KR20060061739A - Device and method for concrete pile accouplement - Google Patents

Device and method for concrete pile accouplement Download PDF

Info

Publication number
KR20060061739A
KR20060061739A KR1020050007066A KR20050007066A KR20060061739A KR 20060061739 A KR20060061739 A KR 20060061739A KR 1020050007066 A KR1020050007066 A KR 1020050007066A KR 20050007066 A KR20050007066 A KR 20050007066A KR 20060061739 A KR20060061739 A KR 20060061739A
Authority
KR
South Korea
Prior art keywords
concrete
pile
concrete pile
jack
wedge
Prior art date
Application number
KR1020050007066A
Other languages
Korean (ko)
Inventor
김사현
Original Assignee
김사현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김사현 filed Critical 김사현
Publication of KR20060061739A publication Critical patent/KR20060061739A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 콘크리트 파일 연결장치 및 그 방법에 관한 것으로, 특히, 콘크리트 파일 연결시, 콘크리트 파일 단부에 부착된 잭에 의해 콘크리트 파일이 1차적으로 부착되고, 콘크리트 파일의 잭에 쐐기를 삽입함에 의해 콘크리트 파일을 2차적으로 부착시켜 견고한 콘크리트 파일의 연결하는 것을 특징으로 하는 콘크리트 파일 연결장치 및 그 방법에 관한 것이다.The present invention relates to a concrete pile connection device and a method thereof, and in particular, when the concrete pile connection, the concrete pile is primarily attached by a jack attached to the concrete pile end, by inserting a wedge into the jack of the concrete pile The present invention relates to a concrete pile connecting device and a method for connecting a pile of concrete by attaching a pile secondaryly.

구조물이 점점 고층화, 대형화되고 지가상승, 환경문제 등의 발생으로 인하여 종래에는 볼 수 없었던 각종 공사가 증가되고 있다. 또한 종래의 건설구조물의 입지로써 경원시 되었던 연약지반에서의 건설과 해안공사도 활발해지고 내진설계법의 도입과 함께 구조물의 안전성에 대한 인식도 달라짐에 따라 기초구조보강을 위해 사용되는 콘크리트 파일은 좀 더 깊은 관입량과 큰 지지력을 필요로 하게 되었다. 따라서, 콘크리트 파일의 연결이 불가피하고 연결부위의 강도가 문제된다. Increasing and large-scaled structures, land price rises, environmental problems, etc. due to the occurrence of various types of construction that has not been seen in the past is increasing. In addition, the construction and coastal works on the soft ground, which were previously used as the location of conventional construction structures, have become more active, and the seismic design method has been introduced and the safety awareness of the structure has been changed. And great support was needed. Therefore, the connection of the concrete pile is inevitable and the strength of the connecting portion is a problem.

종래의 콘크리트 파일의 연결방법은 두개의 콘크리트 파일을 맞대고 접하는 철판부위를 용접하여 연결하였다. 이러한 용접에 의한 연결방법에 의하면, 콘크리트 단부의 둘레를 일일이 용접해야 하므로 시공상의 불편이 있고, 용접에 의해 시간이 많이 소요되므로 공기가 길어지며, 비용면에서도 불리하다. 또한 건축물에서 가장 중요한 구조상 강도문제에 있어서도 용접에 의한 콘크리트 파일의 연결은 용접부위를 먼저 산화하게 하므로 구조강도면에서도 취약한 단점이 지적되고 있다.In the conventional method of connecting the concrete pile, the two steel piles are joined by welding the iron plate parts which are in contact with each other. According to such a connection method by welding, there is an inconvenience in construction because it is necessary to weld the circumference of the concrete end one by one, it takes a long time by welding, and the air becomes long, also disadvantageous in terms of cost. In addition, in the structural strength problem, which is the most important in the building, the connection of concrete piles by welding oxidizes the welded portion first, so it is pointed out that the weak point is also weak in structural strength.

이에 본 발명은 콘크리트관 단부의 수철판, 암철판을 통해 잭과 쐐기를 삽입 하여 콘크리트 파일을 부착시키므로 시공면에서 간단하고, 경제적이며 일부분만 먼저 산화되는 것을 방지하여 구조강도상에도 유리한 콘크리트 파일 연결장치 및 그 방법을 제공하는 것이다. Therefore, the present invention attaches the concrete pile by inserting the jack and the wedge through the spring plate and the rock plate of the concrete tube end, so that the construction file is simple, economical, and prevents only part of the first oxidation. And a method thereof.

수콘크리트 파일, 암콘크리트 파일, 수철판, 암철판, 잭, 쐐기Subconcrete pile, female concrete pile, spring plate, rock plate, jack, wedge

Description

콘크리트 파일 연결장치 및 그 방법 {device and method for concrete pile accouplement} Concrete pile coupling device and its method {device and method for concrete pile accouplement}

도1은 본 발명에 따른 콘크리트파일 연결장치의 수콘크리트 파일과 암콘크리트 파일의 연결상태를 보인 측면도Figure 1 is a side view showing the connection state of the concrete pile and female concrete pile of the concrete pile connection apparatus according to the present invention

도2는 본 발명에 따른 콘크리트파일 연결장치의 수콘크리트 파일과 암콘크리트 파일의 연결상태를 보인 단면도Figure 2 is a cross-sectional view showing a connection state of the male concrete pile and the female concrete pile of the concrete pile connection apparatus according to the present invention

도3는 본 발명에 따른 콘크리트파일 연결장치에 있어 일실시예로서 수콘크리트 파일과 암콘크리트 파일의 부착상태를 보인 측면도Figure 3 is a side view showing the attachment state of the concrete concrete pile and female concrete pile as an embodiment in the concrete pile connection device according to the present invention

도4는 본 발명에 따른 콘크리트파일 연결장치에 있어 또 다른 실시예로서 수콘크리트 파일과 암콘크리트 파일의 부착상태를 보인 측면도 Figure 4 is a side view showing the attachment state of the concrete concrete pile and female concrete pile as another embodiment in the concrete pile connection device according to the present invention

제4도는 콘크리트 파일 연결방법의 흐름도4 is a flow chart of the concrete pile connection method

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols on main parts of drawing

100:수콘크리트 파일 200:암콘크리트 파일 100: male concrete file 200: female concrete file

300:잭 400:쐐기 300: Jack 400: wedge

본 발명은 콘크리트 파일 연결장치 및 그 방법에 관한 것으로, 특히,The present invention relates to a concrete pile connecting device and a method thereof, in particular,

콘크리트 파일 단부에 부착된 잭에 의해 콘크리트 파일이 1차적으로 부착되고, 콘크리트 파일 단부의 잭에 쐐기를 삽입함에 의해 콘크리트 파일을 2차적으로 부착시켜 견고한 콘크리트 파일의 연결을 도모하는 콘크리트 파일 연결장치 및 그 방법에 관한 것이다.Concrete pile is primarily attached by a jack attached to the end of the concrete pile, concrete pile connecting device for attaching the concrete pile secondary by inserting a wedge into the jack of the concrete pile end to facilitate the connection of the concrete pile and It's about how.

종래의 콘크리트 파일의 연결에는 두개의 콘크리트 파일을 맞대고 접하는 철판 가장자리 부위를 용접하여 연결하였다. 이러한 용접에 의한 연결방법에 의하면, 콘크리트 단부의 둘레를 일일이 용접해야 하므로 시공상의 불편이 있고, 용접에 의해 시간이 많이 소요되므로 공기가 길어지며, 비용면에서도 불리하다. 또한 건축물에서 가장 중요한 구조상 강도문제에 있어서도 용접에 의한 콘크리트 파일의 연결은 용접부위를 먼저 산화하게 하므로 구조강도면에서도 취약한 단점이 지적되고 있다.In the conventional concrete pile connection, two concrete piles were joined by welding the edges of the iron plates which face each other. According to such a connection method by welding, there is an inconvenience in construction because it is necessary to weld the circumference of the concrete end one by one, it takes a long time by welding, and the air becomes long, also disadvantageous in terms of cost. In addition, in the structural strength problem, which is the most important in the building, the connection of concrete piles by welding oxidizes the welded portion first, so it is pointed out that the weak point is also weak in structural strength.

이에 본 발명은 상기 종래 기술에 의한 문제점을 해결하기 위하여 안출된 것으로, 콘크리트관 단부의 수철판에 부착된 잭을 콘크리트관 단부의 암철판에 삽입하여 콘크리트 파일을 1차적으로 부착하고, 쐐기를 암철판의 쐐기홀에 삽입하여 콘크리트 파일을 2차적으로 부착시키므로 시공면에서 간단하고, 경제적이며 일부분만 먼저 산화되는 것을 방지하여 구조강도상에도 유리한 콘크리트 파일 연결장치 및 그 방법을 제공함을 목적으로 한다. Therefore, the present invention is devised to solve the problems according to the prior art, by inserting the jack attached to the spring plate of the concrete pipe end to the rock plate of the concrete pipe end to attach the concrete pile primarily, the wedge arm It is intended to provide a concrete pile connection device and method which is advantageous in terms of structural strength by inserting it into a wedge hole of an iron plate and attaching concrete piles secondly, preventing simple oxidation at the construction surface and oxidizing only a part of the first.

본 발명은 상기 목적을 달성하기 위해 콘크리트 파일 연결장치에 있어서, 콘크리트관 단부에 수철판이 부착된 수콘크리트 파일과 콘크리트관 단부에 암철판이 부착된 암콘크리트 파일과, 상기 수철판에 용접에 의해 부착되고 상기 수철판과 상기 암철판을 부착시키는 잭과, 상기 암철판에 삽입하여 상기 잭을 고정시키는 쐐기를 포함하는 것을 특징으로 한다.The present invention is a concrete pile connection device in order to achieve the above object, the male concrete pile is attached to the concrete plate end and the concrete plate end female concrete pile attached to the female iron plate, and the spring plate by welding It is characterized in that it comprises a jack that is attached and attaches the spring plate and the female iron plate, and the wedge is inserted into the female iron plate to fix the jack.

상기 수철판은 파일접촉면에 상기 잭이 삽입되는 잭홀과, 철근을 정착시키고 상기 수철판과 상기 콘크리트관의 부착을 돕는 철근홀과, 상기 파일접촉면의 내부둘레에 융기되어 상기 암철판의 고정홈에 삽입되어 콘트리트 파일의 연결이 직선성을 유지하도록 하는 고정턱과, 상기 파일접촉면의 반대쪽 외부둘레에 융기되어 상기 콘크리트관과 상기 수철판의 부착을 용이하게 하는 레일로 구성된다.The spring plate is a jack hole into which the jack is inserted into the pile contact surface, a reinforcing hole to fix the reinforcing steel and help the attachment of the spring plate to the concrete pipe, and the inner surface of the pile contact surface is raised to the fixing groove of the female plate. A fixed jaw inserted into the concrete pile to maintain the straightness of the concrete pile, and a rail which is raised on the opposite outer circumference of the pile contact surface to facilitate the attachment of the concrete pipe and the spring plate.

상기 암철판은 파일접촉면에 상기 잭이 삽입되는 잭홀과, 철근을 정착시키고 상기 암철판과 상기 콘크리트관의 부착을 돕는 철근홀과, 상기 수철판의 상기 고정턱이 삽입되어 콘크리트 파일 연결의 직선성을 유지하도록 하는 고정홈과, 상기 파일접촉면의 반대쪽 외부둘레에 융기되어 상기 콘크리트관과 상기 암철판의 부착을 용이하게 하는 레일로 구성된다. The female plate has a jack hole in which the jack is inserted into the pile contact surface, a reinforcing hole which fixes the reinforcing steel and helps the attachment of the female plate and the concrete pipe, and the fixing jaw of the spring plate is inserted so that the straightness of the connection of the concrete pile can be achieved. It is composed of a fixing groove to maintain the, and the rail is raised on the opposite outer periphery of the pile contact surface to facilitate the attachment of the concrete tube and the iron plate.

상기 콘크리트관(210)은 상기 잭(310)을 사용하여 콘크리트파일을 연결할 시에는 상기 콘트리트관(210)에 용이하게 삽입되고, 상기 잭(310)의 삽입부(312)와 후크부(313)가 좌,우로 용이하게 유동할 수 있도록 파일접촉면(221)의 반대쪽과 접촉하는 상기 콘크리트관(210)의 단부에 상기 잭홀(222)의 위치와 상응되게 원통모양으로 안이 스티로풀로 채워진 잭홈(227)을 구비하여 구성된다.The concrete pipe 210 is easily inserted into the concrete pipe 210 when connecting the concrete pile using the jack 310, the insertion portion 312 and the hook portion 313 of the jack 310 Jack grooves filled with a styropool in a cylindrical shape corresponding to the position of the jack hole 222 at the end of the concrete pipe 210 in contact with the opposite side of the pile contact surface 221 so that it can easily flow left and right ( 227).

또한 상기 콘크리트관(210)은 상기 잭(320)을 사용하여 콘크리트파일을 연결할 시에는 상기 잭(320)의 삽입부(322)가 상기 콘트리트관(210)에 용이하게 삽입될 수 있도록 파일접촉면(221)의 반대쪽과 접촉하는 상기 콘크리트관(210)의 단부에 상기 잭홀(222)의 위치와 상응되게 원뿔형태의 잭홈(227)을 구비하여 구성된다.In addition, when the concrete pipe 210 is connected to the concrete pile using the jack 320, the insertion portion 322 of the jack 320 can be easily inserted into the concrete pipe 210 (face contact surface ( The conical jack groove 227 is formed at the end of the concrete pipe 210 in contact with the opposite side of the 221 to correspond to the position of the jack hole 222.

상기 잭홀(122,222)은 상기 잭(310)을 사용하여 콘크리트파일을 연결할 시에는 삽입부(312)의 넓이보다 유격(S)을 두되, 후크부(313)의 넓이 보다 좁아 삽입후, 상기 파일접촉면(221)의 반대쪽에 후크부(313)가 걸려 콘크리트 파일이 부착되도록 구성된다.The jack holes 122 and 222 have a clearance S than the width of the insertion part 312 when connecting the concrete pile using the jack 310, but after the insertion is narrower than the width of the hook part 313, the file contact surface is inserted. Hook portion 313 on the opposite side of the 221 is configured to be attached to the concrete pile.

또한, 상기 잭홀(122,222)은 상기 잭(320)을 사용하여 콘크리트파일을 연결할 시에는 삽입부(322)의 넓이와 동일하게 하여 상기 잭(320)을 잭홀(122,222)에 삽입됨에 따라 콘크리트 파일이 견고하게 부착되도록 구성된다.In addition, when the jack holes 122 and 222 connect the concrete pile using the jack 320, the jack pile 122 and 222 have the same width as that of the inserting portion 322 so that the concrete pile is inserted into the jack holes 122 and 222. It is configured to be firmly attached.

상기 레일(226)은 둘레에 상기 수콘크리트 파일(100)과 상기 암콘크리트 파일(200)이 부착된 후, 잭의 쐐기정착홈(314,323)의 위치와 상응하게 쐐기(4)가 삽입되는 쐐기홀(225)로 구성된다.The rail 226 has a wedge hole into which the wedge 4 is inserted corresponding to the position of the wedge fixing grooves 314 and 323 of the jack after the male concrete pile 100 and the female concrete pile 200 are attached to the circumference. 225.

상기 잭(310)은 상기 수철판(120)에 용접에 의해 부착되는 고정단(311)과, 좌,우로 유동성이 있는 2개의 삽입부(312)와 상기 파일접촉면(221)의 반대쪽에 걸려 상기 수콘크리트 파일(100)과 상기 암콘크리트 파일(200)을 부착시키는 후크부 (313)와 상기 쐐기(400)가 정착되도록 하는 쐐기정착홈(314)으로 구성된다. The jack 310 is caught on the opposite side of the fixed end 311 is attached to the spring plate 120 by welding, the two inserting portion 312 and the pile contact surface 221 which is fluid to the left and right It consists of a hook portion 313 for attaching the male concrete pile 100 and the female concrete pile 200 and a wedge fixing groove 314 for fixing the wedge 400.

상기 잭(320)은 상기 수철판(120)에 부착되는 고정단(321)과, 삽입부(322)와, 상기 쐐기(400)가 정착되도록 하고 상기 삽입부(322)의 둘레에 형성된 쐐기정착홈(323)으로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.The jack 320 is a fixed end 321 attached to the spring plate 120, the insertion portion 322, the wedge 400 is fixed to the wedge fixed formed around the insertion portion 322 Concrete pile connection device, characterized in that consisting of a groove (323).

상기 쐐기(400)는 상기 잭(310)을 사용하는 경우 상기 쐐기홀(225)과 상기 쐐기정착홈(314)에 삽입되어 상기 삽입부(312)를 좌,우로 넓혀 상기 후크부(313)를 상기 파일접촉면(221) 반대쪽에 접촉하게 함으로서 상기 수콘크리트 파일(100)과 상기 암콘크리트 파일(200)을 부착시키는 것을 특징으로 한다.The wedge 400 is inserted into the wedge hole 225 and the wedge fixing groove 314 when the jack 310 is used to widen the insertion part 312 to the left and right to open the hook part 313. The male concrete pile 100 and the female concrete pile 200 are attached to each other by being in contact with the opposite side of the pile contact surface 221.

또한 상기 잭(320)을 사용하는 경우 2개의 쐐(400)를 사용하여 2개의 쐐기홀(225)에 삽입하여 상기 삽입부(322) 둘레로 홈을 형성한 쐐기정착홈(323)에 삽입되어 수콘크리트 파일(1)과 상기 암콘크리트 파일(2)을 부착시키는 것을 특징으로 한다.In addition, when the jack 320 is used, two wedges 400 are used to be inserted into two wedge holes 225 to be inserted into the wedge fixing grooves 323 having a groove formed around the insertion part 322. The male concrete pile 1 and the female concrete pile 2 are attached.

또한, 본 발명의 실시예에 의한 콘크리트 파일 연결방법은,In addition, the concrete pile connection method according to an embodiment of the present invention,

콘크리트 파일 연결방법에 있어서, 수철판(100)의 잭홀(122)에 잭(310,320)을 삽입하여 파일접촉면(121)의 반대쪽에 상기 잭의 고정단(311,321)을 용접해서 상기 수철판(120)과 상기 잭을 부착하는 단계(S1)와; In the concrete pile connection method, by inserting jacks 310 and 320 into the jack hole 122 of the spring plate 100 to weld the fixing end (311,321) of the jack on the opposite side of the pile contact surface 121 to the spring plate 120 Attaching the jack (S1);

상기 잭이 부착된 수철판(120)에 콘크리트관(110)을 양생하는 단계(S2)와;Curing the concrete pipe 110 on the spring-loaded spring plate 120 (S2);

암철판(220)에 콘크리트관(210)을 양생하는 단계(S3)와; Curing the concrete pipe 210 on the rock plate 220 (S3);

상기 수콘크리트 파일(100)에 부착된 상기 잭을 상기 암철판(220)의 잭홀(222)에 삽입하여 상기 수콘크리트 파일(100)과 상기 암콘크리트 파일(200)을 1차 적으로 부착하는 단계(S4)와;Inserting the jack attached to the male concrete pile 100 into the jack hole 222 of the female iron plate 220 to attach the male concrete pile 100 and the female concrete pile 200 primarily (S4);

상기 암철판(220)의 쐐기홀(225)에 쐐기(400)를 삽입하여 상기 수콘크리트 파일(100)과 상기 암콘크리트 파일(200)을 2차적으로 부착하는 단계(S5)를 포함하는 것을 특징으로 한다.And inserting the wedge 400 into the wedge hole 225 of the iron plate 220 to secondly attach the male concrete pile 100 and the female concrete pile 200 (S5). It is done.

이상 설명된 내용은 본 발명의 실시예에 의하여 일례로 설명하였으나, 상기한 실시예에 한정되지 아니하며 당업자라면 본 발명의 기술사상을 이탈하지 아니하는 범위에서 다양한 변경 및 수정이 가능함을 알 수 있을 것이다. 따라서 본 발명의 기술적 범위는 명세서에 상세한 설명에 기재된 내용으로 한정되는 것이 아니라 특허청구범위에 의해 정하여져야만 할 것이다.Although the above description has been described as an example by the embodiment of the present invention, it is not limited to the above embodiment and those skilled in the art will be able to realize that various changes and modifications can be made without departing from the technical spirit of the present invention. . Therefore, the technical scope of the present invention should not be limited to the contents described in the detailed description in the specification but should be defined by the claims.

본 발명의 콘크리트 파일 연결장치 및 그 방법은 콘크리트관 단부의 수철판에 부착된 잭을 타 콘트리트관 단부의 암철판의 잭홀에 삽입함으로 콘크리트 파일을 연결하여 부착시키고, 쐐기를 상기 암철판에 삽입하여 콘크리트 파일의 확실한 부착을 도와 종래의 용접에 의한 연결보다 경제적인 측면과 시공상 측면에서 상당한 효과를 가질 수 있고, 일부분만 먼저 산화되는 것을 방지하여 구조강도상에도 유리한 효과를 갖는다.



The concrete pile connecting device and the method of the present invention connects and attaches the concrete pile by inserting the jack attached to the spring plate of the concrete pipe end into the jackhole of the iron plate of the other concrete pipe end, and inserting the wedge into the iron plate The concrete pile can be securely attached, and it can have a considerable effect in terms of economics and construction in connection with conventional welding, and has a favorable effect on structural strength by preventing only partial oxidation.



Claims (7)

콘크리트 파일 연결장치에 있어서,In the concrete pile connecting device, 콘크리트관(110)의 단부에 수철판(120)이 부착된 수콘크리트 파일(100)과, 콘크리트관(210) 단부에 암철판(220)이 부착된 암콘크리트 파일(200)과, 잭(310,320)과, 쐐기(400)로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.The male concrete pile 100 having the spring plate 120 attached to the end of the concrete tube 110, the female concrete pile 200 having the female plate 220 attached to the end of the concrete tube 210, and jacks 310 and 320. ), And the concrete pile connecting device, characterized in that consisting of the wedge (400). 제1항에 있어서, 상기 수철판(120)은 파일접촉면(121)에 잭(310,320)이 삽입되는 잭홀(122)과, 철근이 정착되는 철근홀(123)과, 상기 파일접촉면(121)의 내부둘레에 융기된 고정턱(124)과, 상기 파일접촉면(121)의 반대쪽 외부둘레에 융기된 레일(125)로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.According to claim 1, wherein the spring plate 120 of the jack hole 122 is inserted into the jack (310, 320) in the pile contact surface 121, the reinforcing hole 123 is fixed to the reinforcing bar, and the pile contact surface 121 Concrete pile connection device, characterized in that consisting of the fixing jaw (124) raised in the inner circumference, and the rail 125 is raised on the outer outer side of the pile contact surface (121). 제1항에 있어서, 상기 암철판(220)은 파일접촉면(221)에 상기 잭(310,320)이 삽입되는 잭홀(222)과, 철근이 정착되는 철근홀(223)과, 상기 파일접촉면(221)의 내부둘레에 오목한 고정홈(224)과, 상기 파일접촉면(221)의 반대쪽 외부둘레에 융기되고 쐐기(400)가 삽입되는 쐐기홀(225)을 가지는 레일(226)로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.According to claim 1, The female plate 220 is a jack hole 222, the jack 310, 320 is inserted into the pile contact surface 221, the reinforcing hole 223 is fixed to the reinforcing bar, and the pile contact surface 221 Concave fixed groove 224 in the inner circumference of the concrete, characterized in that consisting of a rail 226 having a wedge hole 225 is raised on the opposite outer circumference of the pile contact surface 221 and the wedge 400 is inserted File Association. 제1항에 있어서, 상기 콘크리트관(210)은 상기 파일접촉면(221)의 반대쪽과 접촉하는 상기 콘크리트관(210)의 단부에 상기 잭(310,320)의 단부가 삽입되는 잭 홈(227)으로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.According to claim 1, The concrete pipe 210 is composed of a jack groove 227 is inserted into the end of the jack (310, 320) to the end of the concrete pipe 210 in contact with the opposite side of the pile contact surface (221) Concrete pile connecting device characterized in that. 제1항에 있어서, 상기 잭(310)은 상기 수철판(120)에 부착되는 고정단(311)과, 2개의 삽입부(312)와, 삽입부 단부의 상기 암철판(220)의 파일접촉면(221)의 반대쪽에 걸리도록 하는 후크부(313)와, 상기 쐐기(400)가 정착되도록 하는 쐐기정착홈(314)으로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.The pile contact surface of claim 1, wherein the jack 310 has a fixed end 311 attached to the spring plate 120, two insertion portions 312, and the female iron plate 220 at the end of the insertion portion. Hook portion (313) to be caught on the opposite side of the (221) and the concrete pile connecting device, characterized in that consisting of the wedge fixing groove 314 for fixing the wedge (400). 제1항에 있어서, 상기 잭(320)은 상기 수철판(120)에 부착되는 고정단(321)과, 삽입부(322)와, 상기 쐐기(400)가 정착되도록 하는 삽입부 둘레에 형성된 쐐기정착홈(323)으로 구성됨을 특징으로 하는 콘크리트 파일 연결장치.According to claim 1, The jack 320 is a fixed end 321 attached to the spring plate 120, the insertion portion 322, the wedge formed around the insertion portion for fixing the wedge 400 Concrete pile connection device, characterized in that consisting of a fixing groove (323). 콘크리트 파일 연결방법에 있어서,In the concrete pile connection method, 수철판(120)에 잭(310,320)을 부착하는 단계(S1)와, 상기 잭이 부착된 수철판(120)에 콘크리트관(110)을 양생하는 단계(S2)와, 암철판(220)에 콘크리트관(210)을 양생하는 단계(S3)와, 상기 수콘크리트 파일(100)에 부착된 상기 잭을 상기 암철판(220)에 삽입하여 상기 수콘크리트 파일(100)과 상기 암콘크리트 파일(200)을 부착하는 단계(S4)와, 상기 암철판(220)에 쐐기(400)를 삽입하는 단계(S5)를 포함하는 것을 특징으로 하는 콘크리트 파일 연결방법.Attaching the jacks 310 and 320 to the spring plate 120 (S1), curing the concrete pipe 110 on the spring plate 120 to which the jack is attached (S2), and the iron plate 220. Curing the concrete pipe (210) (S3), and the jack is attached to the concrete concrete pile 100, the iron plate 220 by inserting the male concrete pile 100 and the female concrete pile 200 Attaching step (S4), and the concrete pile connection method comprising the step (S5) of inserting the wedge (400) in the iron plate (220).
KR1020050007066A 2004-12-02 2005-01-26 Device and method for concrete pile accouplement KR20060061739A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020040100603 2004-12-02
KR1020040100603 2004-12-02

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0002604U Division KR200382590Y1 (en) 2004-12-02 2005-01-28 Device for concrete pile accouplement

Publications (1)

Publication Number Publication Date
KR20060061739A true KR20060061739A (en) 2006-06-08

Family

ID=37158121

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050007066A KR20060061739A (en) 2004-12-02 2005-01-26 Device and method for concrete pile accouplement

Country Status (1)

Country Link
KR (1) KR20060061739A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160110291A (en) 2016-08-29 2016-09-21 (주)지앤디 units of piles-joint
CN111501736A (en) * 2020-05-13 2020-08-07 广东毅马集团有限公司 Lock catch type connecting welding-free tubular pile end plate
CN111535311A (en) * 2020-05-13 2020-08-14 广东毅马集团有限公司 Clamping pin type connection welding-free tubular pile end plate
CN114508096A (en) * 2022-03-03 2022-05-17 李硕 Cement precast pile connecting piece

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160110291A (en) 2016-08-29 2016-09-21 (주)지앤디 units of piles-joint
CN111501736A (en) * 2020-05-13 2020-08-07 广东毅马集团有限公司 Lock catch type connecting welding-free tubular pile end plate
CN111535311A (en) * 2020-05-13 2020-08-14 广东毅马集团有限公司 Clamping pin type connection welding-free tubular pile end plate
CN114508096A (en) * 2022-03-03 2022-05-17 李硕 Cement precast pile connecting piece

Similar Documents

Publication Publication Date Title
CA2295788C (en) Pipe pier system
CN107524232B (en) Integrated profile steel and on-site splicing structure thereof
KR102066926B1 (en) Connecting Structure of Steel Pipe Strut
KR101357775B1 (en) Apparatus for connecting struts using end plate
KR20130061536A (en) Connection apparatus of steel pipe for strut, steel pipe strut using thereof and method of constructing the steel pipe strut
KR20060061739A (en) Device and method for concrete pile accouplement
KR101289149B1 (en) Structure and apparatus for connecting steel pipe struts
JP2006226102A (en) Connecting joint of steel pipe
KR200382590Y1 (en) Device for concrete pile accouplement
JP6005862B2 (en) One-touch three-stage fastening device for joint pipe for pressure pipe connection and pressure pipe construction method using the same
JP3336430B2 (en) Vertical joints for steel pipe sheet piles
KR200380744Y1 (en) device for concrete pile accouplement
KR101773434B1 (en) Coupling device for concrete and steel File
KR100929763B1 (en) A wall fix anchor bolt which the joining is improved
JP4424236B2 (en) Steel pipe sheet pile joint structure and steel pipe sheet pile construction method
KR101252027B1 (en) Coupling apparatus of pile
CN215568557U (en) Concrete drain pipe lined with HDPE (high-density polyethylene) plate
CN215329898U (en) Pile foundation mud jacking device
CN210134420U (en) Composite hoop for trestle steel pipe pile parallel connection
KR20080057020A (en) Steel pipe strut connection structure
CN210341997U (en) Anti-seepage deformation joint structure of underground passage
CN220704506U (en) Precast pile protects barrel mouth location protection device
KR102558048B1 (en) Double socket type shaft member connection structure and connection method for preventing buckling of shaft member connection part
CN220977977U (en) Continuous pressing structure of anchor rod static pressure pile
CN216042051U (en) Closed floor support plate with stable connection structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
NORF Unpaid initial registration fee