CN110284727A - A kind of post-processing approach for preventing vitrified tile hollowing from falling off - Google Patents
A kind of post-processing approach for preventing vitrified tile hollowing from falling off Download PDFInfo
- Publication number
- CN110284727A CN110284727A CN201910593930.5A CN201910593930A CN110284727A CN 110284727 A CN110284727 A CN 110284727A CN 201910593930 A CN201910593930 A CN 201910593930A CN 110284727 A CN110284727 A CN 110284727A
- Authority
- CN
- China
- Prior art keywords
- fixing piece
- vitrified tile
- hollowing
- falling
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012805 post-processing Methods 0.000 title claims abstract description 15
- 238000013459 approach Methods 0.000 title claims abstract description 14
- 239000000693 micelle Substances 0.000 claims abstract description 18
- 238000004826 seaming Methods 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 4
- 239000004570 mortar (masonry) Substances 0.000 claims description 13
- 238000010276 construction Methods 0.000 claims description 11
- 239000000853 adhesive Substances 0.000 claims description 4
- 230000001070 adhesive effect Effects 0.000 claims description 4
- 239000011521 glass Substances 0.000 claims description 3
- 239000000919 ceramic Substances 0.000 abstract description 19
- 230000008439 repair process Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 230000007246 mechanism Effects 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000010521 absorption reaction Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000010079 rubber tapping Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0296—Repairing or restoring facades
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of post-processing approach for preventing vitrified tile hollowing from falling off, comprising the following steps: S5, punch operation is carried out to the wall decorated by vitrified tile in the seaming position of vitrified tile, to form several holes;S6, the setting expansion micelle in described hole, wherein the length value of the expansion micelle is less than or equal to the depth value of described hole;S7, setting fastener;S8, setting fixing piece, the fixing piece include the first fixing piece and the second fixing piece, are detachably connected between first fixing piece and second fixing piece;The through-hole is passed through by fastener and connects the expansion micelle, with fixation first fixing piece;By the way that second fixing piece is connected first fixing piece, to realize that second fixing piece is close to the surface installation of the vitrified tile.The present invention can effectively and easily repair the vitrified tile to have fallen off, and can prevent ceramic tile from continuing to fall off with the time, avoid security risk.
Description
Technical field
The invention belongs to wall surfacing technical fields, and in particular to a kind of post-processing side for preventing vitrified tile hollowing from falling off
Method.
Background technique
In the prior art, for some own property after fitting up a period of time, sky can occur successively in the ceramic tile of staircase metope
The phenomenon that rousing, falling off.The Imitation Rock Porcelain Tiles that are divided into of water absorption rate≤0.5%, water absorption rate >=10% are divided into ceramic by national standard
Brick.And the vitrified tile that property metope uses is usually one kind of Imitation Rock Porcelain Tiles, the water absorption rate of vitrified tile is less than 0.1%, and adhesive surface
Mostly smooth non-porous, when only being pasted by cement, cohesive force is smaller, it is difficult to cement, can be easy to happen after a period of time
Hollowing, the phenomenon that falling off.
In order to overcome the problems referred above, some schemes be also proposed in the prior art, such as:
1, problem ceramic tile is repaired after removing with modified mortar: tile bonding materials'use modified mortar is repaired, general
Increase high molecular polymer in water flowing cement mortar, flexibility can be improved, to improve the ability that mortar adapts to deformation, improves and pass
The performance for cement mortar of uniting.
2, it is replaced after problem ceramic tile is removed with the back line vitrified tile more than hole: using the back such as check design, asperities, strip pattern
The ceramic tile of line structure is repaired, and the ceramic tile with back line structure improves porosity, facilitates the combination of ceramic tile interface and mortar.
However, when repairing the ceramic tile to fall off, needing to cooperate mortar again, on the one hand, the height of addition in scheme 1
Molecular material higher cost;On the other hand, the old sand of the ceramic tile that falls off slurry is cleaned out it is relatively difficult, can there are remnants, it is difficult to
It is cemented admittedly with new mortar, moreover, the ceramic tile to fall off is only smeared to slurry again may be difficult to preferably be combined with the ceramic tile of surrounding.Side
In case 2, when being substituted with the ceramic tile with high voidage back line, the pattern for guaranteeing new ceramic tile and original ceramic tile is also needed
It is similar, it otherwise will affect overall aesthetics, cost is equally higher, and more difficult in conjunction with surrounding ceramic tile.
Globality of the above two scheme after repairing is poor, and process is more complex, higher cost;And only to having occurred
The ceramic tile of problem is repaired, still there is the possibility for continuing to fall off at other positions that do not repair.
Summary of the invention
It to solve the above-mentioned problems, can the present invention is intended to provide a kind of post-processing approach for preventing vitrified tile hollowing from falling off
Effectively easily to repair the vitrified tile to have fallen off, and it can prevent ceramic tile from avoiding safety as the time continues to fall off
Hidden danger.
To achieve the above object, the present invention is achieved by following technical scheme:
A kind of post-processing approach for preventing vitrified tile hollowing from falling off, comprising the following steps:
S5, punch operation is carried out to the wall decorated by vitrified tile in the seaming position of vitrified tile, to form several holes;
S6, the setting expansion micelle in described hole, wherein the length value of the expansion micelle is less than or equal to the hole
The depth value in hole;
S7, setting fastener, wherein one end of the fastener is provided with for expanding what micelle was cooperatively connected with described
Screw mechanism, the other end of the fastener are provided with bulge-structure, and the diameter width values of the bulge-structure are greater than the screw
The maximum diameter width values of pin structure;
S8, setting fixing piece, the fixing piece include the first fixing piece and the second fixing piece, first fixing piece and institute
State is to be detachably connected between the second fixing piece;Wherein, it is provided on first fixing piece and leads to for what the fastener passed through
Hole, the diameter width values of the through-hole are less than the diameter width values of the bulge-structure, and the diameter width values of second fixing piece are greater than the hole
The diameter width values in hole;The through-hole is passed through by fastener and connects the expansion micelle, with fixation first fixing piece;Pass through
Second fixing piece is connected into first fixing piece, to realize that second fixing piece is close to the surface peace of the vitrified tile
Dress.
Preferably, first fixing piece is a washer, the washer is threadedly coupled with second fixing piece.
Preferably, the screw thread length value being arranged on second fixing piece is greater than the thread segment being arranged on the washer
Length value.
Preferably, the lateral surface of second fixing piece is provided with knurling structure.
Preferably, angle end link position of the seaming position described in step S5 between adjacent vitrified tile.
It further, further include preliminary step before executing step S5, the preliminary step includes:
S4, according to construction drawing, the intracorporal pipeline of the wall decorated by vitrified tile is checked, and in punch operation into
Row evacuation.
Further, further include preliminary step before carrying out step S4:
S1, the metope decorated by vitrified tile is checked, hollowing and the vitrified tile that will be fallen off is marked;
S2, removal operation is carried out to there is hollowing and the vitrified tile that will be fallen off, and clear up the vitrified tile and wall after removing
Adhesive surface between body;
Vitrified tile is adhered on wall, until mortar hardening by S3, redistribution mortar again.
Preferably, carrying out spudding in for described hole using glass drill in punch operation.
Compared with prior art, the beneficial effects of the present invention are:
1, in the present solution, by setting fastener and fixing piece, on the basis of the ceramic tile to loose or dislocation is repaired,
Using the method in vitrified tile seam crossing setting fixing piece, globality is carried out for other vitrified tiles repaired and do not repaired
Reinforcing reduce the security risk using vitrified tile it is possible to prevente effectively from vitrified tile hollowing obscission continues to generate.
2, common used material can be used in the fastener in this programme and fixing piece, greatly reduces construction cost, and entire
Process is easy to operate;Other than it can repair the vitrified tile to have fallen off, vitrified tiles all on wall can also be reinforced, be kept away
Exempt from security risk, decreases subsequent number of rewelding;Meanwhile for the region more than the stream of people, construction can be effectively reduced for building
The interference that the public spaces such as terraced corridor use;The space intensive for pipelines such as escalators can also reduce repeatedly to do over again and cause pipe
The risk that line destroys, social benefit are good.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description
Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, general for this field
For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is construction procedure flow chart of the invention.
Fig. 2 is the metope structure schematic diagram after present invention construction.
Fig. 3 is the structural schematic diagram after hole of the present invention construction.
Fig. 4 is the setting schematic diagram of present invention expansion micelle.
Dismantling schematic diagram when Fig. 5 is present invention construction fastener and fixing piece.
Fig. 6 is the cross-sectional side structural schematic diagram of present invention construction back wall.
Wherein:
1- wall, 11- vitrified tile, 2- hole, 3- expand micelle, 4- fastener, 41- screw mechanism, 42- protrusion knot
Structure, the first fixing piece of 51-, the second fixing piece of 52-, 521- knurling structure.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real
Applying mode, the present invention will be described in detail.It should be noted that in the absence of conflict, presently filed embodiment and reality
The feature applied in mode can be combined with each other.Many details are explained in the following description in order to fully understand this hair
Bright, described embodiment is only some embodiments of the invention, rather than whole embodiments.Based on the present invention
In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Mode shall fall within the protection scope of the present invention.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Embodiment 1
As shown in figures 1 to 6, a kind of post-processing approach for preventing vitrified tile hollowing from falling off is provided in the present embodiment, mainly includes
Following construction procedure:
S1, the metope for being bonded with 11 wall 1 of vitrified tile is checked, and to hollowing and the vitrified tile 11 that will fall off into
Line flag.
S2, removal operation is carried out to there is hollowing and the vitrified tile that will be fallen off 11, and clear up the vitrified tile 11 after removing
With the adhesive surface between wall 1.
Vitrified tile 11 is adhered on wall 1, until mortar hardening by S3, redistribution mortar again by mortar.
S4, basis are provided with the construction drawing of the wall 1 of vitrified tile 11, to the pipe in the wall 1 decorated by vitrified tile 11
Line is checked, and pipeline evacuation is carried out in subsequent punch operation.
S5, punch operation is carried out to the wall 1 decorated by vitrified tile 11 in the seaming position of vitrified tile 11, it is several to be formed
Hole 2;In the present embodiment, the selection of seaming position should be selected preferentially at the angle end tie point of four pieces of vitrified tiles 11,
Aperture is carried out at the connecting sewing of the adjacent two pieces of vitrified tiles 11 of secondary reselection;Described hole is carried out using glass drill in punch operation
2 spud in.
S6, the setting expansion micelle 3 in described hole 2;Wherein, the length value of the expansion micelle 3 need to be less than or equal to
The depth value of described hole 2;Also, the ratio between the thickness value of the length value of the hole section in wall 1 and vitrified tile 11, should be greater than
3:1。
S7, setting fastener 4;Wherein, one end of the fastener 4 is provided with connects for cooperating with the expansion micelle 3
The screw mechanism 41 connect, the other end of the fastener 4 are provided with bulge-structure 42, and the diameter width values of the bulge-structure 42 are big
In the maximum diameter width values of the screw mechanism 41.In the present embodiment, the fastener 4 can be directlyed adopt and the expansion micelle
The 3 self-tapping screw nails to match, the bulge-structure 42 is the screw cap end of self-tapping screw nail.
S8, setting fixing piece, the fixing piece include the first fixing piece 51 and the second fixing piece 52, first fixing piece
It is to be detachably connected between 51 and second fixing piece 52.
In the present embodiment, first fixing piece 51 is a washer, and the middle part of first fixing piece 51 is provided with for institute
State the through-hole that fastener 4 passes through, the diameter width values of the through-hole are less than the diameter width values of the bulge-structure 42, when by the fastener
4 when being connected on the expansion micelle 3, first fixing piece 51 can be pressed on the surface of vitrified tile 11.
Second fixing piece 52 is to be threadedly coupled with the washer, the screw thread segment length being arranged on second fixing piece 52
Angle value is greater than the screw thread length value being arranged on the washer;And the diameter width values of second fixing piece 52 are greater than described hole 2
Diameter width values;By the way that second fixing piece 52 is threadedly coupled first fixing piece 51, so that second fixing piece 52
It can tightly be connected on the outer surface of vitrified tile 11, to realize second fixing piece 52 on the surface of the vitrified tile 11
It is close to installation.
As a preferred solution, the end face of second fixing piece 52 may be configured as decorative cover;For the ease of described
Second fixing piece 52 screws installation with first fixing piece 51, is provided with and is used in the lateral surface of second fixing piece 52
The knurling structure 521 of increasing friction force.
In the present embodiment, step S1-S3 is predominantly directed to the wall for having already appeared 11 hollowing of vitrified tile and/or obscission
Face;And step S4-S8 can be individually adapted to the fixing process to intact 11 metope of vitrified tile.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, therefore
Without departing from the technical solutions of the present invention, according to the technical essence of the invention it is to the above embodiments it is any modification,
Equivalent variations and modification, all of which are still within the scope of the technical scheme of the invention.
Claims (8)
1. a kind of post-processing approach for preventing vitrified tile hollowing from falling off, which comprises the following steps:
S5, punch operation is carried out to the wall decorated by vitrified tile in the seaming position of vitrified tile, to form several holes;
S6, the setting expansion micelle in described hole, wherein the length value of the expansion micelle is less than or equal to described hole
Depth value;
S7, setting fastener, wherein one end of the fastener is provided with the screw for being cooperatively connected with the expansion micelle
Pin structure, the other end of the fastener are provided with bulge-structure, and the diameter width values of the bulge-structure are greater than the screw knot
The maximum diameter width values of structure;
S8, setting fixing piece, the fixing piece include the first fixing piece and the second fixing piece, first fixing piece and described the
It is to be detachably connected between two fixing pieces;Wherein, the through-hole passed through for the fastener, institute are provided on first fixing piece
The diameter width values for stating through-hole are less than the diameter width values of the bulge-structure, and the diameter width values of second fixing piece are greater than the diameter of described hole
Width values;The through-hole is passed through by fastener and connects the expansion micelle, with fixation first fixing piece;By will be described
Second fixing piece connects first fixing piece, to realize that second fixing piece is close to the surface installation of the vitrified tile.
2. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 1, which is characterized in that described
One fixing piece is a washer, and the washer is threadedly coupled with second fixing piece.
3. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 2, which is characterized in that described
The screw thread length value being arranged on two fixing pieces is greater than the screw thread length value being arranged on the washer.
4. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 1 or 2, which is characterized in that institute
The lateral surface for stating the second fixing piece is provided with knurling structure.
5. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 4, which is characterized in that step S5
Described in angle end link position of the seaming position between adjacent vitrified tile.
6. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 1 or 5, which is characterized in that
It further include preliminary step before execution step S5, the preliminary step includes:
S4, according to construction drawing, the intracorporal pipeline of the wall decorated by vitrified tile is checked, and is kept away in punch operation
It allows.
7. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 6, which is characterized in that carrying out
Further include preliminary step before step S4:
S1, the metope decorated by vitrified tile is checked, hollowing and the vitrified tile that will be fallen off is marked;
S2, carry out removal operation to there is hollowing and the vitrified tile that will be fallen off, and clear up the vitrified tile after removing and wall it
Between adhesive surface;
Vitrified tile is adhered on wall, until mortar hardening by S3, redistribution mortar again.
8. a kind of post-processing approach for preventing vitrified tile hollowing from falling off according to claim 1 or claim 7, which is characterized in that
Spudding in for described hole is carried out using glass drill in punch operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910593930.5A CN110284727A (en) | 2019-07-03 | 2019-07-03 | A kind of post-processing approach for preventing vitrified tile hollowing from falling off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910593930.5A CN110284727A (en) | 2019-07-03 | 2019-07-03 | A kind of post-processing approach for preventing vitrified tile hollowing from falling off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110284727A true CN110284727A (en) | 2019-09-27 |
Family
ID=68020380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910593930.5A Pending CN110284727A (en) | 2019-07-03 | 2019-07-03 | A kind of post-processing approach for preventing vitrified tile hollowing from falling off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110284727A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114046058A (en) * | 2021-11-23 | 2022-02-15 | 齐洪凯 | Method for fixing wall brick and floor tile to fall off and hollowing |
CN114853445A (en) * | 2022-05-06 | 2022-08-05 | 蒙娜丽莎集团股份有限公司 | Easy-to-bond green body for improving bonding strength of ceramic tile, ceramic tile comprising easy-to-bond green body and preparation method |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1074007A (en) * | 1991-12-30 | 1993-07-07 | 北京市第一建筑工程公司 | Repairing technology for ceramic tile |
CN2385126Y (en) * | 1997-06-10 | 2000-06-28 | 孙力 | Fastening expansion bolt |
CN101251138A (en) * | 2008-03-18 | 2008-08-27 | 郭祥山 | Extending-bulging type glue fixing nail and use method |
CN201401399Y (en) * | 2009-04-22 | 2010-02-10 | 林少林 | Expansion nail |
CN203560239U (en) * | 2013-11-01 | 2014-04-23 | 湖南省金为型材有限公司 | Expansion bolt |
WO2016019913A1 (en) * | 2014-08-08 | 2016-02-11 | 杨东佐 | Expansion fastening connection structure and connection method, and expansion fastening connection assembly |
CN205533623U (en) * | 2016-04-28 | 2016-08-31 | 嘉善固威紧固件有限公司 | Sleeve pipe expansion bolts subassembly |
CN106481628A (en) * | 2016-12-21 | 2017-03-08 | 何志元 | A kind of setscrew |
CN206245695U (en) * | 2016-12-09 | 2017-06-13 | 苏州红叶装饰工程有限公司 | The wall tiling device that a kind of anti-hollowing comes off |
CN108708563A (en) * | 2018-05-28 | 2018-10-26 | 上海天补材料科技有限公司 | It is a kind of to keep the ceramic tile of ceramic tile original state, stone facing point face to reinforce repairing engineering method |
CN109025344A (en) * | 2018-05-28 | 2018-12-18 | 上海天补材料科技有限公司 | Engineering method is repaired in the comprehensive slip casting of inlet fixed pin of a kind of hollowing inner-outer wall ceramic tile, stone material |
CN109057385A (en) * | 2018-05-28 | 2018-12-21 | 上海天补材料科技有限公司 | Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material |
CN208534084U (en) * | 2018-05-28 | 2019-02-22 | 上海天补材料科技有限公司 | A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs |
CN109487974A (en) * | 2018-11-27 | 2019-03-19 | 上海牛元工贸有限公司 | Ceramic tile ruggedized construction and the method for reinforcing ceramic tile using ruggedized construction |
-
2019
- 2019-07-03 CN CN201910593930.5A patent/CN110284727A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1074007A (en) * | 1991-12-30 | 1993-07-07 | 北京市第一建筑工程公司 | Repairing technology for ceramic tile |
CN2385126Y (en) * | 1997-06-10 | 2000-06-28 | 孙力 | Fastening expansion bolt |
CN101251138A (en) * | 2008-03-18 | 2008-08-27 | 郭祥山 | Extending-bulging type glue fixing nail and use method |
CN201401399Y (en) * | 2009-04-22 | 2010-02-10 | 林少林 | Expansion nail |
CN203560239U (en) * | 2013-11-01 | 2014-04-23 | 湖南省金为型材有限公司 | Expansion bolt |
WO2016019913A1 (en) * | 2014-08-08 | 2016-02-11 | 杨东佐 | Expansion fastening connection structure and connection method, and expansion fastening connection assembly |
CN205533623U (en) * | 2016-04-28 | 2016-08-31 | 嘉善固威紧固件有限公司 | Sleeve pipe expansion bolts subassembly |
CN206245695U (en) * | 2016-12-09 | 2017-06-13 | 苏州红叶装饰工程有限公司 | The wall tiling device that a kind of anti-hollowing comes off |
CN106481628A (en) * | 2016-12-21 | 2017-03-08 | 何志元 | A kind of setscrew |
CN108708563A (en) * | 2018-05-28 | 2018-10-26 | 上海天补材料科技有限公司 | It is a kind of to keep the ceramic tile of ceramic tile original state, stone facing point face to reinforce repairing engineering method |
CN109025344A (en) * | 2018-05-28 | 2018-12-18 | 上海天补材料科技有限公司 | Engineering method is repaired in the comprehensive slip casting of inlet fixed pin of a kind of hollowing inner-outer wall ceramic tile, stone material |
CN109057385A (en) * | 2018-05-28 | 2018-12-21 | 上海天补材料科技有限公司 | Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material |
CN208534084U (en) * | 2018-05-28 | 2019-02-22 | 上海天补材料科技有限公司 | A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs |
CN109487974A (en) * | 2018-11-27 | 2019-03-19 | 上海牛元工贸有限公司 | Ceramic tile ruggedized construction and the method for reinforcing ceramic tile using ruggedized construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114046058A (en) * | 2021-11-23 | 2022-02-15 | 齐洪凯 | Method for fixing wall brick and floor tile to fall off and hollowing |
CN114853445A (en) * | 2022-05-06 | 2022-08-05 | 蒙娜丽莎集团股份有限公司 | Easy-to-bond green body for improving bonding strength of ceramic tile, ceramic tile comprising easy-to-bond green body and preparation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110284727A (en) | A kind of post-processing approach for preventing vitrified tile hollowing from falling off | |
EG24580A (en) | Method for reinforcing buildings structures and coating obtained thereby | |
CN1978843A (en) | Construction method for reinforcing steel-bar net mortar thin layer | |
CN204983199U (en) | Screw thread subassembly and corresponding building templates for building templates | |
CN207177263U (en) | A kind of recyclable multi-functional pre-buried wall-connecting piece | |
CN106968400B (en) | A kind of dismounting unbonded prestressed concrete structure moveable anchor and its application method | |
CN205907846U (en) | Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings | |
CN204676890U (en) | A kind of portable through-flooring pipeline preformed hole sleeve pipe | |
CN107447975A (en) | Exterior wall scaffold tapered cup nut wall-connecting piece | |
CN203876019U (en) | Pore-forming member manufacturing preformed hole of precast concrete component | |
CN108729643A (en) | A kind of overhanging type discharging platform steel wire rope drawknot tool | |
CN206815603U (en) | Superelevation sitting posture full glass curtain wall installation glass fixture | |
CN205577465U (en) | Utilize device of FRP reinforcing concrete shear force wall | |
CN204418379U (en) | A kind of prefabricated component syndeton | |
CN210289227U (en) | Anti-falling fixing device for vitrified tiles | |
CN208534084U (en) | A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs | |
CN211200798U (en) | Metal mesh rock wool composite sheet outer wall external insulation system | |
CN205990753U (en) | Exterior wall scaffold tapered cup nut wall-connecting piece | |
CN205857713U (en) | Hole mould is hung in a kind of canalization | |
CN206554369U (en) | A kind of self-heat preserving assembly type wallboard of built-in convex template | |
CN207277564U (en) | Connection structure between blank wall and colored steel roof | |
KR101777525B1 (en) | Repair and Reinforcement Method of Construction of Various Structures using Reinforced Fiber Panel and Fiber Laminated Panel | |
CN206053190U (en) | A kind of special-shaped tetragon stone material post | |
CN207526003U (en) | Prestressing force bellows component | |
CN207660284U (en) | A kind of efficient shear wall through-wall bolt hole mortar controllable type grouting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |