CN110263941A - Maintenance of equipment method and device - Google Patents

Maintenance of equipment method and device Download PDF

Info

Publication number
CN110263941A
CN110263941A CN201810201137.1A CN201810201137A CN110263941A CN 110263941 A CN110263941 A CN 110263941A CN 201810201137 A CN201810201137 A CN 201810201137A CN 110263941 A CN110263941 A CN 110263941A
Authority
CN
China
Prior art keywords
maintenance
repaired
work card
equipment
mark
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810201137.1A
Other languages
Chinese (zh)
Inventor
刘培军
王帅
张凡
许航
王树军
王世龙
黄兆亮
王艳
王培�
侯丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810201137.1A priority Critical patent/CN110263941A/en
Publication of CN110263941A publication Critical patent/CN110263941A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of maintenance of equipment method and devices, belong to overhaul of the equipments technical field.This method comprises: receive the maintenance instructions for being directed to designated equipment, the mark of maintenance task can be carried in the maintenance instructions, terminal is according to the mark of the maintenance task, it can determines target work card corresponding with the mark of the maintenance task.And record has a kind of maintenance flow of maintenance task on each work card, maintenance personal is according to the maintenance flow recorded on the target work card, it can repairs to designated equipment.The method for maintaining it is high-efficient, flexibility is good.

Description

Maintenance of equipment method and device
Technical field
The present invention relates to overhaul of the equipments technical field, in particular to a kind of maintenance of equipment method and device.
Background technique
Equipment after prolonged use, it is possible that failure, in order to guarantee the normal operation of equipment, need to equipment into The periodic inspection and maintenance of row.
In the related technology, when equipment breaks down, maintenance personal can rule of thumb be carried out the failure that equipment occurs Maintenance.
But method in the related technology depends on the service experience of maintenance personal, the flexibility of maintenance of equipment is poor, effect Rate is lower.
Summary of the invention
The embodiment of the invention provides a kind of maintenance of equipment method and devices, can solve maintenance of equipment in the related technology Flexibility is poor, and the lower problem of efficiency, the technical solution is as follows:
According to a first aspect of the embodiments of the present invention, a kind of maintenance of equipment method is provided, which comprises
The maintenance instructions for being directed to designated equipment are received, the mark of maintenance task is carried in the maintenance instructions;
According to the mark of the maintenance task, the determining mark with the maintenance task from pre-stored multiple work cards Corresponding target work card, wherein each work card record has a kind of maintenance flow of maintenance task;
The target work card is shown, so as to the maintenance flow that maintenance personal records according to the target work card, to the finger Locking equipment repairs.
Optionally, the method also includes:
The work card received for specified maintenance task creates instruction, carries the specified dimension in the work card creation instruction Repair the mark of task;
Receive the maintenance flow of the specified maintenance task;
Work card corresponding with the mark of the specified maintenance task is created, and records the specified maintenance in the work card The maintenance flow of task.
Optionally, the method also includes:
Obtain the mark of part to be repaired in the designated equipment;
The corresponding relationship of part mark according to the pre-stored data and Parameters of The Parts information and inventory information obtains described wait tie up Repair the parameter information of part and the inventory information of the part to be repaired;
Show the parameter information of the part to be repaired and the inventory information of the part to be repaired.
Optionally, the method also includes:
Obtain each component in the quantity and the equipment to be repaired of scheduled date equipment to be repaired to be repaired Time between overhauls(TBO);
According to the scheduled date and the maintenance cycle of each component, the date of survey of each component is determined;
The quantity of maintenance personal needed for determining the scheduled date according to the quantity of the equipment to be repaired, and maintenance The quantity of tool;
The maintenance project table of the equipment to be repaired is generated, record has each in the equipment to be repaired in the planning chart The quantity of the date of survey of component, the quantity of maintenance personal needed for the scheduled date and maintenance tool;
Show the maintenance project table of the equipment to be repaired.
Optionally, the method also includes:
Show the scan code of each work card in pre-stored multiple work cards;
The acquisition request for specified work card that mobile terminal is sent is received, the acquisition request is that the mobile terminal exists Scan the scan code generation later of the specified work card;
According to the acquisition request, Xiang Suoshu mobile terminal sends the specified work card.
Optionally, each work card also record have maintenance task needed for maintenance tool type and quantity, maintenance appoint At least one of duration needed for the quantity and maintenance task of maintenance personal needed for business.
According to a second aspect of the embodiments of the present invention, a kind of maintenance of equipment device is provided, described device includes:
First receiving module carries maintenance in the maintenance instructions for receiving the maintenance instructions for being directed to designated equipment The mark of task;
First determining module, for the mark according to the maintenance task, determined from pre-stored multiple work cards with The corresponding target work card of the mark of the maintenance task, wherein each work card record has a kind of maintenance stream of maintenance task Journey;
Display module, for showing the target work card, the maintenance that is recorded so as to maintenance personal according to the target work card Process repairs the designated equipment.
Optionally, described device further include:
Second receiving module, for receiving the work card creation instruction for being directed to specified maintenance task, the work card creation instruction In carry the mark of the specified maintenance task;
Third receiving module, for receiving the maintenance flow of the specified maintenance task;
Creation module for creating work card corresponding with the mark of the specified maintenance task, and is remembered in the work card Record the maintenance flow of the specified maintenance task.
Optionally, described device further include:
First obtains module, for obtaining the mark of part to be repaired in the designated equipment;
Second obtains module, for the corresponding of part mark according to the pre-stored data and Parameters of The Parts information and inventory information Relationship obtains the parameter information of the part to be repaired and the inventory information of the part to be repaired;
The display module is also used to show the parameter information and the part to be repaired of the part to be repaired Inventory information.
Optionally, described device further include:
Third obtains module, for obtaining in the quantity of scheduled date equipment to be repaired to be repaired and described wait tie up Repair the time between overhauls(TBO) of each component in equipment;
Second determining module determines each component for the maintenance cycle according to the scheduled date and each component Date of survey;
Third determining module, for maintenance people needed for determining the scheduled date according to the quantity of the equipment to be repaired The quantity of member and the quantity of maintenance tool;
Generation module, for generating the maintenance project table of the equipment to be repaired, in the planning chart record have it is described to The date of survey of each component in maintenance of equipment, the quantity of maintenance personal needed for the scheduled date and maintenance tool Quantity;
The display module is also used to show the maintenance project table of the equipment to be repaired.
The technical solution that the embodiment of the present invention provides can include the following benefits:
In conclusion the embodiment of the invention provides a kind of maintenance of equipment method and device, this method is carried out to equipment When maintenance, the maintenance instructions of maintenance task mark can be carried by receiving, it can be true according to the mark of the maintenance task Determine target work card corresponding with maintenance task mark, record has the maintenance to the maintenance task of designated equipment in the target work card Process.Maintenance personal can repair designated equipment, according to the target work card to maintenance personal when reducing maintenance of equipment The dependence of service experience improves the flexibility and efficiency of maintenance of equipment.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited Invention.
Detailed description of the invention
In order to illustrate more clearly of the embodiment of the present invention, attached drawing needed in embodiment description will be made below Simply introduce, it should be apparent that, drawings in the following description are only some embodiments of the invention, common for this field For technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of architecture diagram of equipment Maintenance Management System provided in an embodiment of the present invention;
Fig. 2 is a kind of flow chart of maintenance of equipment method provided in an embodiment of the present invention;
Fig. 3 is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Fig. 4 is a kind of schematic diagram of maintenance of equipment process provided in an embodiment of the present invention;
Fig. 5 is a kind of surface chart of equipment Maintenance Management System provided in an embodiment of the present invention;
Fig. 6 is a kind of schematic diagram of work card provided in an embodiment of the present invention;
Fig. 7 is a kind of management process schematic diagram of work card provided in an embodiment of the present invention;
Fig. 8 is a kind of method flow diagram that specified work card is sent to mobile terminal provided in an embodiment of the present invention;
Fig. 9 is a kind of flow chart of method for showing parts information provided in an embodiment of the present invention;
Figure 10 is a kind of method flow diagram for generating maintenance project table provided in an embodiment of the present invention;
Figure 11 is a kind of functional block diagram of equipment Maintenance Management System provided in an embodiment of the present invention;
Figure 12 A is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Figure 12 B is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Figure 12 C is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Figure 12 D is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Figure 12 E is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Figure 12 F is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention;
Figure 13 is a kind of block diagram of maintenance of equipment device provided in an embodiment of the present invention;
Figure 14 is the block diagram of another maintenance of equipment device provided in an embodiment of the present invention.
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention Example, and be used to explain the principle of the present invention together with specification.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into It is described in detail to one step, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole implementation Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts All other embodiment, shall fall within the protection scope of the present invention.
Gas generator is that one kind can produce burning gases, and the thermal energy of burning gases is converted to setting for mechanical energy It is standby, it can be used for providing kinetic energy for load different in the fields such as aviation, ship or electric power.The embodiment of the present invention is sent out with combustion gas For raw device, a kind of maintenance of equipment method is provided.Method for maintaining provided in an embodiment of the present invention can solve in the related technology The service experience of maintenance personal is only relied upon come when repairing to gas generator, flexibility is poor, the lower problem of efficiency.
Fig. 1 shows a kind of architecture diagram of equipment Maintenance Management System provided in an embodiment of the present invention.As shown in Figure 1, should Equipment Maintenance Management System uses the three-tier architecture of standard, i.e. data Layer, application layer and display layer.
Wherein, which stores all database metadata and critical field retrieval information, and can select ORACLE database the maintenance works such as is increased the content of data, is deleted, being modified as underlying database, to realize; The application layer runs application server and hypertext transfer protocol (HyperText Transfer Protocol, HTTP) Server runs all application logics of system in the application server, and the application layer can be divided into three module conducts The application layer framework of whole system, which is respectively technology platform, application platform and service application.The technology platform Layer system has selected MAXIMO system as the technology platform of exploitation, which then utilizes existing secondary control module (Auxiliary Control Module, ACM) and the basic function of MAXIMO are developed, to develop corresponding function Module, the practical business which is then directed to center integrate each functional module, and become complete set is System, the logical process of complete paired data business;The display layer then includes browser and client, belongs to system entry, Yong Hu This layer may be implemented the interaction with system, and access protocol is based entirely on HTTP, access mode can according to business, technology with And access speed is provided to user, system by client end interface form by each module wherein established show so as to Family is checked.
In embodiments of the present invention, selected ORACLE database and Microsoft server2003 database as number According to management platform, to establish the equipment Maintenance Management System.And the system using client computer server (Client Sever, C S) framework and browser/server (Browser/Server, B S) framework mode.Take full advantage of C S establish Network environment on dedicated network and in small range can pass through specialized server between local area network and provide connection and data The advantages of Exchange Service and the stronger adaptation range of B/S, the advantages of capable of being accessed by browser, the behaviour as system Make platform.
When developing the equipment Maintenance Management System, the mode of iterative developing can be selected.The iterative developing can also There is higher success rate and productivity with the exploitation of referred to as iterative and incremental or the exploitation of iterative evolution formula, the development approach.Repeatedly For in formula development approach, entire development is organized as a series of short and small, regular length small project, referred to as a system The iteration of column.Iteration all includes demand analysis, design, realization and test each time.In this way, development can be with Start before demand is determined entirely by, and completes the part of functions of system or the exploitation work of service logic in an iteration Make, then refines the demand of improving by the feedback of client, and start the iteration of a new round.
In embodiments of the present invention, the mode for selecting the iterative developing selects the exploitation of each module Investigation early period, forms the mode of user requirements specification book redevelopment, and special messenger is responsible for the exploitation of correlation module, avoids due to difference The exploitation mistake that the logic of people is different and occurs, it is ensured that in the smooth integration of development late stage module.With reference to Fig. 1, equipment dimension Repairing the application layer in management system may include standard module, ACM module, user management extension, rights management extension, data word Allusion quotation, log management extension and business module extension etc..It again include configuration management, user management, permission pipe in the standard module Reason and other basic modules, the business module extension in again include other expansion modules, handbook management and work card editor and Management.
Fig. 2 is a kind of flow chart of maintenance of equipment method provided in an embodiment of the present invention, and this method can be applied to dispose In the terminal for having equipment Maintenance Management System shown in FIG. 1, as shown in Fig. 2, this method may include:
Step 201 receives the maintenance instructions for being directed to designated equipment.
In embodiments of the present invention, it when maintenance personal executes maintenance task to designated equipment, can input in the terminal The mark of the maintenance task, terminal can receive the maintenance instructions for designated equipment.It can be carried in the maintenance instructions The mark of maintenance task.
Wherein, the mark of the maintenance task can be the task names of the maintenance task, or may be that can be used in Uniquely indicate the character string of the maintenance task.
Step 202, the mark according to maintenance task, the determining mark with maintenance task from pre-stored multiple work cards Corresponding target work card.
In embodiments of the present invention, multiple work cards can be previously stored in terminal, each work card corresponds to a kind of maintenance times The mark of business, and can recorde a kind of maintenance flow of corresponding maintenance task on each work card.When terminal receives needle It, can be according to the mark of the maintenance task carried in maintenance instructions, from pre-stored more after the maintenance instructions of designated equipment Target work card corresponding with the mark of the maintenance task is determined in a work card.
It is exemplary, it is assumed that designated equipment to be repaired is the gas generator of model LM2500+SAC, and terminal receives To maintenance instructions in carry be for the gas generator maintenance task title, the entitled dismantling of the maintenance task Fuel gas conduit, then terminal is according to the title of the maintenance task, it can determining in pre-stored multiple work cards to appoint with the maintenance The corresponding target work card of the title of business.
Step 203, displaying target work card set so as to the maintenance flow that maintenance personal records according to target work card to specified It is standby to repair.
In embodiments of the present invention, after terminal has determined target work card according to maintenance instructions, the target can be directly displayed The content of work card;Or terminal can also show the interior of the target work card after the idsplay order for receiving maintenance personal's triggering Hold, it is not limited in the embodiment of the present invention.
Further, maintenance personal can repair designated equipment according to the maintenance flow recorded on target work card, Avoid due to rely on working experience the designated equipment is repaired when, the lower problem of efficiency.And for unfamiliar For maintenance personal, according to the target work card, quickly the designated equipment can also be repaired, improve and designated equipment is tieed up Flexibility when repairing.
It is exemplary, it is assumed that the target work card shown in terminal is the work card disassembled to fuel gas conduit, then maintenance personal can Disassembled to the fuel gas conduit based on the maintenance flow recorded on the target work card, maintenance efficiency is higher, maintenance effect compared with It is good.
In conclusion the embodiment of the invention provides a kind of maintenance of equipment method, this method when being repaired to equipment, The maintenance instructions that maintenance task mark can be carried by receiving, can determine and the dimension according to the mark of the maintenance task The corresponding target work card of task identification is repaired, record has the maintenance flow to the maintenance task of designated equipment in the target work card.Dimension The personnel of repairing can repair designated equipment according to the target work card, repair and pass through to maintenance personal when reducing maintenance of equipment The dependence tested improves the flexibility and efficiency of maintenance of equipment.
Fig. 3 is the flow chart of another maintenance of equipment method provided in an embodiment of the present invention, and this method can be applied to portion Administration has in the terminal of equipment Maintenance Management System shown in FIG. 1, as shown in figure 3, this method may include:
Step 301 is received for the work card creation instruction for specifying maintenance task.
In embodiments of the present invention, after certain failure of maintenance personal to designated equipment carries out first time maintenance, maintenance Personnel can be by the mark input terminal of the maintenance task, such as the name of maintenance task can be referred to as identifying and be input to end In end, to create work card corresponding to the maintenance task in the terminal.Optionally, display circle of the equipment Maintenance Management System The icon that work card creation can be shown in face creates icon when maintenance personal clicks the work card by single-click operation, and inputs When the mark of specified maintenance task, terminal can receive the work card creation instruction for specified maintenance task, and the work card The mark of specified maintenance task can be carried in creation instruction.
Optionally, the mark of the specified maintenance task can be maintenance personal according to the model or maintenance of equipment to be repaired The title creation of task, be also possible to terminal receive generated at random when work card creation instruction for the unique identification work The character string of card, it is not limited in the embodiment of the present invention.
In practical application, the maintenance flow of equipment may include decomposition as shown in Figure 4, cleaning, non-destructive testing thus inspection, It repairs, collection multiple steps such as part and assembly, and each step requires fixed maintenance personal to execute, therefore in this hair In bright embodiment, each maintenance personal can trigger work card creation instruction, that is to say, terminal can receive different dimensions Repair the work card creation instruction for specified maintenance task of personnel's triggering.With reference to Fig. 4, it can be seen that after working range has been determined, Can execute the double inspection of part disassembly and when the longevity part and attachment validation of information, and decompose therefore inspection, repair and the part of collection part It can be searched in storehouse.
Exemplary, Fig. 5 is the interface for the equipment Maintenance Management System established in a kind of terminal provided in an embodiment of the present invention Figure, maintenance personal, can be with after gas generator of the first time to model LM2500+SAC performs fuel gas conduit dismantling task The work card triggered in Fig. 5 manages window, after maintenance personal triggers work card management window, can show that work card is created in terminal Icon is built, further, maintenance personal can click work card creation icon by single-click operation, and by the name of the maintenance task Referred to as mark is input in terminal, and terminal can receive the work card creation for disassembling task for the fuel gas conduit and refer at this time It enables.
Step 302, the maintenance flow for receiving specified maintenance task.
Further, maintenance personal can input in the terminal for the first time executes when specifying maintenance task designated equipment Maintenance flow, terminal can get the maintenance flow of specified maintenance task.
It is exemplary, what maintenance personal can also disassemble it to the fuel gas conduit of the gas generator of model LM2500+SAC Entire maintenance flow is input in terminal, and terminal can receive the maintenance flow of the maintenance task.
Step 303, creation work card corresponding with the mark of specified maintenance task, and specified maintenance task is recorded in work card Maintenance flow.
In embodiments of the present invention, terminal can create the mark of the maintenance task according to the maintenance flow that maintenance personal records Know corresponding work card, and records the maintenance flow of the specified maintenance task in work card.
Exemplary, Fig. 6 is a kind of schematic diagram of work card provided in an embodiment of the present invention.When maintenance personal is to model After the gas generator of LM2500+SAC performs combustion tube dismantling task, the mark of the maintenance task first can be input to end In end, such as it can be input to the model of the gas generator as the mark of combustion tube dismantling task in terminal.Into one Step, it can be input to terminal to the whole flow process of combustion tube dismantling by maintenance personal, as A, B, C and D in Fig. 6 are For specific maintenance flow.A gas generator to model LM2500+SAC can be generated at the terminal carries out combustion tube The work card of dismantling task.
Further, as shown in fig. 6, maintenance personal can also by the cost of this maintenance, execute the work of the maintenance task Make the type sum number for the maintenance tool used when the parts count used when personnel amount, required duration, maintenance and maintenance Amount etc. is recorded in the work card of the creation, can be direct when to carry out identical maintenance task to the designated equipment next time In established work card, specific tool and quantity needed for determining maintenance, and time etc. is distributed for the maintenance task, into one Step improves the efficiency of maintenance.
It should be noted that in embodiments of the present invention, when creating the work card shown in fig. 6, not only needing and writing this The personnel of work card, such as the author XX in Fig. 6;An auditor is also required for audit the work card of the creation, in Fig. 6 Auditor YY, to guarantee the accuracy rate of maintenance.It should correspondingly, foundation can also have been recorded with reference to Fig. 6, in the work card of the creation The handbook title of foundation and specific section number and version number when work card, so that maintenance personal can be next time to the model Equipment when carrying out identical maintenance, can be with reference to the handbook recorded in the work card.Terminal can also be raw for the work card of the creation It is numbered at work card, such as the work card number LMP000HD01 in Fig. 6;Or release is arranged in the work card of the creation, in Fig. 6 Work card release 01;Serial number (the combustion generator serial number in such as Fig. 6 of equipment can also be recorded in the work card of the creation 641168), work order number (GE-A-0-002-R0 in such as Fig. 6), item number (LM in such as Fig. 6), cell cube number (such as Fig. 6 In LM0000) and subelement body number (LM00 in such as Fig. 6) can indicate the mark of the work card.The work that the Fig. 6 is generated Card further include: plan working hour 4 hours, 2 people of number of work, 4000 yuan of cost centre, parts count 10, the maintenance for needing to use Tool includes: spanner, screw and micrometer etc..
Step 304 receives the maintenance instructions for being directed to designated equipment.
It in embodiments of the present invention, can be in the terminal when maintenance personal needs to execute maintenance task to designated equipment The mark of the maintenance task is inputted, terminal can receive the maintenance instructions for designated equipment.It can be taken in the maintenance instructions Mark with maintenance task.
Wherein, the mark of the maintenance task can be the task names of the maintenance task, or may be that can be used in Uniquely indicate the character string of the maintenance task.After creating work card, identical maintenance is carried out to the designated equipment next time When task, maintenance personal can input maintenance task mark in the terminal, and such as the title of the maintenance task, terminal can be connect The maintenance instructions for the designated equipment are received, the title of the maintenance task can be carried in the maintenance instructions.
Step 305, the mark according to maintenance task, the determining mark with maintenance task from pre-stored multiple work cards Corresponding target work card.
In embodiments of the present invention, multiple work cards can be previously stored in terminal, each work card corresponds to a kind of maintenance times The mark of business, and can recorde a kind of maintenance flow of corresponding maintenance task on each work card.When terminal receives needle It, can be according to the mark of the maintenance task carried in maintenance instructions, from pre-stored more after the maintenance instructions of designated equipment Target work card corresponding with the mark of the maintenance task is determined in a work card.
It is exemplary, it is assumed that designated equipment to be repaired is the gas generator of LM2500+SAC model, and terminal receives Maintenance instructions in carry be for the gas generator maintenance task title, the maintenance task entitled dismantling combustion Tracheae, then terminal is according to the title of the maintenance task, it can determining with the maintenance task in pre-stored multiple work cards The corresponding target work card of title.
Step 306, displaying target work card set so as to the maintenance flow that maintenance personal records according to target work card to specified It is standby to repair.
In embodiments of the present invention, after terminal has determined target work card according to maintenance instructions, the target can be directly displayed The content of work card;Or terminal can also show the interior of the target work card after the idsplay order for receiving maintenance personal's triggering Hold, it is not limited in the embodiment of the present invention.
Further, maintenance personal can repair designated equipment according to the maintenance flow recorded on target work card, Avoid due to rely on working experience the designated equipment is repaired when, the lower problem of efficiency.And for unfamiliar For maintenance personal, according to the target work card, quickly the designated equipment can also be repaired, improve and designated equipment is tieed up Flexibility when repairing.
It is exemplary, it is assumed that terminal is to model LM2500+ according to the maintenance instructions received, the target work card of display The work card for the maintenance task that fuel gas conduit in the gas generator of SAC is disassembled, then maintenance personal can be based on the target work The maintenance flow recorded on card disassembles the fuel gas conduit, and maintenance efficiency is higher, and maintenance effect is preferable.
And in embodiments of the present invention, after carrying out specified maintenance to designated equipment, maintenance personal be can also continue to it The step of implementing result when maintenance and disassembly part and process be recorded in terminal, so as to terminal to the maintenance task into Degree is monitored, and updates the target work card.
It include decomposition, cleaning, event when further, in embodiments of the present invention, due to being repaired to gas generator Multiple steps such as inspection and repairing, therefore the type of the target work card also may include a variety of, such as shown in Fig. 7, the target work Card may include test run work card, decompose work card or repairing work card etc..
With reference to Fig. 7, which includes: system engineer and test run engineer first writes and audits point Solution work card and test run work card are simultaneously presented to test run personnel, and test run personnel get the decomposition work card and test run work card in the terminal Afterwards, decomposition assembly and test run task can be executed, further decomposition personnel can write and issue part class work card, therefore examine people Member gas generator can be cleaned based on the part class work card got and according to fault condition, non-destructive testing and Therefore the operation such as inspection, and repairing work card can be issued, repairman can occur the combustion gas based on the repairing work card got Device repairs the execution of workshop section.
Further, in embodiments of the present invention, determining target work card can also be sent directly to mobile whole by terminal In end, Fig. 8 is a kind of method flow diagram that specified work card is sent to mobile terminal provided in an embodiment of the present invention, as shown in figure 8,
The scan code of each work card in step 3061, the pre-stored multiple work cards of display.
In embodiments of the present invention, the scan code of each work card can be generated in terminal, and the scan code of the generation is carried out It stores, and shows the scan code of each work card in its display interface.Exemplary, terminal can receive the aobvious of user's triggering When showing instruction, the scan code of each work card is shown.Wherein, which can be two dimensional code or bar code.
Step 3062 receives the acquisition request for specified work card that mobile terminal is sent, and acquisition request is mobile terminal It is generated after the scan code for scanning specified work card.
Further, maintenance personal can specify the scan code of work card by mobile scanning terminal, and mobile terminal can be with By parsing the scan code of the specified work card, the mark of the specified corresponding maintenance task of work card is obtained, and send needle to terminal To the acquisition request of specified work card.
It is exemplary, it is assumed that maintenance personal disassembles the work card of task by its mobile terminal to the combustion tube that shows in terminal After scan code is scanned, which can get the mark of combustion tube dismantling task, and can send to terminal For the acquisition request of the work card of combustion tube dismantling task.
Step 3063, according to acquisition request, send specified work card to mobile terminal.
In embodiments of the present invention, terminal is after receiving acquisition request, it can specified work card is sent to scanning should In the mobile terminal of scan code, to facilitate maintenance personal to check, and does not have to other maintenance personals and issued indirectly, further mention The high efficiency of maintenance.
It is exemplary, when terminal receives the work of the combustion tube dismantling for model LM2500+SAC of mobile terminal transmission When the acquisition request of card, work card shown in fig. 6 can be sent in mobile terminal by terminal.
It should be noted that maintenance personal needs to search specific zero in storehouse due in specific maintenance process Part, and since the model of part is more, maintenance personal needs to be grasped various models, therefore the embodiment of the invention provides one kind to show Show the method for parts information, as shown in figure 9, this method may include:
Step 401, the mark for obtaining part to be repaired in designated equipment.
It can be attached in practical application, on each part uniquely to identify, which can be character string, can also be with For two dimensional code or bar code etc..In embodiments of the present invention, the mark identification group for identifying the mark can be set in terminal Part, terminal can pass through the mark of part to be repaired in mark recognizer component acquisition designated equipment.The mark recognizer component can be with For image recognition sensors such as code readers.
It is exemplary, it is assumed that bar code have been attached on the combustion tube of gas generator, maintenance personal should by code reader scanning After bar code, terminal can obtain the mark of the combustion tube on the gas generator.
The corresponding relationship of step 402, part mark according to the pre-stored data and Parameters of The Parts information and inventory information obtains The inventory information of the parameter information of part to be repaired and part to be repaired.
In embodiments of the present invention, part mark and Parameters of The Parts information and part inventory can be previously stored in terminal The corresponding relationship of information can be pre-stored according to this when terminal gets the mark of part to be repaired in designated equipment The corresponding relationship of part mark and Parameters of The Parts information and inventory information, gets the parameter information of the part to be repaired, and The inventory information of part to be repaired.
Exemplary, table 1 shows the mark and parameter information of pre-stored screw in terminal, combustion tube and compressor And the corresponding relationship of inventory information.Reference table 1, the mark can be the part name of the part to be repaired.It can from table 1 Out, the quantity of the screw to be repaired is 1, and stockpile number is 1, and the frame position of screw and is as can also be seen from Table 1 No available state, and reference table 1 can also look at the date that screw needs to overhaul, if screw is located at frame position GE, state is can With the regular inspection date is April 10.
Table 1
Part name Quantity Unit of quantity In library quantity Frame position State The regular inspection date
Screw 1 It is a 1 GE It can use April 10
Combustion tube 2 It is a 1 RR It can use April 8
Compressor 1 Set 1 RR Therefore it examines March 10
The inventory information of step 403, the parameter information of display part to be repaired and part to be repaired.
The parameter information of part to be repaired and the inventory information of part to be repaired are got when terminal, can directly by The parameter information and inventory information of part to be repaired are displayed on the display interface;Alternatively, terminal can also receive display When instruction, the parameter information of part to be repaired and the inventory information of part to be repaired are shown.Further, maintenance personal is The parameter information and inventory information that can directly check part to be repaired at the terminal improve maintenance personal and search part Efficiency, therefore also further improve the efficiency of maintenance of equipment.
Optionally, terminal can also obtain the mark of maintenance tool, and the mark of maintenance tool according to the pre-stored data with The parameter information of maintenance tool and the corresponding relationship of inventory information show the parameter information and inventory information of the maintenance tool, Its specific display methods can be with reference to step 401 to 403, and the embodiment of the present invention repeats no more this.
Further, in order to improve the efficiency of maintenance, Figure 10 is a kind of generation maintenance project provided in an embodiment of the present invention The method flow diagram of table, this method can be applied in the terminal of equipment Maintenance Management System shown in FIG. 1, as shown in Figure 10, This method may include:
Step 501 obtains in the quantity and equipment to be repaired of scheduled date equipment to be repaired to be repaired each group The time between overhauls(TBO) of part.
In embodiments of the present invention, maintenance personal by the quantity of scheduled date equipment to be repaired and to be repaired can set The time between overhauls(TBO) of each component is input in terminal in standby, and terminal can get the number in scheduled date equipment to be repaired The time between overhauls(TBO) of each component in amount and equipment to be repaired.
It is exemplary, it is assumed that maintenance personal was had input in the terminal April 1, and equipment to be repaired is in gas generator Combustion tube, and the quantity for the gas generator repaired that needs to march into the arena is 2, the time between overhauls(TBO) of the combustion tube is 1 month.Then The quantity of the scheduled date that terminal is got equipment to be repaired to be repaired is combustion tube in 2 and equipment to be repaired Time between overhauls(TBO) is 1 month.
Step 502, according to scheduled date and the maintenance cycle of each component, determine the date of survey of each component.
It is exemplary, it is assumed that get combustion tube and repaired within 1st in April, and get the maintenance cycle of the combustion tube It is 1 month, then terminal can determine that the subsequent date of survey of the combustion tube is No. 1 monthly.
Step 503, the scheduled date is determined according to the quantity of equipment to be repaired needed for maintenance personal quantity, and maintenance The quantity of tool.
In embodiments of the present invention, the historical data of one equipment to be repaired of maintenance, the history be can store in terminal It may include personnel amount and the quantity of maintenance tool needed for repairing the equipment to be repaired in data, terminal is based on getting Equipment to be repaired quantity and historical data, it can determine maintenance personal's quantity needed for the scheduled date, and In the quantity for the maintenance tool that the scheduled date needs to distribute for the equipment to be repaired.
It is exemplary, it is assumed that terminal is got there are two the combustion tubes to be repaired on April 1, and dimension is stored in advance in terminal It repairs combustion tube and needs 2 people, need 2 spanners, 2 micrometers, then quantity of the terminal based on the combustion tube got And historical data, it can determine and need to distribute 4 people, and 4 spanners of distribution and 4 micrometers for the secondary maintenance task.
Step 504, the maintenance project table for generating equipment to be repaired.
Wherein, it can be recorded in the planning chart of the generation and need the date of survey of each component in maintenance of equipment, specify The quantity of maintenance personal needed for date and the quantity of maintenance tool.
The maintenance project table of step 505, display equipment to be repaired.
In embodiments of the present invention, terminal can show the specified planning chart when receiving planning chart idsplay order. So that table is that next maintenance task is carried out personnel and prepared and the preparation of maintenance tool etc. to maintenance personal according to this plan.
It should be noted that Figure 11 is a kind of function of the equipment Maintenance Management System of foundation provided in an embodiment of the present invention Block diagram can also include as shown in figure 11 production support and device requirement in the system established in the terminal, to guarantee the dimension Tool is repaired all within the verification phase, that is to say guarantee the maintenance tool can normal use, guarantee going on smoothly for maintenance task.It should It can also include human resource management in system, it can be to personal information (the personal letter in such as Figure 11 in the human resource management Breath management), qualification and technical ability is managed and Training Management.With reference to Figure 11, can also include: in the system cost management, Quality management, production management, engineering management and maintenance project etc. realize the demand of paperless office by the system.It should It include cost accumulation in cost management;It may include quality audit, safety management, quality indicator, single machine shelves in the quality management The tracking of case and repair quality;It may include that engine on-site maintenance, engine are marched into the arena maintenance, engine in the production management Part dismounting, working hour acquisition, non-routine work management, collection part/string part management and manufacturing schedule tracking and control etc.;The engineering It may include equipment evaluation/repacking management, configuration management, technical data management, maintenance program management and engine in management When longevity part and cluster management etc.;The maintenance project includes short-term plan, medium-term and long-term plans, production programming, production scheduling, resource meter It draws and saddlebag management etc..It can be seen from figure 11 that according to device requirement, it is possible to specify production support plan, according to work Packet and requirement can formulate production management plan, according to the content recorded in maintenance feedback and standard work card, can formulate maintenance Plan can carry out cost acquisition according to maintainability, and can also formulate corresponding plan with operation for engine introduction, And engine can be monitored and health control.
It can also include the management of technical data in equipment Maintenance Management System shown in Fig. 5, such as work card management, basis money Expects pipe reason, work card correcting, handbook management, device file management, equivalent assessment, quality document management, technical data management, technology Document management and quota coding management etc.;It can also include dimension overhaul management in the equipment Maintenance Management System, such as project pipe It manages, part dismounting manages, workshop executes, part tracking, collects part store management, short-term deduction, single machine file administration and support Menu manager etc..
Optionally, with reference to Figure 12 A, when the engine of the gas generator needs repairing, the first step needs to be implemented engine It marches into the arena, that is to say and send to maintenance, engineer can be established in cluster management into factory's project, and arranges workshop incoming inspection people Member, for the gas generator after incoming inspection, engineer determines working range according to failure, to establish, issue and remove part The inventory of configuration, and execute file and issue, as can be seen from Figure 12A, which may include quality execution table, marches into the arena and issue Send out catalogue and work card of marching into the arena.
Figure 12 B is specific maintenance flow, first Job-Shop after marching into the arena, and generates shop Planning, and make workshop Decomposition person, which executes to decompose and dismount according to plan, checks that work card further can determine the state of part, in Figure 12 B Including directly send the part for repairing part, direct discard, can appliance and other parts, for can appliance can directly execute printing Label step can be used, workshop cleaning personnel is then arranged to execute cleaning work card, further, workshop non-destructive testing people for other parts Member can execute non-destructive testing work card, workshop thus inspection personnel execute again therefore examine work card, so that it is determined that specific part to be repaired out.
Figure 12 C is the implementation procedure for parts different in equipment to be repaired.For overhaul kit, then need to write failure report List is accused, fault message is filled in, part is inside repaired and selects and issue repairing work card, workshop repairman is based on the repairing work card can be right Part places under repair.Part is repaired for sending, it is also desirable to be write Trouble Report list, be filled in fault message, engineer is according to the event write Barrier information typing can be sent in systems and repair requirements, send repair administrative staff then in systems typing send backfit with and arrival believe Breath.For discard, then it can fill in scrap reason and print and scrap label, engineer removes information according to part, can choose The quantity of order parts, and discard is put into storehouse and is individually stored, service order management personnel reserve inventory's equipment, if not in stock, It then purchases, generates contract, part arrival information is ordered in typing, and engineer can establish and issue and load onto zero according to dismounting information Part configuration inventory installs part.Finally, workshop therefore inspection person can use label based on above- mentioned information printing, collection part personnel execute collection part With string part, assembly crewman executes assembly work card, and test run personnel execute test run work card, finally, Job-Shop, plan for adjustment, recycling Work card, Trouble Report list and tagout.Factory project closeout.
It in embodiments of the present invention, as indicated in fig. 12d, further include workshop tools tool management personnel, it can be to tool work The utensils such as dress, process equipment and meter are managed, and maintenance, maintenance and the equivalent assessment of tool equipment may be implemented; Workshop tools tool management personnel can also be managed equipment, to guarantee the smooth of maintenance;Quality safety personnel then can be with Quality management is executed, guarantees the effect of maintenance.
Maintenance personal is shown in Figure 12 E according to maintenance process, is executed feedback and is submitted and support single operation, engineer is then It can be according to the feedback record administrative analysis of execution, and according to the support single-shot cloth standard information of submission.Figure 12 F is the present invention Implement the flow chart to file management exemplified, terminal provided in an embodiment of the present invention can also be according to initial data and other Source carries out file reception.With reference to Figure 12 F, the received file may include servicing manual, database file, device file, Part inventory and other data.Engineer can carry out file assessment to the received file, and be data library text in file Maintenance program is proposed when part, device file Managed Solution and when file is part inventory is proposed when file is device file It proposes basic configuration management scheme, other data can then be carried out with the management of Fact Book, last executed instruction file, And standard work card is generated, it that is to say that the file standard as shown in Figure 12 F issues catalogue.
It should be noted that the sequencing of maintenance of equipment method and step provided in an embodiment of the present invention can carry out suitably Adjustment, step according to circumstances can also accordingly be increased and decreased, and anyone skilled in the art discloses in the disclosure Technical scope in, the method that can readily occur in variation should all cover within the protection scope of the disclosure, therefore no longer superfluous It states.
In conclusion the embodiment of the invention provides a kind of maintenance of equipment method, this method when being repaired to equipment, The maintenance instructions that maintenance task mark can be carried by receiving, can determine and the dimension according to the mark of the maintenance task The corresponding target work card of task identification is repaired, record has the maintenance flow to the maintenance task of designated equipment in the target work card.Dimension The personnel of repairing can repair designated equipment according to the target work card, repair and pass through to maintenance personal when reducing maintenance of equipment The dependence tested improves the flexibility and efficiency of maintenance of equipment.
Figure 13 is a kind of block diagram of maintenance of equipment device 60 provided in an embodiment of the present invention, as shown in figure 13, the device 60 Include:
First receiving module 601 carries maintenance and appoints for receiving the maintenance instructions for being directed to designated equipment in maintenance instructions The mark of business.
First determining module 602 is determined and is tieed up from pre-stored multiple work cards for the mark according to maintenance task Repair the corresponding target work card of mark of task, wherein each work card record has a kind of maintenance flow of maintenance task.
Display module 603 is used for displaying target work card, so as to the maintenance flow that maintenance personal records according to target work card, Designated equipment is repaired.
In conclusion the embodiment of the invention provides a kind of maintenance of equipment device, which includes the first receiving module, the One determining module and display module, first receiving module can receive the maintenance instructions for carrying maintenance task mark, should First determining module can determine target work card corresponding with maintenance task mark, the target according to the mark of the maintenance task Record has the maintenance flow to the maintenance task of designated equipment in work card.Maintenance personal can be according to the target work card, to specified Equipment repairs, and dependence when reducing maintenance of equipment to maintenance personal's service experience improves the flexibility of maintenance of equipment And efficiency.
Figure 14 is the block diagram of another maintenance of equipment device 60 provided in an embodiment of the present invention, as shown in figure 14, the device 60 can also include:
Second receiving module 604 can be used for receiving the work card creation instruction for specified maintenance task, work card creation The mark of specified maintenance task can be carried in instruction.
Third receiving module 605 can be used for receiving the maintenance flow of specified maintenance task.
Creation module 606 can be used for creating work card corresponding with the mark of specified maintenance task, and remember in the work card Record the maintenance flow of specified maintenance task.
Optionally, which can also include:
First obtains module, can be used for obtaining the mark of part to be repaired in designated equipment.
Second obtains module, can be used for part mark according to the pre-stored data and Parameters of The Parts information and inventory information Corresponding relationship obtains the parameter information of part to be repaired and the inventory information of part to be repaired.
Display module can be also used for the inventory information of the parameter information for showing part to be repaired and part to be repaired.
Optionally, which can also include:
Third obtains module, can be used for obtaining the quantity in scheduled date equipment to be repaired to be repaired, and should be to The time between overhauls(TBO) of each component in maintenance of equipment.
Second determining module can be used for the maintenance cycle according to scheduled date and each component, determine each component Date of survey.
Third determining module, maintenance personal's needed for can be used for determining the scheduled date according to the quantity of equipment to be repaired The quantity of quantity and maintenance tool.
Generation module can be used for generating the maintenance project table of equipment to be repaired, and record needs maintenance of equipment in planning chart In each component date of survey, the quantity of maintenance personal needed for the scheduled date and the quantity of maintenance tool.
Display module can be also used for the maintenance project table for showing equipment to be repaired.
Optionally, which can also include:
Display module can be also used for the scan code for showing each work card in pre-stored multiple work cards.
4th receiving module can be used for receiving the acquisition request for specified work card of mobile terminal transmission, the acquisition Request is that mobile terminal generates after the scan code for scanning specified work card.
Sending module, can be used for according to acquisition request, send specified work card to mobile terminal.
Optionally, the type and quantity, maintenance of maintenance tool needed for which can also record maintenance task At least one of duration needed for the quantity and maintenance task of the maintenance personal of required by task.
In conclusion the embodiment of the invention provides a kind of maintenance of equipment device, which includes the first receiving module, the One determining module and display module, first receiving module can receive the maintenance instructions for carrying maintenance task mark, should First determining module can determine target work card corresponding with maintenance task mark, the target according to the mark of the maintenance task Record has the maintenance flow to the maintenance task of designated equipment in work card.Maintenance personal can be according to the target work card, to specified Equipment repairs, and dependence when reducing maintenance of equipment to maintenance personal's service experience improves the flexibility of maintenance of equipment And efficiency.
About the maintenance of equipment device in above-described embodiment, the concrete mode that wherein modules execute operation is having It closes and is described in detail in the embodiment of this method, no detailed explanation will be given here.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to of the invention its Its embodiment.This application is intended to cover any variations, uses, or adaptations of the invention, these modifications, purposes or Person's adaptive change follows general principle of the invention and including the undocumented common knowledge in the art of the present invention Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are wanted by right It asks and points out.
It should be understood that the present invention is not limited to the precise structure already described above and shown in the accompanying drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is limited only by the attached claims.

Claims (10)

1. a kind of maintenance of equipment method, which is characterized in that the described method includes:
The maintenance instructions for being directed to designated equipment are received, the mark of maintenance task is carried in the maintenance instructions;
According to the mark of the maintenance task, determination is corresponding with the mark of the maintenance task from pre-stored multiple work cards Target work card, wherein each work card record has a kind of maintenance flow of maintenance task;
It shows the target work card, so as to the maintenance flow that maintenance personal records according to the target work card, described specify is set It is standby to repair.
2. the method according to claim 1, wherein the method also includes:
The work card received for specified maintenance task creates instruction, and the specified maintenance is carried in the work card creation instruction and is appointed The mark of business;
Receive the maintenance flow of the specified maintenance task;
Work card corresponding with the mark of the specified maintenance task is created, and records the specified maintenance task in the work card Maintenance flow.
3. the method according to claim 1, wherein the method also includes:
Obtain the mark of part to be repaired in the designated equipment;
The corresponding relationship of part mark according to the pre-stored data and Parameters of The Parts information and inventory information obtains described to be repaired zero The inventory information of the parameter information of part and the part to be repaired;
Show the parameter information of the part to be repaired and the inventory information of the part to be repaired.
4. method according to any one of claims 1 to 3, which is characterized in that the method also includes:
Obtain the maintenance of each component in the quantity and the equipment to be repaired of scheduled date equipment to be repaired to be repaired Period;
According to the scheduled date and the maintenance cycle of each component, the date of survey of each component is determined;
The quantity and maintenance tool of maintenance personal needed for determining the scheduled date according to the quantity of the equipment to be repaired Quantity;
The maintenance project table of the equipment to be repaired is generated, record has each component in the equipment to be repaired in the planning chart Date of survey, the quantity of maintenance personal needed for the scheduled date and the quantity of maintenance tool;
Show the maintenance project table of the equipment to be repaired.
5. method according to any one of claims 1 to 3, which is characterized in that the method also includes:
Show the scan code of each work card in pre-stored multiple work cards;
The acquisition request for specified work card that mobile terminal is sent is received, the acquisition request is that the mobile terminal is scanning It is generated after the scan code of the specified work card;
According to the acquisition request, Xiang Suoshu mobile terminal sends the specified work card.
6. method according to any one of claims 1 to 3, which is characterized in that
Each work card also record maintenance tool needed for having maintenance task type and quantity, maintenance task needed for maintenance At least one of duration needed for the quantity and maintenance task of personnel.
7. a kind of maintenance of equipment device, which is characterized in that described device includes:
First receiving module carries maintenance task in the maintenance instructions for receiving the maintenance instructions for being directed to designated equipment Mark;
First determining module, for the mark according to the maintenance task, determined from pre-stored multiple work cards with it is described The corresponding target work card of the mark of maintenance task, wherein each work card record has a kind of maintenance flow of maintenance task;
Display module, for showing the target work card, so as to the maintenance flow that maintenance personal records according to the target work card, The designated equipment is repaired.
8. device according to claim 7, which is characterized in that described device further include:
Second receiving module is taken in the work card creation instruction for receiving the work card creation instruction for being directed to specified maintenance task Mark with the specified maintenance task;
Third receiving module, for receiving the maintenance flow of the specified maintenance task;
Creation module for creating work card corresponding with the mark of the specified maintenance task, and records institute in the work card State the maintenance flow of specified maintenance task.
9. device according to claim 7, which is characterized in that described device further include:
First obtains module, for obtaining the mark of part to be repaired in the designated equipment;
Second obtains module, the corresponding pass for part mark according to the pre-stored data and Parameters of The Parts information and inventory information System obtains the parameter information of the part to be repaired and the inventory information of the part to be repaired;
The display module is also used to show the parameter information of the part to be repaired and the inventory of the part to be repaired Information.
10. according to any device of claim 7 to 9, which is characterized in that described device further include:
Third obtains module, for obtain scheduled date equipment to be repaired to be repaired quantity and described to be repaired set The time between overhauls(TBO) of each component in standby;
Second determining module determines the inspection of each component for the maintenance cycle according to the scheduled date and each component Repair the date;
Third determining module, for maintenance personal's needed for determining the scheduled date according to the quantity of the equipment to be repaired The quantity of quantity and maintenance tool;
Generation module, for generating the maintenance project table of the equipment to be repaired, there is described to be repaired record in the planning chart The quantity of the date of survey of each component, the quantity of maintenance personal needed for the scheduled date and maintenance tool in equipment;
The display module is also used to show the maintenance project table of the equipment to be repaired.
CN201810201137.1A 2018-03-12 2018-03-12 Maintenance of equipment method and device Pending CN110263941A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810201137.1A CN110263941A (en) 2018-03-12 2018-03-12 Maintenance of equipment method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810201137.1A CN110263941A (en) 2018-03-12 2018-03-12 Maintenance of equipment method and device

Publications (1)

Publication Number Publication Date
CN110263941A true CN110263941A (en) 2019-09-20

Family

ID=67911458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810201137.1A Pending CN110263941A (en) 2018-03-12 2018-03-12 Maintenance of equipment method and device

Country Status (1)

Country Link
CN (1) CN110263941A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111026008A (en) * 2019-12-16 2020-04-17 上海宏力达信息技术股份有限公司 Intelligent switch first-aid repair method and system based on ant colony algorithm
CN111709683A (en) * 2020-06-05 2020-09-25 航电建筑科技(深圳)有限公司 Material query method for property equipment maintenance work order
CN112085410A (en) * 2020-09-18 2020-12-15 广东电网有限责任公司 Maintenance task arrangement method, device, equipment and storage medium
CN114842146A (en) * 2022-05-10 2022-08-02 中国民用航空飞行学院 Civil aviation engine maintenance manual and work card modeling method and storable medium
CN117291399A (en) * 2023-11-24 2023-12-26 中航材利顿航空科技股份有限公司 Visual chemical card data processing method and system based on XML

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666923A (en) * 2008-09-02 2010-03-10 北京京东方光电科技有限公司 Processing method, processing system and maintenance equipment for defects of liquid crystal display panel
CN102117444A (en) * 2011-01-07 2011-07-06 北京三博中自科技有限公司 System for comprehensive arrangement and execution management of production equipment maintenance plan
CN103646304A (en) * 2013-11-21 2014-03-19 桂林福冈新材料有限公司 A automobile fitting data management system based on a Delphi
CN105740086A (en) * 2016-01-20 2016-07-06 北京京东尚科信息技术有限公司 Fault intelligent diagnosing and repairing method and device
CN107180214A (en) * 2017-06-11 2017-09-19 广东金宝力化工科技装备股份有限公司 A kind of equipment monitoring system of all-dimensional multi-angle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666923A (en) * 2008-09-02 2010-03-10 北京京东方光电科技有限公司 Processing method, processing system and maintenance equipment for defects of liquid crystal display panel
CN102117444A (en) * 2011-01-07 2011-07-06 北京三博中自科技有限公司 System for comprehensive arrangement and execution management of production equipment maintenance plan
CN103646304A (en) * 2013-11-21 2014-03-19 桂林福冈新材料有限公司 A automobile fitting data management system based on a Delphi
CN105740086A (en) * 2016-01-20 2016-07-06 北京京东尚科信息技术有限公司 Fault intelligent diagnosing and repairing method and device
CN107180214A (en) * 2017-06-11 2017-09-19 广东金宝力化工科技装备股份有限公司 A kind of equipment monitoring system of all-dimensional multi-angle

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘敬等: "电子工卡在民航维修系统的应用与展望", 《民航管理》 *
张飞等: "无纸化维修工卡可行性的分析与研究", 《黑龙江科技信息》 *
陈桂鑫: "一种跨平台的交互式维修工卡的设计与实现", 《航空维修与工程》 *
韩海荣等: "基于知识的产品维修计划管理技术研究", 《机床与液压》 *
马连元: "对民用飞机维修规划的智能方法与技术的探讨", 《中国战略新兴产业》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111026008A (en) * 2019-12-16 2020-04-17 上海宏力达信息技术股份有限公司 Intelligent switch first-aid repair method and system based on ant colony algorithm
CN111026008B (en) * 2019-12-16 2021-12-24 上海宏力达信息技术股份有限公司 Intelligent switch first-aid repair method and system based on ant colony algorithm
CN111709683A (en) * 2020-06-05 2020-09-25 航电建筑科技(深圳)有限公司 Material query method for property equipment maintenance work order
CN112085410A (en) * 2020-09-18 2020-12-15 广东电网有限责任公司 Maintenance task arrangement method, device, equipment and storage medium
CN114842146A (en) * 2022-05-10 2022-08-02 中国民用航空飞行学院 Civil aviation engine maintenance manual and work card modeling method and storable medium
CN117291399A (en) * 2023-11-24 2023-12-26 中航材利顿航空科技股份有限公司 Visual chemical card data processing method and system based on XML
CN117291399B (en) * 2023-11-24 2024-01-26 中航材利顿航空科技股份有限公司 Visual chemical card data processing method and system based on XML

Similar Documents

Publication Publication Date Title
CN110263941A (en) Maintenance of equipment method and device
Balci How to assess the acceptability and credibility of simulation results
US20040030716A1 (en) Hierarchical environments supporting relational schemas
US20110010221A1 (en) Systems and methods of mobile field inspection
JP2012155720A (en) System and method used for condition-based repair process
JP2001256333A (en) Operation allocation system and method, decentralized client-server system, and computer program storage medium
KR100970851B1 (en) System construction guide system
CN102279945A (en) Business-level process customizing platform and method based on SOA (Service Oriented Architecture)
CN108470218A (en) Public utility operation management system
JP2007304660A (en) Command execution result recording system and command execution result recording method
Pan et al. Facility maintenance traceability information coding in BIM-based facility repair platform
CN108960758A (en) Architectural engineering process control management system
CN114417255A (en) Carbon emission quantification platform and carbon emission quantification system
KR101974631B1 (en) Method for providing customer supproting service using manual after auto-checking based on history log and ambient condition
CN113377952B (en) Automatic generation method for filing number of electronic file for quality test of water conservancy and hydropower engineering
JP2001250022A (en) Device and method for supporting business activity, and recording medium
JP5336906B2 (en) Design process management device
Taylor III et al. Applying Goldratt's thinking process and the theory of constraints to the invoicing system of an oil and gas engineering consulting firm
US7103615B2 (en) Process evaluation distributed system
Nast et al. Methods for Model-Driven Development of IoT Applications: Requirements from Industrial Practice.
Poston et al. Counting down to zero software failures
Arrafi et al. Prototype of laundry status tracking information system using codeigniter framework
Fife Computer software management: a primer for project management and quality control
JPH1078970A (en) Data base design support system and tool and recording medium
Giese et al. Data collection in a process-sensitive software engineering environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920

RJ01 Rejection of invention patent application after publication