CN205907846U - Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings - Google Patents
Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings Download PDFInfo
- Publication number
- CN205907846U CN205907846U CN201620678241.6U CN201620678241U CN205907846U CN 205907846 U CN205907846 U CN 205907846U CN 201620678241 U CN201620678241 U CN 201620678241U CN 205907846 U CN205907846 U CN 205907846U
- Authority
- CN
- China
- Prior art keywords
- secondary structure
- wall
- little
- transition zone
- primary structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a prevent structure of a secondary structure and two secondary structure handing -over department feather checkings, by being located for a secondary structure's shear force wall and infilled wall handing -over department for two secondary structure add the C20 who the establishes concrete transition zone of expanding a little, build by laying bricks or stones the infilled wall wall body both sides for two secondary structure keep somewhere indenting and pre -buried drawknot reinforcing bar constitution, wherein add the C20 that the establishes concrete transition zone of expanding a little, its appearance structural shapes is the indenting shape. The width design that C20 expanded the concrete transition zone a little is 200mm~300mm. Follow the high every 200mm of indenting ~500mm department and set up 2 phi, 6 horizontal drawknot reinforcing bars, imbed the length of the interior drawknot reinforcing bar of wall body, all should not be lighter than 1000mm from staying cha chu to count every limit. The utility model discloses the structure is safe practical, adds the C20 who the establishes concrete transition zone of expanding a little, for when carrying out local standard, provides the wall lacing wire transition region, gos deep into smoothly in the middle of the wall body mortar joint. Add and to establish C20 and expand the indenting form of concrete transition zone a little and reached the effect of constructional column, reduce, the crack of control wall body produces, the intensity of reinforcing brickwork.
Description
Technical field
This utility model is related to a kind of construction preventing primary structure and secondary structure junction generation crack, belongs to building
Field of engineering technology.
Background technology
Primary structure refers to body structure portion, is shear wall structure, is supporting member, first completes.Some subsequently carrying out
Nonweight-bearing masonry, constructional column, lintel etc. some need the part that completes to be commonly referred to as secondary structure (the two before decoration
structure).Why claim secondary structure, be because its operation time of carrying out be those supporting members construction finish with
Just construct afterwards.Secondary structure is for agent structure, is non bearing structure, and such as constructional column, collar tie beam, sealing are anti-
Beam, parapet, bear down on one, fill wall, partition wall etc..
The construction scope of commercial residential building was increasing in recent years, as the masonry of the major bearing structures form of residential building
Structure produced problem also increases therewith, and particularly wall body slit is modal problem.The generation of bond structure crack leads to body of wall
Seepage, have jeopardizes structure safety, from affect the attractive in appearance of building in appearance it is seen that prevention bond structure crack generation be a urgency
Problem to be solved is it is necessary to attract great attention.In prior art, prevention bond structure crack several method, but not ideal or
There is a weak point:
1. fiberglass mesh band, has typically added two-layer, and time crack can only say it is to postpone, and can not prevent.
2. add expanded metal lath in plastering, local still occurs, simply delay the time occurring.
3. smear polymers anti-cracking mortar, effect is all more better than above, but acceptable on a small quantity, and large area uses, and cost is too
High.
Tianjin town and country construction and Communications Commission's file [are built matter peace [2010) No. 1208] to require, from January 1st, 2011
Rise, new construction wall tie bar, constructional column reinforcing bar, the setting of beam steel should adopt reserved, pre-buried mode.And take once
In structure, the mode of reserved tension rib is very high to the positional accuracy requirement of wall lacing wire, and primary structure formwork also should not be constructed, pole
Problems with easily occurs:
1) primary structure formwork inconvenience, template loss is larger;
2) wall lacing wire position during main structure construction it is difficult to ensure that, the inaccurate situation in position, wall easily occur
Lacing wire position is not to it is impossible to be deep in the middle of filling wall mortar joint;
3), after wall plastering, primary structure (shear wall) and secondary structure (filling wall) junction easily produce crack.
How to solve primary structure (shear wall) present in above-mentioned prior art and secondary structure (filling wall) junction
Easily produce crack problem, become the problem of building industry engineers and technicians extremely concern, be also construction engineering technology
The problem of personnel's urgently R and D.
Utility model content
The purpose of this utility model, is the defect existing for prior art, and provides a kind of simple to operate, convenient peace
Entirely, practical a kind of construction preventing primary structure and secondary structure junction generation crack.
This utility model for achieving the above object, be the technical scheme is that
A kind of construction preventing primary structure and secondary structure junction generation crack it is characterised in that: described once tie
Structure and secondary structure are respectively shear wall and filling wall, the described structure preventing primary structure and secondary structure junction generation crack
Make, by be located at for primary structure shear wall with for secondary structure filling wall junction add c20 micro expansive concrete mistake
Cross band, build the indwelling horse tooth trough in the filling wall body of wall both sides for secondary structure and pre-buried steel tie composition by laying bricks or stones, wherein said
The c20 micro expansive concrete intermediate zone adding, its contour structures shape is in horse tooth trough shape.
Described c20 micro expansive concrete intermediate zone, its width design is 200mm~300mm, and described width design cannot be less than
200mm.
Described pre-buried steel tie, the horizontal steel tie of 2 φ 6 of setting along at the high every 200mm~500mm of horse tooth trough, often
While stretching into the length of steel tie in body of wall, all it is not preferably less than 1000mm from staying Cha Chu to count every side.
Beneficial effect
1st, add c20 micro expansive concrete intermediate zone, be in execution local meam time, provide wall lacing wire one transitional region,
Smoothly go deep in the middle of body of wall mortar joint.
2nd, the horse tooth trough form adding c20 micro expansive concrete intermediate zone has reached the effect of constructional column, reduces, controls body of wall
Crack produce, strengthen masonry intensity.
Brief description
Fig. 1 is organigram of the present utility model.
In Fig. 1: 1 is secondary structure;2 is c20 micro expansive concrete intermediate zone;3 is primary structure;4 is steel tie.
Specific embodiment
A kind of construction preventing primary structure and secondary structure junction generation crack, as shown in figure 1, described primary structure
3 and secondary structure 1 be respectively shear wall and filling wall, the described structure preventing primary structure and secondary structure junction generation crack
Make, by be located at for primary structure 3 shear wall with for secondary structure 1 filling wall junction add c20 micro expansive concrete
Intermediate zone 2, builds the indwelling horse tooth trough in the filling wall body of wall both sides for secondary structure 1 by laying bricks or stones and pre-buried steel tie 4 forms, wherein
The described c20 micro expansive concrete intermediate zone 2 adding, its contour structures shape is in horse tooth trough shape.
Described c20 micro expansive concrete intermediate zone 2, its width design is 200mm~300mm, and described width design must not be little
In 200mm, the width design of this utility model intermediate zone 2 is 200mm.
Described pre-buried steel tie 4, the horizontal steel tie 4 of 2 φ 6 of setting along at the high every 200mm~500mm of horse tooth trough,
The length of steel tie 4 in body of wall is stretched on every side, is not all preferably less than 1000mm from staying Cha Chu to count every side.
In this utility model, described c20 micro expansive concrete intermediate zone 2, refer to that intermediate zone is that strength grade of concrete is
The micro expansive concrete of c20.Described micro expansive concrete, refers to add extender to ensure the ungauged regions of concrete or micro- in concrete
Expand, reduce the change in volume after concrete hardening.Micropetrosis concrete has the performance of ungauged regions or microdilatancy, typically will
Seek 14d limited expansion rate >=1.5 × 10e-4.Concrete limited expansion rate assay method gbj1 19 88.Slightly expanded concrete
Intermediate zone xoncrete structure can not only reduce the quality problems such as cavity, honeycomb, pitted skin, and it is close to improve intermediate zone xoncrete structure
Reality, it is to avoid produce crack.
In this utility model, it is that the filling wall of secondary structure 1 is built both sides by laying bricks or stones and needed indwelling horse tooth trough, it is right not allow during formwork
Bolt is drawn to wear masonry wall mistake.
In this utility model, pre-buried steel tie 4 is reached minimizing primary structure 3 and is produced with secondary structure 1 junction and splits
The effect of seam, and avoid the inaccurate problem in pre-buried wall lacing wire position.
The above, be only preferred embodiment of the present utility model, not structure of the present utility model is made any
Pro forma restriction.Every any simple modification above example made according to technical spirit of the present utility model, equivalent
Change and modification, all still fall within the range of the technical solution of the utility model.
Claims (3)
1. a kind of construction preventing primary structure and secondary structure junction generation crack it is characterised in that: described primary structure
(3) it is respectively shear wall and filling wall, described primary structure and the secondary structure junction generation crack of preventing with secondary structure (1)
Construction, by be located at for primary structure (3) shear wall with for secondary structure (1) fill wall junction add c20 micro-
Swollen concrete intermediate zone (2), builds the indwelling horse tooth trough in the filling wall body of wall both sides for secondary structure (1) and pre-buried drawknot steel by laying bricks or stones
Muscle (4) forms, wherein said c20 micro expansive concrete intermediate zone (2) adding, and its contour structures shape is in horse tooth trough shape.
2. prevent the construction in primary structure and secondary structure junction generation crack according to claim 1 it is characterised in that:
Described c20 micro expansive concrete intermediate zone (2), its width design is 200mm~300mm, and described width design cannot be less than
200mm.
3. prevent the construction in primary structure and secondary structure junction generation crack according to claim 1 it is characterised in that:
Described pre-buried steel tie (4), the horizontal steel tie (4) of 2 φ 6 of setting along at the high every 200mm~500mm of horse tooth trough, every side
Stretch into the length of steel tie in body of wall (4), be not all preferably less than 1000mm from staying Cha Chu to count every side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620678241.6U CN205907846U (en) | 2016-06-30 | 2016-06-30 | Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620678241.6U CN205907846U (en) | 2016-06-30 | 2016-06-30 | Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205907846U true CN205907846U (en) | 2017-01-25 |
Family
ID=57813296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620678241.6U Active CN205907846U (en) | 2016-06-30 | 2016-06-30 | Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205907846U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237424A (en) * | 2017-07-26 | 2017-10-10 | 天津三建建筑工程有限公司 | A kind of agent structure and the drawknot construction method of filling wall |
CN107268810A (en) * | 2017-07-04 | 2017-10-20 | 山西西建集团有限公司 | It is a kind of to prevent from filling the construction method that wall produces crack with concrete wall column joint part |
CN112359805A (en) * | 2020-11-09 | 2021-02-12 | 中国水利水电科学研究院 | Method for preventing crack generation of thin-wall structure of lock chamber after long-time intermittence |
-
2016
- 2016-06-30 CN CN201620678241.6U patent/CN205907846U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268810A (en) * | 2017-07-04 | 2017-10-20 | 山西西建集团有限公司 | It is a kind of to prevent from filling the construction method that wall produces crack with concrete wall column joint part |
CN107237424A (en) * | 2017-07-26 | 2017-10-10 | 天津三建建筑工程有限公司 | A kind of agent structure and the drawknot construction method of filling wall |
CN112359805A (en) * | 2020-11-09 | 2021-02-12 | 中国水利水电科学研究院 | Method for preventing crack generation of thin-wall structure of lock chamber after long-time intermittence |
CN112359805B (en) * | 2020-11-09 | 2021-09-17 | 中国水利水电科学研究院 | Method for preventing crack generation of thin-wall structure of lock chamber after long-time intermittence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775553B (en) | Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member | |
CN106760054B (en) | Prefabricated reinforced concrete shear wall | |
CN105804410B (en) | Prefabricated concrete structure is vertically connected with dividing storehouse slip casing by pressure method | |
CN205907846U (en) | Prevent structure of a secondary structure and two secondary structure handing -over department feather checkings | |
CN205242706U (en) | Cast -in -place constructional column of infilled wall and wall body synchronous construction structure between high -rise outer eaves window | |
AU2015100669A4 (en) | Hollow Wall | |
CN105089178B (en) | A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls | |
CN102433938A (en) | Hooped steel reinforced concrete beam-column joint of core area U-shaped column | |
CN103603445B (en) | A kind of power consumption steel frame building block infilled wall | |
CN104153495B (en) | A kind of attachment structure of Multi-function light concrete curtain wall | |
CN108775084B (en) | Steel-concrete combined precast beam and precast column connecting structure and construction method | |
CN107558633A (en) | It is provided with the installation method of the prefabricated panel with distribution box | |
CN109184030A (en) | A kind of assembly concrete shear wall Type Composite Structure System and installation method | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN203961099U (en) | A kind of high strength hollow constructional column template brick and the constructional column of building thereof | |
CN202202417U (en) | Beam-column skew crossing section steel concrete beam-column node | |
CN105040855B (en) | Prefabricated shear wall welded end plate and horizontal section steel combined connection apparatus | |
CN101333875A (en) | Brick wall reinforced concrete wall stud structure | |
CN203795721U (en) | Concrete column with built-in square steel tube | |
CN110397187A (en) | Assembled architecture and construction method | |
CN106193120A (en) | Basement is encorbelmented, and base plate is inverse makees structure and construction method | |
CN206636034U (en) | A kind of high intensity Hollow blockses | |
CN206233414U (en) | A kind of connecting sewing constructing structure of shear wall and Concrete Filled wall | |
CN204703363U (en) | Energy-saving wall heat insulation building block | |
CN215830079U (en) | Reinforcing node system for retaining high and large masonry wall of outer vertical face by original appearance of historical building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200331 Address after: 300170 No. eight north latitude road, Hedong District, Tianjin, 17 Co-patentee after: TIANJIN JINBEIER CONSTRUCTIONAL ENGINEERING TESTING DETECTION TECHNOLOGY Co.,Ltd. Patentee after: TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 300170, No. eight north latitude road, Hedong District, Hedong District, Tianjin, 17 Patentee before: TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co.,Ltd. |