公司 A kind of interruption maintenance circuit temporary mark board apparatus
CN206711571U (en) * 2017-05-11 2017-12-05 国家电网公司 A kind of Smart Logo board for power station
CN110288316A (en) * 2019-06-20 2019-09-27 国家电网有限公司 The method and terminal device of transforming plant primary equipment work card arrangement
CN209471685U (en) * 2019-04-10 2019-10-08 广东电网有限责任公司 A kind of substation signboard remote control device
CN110956031A (en) * 2019-11-13 2020-04-03 广州供电局有限公司 Text similarity matching method, device and system
CN210324995U (en) * 2019-08-14 2020-04-14 广东电网有限责任公司 Signboard with digital display

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103729731A (en) * 2013-12-16 2014-04-16 北京能源投资(集团)有限公司 Sign management method and device
CN205722641U (en) * 2016-05-03 2016-11-23 国网山东省电力公司莱西市供电公司 A kind of interruption maintenance circuit temporary mark board apparatus
CN206711571U (en) * 2017-05-11 2017-12-05 国家电网公司 A kind of Smart Logo board for power station
CN209471685U (en) * 2019-04-10 2019-10-08 广东电网有限责任公司 A kind of substation signboard remote control device
CN110288316A (en) * 2019-06-20 2019-09-27 国家电网有限公司 The method and terminal device of transforming plant primary equipment work card arrangement
CN210324995U (en) * 2019-08-14 2020-04-14 广东电网有限责任公司 Signboard with digital display
CN110956031A (en) * 2019-11-13 2020-04-03 广州供电局有限公司 Text similarity matching method, device and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113077137A (en) * 2021-03-30 2021-07-06 广东电网有限责任公司 Sign board intelligent management device

Similar Documents

Publication Publication Date Title
CN103761624A (en) Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
CN111860420A (en) Transformer substation safety signboard processing method and system, storage medium and computer equipment
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN112477927A (en) Rail transit station control information system based on mobile terminal
JP4170000B2 (en) Device connection management system
CN114386780A (en) Intelligent work ticket operation ticket system
Floyd A practical guide for applying the hierarchy of controls to electrical hazards
CN111861156A (en) Power distribution network scheduling operation safety management and control system and method
CN107862477B (en) Automatic auditing method for first work ticket safety measures of line
Anderson et al. Electrical safety in industrial construction: An analysis of 10 years of incidents in the global engineering, procurement, and construction industry
JP2008299859A (en) Equipment connection management system
CN115392511A (en) Electronic signal display method, device, equipment and storage medium
JP2006343675A (en) Operation prohibition tag , and operation prohibition tag management system
CN201089680Y (en) Device for reconditioning elevator car top
CN207134051U (en) A kind of secure ID board based on Substation Optimization design
CN112468774B (en) Multifunctional equipment marking system and method for transformer substation
Cesar et al. Technological obsolescence management of electrical equipment and automation systems
CN202512390U (en) Landing leg identification system and engineering machinery provided with the same
CN201466532U (en) Isolation hood for secondary insurance of relay protection
CN114884219A (en) Secondary screen cabinet safety measure integrated device
CN215341714U (en) Warning device of equipment maintenance switch
Camp Electrical Safety and Arc Flash Protection
CN218768560U (en) Power distribution identification assembly and power distribution cabinet device
Oono et al. A new large scale DAS in CEPCO
CN107404089A (en) A kind of recognition methods of linear quadratic control cable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination