CN110258357A - A kind of construction method that steel tube arch rib segment connects in the air - Google Patents
A kind of construction method that steel tube arch rib segment connects in the air Download PDFInfo
- Publication number
- CN110258357A CN110258357A CN201910617322.3A CN201910617322A CN110258357A CN 110258357 A CN110258357 A CN 110258357A CN 201910617322 A CN201910617322 A CN 201910617322A CN 110258357 A CN110258357 A CN 110258357A
- Authority
- CN
- China
- Prior art keywords
- rib
- steel pipe
- limit
- limit base
- lifting section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Abstract
The invention discloses a kind of construction methods that steel tube arch rib segment connects in the air, include the following steps that A installs two semiorbicular anchor ear steel plates that can be bolted in the end of rib-lifting section steel pipe, anchor ear steel plate is equipped with the first limit base, the second limit base and floor of putting more energy into;Guide and limit item is connected on the first limit base of B, the second limit base is equipped with limiting slot, and guide and limit item is adapted to limiting slot;C is lifted at rib-lifting section steel pipe to aerial assembled position, adjustment rib-lifting section steel pipe position makes the guide and limit item on rib-lifting section be inserted into the limiting slot on arch rib erection steel pipe, rib-lifting section steel pipe is moved to being aligned and abutting with arch rib erection steel pipe, by the locking opposite with the limiting slot on arch rib erection steel pipe of the guide and limit item on rib-lifting section along guide and limit length direction;D rib-lifting section steel pipe and arch rib erection butt welding of steel tube is integral in succession.The construction method step is simple, easy to implement, works well, and has very strong applicability and economy.
Description
Technical field
The present invention relates to field of bridge construction, in particular to a kind of construction method that steel tube arch rib segment connects in the air.
Background technique
Cable-hoisting construction method is one of CFST Arch Bridge main construction method, and as shown in Fig. 1, it is by arch rib edge
Bridge is divided longitudinally into several rib-lifting sections 01, and by the lifting of tower crane 03 and 04 mode of traction of cable, rib-lifting section 01 is transported
To aerial installation site, then it is soldered in 02 structure of arch rib erection.
In order to guarantee to lift the precision and quality of the aerial welding procedure of rib-lifting section, need its temporary locking to having installed
On rib structure, temporary locking mode and its construction method are to be welded to connect the key link of construction, relationship arch rib steel-tube construction
Stress and safety, have an effect on the perfusion intensity and quality of jack-up construction steel pipe inner concrete.
Existing construction method is generally fixed temporarily tubular arch using 05 formula locking device of inner flange as shown in Fig. 2
Rib segment, the 05 formula locking structure of ring flange of first 01 steel duct of arch rib erection segment, then rib-lifting section 01 is lifted to aerial peace
Rib-lifting section 01 is locked in 02 structure of arch rib erection by ring flange 05 and bolt connecting mode, is then pacified by holding position
Fill the docking casing 07 at joints, and will docking casing 07 with 01 steel pipe of rib-lifting section and 02 steel pipe of arch rib erection respectively
Butt welding is carried out, steel tube arch rib segment 01 is completed and welds in the air.
But the construction method of above-mentioned 05 formula locking device of ring flange has the following problems:
1, the skyborne rib-lifting section 01 of lifting is positioned using the construction method of ring flange 05 and bolt device to hole, because of device to hole
Installation accuracy requirement is very high, and positioning difficulty is big, construction efficiency is low;
2, in locking device installation, 06 both ends of floor are all made of welded connecting, and welding procedure easily leads to ring flange 05
It bends and influences bolt installation, welding residual stress also results in steel tube section stress collection and neutralizes unbalance stress;
3, locking device is set to steel duct, and after docking the embedding benefit of casing 07, locking device can not be removed and be reused, no
Construction auxiliary expenses is increased only, and stops the jack-up construction of steel pipe inner concrete.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, it is empty to provide a kind of steel tube arch rib segment
The construction method of middle connection.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of construction method that steel tube arch rib segment connects in the air, comprising the following steps:
A, two semiorbicular anchor ear steel plates are installed in the end of rib-lifting section steel pipe, each anchor ear steel plate both ends are set
There is otic placode, the otic placode after two anchor ear steel plate cooperations is by several first bolted-ons, so that two anchor ear steel
Plate is held tightly in the rib-lifting section steel pipe periphery, the rib-lifting section steel pipe need on one end that arch rib erection steel pipe docks
The anchor ear steel plate on connect the first limit base, if being connected between first limit base and the corresponding anchor ear steel plate
Dry floor of putting more energy into, is connected with and first limit base pair on the anchor ear steel plate on the rib-lifting section steel pipe other end
The second limit base answered is connected with several ribbed stiffeners between second limit base and the corresponding anchor ear steel plate
Plate, one end of each floor of putting more energy into is connected on the corresponding otic placode, the other end is connected to corresponding first limit
On position seat or second limit base, the side of each floor of putting more energy into is connected on the corresponding anchor ear steel plate;
It should here be understood that being, the free end of the steel pipe of arch rib erection also remains with it as a upper arch rib
The anchor ear steel plate and second limit base when steel pipe of segment.
B, guide and limit item is connected on first limit base, second limit base is equipped with limiting slot, described to lead
It is adapted to positive stop strip and is used to be plugged in the limiting slot;
C, lift at the rib-lifting section steel pipe to aerial assembled position, adjust rib-lifting section steel pipe position make it is described
The limiting slot on the guide and limit item insertion arch rib erection steel pipe on rib-lifting section, along the guide and limit
The mobile rib-lifting section steel pipe of length direction is to being aligned and abutting with the steel pipe of arch rib erection, by the rib-lifting section
On the guide and limit item and the steel pipe of arch rib erection on second limit base by the second bolt locking;
D, the rib-lifting section steel pipe and the butt welding of steel tube of arch rib erection are integral in succession, formed it is new it is described
Arch rib erection steel pipe.
Correspondingly, it is also possible to be connected with guide and limit item on second limit base, first limit base is equipped with
Limiting slot, the guide and limit item is for being plugged in the corresponding limiting slot, by the limiting section on the rib-lifting section steel pipe
Limiting component alignment on part and the steel pipe of arch rib erection.
A kind of construction method that steel tube arch rib segment connects in the air of the present invention, is connected respectively using anchor ear type of attachment
Connect rib-lifting section steel pipe and arch rib erection steel pipe, avoid welding residual stress cause arch rib steel tube section stress collection neutralize by
The problem of power unevenness, anchor ear steel plate and limiting component are respectively positioned on outside arch rib steel pipe, and easy to disassemble and recycling is reduced and applied
Work auxiliary expenses guarantees that the jack-up construction of subsequent steel pipe inner concrete is unaffected, and locking operation is not limited by a space, without setting
Docking casing is set, the main arch butt welding of steel tube for reducing half connects, and construction efficiency is improved, using being arranged on two the first limit bases
On guide and limit item and corresponding second limit base be arranged limiting slot grafting construction, can to above and below rib-lifting section, left and right four
Direction is oriented to, and high-altitude construction risk is reduced, solve required using ring flange and bolt device to hole installation accuracy it is very high, it is fixed
The position problem that difficulty is big, construction efficiency is low, the construction method step is simple, easy to implement, works well, and has very strong be applicable in
Property and economy.
Preferably, first limit base is equipped with the limiting slot, the limiting slot on first limit base with
The limiting slot on second limit base is corresponding, and the guide and limit item is bolted by third in first limit
In the limiting slot on the seat of position, first limit base is consistent with the structure of second limit base.
First limit base is consistent with the structure of second limit base, and the guide and limit item may connect to correspond to
The limiting slot in, in use next time, do not have to distinguish first limit base and second limit base, can be directly by institute
State that guide and limit item is connected to first limit base or second limit base comes into operation, convenient for guiding locking structure
Management.
The anchor ear steel plate, which is bolted, by described first forms the holding rib-lifting section steel pipe and arch rib erection
The guide and limit item is quickly connected to the limit of first limit base by the third bolt by the anchor ear of steel pipe
Limiting component is formed in slot, by second bolt quickly by second limit base and the opposite lock of the guide and limit item
It is fixed, the locking of the arch rib erection steel pipe is aligned and abutted to complete rib-lifting section steel pipe, i.e. site operation only needs simple spiral shell
Bolt installation exercise, construction technical requirement is low, and construction efficiency is higher.
Preferably, one end of the guide and limit item is equipped with grafting guide head, and the grafting guide head is wedge shape or cone
Shape structural member, the grafting guide head is for guiding first limit base and corresponding described during the step C grafting
The alignment of second limit base.
It, can quickly and correctly grafting enters the limiting slot by the grafting guide head using this structure setting
It is interior, facilitate positioning to be located at the aerial rib-lifting section, improves construction efficiency.
Preferably, first limit base and second limit base are gate frame, and the guide and limit item is to lead
To splice plate, the width of the guiding splice plate is adapted to the width of the limiting slot on the gate frame.
Preferably, all floors of putting more energy into are arranged along the axially spaced-apart of the corresponding anchor ear steel plate.
It is further preferred that all floor spaced sets of putting more energy into.
It is further preferred that first bolt is arranged between the two neighboring floor of putting more energy into.
Preferably, each floor of putting more energy into is arranged along the circumferential direction of the anchor ear steel plate.
Preferably, in the step A, contact surface between the anchor ear steel plate and the rib-lifting section steel pipe and/
Or anti-slip layer is set on the contact surface between the steel pipe of arch rib erection, to enhance attachment force between the two, guarantee to embrace
Bind round the reliability of connection.
It is further preferred that the anti-slip layer is antislip paint or non-slip mat.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1, the present invention penetrates the aerial location method of corresponding limiting slot using guide and limit item, can to above and below rib-lifting section,
Left and right four direction is oriented to, and is quickly and correctly positioned aerial rib-lifting section, is improved construction efficiency, is reduced high-altitude and is applied
Work risk;
2, the temporary locking device for assisting rib-lifting section to connect in the air is set to outside steel pipe by the present invention, docking that no setting is required
Casing reduces the main arch butt welding of steel tube seam of half, avoids excessive welding and influence main arch steel pipe stress performance, improve
The safety of bridge structure;
3, the mode that the present invention is connected by screw bolts anchor ear steel plate carries out temporary locking, and temporary locking device can be convenient
Subsequent rib-lifting section splicing is removed and is recycled and reused on ground, substantially saves construction ancillary works expense;
4, temporary locking site operation of the invention is bolt installation exercise, avoids welding residual stress to structure
Adverse effect, and construction technical requirement is low, construction efficiency is high;
5, construction method of the invention is easy to operate, construction technology mature and reliable, and construction auxiliary expenses is lower, has very strong
Applicability and economy.
Detailed description of the invention
Fig. 1 is the schematic diagram of the cable-hoisting construction method of CFST Arch Bridge;
Fig. 2 is the structural schematic diagram of existing inner flange disc type locking device;
Fig. 3 be the rib-lifting section, anchor ear steel plate, the first limit base, guide and limit item, floor of putting more energy into, the first bolt and
The structure and connection relationship diagram of second bolt;
Fig. 4 is the knot of arch rib erection, anchor ear steel plate, the second limit base, limiting slot, the put more energy into floor and the first bolt
Structure and connection relationship diagram;
Fig. 5 is a kind of schematic diagram for the construction method that steel tube arch rib segment connects in the air of the present invention;
Fig. 6 is the structural schematic diagram of the anchor ear steel plate;
Fig. 7 is the structural schematic diagram of first limit base, the second limit base and limiting slot;
Fig. 8 is the structural schematic diagram of the guide and limit item and grafting guide head.
Marked in the figure: 01- rib-lifting section, 02- arch rib erection, 03- tower crane, 04- cable, 05- ring flange, 06- floor,
07- docking casing, 1- anchor ear steel plate, 2- limiting component, the first limit base of 21-, the second limit base of 22-, 23- guide and limit item,
24- limiting slot, 25- grafting guide head, the first bolt of 3-, 4- put more energy into floor, 5- third bolt, the second bolt of 6-.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood
It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments
The range of invention.
Embodiment
As shown in figures 3-8, a kind of construction method that steel tube arch rib segment connects in the air of the present invention, including following step
It is rapid:
A, as seen in figures 3-6, in the end of 01 steel pipe of rib-lifting section, two size and shapes of installation are consistent semiorbicular
Anchor ear steel plate 1, contact surface between 01 steel pipe of the anchor ear steel plate 1 and the rib-lifting section and with 02 steel pipe of arch rib erection
Between contact surface on be coated with antislip paint;
B, each 1 both ends of anchor ear steel plate are equipped with otic placode, and the otic placode after two cooperations of anchor ear steel plates 1 passes through several
A first bolt 3 bolts, so that two anchor ear steel plates 1 are held tightly in the 01 steel pipe periphery of rib-lifting section;
As shown in figure 3,01 steel pipe of rib-lifting section need with it is described on one end that 02 steel pipe of arch rib erection docks
The first limit base 21 is connected among the outer wall of anchor ear steel plate 1, first limit base 21 is gate frame steel construction, specifically with it is right
The anchor ear steel plate 1 answered is welded to connect, and is connected between first limit base 21 and the corresponding anchor ear steel plate 1 several
A floor 4 of putting more energy into;
As shown in figure 4, being connected with and described first on the anchor ear steel plate 1 on the 01 steel pipe other end of rib-lifting section
Corresponding second limit base 22 of limit base 21, second limit base 22 be gate frame steel construction, specifically with it is corresponding described
Anchor ear steel plate 1 is welded to connect, be connected between second limit base 22 and the corresponding anchor ear steel plate 1 several it is described plus
Strength floor 4, it should here be understood that being, the free end of 02 steel pipe of arch rib erection also remains with it as a upper arch
The anchor ear steel plate 1 and second limit base 22 when 01 steel pipe of rib segment, first limit base 21 and second limit
The structure of position seat 22 is consistent;
As seen in figures 3-6, the floor 4 of putting more energy into is steel construction, and one end of each floor 4 of putting more energy into is welded in corresponding
On the otic placode, the other end be welded on corresponding first limit base 21 or second limit base 22, it is each described
The put more energy into side of floor 4 is welded on the corresponding anchor ear steel plate 1, each described to put more energy into floor 4 along the anchor ear steel plate 1
Circumferential to be arranged, all floors 4 of putting more energy into are arranged along the axial equidistant interval of the corresponding anchor ear steel plate 1, two neighboring
One first bolt 3 is set between the floor 4 of putting more energy into, and 1 both ends of anchor ear steel plate are respectively set one described first
Bolt 3;
C, guide and limit item 23, second limit base 22 as shown in Figures 3 and 5, are connected on first limit base 21
It is equipped with limiting slot 24, the guide and limit item 23 is guiding splice plate, and the width of the guiding splice plate is adapted to the gate
The width of the limiting slot 24 on frame, the guide and limit item 23 is for being plugged in the limiting slot 24;
As shown in Fig. 3,5 and 8, one end of the guide and limit item 23 is equipped with grafting guide head 25, the grafting guide head
25 be wedge structure part, and the grafting guide head 25 is for guiding first limit base 21 and corresponding second limit base
22 alignment can quickly and correctly grafting enters the limit by the grafting guide head 25 using this structure setting
24 in slot, facilitates positioning to be located at the aerial rib-lifting section 01, improve construction efficiency;
D, as shown in figure 5, lifting at 01 steel pipe of rib-lifting section to aerial assembled position, the rib-lifting section 01 is adjusted
It is described on 02 steel pipe of arch rib erection that steel pipe position is inserted into the guide and limit item 23 on the rib-lifting section 01
Limiting slot 24, along 23 length direction of guide and limit item move 01 steel pipe of rib-lifting section to arch rib erection 02
Steel pipe is aligned and abuts, will be on the guide and limit item 23 and 02 steel pipe of arch rib erection on the rib-lifting section 01
Second limit base 22 is locked by the second bolt 6;
E, 01 steel pipe of rib-lifting section and 02 butt welding of steel tube of arch rib erection are integral in succession, form new institute
State 02 steel pipe of arch rib erection.
As a preferred embodiment of the present embodiment, first limit base 21 is equipped with the limiting slot 24, and described the
The limiting slot 24 on one limit base 21 is corresponding with the limiting slot 24 on second limit base 22, the guiding limit
Position item 23 is connected in the limiting slot 24 on first limit base 21 by third bolt 5, first limit base 21
It is consistent with the structure of second limit base 22.
First limit base 21 is consistent with the structure of second limit base 22, and the guide and limit item 23 can connect
In in the corresponding limiting slot 24, in use next time, do not have to distinguish first limit base 21 and second limit base
22, the guide and limit item 23 directly can be connected to first limit base 21 or second limit base 22 investment makes
With convenient for being oriented to the management of locking structure.
The formation of anchor ear steel plate 1 holding 01 steel pipe of rib-lifting section is connected by first bolt 3 and has been installed
The guide and limit item 23 is quickly connected to first limit base by the third bolt 5 by the anchor ear of 02 steel pipe of arch rib
Limiting component is formed in 21 limiting slot 24, by second bolt 6 quickly by second limit base 22 and described
Guide and limit item 23 is opposite to be locked, and the lock of 02 steel pipe of arch rib erection is aligned and abutted to complete 01 steel pipe of rib-lifting section
Fixed, i.e., site operation only needs simple bolt installation exercise, and construction technical requirement is low, and construction efficiency is higher.
A kind of construction method that steel tube arch rib segment connects in the air of the present invention, is connected respectively using anchor ear type of attachment
01 steel pipe of rib-lifting section and 02 steel pipe of arch rib erection are connect, welding residual stress is avoided and arch rib steel tube section stress is caused to be concentrated
And the problem of unbalance stress, anchor ear steel plate and limiting component are respectively positioned on outside arch rib steel pipe, easy to disassemble and recycling reduces
Construction auxiliary expenses, guarantees that the jack-up construction of subsequent steel pipe inner concrete is unaffected, and locking operation is not limited by a space, nothing
Docking casing 07 need to be set, and the main arch butt welding of steel tube for reducing half connects, and construction efficiency is improved, using two the first limit bases
The grafting construction that limiting slot 24 is arranged on guide and limit item 23 and corresponding second limit base 22 is set on 21, it can be to arch rib section
Section is upper and lower, left and right four direction is oriented to, and reduces high-altitude construction risk, solves using ring flange and the installation of bolt device to hole
Required precision is very high, and the problem that positioning difficulty is big, construction efficiency is low, the construction method step is simple, and easy to implement, effect is good
It is good, there is very strong applicability and economy.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (10)
1. a kind of construction method that steel tube arch rib segment connects in the air, which comprises the following steps:
A, two semiorbicular anchor ear steel plates (1), each anchor ear steel plate (1) are installed in the end of rib-lifting section (01) steel pipe
Both ends are equipped with otic placode, and the otic placode after two anchor ear steel plate (1) cooperations is bolted by several first bolts (3), so that two
A anchor ear steel plate (1) is held tightly in the rib-lifting section (01) steel pipe periphery, rib-lifting section (01) steel pipe need with
It is connected the first limit base (21) on the anchor ear steel plate (1) on one end of arch rib erection (02) steel pipe docking, first limit
Several floors of putting more energy into (4), rib-lifting section (01) steel are connected between position seat (21) and the corresponding anchor ear steel plate (1)
It is connected with the second limit base (22) corresponding with the first limit base (21) on the anchor ear steel plate (1) on the pipe other end,
It is connected with described in several and puts more energy into floor (4) between second limit base (22) and the corresponding anchor ear steel plate (1), each
One end of the floor of putting more energy into (4) is connected on the corresponding otic placode, the other end is connected to corresponding first limit base
(21) or on second limit base (22), the side of each floor (4) of putting more energy into is connected to the corresponding anchor ear steel
On plate (1);
B, it is connected with guide and limit item (23) on first limit base (21), second limit base (22) is equipped with limiting slot
(24), the guide and limit item (23) is adapted to and for being plugged in the limiting slot (24);
C, it lifts at rib-lifting section (01) steel pipe to aerial assembled position, adjusting the rib-lifting section (01) steel pipe position makes
The limit on described arch rib erection (02) steel pipe of the guide and limit item (23) insertion on the rib-lifting section (01)
Slot (24), along mobile rib-lifting section (01) steel pipe of guide and limit item (23) length direction to the arch rib erection
(02) steel pipe is aligned and abuts, by the rib-lifting section (01) the guide and limit item (23) and the arch rib erection
(02) second limit base (22) on steel pipe is locked by the second bolt (6);
D, rib-lifting section (01) steel pipe and the arch rib erection (02) butt welding of steel tube are integral in succession, form new institute
State arch rib erection (02) steel pipe.
2. construction method according to claim 1, which is characterized in that first limit base (21) is equipped with the limit
Slot (24), the limiting slot on the limiting slot (24) and second limit base (22) on first limit base (21)
(24) corresponding, the guide and limit item (23) is connected to described on first limit base (21) by third bolt (5)
In limiting slot (24).
3. construction method according to claim 1, which is characterized in that one end of the guide and limit item (23) is equipped with grafting
Guide head (25), the grafting guide head (25) are wedge shape or tapering structural member, and the grafting guide head (25) is for described
First limit base (21) and corresponding second limit base (22) alignment are guided during step C grafting.
4. construction method according to claim 1, which is characterized in that first limit base (21) and second limit
Seat (22) is gate frame, and the guide and limit item (23) is guiding splice plate, and the width of the guiding splice plate is adapted to institute
State the width of the limiting slot (24) on gate frame.
5. construction method according to claim 1, which is characterized in that put more energy into floor (4) along corresponding described described in all
The axially spaced-apart of anchor ear steel plate (1) is arranged.
6. construction method according to claim 5, which is characterized in that all described floor (4) spaced sets of putting more energy into.
7. construction method according to claim 5, which is characterized in that two neighboring described put more energy into is arranged between floor (4)
One first bolt (3).
8. construction method according to claim 1, which is characterized in that put more energy into floor (4) along the anchor ear steel described in each
The circumferential setting of plate (1).
9. construction method according to claim 1-8, which is characterized in that in the step A, in the anchor ear
Contact surface between steel plate (1) and the rib-lifting section (01) steel pipe and/or between arch rib erection (02) steel pipe
Anti-slip layer is set on contact surface.
10. construction method according to claim 9, which is characterized in that the anti-slip layer is antislip paint or non-slip mat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910617322.3A CN110258357B (en) | 2019-07-09 | 2019-07-09 | Construction method for steel pipe arch rib segment air connection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910617322.3A CN110258357B (en) | 2019-07-09 | 2019-07-09 | Construction method for steel pipe arch rib segment air connection |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258357A true CN110258357A (en) | 2019-09-20 |
CN110258357B CN110258357B (en) | 2020-09-22 |
Family
ID=67925348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910617322.3A Active CN110258357B (en) | 2019-07-09 | 2019-07-09 | Construction method for steel pipe arch rib segment air connection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258357B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622125A (en) * | 2020-06-10 | 2020-09-04 | 中铁二局第二工程有限公司 | Method for mounting through-type inverted triangular comb-shaped steel pipe arch rib |
CN112502024A (en) * | 2020-11-26 | 2021-03-16 | 上海建工五建集团有限公司 | Device and method for connecting wet joints of prefabricated arch rib beams |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001098514A (en) * | 1999-10-01 | 2001-04-10 | Ps Corp | Method for constructing arch rib of concrete arch bridge |
CN202509408U (en) * | 2012-03-31 | 2012-10-31 | 张领先 | Guiding and rectifying bridge arch |
CN202882448U (en) * | 2012-10-29 | 2013-04-17 | 中冶天工上海十三冶建设有限公司 | Temporary fixing device for circular steel tube truss installing |
CN105442935A (en) * | 2015-12-30 | 2016-03-30 | 国家电网公司 | Tool kit for cross butt-joint assembly of iron tower through helicopter and iron tower assembly method |
CN105756356A (en) * | 2016-03-23 | 2016-07-13 | 中冶建工集团有限公司 | Method for adjusting and aligning steel pipe column casings while installation |
CN207244467U (en) * | 2017-09-19 | 2018-04-17 | 中铁上海工程局集团有限公司 | A kind of steel box arch rib assembly positioner |
CN108611984A (en) * | 2018-06-20 | 2018-10-02 | 杭州江润科技有限公司 | Filled Steel Tubular Arch Bridge regularization fixture and construction method |
-
2019
- 2019-07-09 CN CN201910617322.3A patent/CN110258357B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001098514A (en) * | 1999-10-01 | 2001-04-10 | Ps Corp | Method for constructing arch rib of concrete arch bridge |
CN202509408U (en) * | 2012-03-31 | 2012-10-31 | 张领先 | Guiding and rectifying bridge arch |
CN202882448U (en) * | 2012-10-29 | 2013-04-17 | 中冶天工上海十三冶建设有限公司 | Temporary fixing device for circular steel tube truss installing |
CN105442935A (en) * | 2015-12-30 | 2016-03-30 | 国家电网公司 | Tool kit for cross butt-joint assembly of iron tower through helicopter and iron tower assembly method |
CN105756356A (en) * | 2016-03-23 | 2016-07-13 | 中冶建工集团有限公司 | Method for adjusting and aligning steel pipe column casings while installation |
CN207244467U (en) * | 2017-09-19 | 2018-04-17 | 中铁上海工程局集团有限公司 | A kind of steel box arch rib assembly positioner |
CN108611984A (en) * | 2018-06-20 | 2018-10-02 | 杭州江润科技有限公司 | Filled Steel Tubular Arch Bridge regularization fixture and construction method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622125A (en) * | 2020-06-10 | 2020-09-04 | 中铁二局第二工程有限公司 | Method for mounting through-type inverted triangular comb-shaped steel pipe arch rib |
CN112502024A (en) * | 2020-11-26 | 2021-03-16 | 上海建工五建集团有限公司 | Device and method for connecting wet joints of prefabricated arch rib beams |
CN112502024B (en) * | 2020-11-26 | 2023-03-17 | 上海建工五建集团有限公司 | Device and method for connecting wet joints of prefabricated arch rib beams |
Also Published As
Publication number | Publication date |
---|---|
CN110258357B (en) | 2020-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110258357A (en) | A kind of construction method that steel tube arch rib segment connects in the air | |
CN103541365B (en) | A kind of hood type segmented head for base pit engineering inner support and construction method thereof | |
CN107191676A (en) | Buried pipeline construction method | |
JP2011117274A (en) | Artificial ground such as road and method of constructing the same | |
CN107152078B (en) | Hinge device and construction method for releasing welding internal stress of steel gallery by using hinge device | |
CN103821087A (en) | Precast bridge deck space steel pipe concrete truss composite beam and construction method | |
CN104652421B (en) | A kind of prefabricated pipe stake and method of attachment | |
CN110374013A (en) | Steel box-girder lifts positioning device and construction method | |
CN206844322U (en) | A kind of rigid joint of steel pipe column and H profile steel beam | |
US6701564B2 (en) | System and method for positioning a pile cap underneath an existing elevated bridge assembly | |
CN208219384U (en) | A kind of overlapping girder segment | |
CN112252589A (en) | Steel reinforcement cage structure and installation method thereof | |
CN105274940B (en) | A kind of bridge arch rib integral installation method | |
CN110485386B (en) | Hoisting operation method for installation and construction of ultra-large radial gate in flood discharge tunnel | |
CN212612443U (en) | Staple bolt formula benefit stake device | |
CN212224677U (en) | Temporary fixing adjusting system for drop position of section steel beam | |
KR20060061739A (en) | Device and method for concrete pile accouplement | |
CN210482262U (en) | Temporary platform for trestle steel pipe pile hole leading under bare rock condition | |
CN220792273U (en) | Automatic tensioning device for pipeline internal pulling method construction | |
CN111691419A (en) | Tower frame of pile driver | |
US3055090A (en) | Apparatus for bridge construction | |
CN206289987U (en) | Reusable erection of steel pipe column device | |
CN109024911A (en) | A kind of assembled stair cast-in-place node pre-cast bolt positioning device and its construction method | |
CN212295604U (en) | Protective device for climbing frame body | |
CN213951987U (en) | Operation platform for maintaining high-speed railway pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230410 Address after: No.3, Tongjin Road, Jinniu District, Chengdu, Sichuan 610000 Patentee after: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd. Patentee after: CREEC (CHENGDU) SURVEY, DESIGN AND RESEARCH Co.,Ltd. Address before: No.4, West Lane 2, north railway station, Jinniu District, Chengdu, Sichuan 610081 Patentee before: CREEC (CHENGDU) SURVEY, DESIGN AND RESEARCH Co.,Ltd. |