KR101252027B1 - Coupling apparatus of pile - Google Patents

Coupling apparatus of pile Download PDF

Info

Publication number
KR101252027B1
KR101252027B1 KR1020120097576A KR20120097576A KR101252027B1 KR 101252027 B1 KR101252027 B1 KR 101252027B1 KR 1020120097576 A KR1020120097576 A KR 1020120097576A KR 20120097576 A KR20120097576 A KR 20120097576A KR 101252027 B1 KR101252027 B1 KR 101252027B1
Authority
KR
South Korea
Prior art keywords
pile
sleeve
binding member
bolt
support ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020120097576A
Other languages
Korean (ko)
Inventor
최성희
Original Assignee
최성희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최성희 filed Critical 최성희
Priority to KR1020120097576A priority Critical patent/KR101252027B1/en
Application granted granted Critical
Publication of KR101252027B1 publication Critical patent/KR101252027B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 말뚝 이음 장치에 관한 것으로, 본 발명은 단순한 구조로써 제작 및 사용의 편의성이 높고, 빠른 시공이 가능하며, 공장에서 말뚝의 제작시 선단캡과 두부캡에 슬리브를 미리 설치하여 체결공을 형성하고, 슬리브의 일측에 너트를 부착해 놓음으로써, 시공현장에서 말뚝에 별도의 가공을 하지 않아 말뚝 두부나 선단이 파손되는 것을 방지하고, 결속부재 및 볼트의 설치가 용이하게 이루어지도록 하는 말뚝 이음 장치를 제공함에 있다.
본 발명은 하부말뚝의 두부에 설치된 두부캡과 상부말뚝의 선단에 설치된 선단캡을 상호 연결하여 하부말뚝과 상부말뚝을 결합하는 말뚝 이음 장치에 있어서, 상부말뚝의 선단에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 제1슬리브와, 상기 제1슬리브에 인접하도록 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 볼트체결용 슬리브와 상기 볼트체결용 슬리브의 끝단에 부착되는 너트로 구성되는 선단캡; 하부말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 제2슬리브로 구성되는 두부캡; 상기 선단캡의 제1슬리브에 일측단이 삽입되고 타측단은 선단캡과 두부캡의 외면에 밀착되는 제1결속부재; 상기 두부캡의 제2슬리브에 일측단이 삽입되고 타측단은 상기 제1결속부재의 외면에 밀착되어 겹쳐지는 제2결속부재; 상기 제1,2결속부재를 관통하여 상기 볼트체결용 슬리브에 삽입되고 너트에 체결되는 볼트;를 포함하여 구성된 것을 기술적 요지로 한다.
The present invention relates to a pile joint device, the present invention is a simple structure, easy to manufacture and use, fast construction is possible, when manufacturing the pile in the factory to install the sleeve in the front end cap and head cap fastening hole By forming a nut and attaching a nut to one side of the sleeve, the pile head is prevented from being damaged because the pile head or tip is not processed and the binding member and the bolt are easily installed. In providing a device.
The present invention is connected to the head cap installed on the head of the lower pile and the tip cap installed on the tip of the upper pile interconnecting the lower pile and the upper pile in the pile joint device, the support ring attached to the tip of the upper pile, and A reinforcing band formed at a predetermined height along an edge of the support ring to surround the outer circumferential surface of the pile, and a first sleeve installed at one side of the support ring along a circumferential direction at a predetermined interval, and adjacent to the first sleeve. A tip cap comprising a bolting sleeve installed at a predetermined interval along the circumferential direction on one side of the support ring and a nut attached to the end of the bolting sleeve; A support ring attached to the head of the lower pile, a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer circumferential surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring. Tofu cap consisting of two sleeves; A first binding member in which one end is inserted into the first sleeve of the tip cap and the other end is in close contact with the outer surface of the tip cap and the head cap; A second binding member in which one end is inserted into the second sleeve of the head cap and the other end is in close contact with the outer surface of the first binding member and overlaps; It is a technical subject matter that includes a; a bolt inserted through the first and second fastening members to the bolt fastening sleeve and fastened to the nut.

Description

말뚝 이음 장치{Coupling apparatus of pile}Coupling apparatus of pile

본 발명은 건축 또는 토목 구조물의 시공 시 사용되는 말뚝간의 결합을 위한 이음 장치에 관한 것으로, 특히 말뚝의 제조 시 말뚝 이음장치의 볼팅 및 끼움 지점에 슬리브와 너트를 간단히 설치하여, 시공현장에서 말뚝간의 이음 작업을 손쉽게 실시할 수 있도록 한 말뚝 이음 장치에 관한 것이다.
The present invention relates to a joint device for coupling between piles used in the construction or construction of civil engineering structures, and in particular, by simply installing a sleeve and a nut at the bolting and fitting points of the pile joint when manufacturing the pile, It relates to a pile joint device to facilitate the joint operation.

일반적으로 연약지반에 건축 또는 토목 구조물을 시공하고자 할 경우, 구조물의 하중을 지지층으로 전달하여 구조물의 안정성을 확보할 수 있도록 지표면으로부터 지지층으로 연결되는 말뚝이 사용되고 있다.In general, when constructing a construction or civil engineering structure on a soft ground, a pile is connected to the support layer from the ground surface to transfer the load of the structure to the support layer to ensure the stability of the structure.

한편 말뚝의 시공을 위한 지지층은 주로 지표면으로부터 수십 미터의 깊이에 존재하며, 말뚝의 경우 생산 및 운반의 편의성을 위하여 10m 내외의 길이로 제작되는 바, 다수 개의 말뚝을 상호 연결하여 지표면으로부터 지지층으로 말뚝을 연장시키게 된다.On the other hand, the support layer for the construction of the pile is mainly located in the depth of several tens of meters from the ground surface, in the case of the pile is produced in a length of about 10m for the convenience of production and transport, the pile is interconnected from the ground surface to the support layer Will be extended.

한편 PHC 말뚝(Pretensioned spun High strength Concrete Pile)은 원심력을 이용하여 제작된 속이 빈 고강도 콘크리트 파일에 프리텐션방식으로 프리스트레스를 도입한 것으로 제작되며, 이러한 PHC 말뚝은 휨 저항성, 수직력과 수평력에 대한 저항성이 뛰어난 특징을 갖고 있으며, 항타공법 등을 이용하여 시공이 가능하므로 연약지반에 구조물을 시공하고자 할 경우 많이 사용되고 있다.
On the other hand, PHC pile (Pretensioned spun High strength Concrete Pile) is made by introducing pre-stressed prestressed to hollow high strength concrete piles made by centrifugal force, and these PHC piles have bending resistance, resistance to vertical force and horizontal force. It has excellent features, and can be constructed using anti-punching methods, so it is widely used to construct structures on soft ground.

한편 PHC 말뚝간의 결합을 위하여 서로 맞대어지는 말뚝의 선단 및 두부에는 말뚝의 보호를 위한 금속재질의 보호캡이 설치되며, 하부 말뚝의 두부에 설치된 캡과 상부 말뚝의 선단에 설치된 캡이 맞대어지도록 상부 말뚝을 배치한 상태에서 두 캡의 원주 둘레를 용접하는 방식으로 말뚝간의 이음이 이루어지게 된다.On the other hand, the front and the head of the pile to be bonded to each other for coupling between the PHC pile is installed a metal protective cap for the protection of the pile, the upper pile so that the cap installed on the head of the lower pile and the cap installed on the tip of the upper pile In the state of arranging the joint between the pile is made by welding the circumference of the two caps.

그러나 상기와 같은 용접에 의한 말뚝간의 이음은 작업이 실제 이루어지는 현장의 여건이나 날씨 그리고 작업자의 숙련도에 따라 품질에 차이가 발생되어, 부득이 고비용의 숙련된 용접공이 필요하며, 고비용 용접공의 현장 대기시간이 길고 (실제 작업시간은 짧음) 용접잔류응력에 의하여 캡의 내구 수명(품질저하)이 저하되는 등의 문제점이 있다. 또한 일정한 수준이상의 품질유지에 어려워 품질관리에 많은 비용 을 지불하여야 하는 문제점들을 갖고 있다.However, the seams between piles due to welding are different in quality depending on the condition of the site where the work is actually performed, the weather, and the skill of the operator, which inevitably requires a costly skilled welder, and a high cost welder's on-site waiting time. Long (actual working time is short), there is a problem such as the durability of the cap (deterioration of quality) is reduced by the welding residual stress. In addition, there is a problem in that it is difficult to maintain a certain level of quality, and therefore, high costs are required for quality control.

이러한 문제점을 감안하여 비용접식으로 말뚝간의 이음작업을 실시하는 다양한 방법이 제안되고 있으나, 이러한 종래의 비용접식 이음방법에 사용되는 이음장치는 구조가 복잡하여 제작 및 시공이 용이하지 못하고 말뚝 연결을 위해 말뚝의 두부와 선단에 별도의 가공을 함으로써 말뚝의 두부와 선단의 강도가 저하되어 항타 시에 이음 부분이 파손되는 문제점이 있다.
In view of the above problems, various methods for performing a joint operation between piles have been proposed, but the joint apparatus used in the conventional non-folding joint method has a complicated structure, which is not easy to manufacture and install, By processing the head and the tip of the pile separately, there is a problem that the strength of the head and the tip of the pile is lowered and the joint portion is damaged during driving.

실용신안등록 20-309950Utility Model Registration 20-309950 공개특허 10-2006-0095883Patent Publication 10-2006-0095883

본 발명은 상기와 같은 문제점을 고려하여 이루어진 것으로, 본 발명은 단순한 구조로써 제작 및 사용의 편의성이 높고, 현장 작업을 단순화 및 최소화 시킴으로서 비숙련공이라도 빠른 시공과 균일한 품질유지가 가능하며 말뚝의 제작 시 선단캡과 두부캡에 슬리브를 미리 설치하여 체결공을 형성하고, 슬리브의 일측에 너트를 부착해 놓음으로써 현장에서 말뚝에 별도의 가공을 하지 않아 말뚝 두부나 선단이 파손되는 것을 방지하며 결속부재 및 볼트의 설치가 용이하게 이루어지도록 하는 말뚝 이음 장치를 제공함에 있다.
The present invention has been made in consideration of the above problems, the present invention is simple structure and easy to manufacture and use, by simplifying and minimizing the field work, even in the unskilled construction is possible to fast construction and uniform quality and manufacture of the pile When the sleeve is pre-installed at the tip cap and the head cap to form a fastening hole, and the nut is attached to one side of the sleeve to prevent damage to the pile head or the tip without additional processing on the pile in the field. And to provide a pile coupling device to facilitate the installation of the bolt.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 하부말뚝의 두부에 설치된 두부캡과 상부말뚝의 선단에 설치된 선단캡을 상호 연결하여 하부말뚝과 상부말뚝을 결합하는 말뚝 이음 장치에 있어서, 상부말뚝의 선단에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 제1슬리브와, 상기 제1슬리브에 인접하도록 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 볼트체결용 슬리브와 상기 볼트체결용 슬리브의 끝단에 부착되는 너트로 구성되는 선단캡; 하부말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 제2슬리브로 구성되는 두부캡; 상기 선단캡의 제1슬리브에 일측단이 삽입되고 타측단은 선단캡과 두부캡의 외면에 밀착되는 제1결속부재; 상기 두부캡의 제2슬리브에 일측단이 삽입되고 타측단은 상기 제1결속부재의 외면에 밀착되어 겹쳐지는 제2결속부재; 상기 제1,2결속부재를 관통하여 상기 볼트체결용 슬리브에 삽입되고 너트에 체결되는 볼트;를 포함하여 구성된 것을 특징으로 한다.The present invention to achieve the object as described above and to perform the problem for eliminating the conventional defects, the lower pile and the upper pile by interconnecting the head cap installed on the head of the lower pile and the end cap installed on the tip of the upper pile In the coupling pile coupling device, a support ring attached to the tip of the upper pile, a reinforcement band formed to a certain height along the edge of the support ring to surround the outer peripheral surface of the pile, and circumferential direction on one side of the support ring A first sleeve installed at a predetermined interval along the bolt sleeve and a bolting sleeve installed at a predetermined interval along the circumferential direction on one side of the support ring so as to be adjacent to the first sleeve and attached to an end of the bolting sleeve. A tip cap composed of a nut; A support ring attached to the head of the lower pile, a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer circumferential surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring. Tofu cap consisting of two sleeves; A first binding member in which one end is inserted into the first sleeve of the tip cap and the other end is in close contact with the outer surface of the tip cap and the head cap; A second binding member in which one end is inserted into the second sleeve of the head cap and the other end is in close contact with the outer surface of the first binding member and overlaps; And a bolt inserted through the first and second binding members to the bolt fastening sleeve and fastened to the nut.

또한 상기 제1 결속부재는, 제1슬리브에 삽입되어 결합되는 제1삽입부와, 상기 제1삽입부의 외측단부로부터 수직 하부로 연장되게 형성되어 선단캡과 두부캡의 외면에 밀착되는 제1연장부와, 상기 제1연장부의 측면에 돌출되도록 형성되고 상기 볼트체결용 슬리브와 연통되는 볼트홀이 형성되어 있는 제1볼트결합부로 구성되고, 상기 제2결속부재는 상기 제2슬리브에 삽입되어 결합되는 제2삽입부와, 상기 제2삽입부의 외측단부로부터 수직 상부로 연장되게 형성되되 제1연장부 외면에 밀착되게 형성된 제2연장부와, 상기 제2연장부의 측면에 돌출되도록 형성되고 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제2볼트결합부로 구성되며, 상기 볼트는 제2볼트결합부와 제1볼트결합부 및 볼트체결용 슬리브를 통해 삽입되어 너트에 체결되는 것을 특징으로 한다.The first binding member may include a first insertion portion inserted into and coupled to the first sleeve, and a first extension formed to extend vertically downward from an outer end portion of the first insertion portion to be in close contact with the outer surface of the tip cap and the head cap. And a first bolt coupling portion formed to protrude from the side of the first extension portion and having a bolt hole communicating with the bolt fastening sleeve, wherein the second binding member is inserted into and coupled to the second sleeve. A second insertion portion formed therein, a second extension portion formed to extend vertically from an outer end portion of the second insertion portion and formed to be in close contact with an outer surface of the first extension portion, and protruding to a side surface of the second extension portion; And a second bolt coupling portion having a bolt hole communicating with the hole, wherein the bolt is inserted through the second bolt coupling portion, the first bolt coupling portion, and the bolt fastening sleeve to be fastened to the nut. .

또한 상기 제1볼트결합부와 제2볼트결합부는 제1연장부 및 제2연장부의 일측 또는 양측면에 돌출되도록 형성되는 것을 특징으로 한다.The first bolt coupling portion and the second bolt coupling portion may be formed to protrude on one side or both sides of the first extension portion and the second extension portion.

한편 본 발명은 하부말뚝의 두부에 설치된 두부캡과 상부말뚝의 선단에 설치된 선단캡을 상호 연결하여 하부말뚝과 상부말뚝을 결합하는 말뚝 이음 장치에 있어서, 상부말뚝의 선단에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제3슬리브로 구성되는 선단캡; 하부말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제4슬리브로 구성되는 두부캡; 상기 선단캡의 제3슬리브에 일측단이 끼워져 상기 걸림홈에 걸려지고 타측단은 선단캡과 두부캡의 외면에 밀착되는 제3결속부재; 상기 두부캡의 제4슬리브에 일측단이 끼워져 상기 걸림홈에 걸려지고 타측단은 선단캡 방향으로 연장되어 상기 제3결속부재와 겹쳐지는 제4결속부재; 상기 제3결속부재와 제4결속부재의 겹쳐지는 부분으로 체결되어 제3결속부재와 제4결속부재 일체로 연결해줌으로써 상부말뚝과 하부말뚝이 연결되도록 하는 볼트;를 포함하여 구성된 것을 특징으로 한다.On the other hand the present invention is connected to the head cap installed on the head of the lower pile and the end cap installed on the tip of the upper pile mutually connected to the lower pile and the upper pile in the pile connecting device, the support ring attached to the tip of the upper pile, Reinforcing band formed to a certain height along the edge of the support ring to surround the outer circumferential surface of the pile, and a third sleeve that is installed at a predetermined interval along the circumferential direction on one side of the support ring and the engaging groove is formed therein A tip cap configured; A support ring attached to the head of the lower pile, and a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer peripheral surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring Head cap consisting of a fourth sleeve is formed in the engaging groove; A third binding member fitted to one end of the third sleeve of the front end cap to be caught by the locking groove, and the other end to be in close contact with the outer surface of the front end cap and the head cap; A fourth binding member fitted with one end to the fourth sleeve of the head cap and engaged with the locking groove, and the other end extending in the tip cap direction to overlap with the third binding member; It is fastened to the overlapping portion of the third binding member and the fourth binding member is connected to the third binding member and the fourth binding member integrally so that the upper pile and the lower pile is connected to the bolt.

또한 상기 제3결속부재는, 상기 제3슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있는 제3삽입부와, 상기 제3삽입부의 외측단부로부터 수직하부로 형성되어 선단캡과 두부캡의 외면에 밀착되고 상기 볼트가 체결될 수 있도록 볼트홀이 형성되어 있는 제3연장부로 구성되고, 상기 제4결속부재는 상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 일측단에 걸림돌기가 형성되어 있는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되어 상기 제3연장부의 외면에 겹쳐져 밀착되며 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제4연장부로 구성된 것을 특징으로 한다.In addition, the third binding member may include a third insertion portion formed with a locking protrusion to be inserted into the third sleeve and to be engaged with the locking groove, and formed vertically from the outer end of the third insertion portion to the front end cap and the head. The third extension part is in close contact with the outer surface of the cap and the bolt hole is formed so that the bolt can be fastened, and the fourth binding member is fitted to the fourth sleeve and is caught at one end to be caught in the locking groove. And a fourth extension portion formed with a fourth insertion portion having a group formed thereon, and a fourth extension portion formed vertically upward from an outer end of the fourth insertion portion and overlapping with the outer surface of the third extension portion to form a bolt hole in communication with the bolt hole. It is characterized by.

또한 상기 제3결속부재는 상기 제3슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있는 제3삽입부와, 상기 제3삽입부의 외측단부로부터 수직하부로 형성되어 선단캡과 두부캡의 외면에 밀착되고 상기 볼트가 체결될 수 있도록 볼트홀이 형성되어 있는 제3연장부와, 상기 제3연장부의 끝단에 오목하게 형성되어 상기 제4결속부재에 끼워지는 제1끼움홈과, 상기 제3연장부의 외면에 돌출되도록 형성되는 끼움돌기로 구성되고, 상기 제4결속부재는 상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 일측단에 걸림돌기가 형성되어 있으며 상기 제1끼움홈에 끼워지는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되어 상기 제3연장부의 외면에 겹쳐져 밀착되며 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제4연장부와, 상기 제4연장부의 단부에 오목하게 형성되어 상기 끼움돌기가 끼워질 수 있도록 하는 제2끼움홈으로 구성되는 것을 특징으로 한다.In addition, the third binding member may be inserted into the third sleeve and formed with a locking projection so that the locking protrusion may be engaged with the locking groove, and the tip cap and the head cap are formed vertically from the outer end of the third insertion portion. A third extension part in close contact with an outer surface of the third extension part in which a bolt hole is formed so as to fasten the bolt, and a first fitting groove recessed in an end of the third extension part and fitted into the fourth binding member; It is composed of a fitting protrusion which is formed to protrude on the outer surface of the third extension, the fourth binding member is formed in the first fitting groove is formed with a locking projection at one end to be fitted to the fourth sleeve and caught in the locking groove. A fourth insertion portion to be fitted, and a fourth bolt portion formed vertically from an outer end of the fourth insertion portion to overlap the outer surface of the third extension portion and to be in close contact with the bolt hole. It is characterized by consisting of an extension portion and the second fitting groove is formed concave at the end of the fourth extension portion to allow the fitting projection to be fitted.

한편 본 발명은 PHC말뚝과 강관말뚝을 결합하는 말뚝 이음 장치에 있어서, PHC말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제4슬리브로 구성되는 두부캡; 강관말뚝의 둘레를 따라 형성되는 다수의 슬롯홀에 끼워지고 강관말뚝의 내벽면에 걸려질 수 있도록 양측에 걸림턱이 형성되어 있는 제5삽입부와, 상기 제5삽입부의 외측단부로부터 수직하부로 형성되어 두부캡의 외면에 밀착되며 볼트홀이 형성되어 있는 제5연장부와, 상기 제5연장부의 하부에 오목하게 형성되는 제3끼움홈과, 상기 제5연장부의 외측으로 돌출 형성되는 끼움돌기로 이루어진 제5결속부재; 상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있으며 상기 제3끼움홈에 끼워지는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되어 상기 제5연장부의 외면에 겹쳐져 밀착되며 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제4연장부와, 상기 4연장부의 상단에 오목하게 형성되어 상기 끼움돌기가 끼워질 수 있도록 하는 제2끼움홈으로 이루어진 제4결속부재; 상기 제4결속부재와 제5결속부재에 형성된 볼트홀을 통해 체결되어 제4결속부재와 제5결속부재 일체로 연결해줌으로써 PHC말뚝과 강관말뚝이 연결되도록 하는 볼트;를 포함하여 구성된 것을 특징으로 한다.On the other hand the present invention is a pile joint device for coupling the PHC pile and the steel pipe pile, and the support ring is attached to the head of the PHC pile, and formed along the edge of the support ring to a certain height to reinforce the band surrounding the outer peripheral surface of the pile; A head cap installed on one side of the support ring at a predetermined interval along the circumferential direction and comprising a fourth sleeve having a locking groove formed therein; A fifth insertion part which is fitted into a plurality of slot holes formed along the circumference of the steel pipe pile and has locking jaws formed on both sides thereof so as to be caught on the inner wall surface of the steel pipe pile; A fifth extension part formed to be in close contact with the outer surface of the head cap and having a bolt hole formed therein, a third fitting groove formed concavely in the lower part of the fifth extension part, and a fitting protrusion protruding outward of the fifth extension part; The fifth binding member consisting of; A locking protrusion is formed to be fitted to the fourth sleeve and to be engaged with the locking groove, and the fourth insertion portion is inserted into the third fitting groove, and is formed vertically from the outer end of the fourth insertion portion to extend the fifth extension. A fourth extension part which is overlapped with the outer surface of the part and is in close contact with the bolt hole, and a second fitting groove which is formed concavely at an upper end of the fourth extension part to allow the fitting protrusion to be fitted thereto; 4 binding member; It is fastened through the bolt hole formed in the fourth binding member and the fifth binding member is connected to the fourth binding member and the fifth binding member integrally so that the PHC pile and the steel pipe pile is connected to the bolt.

한편 본 발명은 PHC말뚝과 강관말뚝을 결합하는 말뚝 이음 장치에 있어서, PHC말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제4슬리브로 이루어진 두부캡; 상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되며 볼트홀이 형성되어 있는 제4연장부로 이루어진 제4결속부재; 상기 강관말뚝의 내측에서 상기 두부캡의 받침링에 결합되어 강관말뚝을 받쳐주면서 내주면에 밀착되어 강관말뚝을 지지해주는 내부보강부재;; 상기 제4결속부재에 형성된 볼트홀과 강관말뚝의 둘레를 따라 일정간격으로 형성되는 관통홀 및 상기 내부보강부재에 형성된 볼트홀을 통해 삽입되고 내부보강부재의 내벽면에 볼트홀과 연통되도록 설치되는 너트에 체결됨으로서 제4결속부재와 내부보강부재를 결합하여 PHC말뚝인 하부말뚝과 강관말뚝이 연결되도록 하는 볼트;를 포함하여 구성된 것을 특징으로 한다.On the other hand the present invention is a pile joint device for coupling the PHC pile and the steel pipe pile, and the support ring is attached to the head of the PHC pile, and formed along the edge of the support ring to a certain height to reinforce the band surrounding the outer peripheral surface of the pile; A head cap comprising a fourth sleeve installed at a predetermined interval along the circumferential direction on one side of the support ring and having a locking groove formed therein; A fourth insertion portion formed with a locking protrusion so as to be fitted into the fourth sleeve and to be engaged with the locking groove, and a fourth extension portion formed vertically from an outer end of the fourth insertion portion and having a bolt hole formed therein; 4 binding member; An inner reinforcing member coupled to the support ring of the head cap at the inner side of the steel pipe pile to support the steel pipe pile and to be in close contact with the inner circumferential surface to support the steel pipe pile; Inserted through the through-hole formed at a predetermined interval along the circumference of the bolt hole and the steel pipe pile formed in the fourth binding member and the bolt hole formed in the internal reinforcing member and installed to communicate with the bolt hole on the inner wall surface of the internal reinforcing member The bolt is connected to the fourth binding member and the internal reinforcing member by being fastened to the nut to connect the lower pile and the steel pipe pile, which is a PHC pile.

또한 상기 내부보강부재는, 두부캡의 받침링에 놓여져 볼트를 통해 받침링에 결합되고 상기 강관말뚝을 받쳐주는 링형태의 수평부; 상기 수평부에서 수직하게 형성되어 강관말뚝의 내벽면에 밀착되어 강관을 지지하고 상기 볼트홀이 다수개 형성되어 있는 수직부;를 포함하여 구성된 특징으로 한다.In addition, the internal reinforcing member is placed in the support ring of the head cap is coupled to the support ring through a bolt and the horizontal portion of the ring-shaped to support the steel pipe pile; The vertical portion is formed vertically in the horizontal portion is in close contact with the inner wall surface of the steel pipe pile to support the steel pipe and the plurality of bolt holes are formed; characterized in that it comprises a.

또한 상기 수직부의 상부 끝단에서 내부방향으로 절곡되도록 형성되는 절곡부를 더 포함하여 구성된 것을 특징으로 한다.In addition, the upper end of the vertical portion is characterized in that it further comprises a bent portion formed to be bent inwardly.

또한 상기 내부보강부재는 적어도 2개 이상의 조각으로 분할되도록 형성되는 것을 특징으로 한다.In addition, the internal reinforcing member is characterized in that it is formed to be divided into at least two pieces.

또한 상기 제3슬리브와 제4슬리브에 끼워져 결속부재들의 유동을 방지하는 금속편을 더 포함하여 구성된 것을 특징으로 한다.
In addition, it characterized in that it further comprises a metal piece inserted into the third sleeve and the fourth sleeve to prevent the flow of the binding members.

상기와 같은 특징을 갖는 본 발명에 의하면, 상부말뚝의 선단캡과 하부말뚝의 두부캡의 연결시 선단캡과 두부캡에 미리 설치되어 있는 슬리브에 의해 형성되는 체결공을 통해 제1결속부재와 제2결속부재를 결합하고 볼트를 이용하여 말뚝에 고정시키는 매우 간단한 방식으로 말뚝의 이음이 이루어지게 됨으로서, 작업현장의 날씨, 현장여건 등에 영향을 받지 아니하고 작업이 가능하며, 또한 고비용의 용접공이 필요 없으며, 비숙련자라도 현장에서 간단한 교육으로 시공이 가능한 효과가 있다.According to the present invention having the characteristics as described above, the first binding member and the first through the fastening hole formed by the sleeve is pre-installed in the head cap and the head cap when connecting the head cap of the upper pile and the head cap of the lower pile 2The joints of the piles are made in a very simple manner by combining the binding members and fixing them to the piles using bolts, so that work can be performed without being affected by the weather and the site conditions of the work site, and no expensive welders are required In addition, even the unskilled person can be constructed by simple education in the field.

또한 2개의 결속부재를 서로 부착하여 말뚝을 연결해주게 됨으로써 말뚝을 보다 견고하게 지지하여 안정적인 말뚝 이음 시공이 가능하다.In addition, by attaching the two binding members to each other to connect the pile it is possible to support the pile more firmly stable stable joint construction.

또한 본 발명은 슬리브 제작 및 받침링에 부착 , 결속부재 및 볼트 등을 공장에서 제작하고, 현장에서는 단순한 볼팅 작업만 함으로서 품질유지가 매우 용이하며 이로 인해 품질관리 비용이 거의 발생치 아니한 효과가 있다.In addition, the present invention is attached to the sleeve manufacturing and the support ring, the binding member and bolts, etc. are manufactured in the factory, the quality is very easy to maintain by simply bolting work in the field, which has the effect that almost no quality control costs.

또한 보다 용이하고, 보다 신속한 이음시공을 할 수 있어 경제성 있게 하는 효과가 있다.In addition, there is an effect that can be made easier, faster joint construction economical.

또한 제3결속부재와 제4결속부재가 서로 끼워진 상태에서 볼트를 이용하여 조여지고 이로 인해 슬리브에 형성된 걸림홈에 걸려져 상부말뚝과 하부말뚝의 이음이 이루어지게 됨으로서 제3결속부재와 제4결속부재의 결속력이 향상되어 견고하고 안정적으로 말뚝의 이음이 이루어지고, 말뚝의 가공은 최소화 하면서 말뚝을 연결할 수 있어 말뚝의 선단과 두부의 강도 저하를 방지해주는 효과가 있다.In addition, the third binding member and the fourth binding member are fastened by using a bolt in a state where the third binding member and the fourth binding member are fitted to each other, thereby engaging the engaging groove formed in the sleeve so that the joint between the upper and lower piles is made. As the binding force of the member is improved, the joint of the pile is firmly and stably made, and the pile can be connected while minimizing the processing of the pile, thereby preventing the strength of the tip and the head of the pile.

또한 강관말뚝과 PHC말뚝의 이음시 내부보강부재를 더 설치함으로써 제4결속부재를 통해 강관말뚝과 PHC말뚝을 연결하면서 내부보강부재를 통해 강관말뚝의 내부를 안정적으로 지지하여 말뚝의 견고한 이음이 가능한 매우 획기적이고, 매우 유용한 발명이다.
In addition, by installing the internal reinforcing member at the joint of the steel pipe pile and the PHC pile, the steel pipe pile and the PHC pile are connected through the fourth binding member, and the internal reinforcing member can be stably supported to secure the inside of the steel pipe pile. It is a very innovative and very useful invention.

도 1 은 본 발명의 제1실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도,
도 2 는 본 발명의 제1실시예에 의한 말뚝 이음 장치에 의하여 두 말뚝의 이음이 이루어진 상태를 보인 단면도,
도 3 은 본 발명의 제1실시예에 의한 말뚝 이음 장치의 슬리브 설치 상태를 나타낸 정면도,
도 4 는 본 발명의 제1실시예에 의한 말뚝 이음 장치의 슬리브 설치 상태를 나타낸 평면도,
도 5 는 본 발명의 제1실시예에 의한 말뚝 이음 장치에서 제1볼트결합부와 제2볼트결합부를 하나만 형성한 상태를 나타낸 사시도,
도 6 은 본 발명의 제2실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도,
도 7 은 본 발명의 제2실시예에 의한 말뚝 이음 장치의 구조를 보인 단면도,
도 8 은 본 발명의 제3실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도,
도 9 는 본 발명에 의한 말뚝 이음 장치에서 금속편을 더 설치한 상태를 나타낸 단면도,
도 10 은 본 발명의 제4실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도,
도 11 은 본 발명의 제4실시예에 의한 PHC말뚝과 강관말뚝의 체결과정을 나타낸 단면도,
도 12 는 본 발명의 제5실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도,
도 13 은 본 발명의 제5실시예에 의한 말뚝 이음 장치의 구조를 보인 단면도,
도 14 는 본 발명에 의한 내부보강부재의 분할된 상태를 나타낸 평면도,
1 is a perspective view showing the structure of a pile joint according to a first embodiment of the present invention,
Figure 2 is a cross-sectional view showing a state in which the joints of the two piles made by the pile joint according to the first embodiment of the present invention,
3 is a front view showing a sleeve installation state of the pile joint according to the first embodiment of the present invention,
4 is a plan view showing a sleeve installation state of the pile joint according to the first embodiment of the present invention,
5 is a perspective view illustrating a state in which only one first bolt coupling part and a second bolt coupling part are formed in the pile fitting apparatus according to the first embodiment of the present invention;
Figure 6 is a perspective view showing the structure of the pile joint according to the second embodiment of the present invention,
7 is a cross-sectional view showing the structure of a pile joint according to a second embodiment of the present invention;
8 is a perspective view showing the structure of a pile joint according to a third embodiment of the present invention;
9 is a cross-sectional view showing a state in which a metal piece is further installed in the pile joint according to the present invention;
10 is a perspective view showing the structure of a pile joint according to a fourth embodiment of the present invention;
11 is a cross-sectional view showing a fastening process between the PHC pile and the steel pipe pile according to the fourth embodiment of the present invention;
12 is a perspective view showing the structure of a pile joint according to a fifth embodiment of the present invention;
13 is a cross-sectional view showing the structure of a pile joint according to a fifth embodiment of the present invention;
14 is a plan view showing a divided state of the internal reinforcing member according to the present invention;

이하, 본 발명의 바람직한 실시예를 첨부된 도면과 연계하여 상세히 설명하면 다음과 같다. 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1 은 본 발명의 제1실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도, 도 2 는 본 발명의 제1실시예에 의한 말뚝 이음 장치에 의하여 두 말뚝의 이음이 이루어진 상태를 보인 단면도, 도 3 은 본 발명의 제1실시예에 의한 말뚝 이음 장치의 슬리브 설치 상태를 나타낸 정면도, 도 4 는 본 발명의 제1실시예에 의한 말뚝 이음 장치의 슬리브 설치 상태를 나타낸 평면도로서,1 is a perspective view showing the structure of the pile joint according to the first embodiment of the present invention, Figure 2 is a cross-sectional view showing a state in which two piles are made by the pile joint according to the first embodiment of the present invention, 3 is a front view showing a sleeve installation state of the pile joint according to the first embodiment of the present invention, Figure 4 is a plan view showing a sleeve installation state of the pile joint according to the first embodiment of the present invention,

도면에서와 같이 제1실시예에 의한 본 발명의 말뚝 이음 장치는, 상부말뚝(20)의 선단에 설치되어 말뚝의 선단을 보호해주는 원판 형태의 선단캡(40)과, 하부말뚝(10)의 두부에 설치되는 말뚝의 두부를 보호해주는 두부캡(30)과, 상기 선단캡(40)에 일측단이 끼워지고 타측단은 두부캡(30) 방향으로 연장되는 제1결속부재(100)와, 상기 두부캡(30)에 일측단이 끼워지고 타측단은 상기 제1결속부재(100)와 겹쳐지는 제2결속부재(110)와, 상기 제1결속부재(100)와 제2결속부재(110)를 관통하여 상부말뚝(20)의 선단캡(40) 또는 하부말뚝(10)의 두부캡(30)에 체결되어 상부말뚝(20)과 하부말뚝(10)을 연결해주는 볼트(300)를 포함하여 구성된다.The pile joint device of the present invention according to the first embodiment, as shown in the drawing, is installed at the tip of the upper pile 20 to protect the tip of the pile end cap 40 and the bottom of the pile 10 Head cap 30 to protect the head of the pile is installed in the head, and the first end member is inserted into the front end cap 40, the other end is extended in the direction of the head cap 30, and One end is inserted into the head cap 30 and the other end is the second binding member 110 overlapping with the first binding member 100, the first binding member 100 and the second binding member 110. It is fastened to the head cap 30 of the upper end cap 40 or the lower pile 10 of the upper pile 20 to include a bolt 300 connecting the upper pile 20 and the lower pile 10 It is configured by.

상기 선단캡(40)은 상부말뚝(20)의 선단에 부착되어 상부말뚝(20)의 선단을 보호해주는 받침링(41)과, 상기 받침링(41)의 가장자리를 따라 일정 높이로 형성되어 상부말뚝(20)의 외주면을 감싸 보호해주는 보강밴드(42)와, 후술되는 제1결속부재(100)의 제1삽입부(101)가 삽입되기 위한 체결공(60)을 형성할 수 있도록 상기 받침링(41)의 일측면에 원주방향을 따라 일정간격으로 설치되는 제1슬리브(50)와, 상기 볼트(300)가 삽입될 수 있도록 상기 제1슬리브(50)의 양측에 인접하고 상기 받침링(41)의 일측면에 원주방향을 따라 일정간격으로 설치되는 볼트체결용 슬리브(55)와, 상기 볼트체결용 슬리브(55)의 끝단에 부착되어 상기 볼트(300)가 체결될 수 있도록 하는 너트(310)를 포함하여 구성된다.The tip cap 40 is attached to the front end of the upper pile 20, the support ring 41 to protect the tip of the upper pile 20, and formed at a predetermined height along the edge of the support ring 41, the upper The support so as to form a reinforcing band 42 to protect the outer circumferential surface of the pile 20 and a fastening hole 60 for inserting the first inserting portion 101 of the first binding member 100 to be described later The support ring is adjacent to both sides of the first sleeve 50 and the first sleeve 50 to be inserted at a predetermined interval along the circumferential direction on one side of the ring 41, the bolt 300 is inserted A bolt fastening sleeve 55 installed at a predetermined interval along the circumferential direction on one side of the 41 and a nut attached to an end of the bolt fastening sleeve 55 so that the bolt 300 can be fastened. 310 is configured to include.

상기 너트(310)는 상부말뚝(20)의 내측면에 설치되는 것으로, 보다 구체적으로는 상부말뚝(20)의 내측면에서 볼트체결용 슬리브(55)에 연결되도록 용접 결합하여 볼트체결용 슬리브(55)를 통해 삽입되는 볼트(300)가 체결되도록 하는 것이다.The nut 310 is installed on the inner side of the upper pile 20, more specifically, the bolting sleeve by welding to be connected to the bolting sleeve 55 on the inner side of the upper pile 20 ( 55 is to be fastened to the bolt 300 is inserted through.

상기 두부캡(30)은 하부말뚝(10)의 두부에 설치되어 말뚝의 두부를 보호해주는 원판 형태의 받침링(31)과, 상기 받침링(31)의 가장자리를 따라 일정 높이로 형성되어 하부말뚝(10)의 외주면을 감싸 보호해주는 보강밴드(32)와, 후술되는 제2결속부재(110)의 제2삽입부(111)가 삽입되기 위한 체결공(60)을 형성할 수 있도록 상기 받침링(31)의 일측면에 원주방향을 따라 일정간격으로 설치되는 제2슬리브(51)로 구성된다.The head cap 30 is installed on the head of the lower pile 10 to support the head of the pile support ring 31 and the lower pile is formed at a predetermined height along the edge of the support ring 31 The support ring to form a reinforcing band 32 to protect the outer circumferential surface of the 10 and the fastening hole 60 for inserting the second insertion portion 111 of the second binding member 110 to be described later It is composed of a second sleeve (51) which is provided on one side of the (31) at regular intervals along the circumferential direction.

상기 제1,2슬리브(50)(51) 및 볼트체결용 슬리브(55)를 용접을 통해 받침링(31)에 미리 부착해 놓음으로써 말뚝 제조시 타설되는 콘크리트에 매설되어 일체화되면서 체결공(60)을 형성한다.The first and second sleeves 50 and 51 and the bolt fastening sleeve 55 are attached to the support ring 31 by welding in advance so that the fastening holes 60 may be embedded and embedded in concrete that is poured during pile manufacturing. ).

상기 제1결속부재(100)는, 상기 제1슬리브(50)에 삽입되는 제1삽입부(101)와, 상기 제1삽입부(101)의 외측단부로부터 수직하부로 연장되게 형성되어 선단캡(40)과 두부캡(30)의 외면에 밀착되는 제1연장부(102)와, 상기 제1연장부(102)의 양측에 돌출되도록 형성되고 상기 볼트(300)가 체결될 수 있도록 볼트홀(104)이 형성되어 있는 제1볼트결합부(103)로 구성된다.The first binding member 100 is formed to extend from the outer end of the first insertion portion 101 and the first insertion portion 101 to be inserted into the first sleeve 50 to the vertical lower end cap The first extension part 102 in close contact with the outer surface of the head cap 30 and the head cap 30 and the bolt hole are formed to protrude on both sides of the first extension part 102 so that the bolt 300 can be fastened. It is composed of a first bolt engaging portion 103 is formed 104.

상기 제2결속부재(110)는 제2슬리브(51)에 삽입되어 결합되는 제2삽입부(111)와, 상기 제2삽입부(111)의 외측단부로부터 수직 상부로 연장되게 형성되어 제1연장부(102) 외면에 밀착되는 제2연장부(112)와, 상기 제2연장부(112)의 양측에 돌출되도록 형성되고 상기 볼트홀(104)과 연통되는 볼트홀(114)이 형성되어 있는 제2볼트결합부(113)로 구성된다.
The second binding member 110 is formed to extend from the outer end of the second inserting portion 111 and the second inserting portion 111 is inserted into the second sleeve 51 to the vertical upper portion of the first A second extension part 112 in close contact with the outer surface of the extension part 102 and a bolt hole 114 formed to protrude on both sides of the second extension part 112 and in communication with the bolt hole 104 are formed. It is composed of a second bolt coupling portion 113.

이와 같이 구성되는 제1실시예에 의한 말뚝 이음 장치를 이용한 말뚝 이음과정을 설명하면, Referring to the pile joint process using the pile joint according to the first embodiment configured as described above,

먼저 상부말뚝(20)의 선단캡(40)과 하부말뚝(10)의 두부캡(30)을 맞닿도록 위치시킨 상태에서 제1결속부재(100)의 제1삽입부(101)를 선단캡(40)의 제1슬리브(50)에 삽입하고, 제2결속부재(110)의 제2삽입부(111)를 제2슬리브(51)에 삽입한 후 제2연장부(112)가 제1연장부(102)의 외면에 밀착되도록 한다.First, the first cap 101 of the first binding member 100 is positioned in a state where the tip cap 40 of the upper pile 20 and the head cap 30 of the lower pile 10 are in contact with each other. 40 and insert the second insertion portion 111 of the second binding member 110 into the second sleeve 51, and then the second extension portion 112 extends first. It is in close contact with the outer surface of the part (102).

이후 볼트(300)를 이용하여 제1볼트결합부(103)와 제2볼트결합부(113)에 형성된 볼트홀(104)(114)을 관통하여 볼트체결용 슬리브(55)에 삽입하고 너트(301)에 체결함으로써 제1결속부재(100)와 제2결속부재(110)를 일체로 조여 주고 이로 인해 상부말뚝(20)과 하부말뚝(10)이 연결되는 것이다.Thereafter, the bolt 300 is inserted into the bolt fastening sleeve 55 through the bolt holes 104 and 114 formed in the first bolt coupling part 103 and the second bolt coupling part 113, and the nut ( By fastening to 301, the first binding member 100 and the second binding member 110 are integrally tightened, and thus the upper pile 20 and the lower pile 10 are connected.

이러한 제1실시예에 의한 말뚝 이음 장치는 말뚝의 제작시 제1슬리브(50)와 볼트체결용 슬리브(55) 및 제2슬리브(51)를 미리 설치하여 체결공(60)을 형성해 놓음으로써 현장에서 별도의 가공 없이 제1결속부재(100)와 제2결속부재(110)를 볼트를 이용하여 말뚝에 간편하게 시공할 수 있다.The pile joint device according to the first embodiment is installed by the first sleeve 50, the bolting sleeve 55 and the second sleeve 51 in advance to form a fastening hole 60 in the manufacture of the pile In the first binding member 100 and the second binding member 110 can be easily installed on the pile using a bolt without additional processing.

또한 제1볼트결합부(103)와 제2볼트결합부(113)를 통해 제1결속부재(100)와 제2결속부재(110)를 일체로 하여 말뚝을 연결해줌으로서 말뚝의 견고한 이음이 가능하게 된다.In addition, the first bolt coupling portion 103 and the second bolt coupling portion 113 through the first binding member 100 and the second binding member 110 by integrally connecting the pile to enable a solid joint of the pile. Done.

한편 본 발명은 도 5 에서와 같이 제1볼트결합부(103)를 제1연장부(102)의 일측에 형성하고, 제2볼트결합부(113)를 제2연장부(112)의 일측에 형성하여 볼트(300)를 통해 체결할 수 있다.Meanwhile, in the present invention, as shown in FIG. 5, the first bolt coupling part 103 is formed at one side of the first extension part 102, and the second bolt coupling part 113 is at one side of the second extension part 112. It can be formed and fastened through the bolt 300.

상기 제1,2볼트결합부(103)(113)는 제1연장부(102)와 제2연장부(112)의 어느 한 부분에만 형성함으로써 제1결속부재(100)와 제2결속부재(110)의 결속은 이루어지도록 하면서 조립과정을 보다 간편하게 하여 빠른 조립이 이루어지게 된다.The first and second bolt coupling parts 103 and 113 may be formed only at one portion of the first extension part 102 and the second extension part 112 so that the first binding member 100 and the second binding member ( Binding of the 110 is made while making the assembly process easier and faster assembly is made.

한편 도 6 은 본 발명의 제2실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도, 도 7 은 본 발명의 제2실시예에 의한 말뚝 이음 장치의 구조를 보인 단면도로서,6 is a perspective view showing the structure of the pile joint according to the second embodiment of the present invention, Figure 7 is a cross-sectional view showing the structure of the pile joint according to the second embodiment of the present invention,

도면에서와 같이 제2실시예에 의한 본 발명의 말뚝 이음 장치는, 상부말뚝(20)의 선단에 설치되어 말뚝의 선단을 보호해주는 원판 형태의 선단캡(40)과, 하부말뚝(10)의 두부에 설치되는 말뚝의 두부를 보호해주는 두부캡(30)과, 상기 선단캡(40)에 일측단이 끼워져 선단캡(40) 내부에서 걸려지고 타측단은 두부캡(30) 방향으로 연장되어 선단캡(40)과 두부캡(30)의 외면에 밀착되는 제3결속부재(200)와, 상기 두부캡(30)에 일측단이 끼워져 두부캡(30)의 내부에서 걸려지고 타측단은 선단캡(40) 방향으로 연장되어 상기 제3결속부재(200)와 겹쳐지는 제4결속부재(210)와, 상기 제3결속부재(200)와 제4결속부재(210)의 겹쳐지는 부분으로 체결되어 제3결속부재(200)와 제4결속부재(210)를 일체로 연결해줌으로써 상부말뚝(20)과 하부말뚝(10)이 연결되도록 하는 볼트(300)를 포함하여 구성된다.The pile joint device of the present invention according to the second embodiment, as shown in the drawing, is installed on the tip of the upper pile 20 to protect the tip of the pile end cap 40 and the lower pile 10 Head cap 30 to protect the head of the pile to be installed to the head, and one end is inserted into the front end cap 40 is caught in the front end cap 40 and the other end is extended in the direction of the head cap (30) The third binding member 200 in close contact with the outer surface of the cap 40 and the head cap 30 and one end is fitted to the head cap 30 to be caught inside the head cap 30 and the other end is the end cap. A fourth binding member 210 extending in the direction of 40 and overlapping with the third binding member 200 and fastened to an overlapping portion of the third binding member 200 and the fourth binding member 210. It includes a bolt 300 to connect the upper pile 20 and the lower pile 10 by connecting the third binding member 200 and the fourth binding member 210 integrally. It is configured.

상기 선단캡(40)은 상부말뚝(20)의 선단에 부착되어 말뚝의 선단을 보호해주는 원판 형태의 받침링(41)과, 상기 받침링(41)의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드(42)와, 상기 받침링(41)의 일측면에 원주방향을 따라 일정간격으로 설치되고 후술되는 제3결속부재(200)의 제3삽입부(201)가 삽입될 수 있도록 체결공(60)을 형성하고 삽입된 제3삽입부(201)의 걸림돌기(201a)가 걸려질 수 있도록 하부에 걸림홈(54)이 형성되어 있는 제3슬리브(52)를 포함하여 구성된다.The tip cap 40 is attached to the tip of the upper pile 20 to protect the tip of the pile support ring 41 of the disk shape and formed along the edge of the support ring 41 to a certain height of the pile A reinforcing band 42 surrounding the outer circumferential surface and a third insertion portion 201 of the third binding member 200 to be described below are installed at predetermined intervals along the circumferential direction on one side of the support ring 41 and will be described later. Including a third sleeve 52 to form a fastening hole 60 and the locking groove 54 is formed in the lower portion so that the locking projection 201a of the inserted third inserting portion 201 can be caught. It is composed.

상기 두부캡(30)은 하부말뚝(10)의 두부에 설치되어 말뚝의 두부를 보호해주는 원판 형태의 받침링(31)과, 상기 받침링(31)의 가장자리를 따라 일정 높이로 형성되어 하부말뚝(10)의 외주면을 감싸 보호해주는 보강밴드(32)와, 후술되는 제4결속부재(210)의 제4삽입부(211)가 삽입될 수 있도록 체결공(60)을 형성하고 삽입된 제4삽입부(211)의 걸림돌기(211a)가 걸려질 수 있도록 상부면 걸림홈(54)이 형성되어 있는 제4슬리브(53)를 포함하여 구성된다.The head cap 30 is installed on the head of the lower pile 10 to support the head of the pile support ring 31 and the lower pile is formed at a predetermined height along the edge of the support ring 31 Fourth to form a fastening hole 60 so that the reinforcing band 32 to protect the outer peripheral surface of the 10 and the fourth insertion portion 211 of the fourth binding member 210 to be described later can be inserted It is configured to include a fourth sleeve 53, the upper surface engaging groove 54 is formed so that the locking projection (211a) of the insertion portion 211 is caught.

한편 상기 제3결속부재(200)는, 상기 제3슬리브(52)에 삽입되고 걸림홈(54)에 걸려질 수 있도록 하부면에 걸림돌기(201a)가 형성되어 있는 제3삽입부(201)와, 상기 제3삽입부(201)의 외측단부로부터 수직하부로 형성되어 선단캡(40)과 두부캡(30)의 외면에 밀착되고 상기 볼트(300)가 체결될 수 있도록 수평방향으로 볼트홀(205)이 형성되어 있는 제3연장부(202)로 구성된다.On the other hand, the third binding member 200, the third insertion portion 201 is inserted into the third sleeve 52 and the locking projection 201a is formed on the lower surface to be caught in the locking groove 54 And a vertical hole formed from an outer end of the third inserting portion 201 to be in close contact with the outer surfaces of the front end cap 40 and the head cap 30 and the bolt hole in the horizontal direction so that the bolt 300 can be fastened. 205 is formed of a third extension portion 202.

상기 제4결속부재(210)는, 상기 제4슬리브(53)에 끼워지고 걸림홈(54)에 걸려질 수 있도록 상부면에 걸림돌기(211a)가 형성되어 있는 제4삽입부(211)와, 상기 제4삽입부(211)의 외측단부로부터 수직상부로 형성되어 상기 제3연장부(202)의 외면에 겹쳐져 밀착되며 상기 볼트홀(205)과 연통되는 볼트홀(215)이 형성되어 있는 제4연장부(212)로 구성된다.
The fourth binding member 210 may include a fourth inserting portion 211 having a locking protrusion 211a formed on an upper surface thereof so as to be fitted into the fourth sleeve 53 and to be caught by the locking groove 54. And a bolt hole 215 which is formed vertically from an outer end of the fourth inserting portion 211 and overlaps with the outer surface of the third extension portion 202 and is in close contact with the bolt hole 205. 4th extension part 212 is comprised.

이와 같이 구성되는 본 발명의 제2실시예에 의한 말뚝 이음 장치를 이용하여 말뚝의 이음 과정을 설명하면, Using the pile joint according to the second embodiment of the present invention constituted as described above,

먼저 상부말뚝(20)의 선단캡(40)과 하부말뚝(10)의 두부캡(30)이 맞닿도록 위치시킨 상태에서 제3결속부재(200)의 제3삽입부(201)를 제3슬리브(52)에 삽입하고, 제4결속부재(210)의 제4삽입부(211)를 제4슬리브(53)에 삽입하여 제4연장부(212)가 제3연장부(202)의 외면에 맞닿도록 밀착시킨다.First, the third inserting portion 201 of the third binding member 200 is positioned in a state in which the tip cap 40 of the upper pile 20 and the head cap 30 of the lower pile 10 are in contact with each other. Inserted into the 52, the fourth inserting portion 211 of the fourth binding member 210 is inserted into the fourth sleeve 53, the fourth extension portion 212 to the outer surface of the third extension portion 202 Close contact.

이때 제3삽입부(201)의 걸림돌기(201a)는 제3슬리브(52)의 걸림홈(54)에 삽입되어 걸려지고, 제4삽입부(211)의 걸림돌기(211a)는 제4슬리브(53)의 걸림홈(54)에 걸려지게 된다.At this time, the locking projection 201a of the third insertion portion 201 is inserted into the locking groove 54 of the third sleeve 52 and is caught, and the locking projection 211a of the fourth insertion portion 211 is the fourth sleeve. The engaging groove 54 of the 53 is caught.

이와 같이 제3결속부재(200)와 제4결속부재(210)가 설치되면 제4연장부(212)와 제3연장부(202)에 형성된 볼트홀(215)(205)을 통해 볼트(300)를 체결되어 제3결속부재(200)와 제4결속부재(210)를 결합해줌으로써 상부말뚝(20)과 하부말뚝(10)이 서로 연결되는 것이다.As such, when the third binding member 200 and the fourth binding member 210 are installed, the bolt 300 may be formed through the bolt holes 215 and 205 formed in the fourth extension part 212 and the third extension part 202. The upper pile 20 and the lower pile 10 are connected to each other by coupling the third binding member 200 and the fourth binding member 210 to each other.

이러한 본 발명의 제2실시예에 의한 말뚝 이음 장치는 제3결속부재(200)와 제4결속부재(210)가 서로 겹쳐진 후 상부말뚝(20)과 하부말뚝(10)을 연결해줌으로써, 견고하고 안정적으로 말뚝들을 연결해주고 설치가 간편하여 보다 빠른 시공이 이루어진다.The pile coupling device according to the second embodiment of the present invention is firm by connecting the upper pile 20 and the lower pile 10 after the third binding member 200 and the fourth binding member 210 overlap each other. Faster construction is achieved by connecting the piles stably and simple installation.

또한 제3결속부재(200)와 제4결속부재(210)가 제3슬리브(52)와 제4슬리브(53)의 걸림홈(54)에 걸려진 상태에서 볼트(300)를 이용하여 서로 조립되어 조여짐으로써 선단캡(40)과 두부캡(30)에서 이탈되지 않고 걸림홈(54)에 견고히 걸려져 상부말뚝(20)과 하부말뚝(10)을 연결해 주게 된다.In addition, the third binding member 200 and the fourth binding member 210 are assembled to each other using the bolt 300 in a state where the locking groove 54 of the third sleeve 52 and the fourth sleeve 53 is caught. By being tightened, the front cap 20 and the lower pile 10 are firmly caught by the locking groove 54 without being separated from the tip cap 40 and the head cap 30.

또한 볼트(300)가 선단캡(40)과 두부캡(30)에 설치되지 않고 단순히 제3결속부재(200)와 제4결속부재(210)를 연결하는 것만으로도 상부말뚝(20)과 하부말뚝(10)을 안정적으로 연결할 수 있어 상부말뚝(20)과 하부말뚝(10)의 가공은 최소화하면서 말뚝의 이음시공이 가능하다
In addition, the bolt 300 is not installed on the tip cap 40 and the head cap 30, and simply connects the third binding member 200 and the fourth binding member 210 to the upper pile 20 and the lower portion. Since the pile 10 can be connected stably, the construction of the pile can be performed while minimizing the processing of the upper pile 20 and the lower pile 10.

한편 도 8 은 본 발명의 제3실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도로서, 도면에서와 같이 본 발명은 제3결속부재(200)와 제4결속부(210)의 체결이 보다 견고하게 이루어질 수 있도록, 제3결속부재(200)에는 제3연장부(202)의 끝단에 오목하게 형성되어 제1끼움홈(203) 및 상기 제3연장부(202)의 외면에 돌출되도록 형성되는 끼움돌기(204)를 더 형성하고, 또한 상기 제4결속부재(210)에는 제4연장부(212)의 단부에 오목하게 형성되어 상기 제3결속부재(200)의 끼움돌기(204)가 끼워질 수 있도록 하는 제2끼움홈(213)을 더 포함하여 구성된다.8 is a perspective view showing the structure of the pile joint according to the third embodiment of the present invention. As shown in the drawing, the fastening of the third binding member 200 and the fourth binding unit 210 is more robust. To be made, the third binding member 200 is formed to be concave at the end of the third extension portion 202 to protrude to the outer surface of the first fitting groove 203 and the third extension portion 202. The fitting protrusion 204 is further formed, and the fourth binding member 210 is formed to be concave at the end of the fourth extension part 212 so that the fitting protrusion 204 of the third binding member 200 is fitted. It is configured to further include a second fitting groove 213 to be lost.

이와 같이 구성되는 제3실시예에 의한 말뚝 이음 장치는 제3결속부재(200)와 제4결속부재(210)의 체결시 제4결속부재(210)의 제4삽입부(211)는 제3결속부재(200)의 제1끼움홈(203)에 삽입되고, 제3결속부재(200)의 끼움돌기(204)는 제4결속부재(210)의 제2끼움홈(213)에 삽입되어 제3결속부재(200)와 제4결속부재(210)가 상호 끼워짐으로써 보다 안정적으로 체결되는 것이다.
In the pile joint according to the third embodiment configured as described above, when the third binding member 200 and the fourth binding member 210 are fastened to each other, the fourth inserting portion 211 of the fourth binding member 210 may be a third. The first fitting groove 203 of the binding member 200 is inserted, and the fitting protrusion 204 of the third binding member 200 is inserted into the second fitting groove 213 of the fourth binding member 210 to be formed. The third binding member 200 and the fourth binding member 210 are fitted to each other to be more stably fastened.

한편 본 발명은 도 9 에서와 같이 상기 제3슬리브(52)와 제4슬리브(53)에 삽입되어 제3삽입부(201)와 제4삽입부(211)가 제3슬리브(52)와 제4슬리브(53)의 내부에서 유동되는 것을 방지하는 금속편(70)을 포함하여 구성된다.Meanwhile, the present invention is inserted into the third sleeve 52 and the fourth sleeve 53 as shown in FIG. 9 so that the third inserting portion 201 and the fourth inserting portion 211 are formed in the third sleeve 52 and the third sleeve 52. It is comprised including the metal piece 70 which prevents it from flowing inside the four sleeve 53. As shown in FIG.

이러한 금속편(70)은 제3삽입부(201)와 제4삽입부(211)의 걸림돌기(201a)(211a)가 걸림홈(54)에 걸려질 경우 제3슬리브(52)와 제4슬리브(53)의 내부에서 틈이 발생할 수 있으므로, 틈에 금속편(70)을 삽입하여 제3결속부재(200)와 제4결속부재(210)가 유동되지 않도록 하는 것이다.
The metal piece 70 has a third sleeve 52 and a fourth sleeve when the engaging projections 201a and 211a of the third inserting portion 201 and the fourth inserting portion 211 are caught by the catching groove 54. Since a gap may occur inside the 53, the metal piece 70 is inserted into the gap so that the third binding member 200 and the fourth binding member 210 do not flow.

한편 도 10 은 본 발명의 제4실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도, 도 11 은 본 발명의 제4실시예에 의한 PHC말뚝과 강관말뚝의 체결과정을 나타낸 단면도로서, 말뚝 이음 장치는, PHC말뚝인 하부말뚝(10)과 강관말뚝(80)을 연결해주는 것으로, 하부말뚝(10)의 두부에 부착되는 받침링(31)과, 상기 받침링(31)의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드(32)와, 상기 받침링(31)의 일측면에 원주방향을 따라 일정간격으로 설치되어 체결공(60)을 형성하고 내부에 걸림홈(54)이 형성되어 있는 제4슬리브(53)로 구성되는 두부캡(30)과, 상기 강관말뚝(80)의 둘레를 따라 형성되는 다수의 슬롯홀(81)에 일측단이 끼워져 강관말뚝(80) 내벽면에 걸려지고 타측단은 두부캡(30) 방향으로 연장되는 제5결속부재(220)와, 상기 두부캡(30)의 제4슬리브(53)에 일측단이 끼워져 걸림홈(54)에 걸려지고 타측단은 강관말뚝(80) 방향으로 연장되어 상기 제5결속부재(220)의 외면에 겹쳐지는 제4결속부재(210)와, 상기 제4결속부재(210)와 제5결속부재(220)의 겹쳐지는 부분으로 체결되어 제4결속부재(210)와 제5결속부재(220)를 일체로 연결해줌으로써 강관말뚝(80)과 PHC말뚝인 하부말뚝(10)이 연결되도록 하는 볼트(300)를 포함하여 구성된다.10 is a perspective view showing a structure of a pile joint according to a fourth embodiment of the present invention, and FIG. 11 is a cross-sectional view showing a fastening process between a PHC pile and a steel pipe pile according to a fourth exemplary embodiment of the present invention. Is connected to the lower pile 10 and the steel pipe pile 80, which is the PHC pile, the support ring 31 is attached to the head of the lower pile 10, and a predetermined height along the edge of the support ring 31 Reinforcement band 32 formed to surround the outer circumferential surface of the pile and the one side of the support ring 31 is installed at regular intervals along the circumferential direction to form a fastening hole 60 and the locking groove 54 therein One end is inserted into the head cap 30 formed of the fourth sleeve 53 formed therein, and a plurality of slot holes 81 formed along the circumference of the steel pipe pile 80 so that the steel pipe pile 80 is formed. The other end is hung on the wall and the other end extending in the direction of the head cap 30, the fifth binding member 220, and the head cap 30 One end is inserted into the fourth sleeve 53 to be caught by the locking groove 54, and the other end extends in the direction of the steel pipe pile 80 to overlap the outer surface of the fifth binding member 220. ) And the fourth binding member 210 and the fifth binding member 220 are fastened to overlap with each other to connect the fourth binding member 210 and the fifth binding member 220 integrally with the steel pipe pile 80. ) Is configured to include a bolt (300) to be connected to the lower pile 10 is PHC pile.

상기 제5결속부재(220)는, 강관말뚝(80)의 둘레를 따라 형성되는 다수의 슬롯홀(81)에 끼워지고 강관말뚝(80)의 내벽면에 걸려질 수 있도록 양측에 걸림턱(221a)이 형성되어 있는 제5삽입부(221)와, 상기 제5삽입부(221)의 외측단부로부터 수직하부로 형성되어 두부캡(30)의 외면에 밀착되며 볼트홀(225)이 형성되어 있는 제5연장부(222)와, 상기 제5연장부(222)의 하부에 오목하게 형성되는 제3끼움홈(223)과, 상기 제5연장부(222)의 상부에서 외측으로 돌출 형성되는 끼움돌기(224)로 이루어진다.The fifth binding member 220 is fitted to a plurality of slot holes 81 formed along the circumference of the steel pipe pile 80 and is caught on both sides so as to be caught on the inner wall surface of the steel pipe pile 80. ) Is formed in the fifth inserting portion 221 and the lower vertical portion from the outer end of the fifth inserting portion 221 is in close contact with the outer surface of the head cap 30, the bolt hole 225 is formed The fifth extension portion 222, the third fitting groove 223 is formed concave in the lower portion of the fifth extension portion 222, the fitting is formed to protrude outward from the upper portion of the fifth extension portion 222. It is made of a projection 224.

상기 제4결속부재(210)는 받침링(31)에 부착된 제4슬리브(53)에 끼워지고 걸림홈(54)에 걸려질 수 있도록 걸림돌기(211a)가 형성되어 있으며 상기 제3끼움홈(223)에 끼워지는 제4삽입부(211)와, 상기 제4삽입부(211)의 외측단부로부터 수직상부로 형성되어 상기 제5연장부(222)의 외면에 겹쳐져 밀착되며 상기 볼트홀(225)과 연통되는 볼트홀(225)이 형성되어 있는 제4연장부(212)와, 상기 제4연장부(212의 상단에 오목하게 형성되어 상기 끼움돌기(224)가 끼워질 수 있도록 하는 제2끼움홈(213)으로 이루어진다.The fourth binding member 210 is fitted with a fourth sleeve 53 attached to the support ring 31 and has a locking protrusion 211a formed to be caught by the locking groove 54 and the third fitting groove. A fourth insertion part 211 fitted to the second and second end portions 223 and a vertical upper part from an outer end of the fourth insertion part 211 and overlapping with the outer surface of the fifth extension part 222 to be in close contact with the bolt hole; A fourth extension part 212 having a bolt hole 225 communicating with 225 and a concavity formed at an upper end of the fourth extension part 212 to allow the fitting protrusion 224 to be fitted thereto; It consists of two fitting grooves (213).

이와 같이 구성되는 제4실시예에 의한 말뚝 이음 장치는, 좌,우 폭보다 상,하 길이가 더 길게 형성되는 슬롯홀(81)에 제5결속부재(220)의 걸림턱(221a)이 걸려지지 않도록 일정각도로 회전시킨 상태에서 슬롯홀(81)에 삽입한 후 원위치로 회전시키기 되면 걸림턱(221a)이 강관말뚝(80)의 내벽면에 걸려지게 되어 슬롯홀(81)에서 이탈되지 않고 걸려지게 된다.In the pile joint according to the fourth embodiment configured as described above, the locking jaw 221a of the fifth binding member 220 is caught in the slot hole 81 formed longer than the left and right widths. When inserted into the slot hole 81 while being rotated at a predetermined angle so as not to be supported and then rotated to its original position, the locking jaw 221a is caught on the inner wall surface of the steel pipe pile 80 so that it is not separated from the slot hole 81. Will be caught.

이렇게 제5결속부재(220)가 슬롯홀(81)에 끼워지면 제4결속부재(210)의 제4삽입부(211)를 제4슬리브(53)에 삽입하여 제4연장부(212)가 제5연장부(222)의 외면에 맞닿도록 위치시킨다.When the fifth binding member 220 is inserted into the slot hole 81, the fourth insertion portion 211 of the fourth binding member 210 is inserted into the fourth sleeve 53 so that the fourth extension portion 212 is provided. The fifth extension portion 222 is positioned to abut on the outer surface.

이때 제4삽입부(211)의 걸림돌기(211a)는 제4슬리브(53)의 걸림홈(54)에 걸려지게 된다.At this time, the locking protrusion 211a of the fourth inserting portion 211 is caught by the locking groove 54 of the fourth sleeve 53.

또한 제4삽입부(211)는 상기 제5연장부(222)의 하부에 오목하게 형성되는 제3끼움홈(223)에 삽입되고 제5연장부(222)의 외측으로 돌출 형성되는 끼움돌기(224)는 제4연장부(212)의 상단에 오목하게 형성되는 제2끼움홈(213)에 삽입되어, 제4결속부재(210)와 제5결속부재(220)가 서로 끼움 결합된다.In addition, the fourth insertion portion 211 is inserted into the third fitting groove 223 which is formed concave in the lower portion of the fifth extension portion 222 and the protrusion formed to protrude out of the fifth extension portion 222 ( 224 is inserted into the second fitting groove 213 formed concave on the upper end of the fourth extension portion 212, the fourth binding member 210 and the fifth binding member 220 is fitted to each other.

이렇게 제4결속부재(210)와 제5결속부재(220)가 끼움 결합되면 제4연장부(212)와 제5연장부(222)에 형성된 볼트홀(215)(225)을 통해 볼트(300)를 체결하여 제4결속부재(210)와 제5결속부재(220)를 일체로 연결해줌으로써 강관말뚝(80)과 PHC말뚝인 하부말뚝(10)이 서로 연결되는 것이다.When the fourth binding member 210 and the fifth binding member 220 are fitted to each other, the bolt 300 may be formed through the bolt holes 215 and 225 formed in the fourth extension part 212 and the fifth extension part 222. ) By connecting the fourth binding member 210 and the fifth binding member 220 integrally, the steel pipe pile 80 and the lower pile 10, which is a PHC pile, are connected to each other.

한편 제4슬리브(53)에 삽입되어 제4삽입부(211)가 제4슬리브(53)의 내부에서 유동되는 것을 방지하는 금속편(70)을 포함하여 구성된다.
On the other hand, it is configured to include a metal piece 70 is inserted into the fourth sleeve 53 to prevent the fourth inserting portion 211 from flowing inside the fourth sleeve (53).

한편 도 12 는 본 발명의 제5실시예에 의한 말뚝 이음 장치의 구조를 보인 사시도, 도 13 은 본 발명의 제5실시예에 의한 말뚝 이음 장치의 구조를 보인 단면도로서,12 is a perspective view showing a structure of a pile joint according to a fifth embodiment of the present invention, and FIG. 13 is a cross-sectional view showing a structure of a pile joint according to a fifth embodiment of the present invention.

도면에서와 같이 말뚝 이음 장치는, PHC말뚝인 하부말뚝(10)과 강관말뚝(80)을 연결해주는 것으로, 하부말뚝(10)의 두부에 부착되는 받침링(31)과, 상기 받침링(31)의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드(32)와, 상기 받침링(31)의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈(54)이 형성되어 있는 제4슬리브(53)로 이루어진 두부캡(30)과, 상기 제4슬리브(53)에 끼워지고 걸림홈(54)에 걸려질 수 있도록 걸림돌기(211a)가 형성되어 있는 제4삽입부(211)와 상기 제4삽입부(211)의 외측단부로부터 수직상부로 형성되며 볼트홀(215)이 형성되어 있는 제4연장부(212)로 이루어진 제4결속부재(210)와, 상기 강관말뚝(80)의 내측에서 상기 두부캡(30)의 받침링(31)에 놓여져 볼트(300) 결합되고, 강관말뚝(80)을 받쳐주면서 내주면에 밀착되어 강관말뚝(80)을 지지해주는 내부보강부재(400)와, 상기 제4결속부재(210)의 볼트홀(215)과 강관말뚝(80)의 둘레를 따라 일정간격으로 형성되는 관통홀(82) 및 상기 내부보강부재(400)에 형성되는 볼트홀을 통해 삽입되고 내부보강부재(400)의 내벽면에 볼트홀과 연통되도록 설치되는 너트(310)에 체결됨으로서 제4결속부재(210)와 내부보강부재(400)를 결합하여 PHC말뚝인 하부말뚝(10)과 강관말뚝(80)이 연결되도록 하는 볼트(300)를 포함하여 구성된다.As shown in the drawing, the pile fitting device, which connects the lower pile 10 and the steel pipe pile 80, which are PHC piles, includes a support ring 31 attached to the head of the lower pile 10, and the support ring 31. Reinforcement band 32 is formed at a predetermined height along the edge of the cover to surround the outer peripheral surface of the pile, and is installed at one side of the support ring 31 at regular intervals along the circumferential direction and the locking groove 54 therein A head insert 30 having a fourth sleeve 53 formed therein, and a fourth insertion protrusion 211a having a locking protrusion 211a formed to be fitted to the fourth sleeve 53 and to be caught by the locking groove 54. A fourth binding member 210 formed of a vertical extension from an outer end of the portion 211 and the fourth insertion portion 211 and having a fourth extension portion 212 in which a bolt hole 215 is formed; Inside the steel pipe pile 80 is placed on the support ring 31 of the head cap 30 is coupled to the bolt 300, while supporting the steel pipe pile 80, the inner circumference It is in close contact with the inner reinforcing member 400 to support the steel pipe pile 80, and the through-hole formed at a predetermined interval along the circumference of the bolt hole 215 and the steel pipe pile 80 of the fourth binding member 210 The fourth binding member 210 is fastened to the nut 310 which is inserted through the bolt hole formed in the inner reinforcing member 400 and installed in communication with the bolt hole on the inner wall surface of the inner reinforcing member 400. ) And the internal reinforcing member 400 is configured to include a bolt 300 to be connected to the lower pile 10 and the steel pipe pile 80 is a PHC pile.

상기 내부보강부재(400)는 두부캡(30)의 받침링(31)에 놓여져 상기 강관말뚝(80)을 받쳐주고 볼트(300)를 통해 받침링(31)에 결합될 수 있도록 일정간격으로 다수의 볼트홀(411)이 형성되어 있는 링형태의 수평부(410)와, 상기 수평부(410)의 상부에서 수직하게 형성되어 강관말뚝(80)의 내벽면에 밀착되고 일정간격으로 상기 관통홀(82)과 연통되는 볼트홀(421)이 다수개 형성되어 있는 수직부(420)를 포함하여 구성된다.The internal reinforcing member 400 is placed on the support ring 31 of the head cap 30 to support the steel pipe pile 80 and a plurality of at regular intervals to be coupled to the support ring 31 through the bolt 300. The horizontal hole 410 of the ring-shaped bolt hole 411 is formed, and is formed vertically on the upper portion of the horizontal portion 410 is in close contact with the inner wall surface of the steel pipe pile 80 and the through hole at regular intervals It is configured to include a vertical portion 420 is formed with a plurality of bolt holes 421 communicating with (82).

상기 너트(310)는 볼트홀(421)에 연통되도록 수직부(420)의 내주면이 미리 용접하여 부착해 놓아 말뚝 이음작업이 보다 빠르게 이루어지도록 한다.The nut 310 is welded and attached to the inner circumferential surface of the vertical portion 420 so as to communicate with the bolt hole 421 so that the piling operation can be made faster.

한편 상기 수직부(420)는 상부 끝단이 내부보강부재(400)의 내부방향으로 절곡함으로써 형성되는 절곡부(430)를 더 포함하여 구성된다.On the other hand, the vertical portion 420 is configured to further include a bent portion 430 is formed by the upper end is bent in the inner direction of the internal reinforcing member 400.

이렇게 절곡부(430)를 더 형성함으로써 내부보강부재(400)의 수직부(420) 외측으로 끼워지는 강관말뚝(80)이 수직부(420)에 간섭받지 않고 쉽게 삽입되고 이로 인해 말뚝 이음 작업을 보다 빠르고 쉽게 수행할 수 있게 된다.Thus, by further forming the bent portion 430, the steel pipe pile 80 that is fitted to the outside of the vertical portion 420 of the internal reinforcing member 400 is easily inserted without being interfered with the vertical portion 420 and thereby the pile joint operation It will be faster and easier to do.

이와 같이 구성되는 제5실시예에 의한 말뚝 이음 장치는, 두부캡에 내부보강부재(400)를 미리 설치해 놓고 내부보강부재(400)의 외측으로 끼워지도록 강관말뚝(80)을 설치하며, 제4결속부재(210)와 내부보강부재(400)를 체결함으로써 말뚝을 내,외부에서 지지하여 안정적이고 견고한 말뚝 이음이 가능하게 된다.The pile joint device according to the fifth embodiment configured as described above has the internal reinforcing member 400 installed in the head cap in advance, and the steel pipe pile 80 is installed to be fitted to the outside of the internal reinforcing member 400. By fastening the binding member 210 and the internal reinforcing member 400, the pile is supported from the inside and outside to enable a stable and strong pile joint.

또한 제4슬리브(53)에 삽입되어 제4삽입부(211)가 제4슬리브(53)의 내부에서 유동되는 것을 방지하는 금속편(70)을 포함하여 구성된다.In addition, it is configured to include a metal piece 70 is inserted into the fourth sleeve 53 to prevent the fourth inserting portion 211 from flowing inside the fourth sleeve 53.

한편 상기와 같이 구성되는 본 발명의 내부보강부재(400)는 도 14 에서와 같이 3개의 조각으로 분할 되도록 구성할 수 있으며, 바람직하게는 2개 이상의 조각으로 다수개를 분할하여 사용할 수 있다.Meanwhile, the internal reinforcing member 400 of the present invention configured as described above may be configured to be divided into three pieces as shown in FIG. 14, and preferably, a plurality of pieces may be divided into two or more pieces.

한편 본 발명은 상기 내부보강부재(400)에 형성되는 볼트홀(421)과 강관말뚝(80)에 형성되는 관통홀(82)은 볼트(300)의 체결이 용이하게 이루어지도록 장공형태로 형성될 수 도 있다.Meanwhile, in the present invention, the bolt hole 421 formed in the internal reinforcing member 400 and the through hole 82 formed in the steel pipe pile 80 may be formed in a long hole shape so that the bolt 300 is easily fastened. Can also be.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

(10) : 하부말뚝 (20) : 상부말뚝
(30) : 두부캡 (31) : 받침링
(32) : 보강밴드 (40) : 선단캡
(41) : 받침링 (42) : 보강밴드
(50) : 제1슬리브 (51) : 제2슬리브
(52) : 제3슬리브 (53) : 제4슬리브
(54) : 걸림홈 (55) : 볼트체결용 슬리브
(60) : 체결공 (70) : 금속편
(80) : 강관말뚝 (81) : 슬롯홀
(82) : 관통홀 (100) : 제1결속부재
(101) : 제1삽입부 (102) : 제1연장부
(103) : 제1볼트결합부 (104) : 볼트홀
(110) : 제2결속부재 (111) : 제2삽입부
(112) : 제2연장부 (113) : 제2볼트결합부
(114) : 볼트홀 (200) : 제3결속부재
(201) : 제3삽입부 (201a) : 걸림돌기
(202) : 제3연장부 (203) : 제1끼움홈
(204) : 끼움돌기 (205) : 볼트홀
(210) : 제4결속부재 (211) : 제4삽입부
(211a) : 걸림돌기 (212) : 제4연장부
(213) : 제2끼움홈 (215) : 볼트홀
(220) : 제5결속부재 (221) : 제5삽입부
(221a) : 걸림턱 (222) : 제5연장부
(223) : 제3끼움홈 (224) : 끼움돌기
(225) : 볼트홀 (230) : 보강판
(231) : 제4끼움홈 (232) : 볼트홀
(300) : 볼트 (310) : 너트
(400) : 내부보강부재 (410) : 수평부
(411) : 볼트홀 (420) : 수직부
(421) : 볼트홀 (430) : 절곡부
(440) : 볼트홀
(10): lower pile (20): upper pile
(30): Tofu cap (31): Supporting ring
(32): reinforcement band (40): tip cap
(41): support ring (42): reinforcement band
(50): first sleeve (51): second sleeve
(52): third sleeve (53): fourth sleeve
(54): Locking groove (55): Bolting sleeve
60: fastening hole 70: metal piece
(80): steel pipe pile (81): slot hole
(82): through hole (100): first binding member
(101): first insertion part (102): first extension part
103: first bolt coupling portion 104: bolt hole
110: second binding member 111: second insertion portion
(112): second extension portion (113): second bolt coupling portion
(114): bolt hole (200): third binding member
201: third insertion portion 201a: locking projection
(202): third extension part (203): first fitting groove
(204): fitting protrusion (205): bolt hole
(210): fourth binding member (211): fourth insertion portion
211a: engaging projection 212: fourth extension part
(213): second fitting groove (215): bolt hole
220: fifth binding member 221: fifth insertion portion
221a: engaging jaw 222: fifth extension part
(223): third fitting groove (224): fitting protrusion
(225): bolt hole 230: reinforcement plate
(231): fourth fitting groove (232): bolt hole
300: Bolt 310: Nut
400: internal reinforcing member 410: horizontal portion
(411): bolt hole 420: vertical part
(421): bolt hole 430: bend
(440): bolt hole

Claims (13)

하부말뚝의 두부에 설치된 두부캡과 상부말뚝의 선단에 설치된 선단캡을 상호 연결하여 하부말뚝과 상부말뚝을 결합하는 말뚝 이음 장치에 있어서,
상부말뚝의 선단에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 제1슬리브와, 상기 제1슬리브에 인접하도록 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 볼트체결용 슬리브와 상기 볼트체결용 슬리브의 끝단에 부착되는 너트로 구성되는 선단캡;
하부말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되는 제2슬리브로 구성되는 두부캡;
상기 선단캡의 제1슬리브에 일측단이 삽입되고 타측단은 선단캡과 두부캡의 외면에 밀착되는 제1결속부재;
상기 두부캡의 제2슬리브에 일측단이 삽입되고 타측단은 상기 제1결속부재의 외면에 밀착되어 겹쳐지는 제2결속부재;
상기 제1,2결속부재를 관통하여 상기 볼트체결용 슬리브에 삽입되고 너트에 체결되는 볼트;를 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.
In the pile jointing device for coupling the lower pile and the upper pile by connecting the head cap installed on the head of the lower pile and the end cap installed on the tip of the upper pile,
A support ring attached to the tip of the upper pile, a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer circumferential surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring. A tip cap comprising a sleeve and a bolt for attaching a bolt to the end of the bolt for fixing the sleeve to be installed at a predetermined interval along the circumferential direction on one side of the support ring so as to be adjacent to the first sleeve;
A support ring attached to the head of the lower pile, a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer circumferential surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring. Tofu cap consisting of two sleeves;
A first binding member in which one end is inserted into the first sleeve of the tip cap and the other end is in close contact with the outer surface of the tip cap and the head cap;
A second binding member in which one end is inserted into the second sleeve of the head cap and the other end is in close contact with the outer surface of the first binding member and overlaps;
And a bolt inserted through the first and second fastening members and inserted into the bolt fastening sleeve and fastened to a nut.
제 1 항에 있어서,
상기 제1 결속부재는, 제1슬리브에 삽입되어 결합되는 제1삽입부와, 상기 제1삽입부의 외측단부로부터 수직 하부로 연장되게 형성되어 선단캡과 두부캡의 외면에 밀착되는 제1연장부와, 상기 제1연장부의 측면에 돌출되도록 형성되고 상기 볼트체결용 슬리브와 연통되는 볼트홀이 형성되어 있는 제1볼트결합부로 구성되고,
상기 제2결속부재는 상기 제2슬리브에 삽입되어 결합되는 제2삽입부와, 상기 제2삽입부의 외측단부로부터 수직 상부로 연장되게 형성되되 제1연장부 외면에 밀착되게 형성된 제2연장부와, 상기 제2연장부의 측면에 돌출되도록 형성되고 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제2볼트결합부로 구성되며,
상기 볼트는 제2볼트결합부와 제1볼트결합부 및 볼트체결용 슬리브를 통해 삽입되어 너트에 체결되는 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 1,
The first binding member may include a first insertion part inserted into and coupled to the first sleeve, and a first extension part formed to extend vertically downward from an outer end of the first insertion part to be in close contact with the outer surface of the tip cap and the head cap. And a first bolt coupling part formed to protrude on the side of the first extension part and having a bolt hole communicating with the bolt fastening sleeve.
The second binding member may include a second insertion part inserted into and coupled to the second sleeve, a second extension part formed to extend vertically upward from an outer end of the second insertion part, and formed to be in close contact with an outer surface of the first extension part; And a second bolt coupling part formed to protrude on the side of the second extension part and having a bolt hole communicating with the bolt hole.
The bolt is a pile coupling device, characterized in that is fastened to the nut is inserted through the second bolt coupling portion and the first bolt coupling portion and the bolt fastening sleeve.
제 2 항에 있어서,
상기 제1볼트결합부와 제2볼트결합부는 제1연장부 및 제2연장부의 일측 또는 양측면에 돌출되도록 형성되는 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 2,
The first bolt coupling portion and the second bolt coupling portion of the pile coupling device, characterized in that formed to protrude on one side or both sides of the first extension and the second extension.
하부말뚝의 두부에 설치된 두부캡과 상부말뚝의 선단에 설치된 선단캡을 상호 연결하여 하부말뚝과 상부말뚝을 결합하는 말뚝 이음 장치에 있어서,
상부말뚝의 선단에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제3슬리브로 구성되는 선단캡;
하부말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제4슬리브로 구성되는 두부캡;
상기 선단캡의 제3슬리브에 일측단이 끼워져 상기 걸림홈에 걸려지고 타측단은 선단캡과 두부캡의 외면에 밀착되는 제3결속부재;
상기 두부캡의 제4슬리브에 일측단이 끼워져 상기 걸림홈에 걸려지고 타측단은 선단캡 방향으로 연장되어 상기 제3결속부재와 겹쳐지는 제4결속부재;
상기 제3결속부재와 제4결속부재의 겹쳐지는 부분으로 체결되어 제3결속부재와 제4결속부재 일체로 연결해줌으로써 상부말뚝과 하부말뚝이 연결되도록 하는 볼트;를 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.
In the pile jointing device for coupling the lower pile and the upper pile by connecting the head cap installed on the head of the lower pile and the end cap installed on the tip of the upper pile,
A support ring attached to the front end of the upper pile, and a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer peripheral surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring Tip cap consisting of a third sleeve is formed in the engaging groove;
A support ring attached to the head of the lower pile, and a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer peripheral surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring Head cap consisting of a fourth sleeve is formed in the engaging groove;
A third binding member fitted to one end of the third sleeve of the front end cap to be caught by the locking groove, and the other end to be in close contact with the outer surface of the front end cap and the head cap;
A fourth binding member fitted with one end to the fourth sleeve of the head cap and engaged with the locking groove, and the other end extending in the tip cap direction to overlap with the third binding member;
And a bolt that is connected to the overlapping portion of the third binding member and the fourth binding member so that the upper and lower piles are connected by connecting the third binding member and the fourth binding member integrally. Device.
제 4 항에 있어서,
상기 제3결속부재는, 상기 제3슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있는 제3삽입부와, 상기 제3삽입부의 외측단부로부터 수직하부로 형성되어 선단캡과 두부캡의 외면에 밀착되고 상기 볼트가 체결될 수 있도록 볼트홀이 형성되어 있는 제3연장부로 구성되고,
상기 제4결속부재는 상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 일측단에 걸림돌기가 형성되어 있는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되어 상기 제3연장부의 외면에 겹쳐져 밀착되며 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제4연장부로 구성된 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 4, wherein
The third binding member may include a third insertion portion formed with a locking protrusion to be inserted into the third sleeve and engaged with the locking groove, and formed vertically from the outer end of the third insertion portion with the tip cap and the head cap. It is in close contact with the outer surface and consists of a third extension portion is formed with a bolt hole so that the bolt can be fastened,
The fourth binding member may include a fourth inserting portion having a locking protrusion formed at one end thereof so as to be fitted into the fourth sleeve and to be caught by the catching groove, and vertically formed from an outer end portion of the fourth inserting portion. The pile joint device, characterized in that consisting of a fourth extension portion which is overlapped with the outer surface of the extension portion is in close contact with the bolt hole is formed.
제 4 항에 있어서,
상기 제3결속부재는 상기 제3슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있는 제3삽입부와, 상기 제3삽입부의 외측단부로부터 수직하부로 형성되어 선단캡과 두부캡의 외면에 밀착되고 상기 볼트가 체결될 수 있도록 볼트홀이 형성되어 있는 제3연장부와, 상기 제3연장부의 끝단에 오목하게 형성되어 상기 제4결속부재에 끼워지는 제1끼움홈과, 상기 제3연장부의 외면에 돌출되도록 형성되는 끼움돌기로 구성되고,
상기 제4결속부재는 상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 일측단에 걸림돌기가 형성되어 있으며 상기 제1끼움홈에 끼워지는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되어 상기 제3연장부의 외면에 겹쳐져 밀착되며 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제4연장부와, 상기 제4연장부의 단부에 오목하게 형성되어 상기 끼움돌기가 끼워질 수 있도록 하는 제2끼움홈으로 구성되는 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 4, wherein
The third binding member may include a third insertion portion formed with a locking protrusion so as to be fitted into the third sleeve and to be engaged with the locking groove, and formed vertically from an outer end of the third insertion portion to form a tip cap and a head cap. A third extension portion in close contact with an outer surface and having a bolt hole formed therein; a first fitting groove recessed at an end of the third extension portion and fitted into the fourth binding member; Consists of a fitting protrusion formed to protrude on the outer surface of the three extensions,
The fourth binding member has a locking protrusion formed at one end thereof so as to be fitted into the fourth sleeve and to be caught by the locking groove, and the fourth insertion portion fitted to the first fitting groove and from the outer end of the fourth insertion portion. A fourth extension part formed as a vertical upper part, overlapping and closely contacting with an outer surface of the third extension part, and having a bolt hole communicating with the bolt hole, and a recess formed at an end of the fourth extension part to be fitted with the fitting protrusion. Pile fitting device, characterized in that consisting of a second fitting groove to be made.
PHC말뚝과 강관말뚝을 결합하는 말뚝 이음 장치에 있어서,
PHC말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제4슬리브로 구성되는 두부캡;
강관말뚝의 둘레를 따라 형성되는 다수의 슬롯홀에 끼워지고 강관말뚝의 내벽면에 걸려질 수 있도록 양측에 걸림턱이 형성되어 있는 제5삽입부와, 상기 제5삽입부의 외측단부로부터 수직하부로 형성되어 두부캡의 외면에 밀착되며 볼트홀이 형성되어 있는 제5연장부와, 상기 제5연장부의 하부에 오목하게 형성되는 제3끼움홈과, 상기 제5연장부의 외측으로 돌출 형성되는 끼움돌기로 이루어진 제5결속부재;
상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있으며 상기 제3끼움홈에 끼워지는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되어 상기 제5연장부의 외면에 겹쳐져 밀착되며 상기 볼트홀과 연통되는 볼트홀이 형성되어 있는 제4연장부와, 상기 4연장부의 상단에 오목하게 형성되어 상기 끼움돌기가 끼워질 수 있도록 하는 제2끼움홈으로 이루어진 제4결속부재;
상기 제4결속부재와 제5결속부재에 형성된 볼트홀을 통해 체결되어 제4결속부재와 제5결속부재 일체로 연결해줌으로써 PHC말뚝과 강관말뚝이 연결되도록 하는 볼트;를 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.
In the pile joint device which combines PHC pile and steel pipe pile,
A support ring attached to the head of the PHC pile, a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer circumferential surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring. Head cap consisting of a fourth sleeve is formed in the engaging groove;
A fifth insertion part which is fitted into a plurality of slot holes formed along the circumference of the steel pipe pile and has locking jaws formed on both sides thereof so as to be caught on the inner wall surface of the steel pipe pile, and from the outer end of the fifth insertion portion to the vertical bottom; A fifth extension part formed to be in close contact with the outer surface of the head cap and having a bolt hole formed therein, a third fitting groove formed concavely in the lower part of the fifth extension part, and a fitting protrusion protruding outward of the fifth extension part; The fifth binding member consisting of;
A locking protrusion is formed to be fitted to the fourth sleeve and to be engaged with the locking groove, and the fourth insertion portion is inserted into the third fitting groove, and is formed vertically from the outer end of the fourth insertion portion to extend the fifth extension. A fourth extension part which is overlapped with the outer surface of the part and is in close contact with the bolt hole, and a second fitting groove which is formed concavely at an upper end of the fourth extension part to allow the fitting protrusion to be fitted thereto; 4 binding member;
The bolt is fastened through a bolt hole formed in the fourth binding member and the fifth binding member to connect the fourth binding member and the fifth binding member integrally so that the PHC pile and the steel pipe pile are connected. Joint device.
PHC말뚝과 강관말뚝을 결합하는 말뚝 이음 장치에 있어서,
PHC말뚝의 두부에 부착되는 받침링과, 상기 받침링의 가장자리를 따라 일정 높이로 형성되어 말뚝의 외주면을 감싸주는 보강밴드와, 상기 받침링의 일측면에 원주방향을 따라 일정간격으로 설치되고 내부에 걸림홈이 형성되어 있는 제4슬리브로 이루어진 두부캡;
상기 제4슬리브에 끼워지고 걸림홈에 걸려질 수 있도록 걸림돌기가 형성되어 있는 제4삽입부와, 상기 제4삽입부의 외측단부로부터 수직상부로 형성되며 볼트홀이 형성되어 있는 제4연장부로 이루어진 제4결속부재;
상기 강관말뚝의 내측에서 상기 두부캡의 받침링에 결합되어 강관말뚝을 받쳐주면서 내주면에 밀착되어 강관말뚝을 지지해주는 내부보강부재;
상기 제4결속부재에 형성된 볼트홀과 강관말뚝의 둘레를 따라 일정간격으로 형성되는 관통홀 및 상기 내부보강부재에 형성된 볼트홀을 통해 삽입되고 내부보강부재의 내벽면에 볼트홀과 연통되도록 설치되는 너트에 체결됨으로서 제4결속부재와 내부보강부재를 결합하여 PHC말뚝인 하부말뚝과 강관말뚝이 연결되도록 하는 볼트;를 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.
In the pile joint device which combines PHC pile and steel pipe pile,
A support ring attached to the head of the PHC pile, a reinforcement band formed at a predetermined height along the edge of the support ring to cover the outer circumferential surface of the pile, and installed at regular intervals along the circumferential direction on one side of the support ring. Head cap made of a fourth sleeve is formed in the engaging groove;
A fourth insertion portion formed with a locking protrusion so as to be fitted into the fourth sleeve and to be engaged with the locking groove, and a fourth extension portion formed vertically from an outer end of the fourth insertion portion and having a bolt hole formed therein; 4 binding member;
An internal reinforcing member coupled to the support ring of the head cap at the inner side of the steel pipe pile to support the steel pipe pile and to be in close contact with the inner circumferential surface to support the steel pipe pile;
Inserted through the through-hole formed at a predetermined interval along the circumference of the bolt hole and the steel pipe pile formed in the fourth binding member and the bolt hole formed in the internal reinforcing member and installed to communicate with the bolt hole on the inner wall surface of the internal reinforcing member And a bolt connecting the fourth binding member and the internal reinforcing member to be connected to the nut to connect the lower pile and the steel pipe pile, which are PHC piles.
제 8 항에 있어서,
상기 내부보강부재는, 두부캡의 받침링에 놓여져 볼트를 통해 받침링에 결합되고 상기 강관말뚝을 받쳐주는 링형태의 수평부;
상기 수평부에서 수직하게 형성되어 강관말뚝의 내벽면에 밀착되어 강관을 지지하고 상기 볼트홀이 다수개 형성되어 있는 수직부;를 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 8,
The internal reinforcing member is placed on the support ring of the head cap is coupled to the support ring through the bolt and the horizontal portion of the ring-shaped to support the steel pipe pile;
And a vertical portion formed vertically in the horizontal portion to be in close contact with the inner wall surface of the steel pipe pile to support the steel pipe and having a plurality of bolt holes formed therein.
제 9 항에 있어서,
상기 수직부의 상부 끝단에서 내부방향으로 절곡되도록 형성되는 절곡부를 더 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 9,
Pile joint device further comprises a bent portion formed to be bent in the inner direction at the upper end of the vertical portion.
제 8 항에 있어서,
상기 내부보강부재는 적어도 2개 이상의 조각으로 분할되도록 형성되는 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 8,
The inner reinforcing member is piling device characterized in that it is formed to be divided into at least two pieces.
제 8 항에 있어서,
상기 내부보강부재에 형성되는 볼트홀과 강관말뚝에 형성되는 관통홀은 볼트의 체결이 용이하게 이루어지도록 장공형태로 형성되는 것을 특징으로 하는 말뚝 이음 장치.
The method of claim 8,
The bolt hole formed in the internal reinforcing member and the through-hole formed in the steel pipe pile is formed in the form of a long hole so that the fastening of the bolt is easily formed.
제 4 항 또는 제 7 항 또는 제 8 항에 있어서,
상기 제3슬리브와 제4슬리브에 끼워져 결속부재들의 유동을 방지하는 금속편을 더 포함하여 구성된 것을 특징으로 하는 말뚝 이음 장치.









The method according to claim 4 or 7 or 8,
And a metal piece inserted into the third sleeve and the fourth sleeve to prevent flow of the binding members.









KR1020120097576A 2012-09-04 2012-09-04 Coupling apparatus of pile Expired - Fee Related KR101252027B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120097576A KR101252027B1 (en) 2012-09-04 2012-09-04 Coupling apparatus of pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120097576A KR101252027B1 (en) 2012-09-04 2012-09-04 Coupling apparatus of pile

Publications (1)

Publication Number Publication Date
KR101252027B1 true KR101252027B1 (en) 2013-04-10

Family

ID=48442604

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120097576A Expired - Fee Related KR101252027B1 (en) 2012-09-04 2012-09-04 Coupling apparatus of pile

Country Status (1)

Country Link
KR (1) KR101252027B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101774343B1 (en) * 2015-03-12 2017-09-04 최성희 Coupling apparatus of pile
CN113981809A (en) * 2020-06-28 2022-01-28 周兆弟 Tramcar roadbed structure and construction method
US20220098814A1 (en) * 2020-09-26 2022-03-31 Jiangsu Ocean University Frp composite material pile prepared by frp composite material and preparation and pile forming methods

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3418170B2 (en) 2000-11-24 2003-06-16 株式会社ジオトップ Connection structure of pile
KR20040091887A (en) * 2003-04-23 2004-11-03 민경건설 주식회사 coupling device of steel pipe casing for concrete piles driven in field
KR100870863B1 (en) 2006-07-25 2008-11-27 이호경 Linkage structure of PH file
KR20120029607A (en) * 2010-09-17 2012-03-27 (주)지앤디 The bolt cap coupling structure of pretentioned spun high strength concrete piles and pipe pile using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3418170B2 (en) 2000-11-24 2003-06-16 株式会社ジオトップ Connection structure of pile
KR20040091887A (en) * 2003-04-23 2004-11-03 민경건설 주식회사 coupling device of steel pipe casing for concrete piles driven in field
KR100870863B1 (en) 2006-07-25 2008-11-27 이호경 Linkage structure of PH file
KR20120029607A (en) * 2010-09-17 2012-03-27 (주)지앤디 The bolt cap coupling structure of pretentioned spun high strength concrete piles and pipe pile using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101774343B1 (en) * 2015-03-12 2017-09-04 최성희 Coupling apparatus of pile
CN113981809A (en) * 2020-06-28 2022-01-28 周兆弟 Tramcar roadbed structure and construction method
US20220098814A1 (en) * 2020-09-26 2022-03-31 Jiangsu Ocean University Frp composite material pile prepared by frp composite material and preparation and pile forming methods
US11655605B2 (en) * 2020-09-26 2023-05-23 Jiangsu Ocean University FRP composite material pile prepared by FRP composite material and preparation and pile forming methods

Similar Documents

Publication Publication Date Title
KR101174273B1 (en) Coupling apparatus of concrete pile
JP5718861B2 (en) Construction method of pile-type pier
KR20150017079A (en) Coupling apparatus for non-welding of pile
WO2017013694A1 (en) Framework structure and construction method for same
KR100954967B1 (en) Prefab apparatus for reinforcing head of pile
KR101714371B1 (en) Joints Appartus of The Concrete Piles and Steel Pipe
KR101252027B1 (en) Coupling apparatus of pile
KR20160079458A (en) Hybrid bridge connecting structure and method for constructing thereof
KR20150117791A (en) Coupling apparatus for non-welding of PHC pile
KR20100052847A (en) Apparatus for connecting both piles
KR101192633B1 (en) Coupling apparatus of pile
JP5280228B2 (en) Reinforcing bar assembly structure
KR200381589Y1 (en) A pile head reinforcement structure of precastconcrete pile
KR101773434B1 (en) Coupling device for concrete and steel File
JP5077865B2 (en) Ready-made pile and foundation pile structure
KR20140131648A (en) Coupling apparatus of pile using coupler integrated pc nut
KR20090006472U (en) Head reinforcement device of prefabricated steel pipe pile
KR200455415Y1 (en) Head reinforcement assembly of concrete pile for foundation work
KR101304501B1 (en) Steel Pipe Pile head reinforcement device
JP6130991B2 (en) Foundation structure
KR200448755Y1 (en) Prefabricated head reinforcement device for building pile
JP6392577B2 (en) Reinforcing members used for seismic reinforcement of power poles
KR101205919B1 (en) Apparatus for connecting concrete piles
JP2013002047A (en) Steel pipe concrete composite pile
JP2018071056A (en) Pile head reinforcement structure

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

A302 Request for accelerated examination
PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20170403

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20170403

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301