JP2001098514A - Method for constructing arch rib of concrete arch bridge - Google Patents
Method for constructing arch rib of concrete arch bridgeInfo
- Publication number
- JP2001098514A JP2001098514A JP28177899A JP28177899A JP2001098514A JP 2001098514 A JP2001098514 A JP 2001098514A JP 28177899 A JP28177899 A JP 28177899A JP 28177899 A JP28177899 A JP 28177899A JP 2001098514 A JP2001098514 A JP 2001098514A
- Authority
- JP
- Japan
- Prior art keywords
- arch
- concrete
- steel pipe
- zenith
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 49
- 238000000034 method Methods 0.000 title claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 71
- 239000010959 steel Substances 0.000 claims abstract description 71
- 239000011382 roller-compacted concrete Substances 0.000 claims description 7
- 230000006835 compression Effects 0.000 claims description 5
- 238000007906 compression Methods 0.000 claims description 5
- 238000004804 winding Methods 0.000 claims description 3
- 238000005452 bending Methods 0.000 abstract description 10
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 14
- 239000012530 fluid Substances 0.000 description 7
- 238000002347 injection Methods 0.000 description 4
- 239000007924 injection Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- MBNGWHIJMBWFHU-UHFFFAOYSA-N diosmetin Chemical compound C1=C(O)C(OC)=CC=C1C1=CC(=O)C2=C(O)C=C(O)C=C2O1 MBNGWHIJMBWFHU-UHFFFAOYSA-N 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 229920003051 synthetic elastomer Polymers 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 239000005061 synthetic rubber Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、コンクリートアー
チ橋の構築方法に関し、更に詳しくはアーチ状の鋼管を
架設し、その鋼管にコンクリートを充填し、その後に鋼
管に巻立てコンクリートを巻立ててアーチリブを形成す
る合成構造コンクリートアーチ橋のアーチリブ構築方法
に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete arch bridge, and more particularly, to an arch-shaped steel pipe, filling the steel pipe with concrete, and then winding the concrete on the steel pipe to form an arch rib. TECHNICAL FIELD The present invention relates to a method for constructing an arch rib of a composite arch bridge having a composite structure.
【0002】[0002]
【従来の技術】従来、力学的に優れた構造系を有し、景
観上も優れた美観を有するという観点から、アーチ形式
の多数の橋が建設されてきた。一般的にコンクリートア
ーチ橋の構築方法は、アーチリブ全体を支保工を用いて
構築し、その後、橋脚及び橋体(補剛桁)を構築する方
法と、支保工を必要としない張出し架設による方法など
がある。本発明者等は、特公昭60−15763号公報
に示すように、アーチリブ構築位置に予め鋼管を架設
し、その鋼管内にコンクリートを充填して剛性を高め、
その鋼管を囲繞して巻立てコンクリートを打設してアー
チリブを先行構築し、そのアーチリブを支保工として橋
脚、補剛桁を構築するコンクリートアーチ橋の構築方法
を提供して好評を得ている。このアーチ橋の構築方法で
は、仮設支柱や枠組足場などの支保工を必要としない。2. Description of the Related Art Conventionally, a large number of arch-type bridges have been constructed from the viewpoint of having a structurally superior structural system and an excellent aesthetic appearance. In general, concrete arch bridges are constructed in such a way that the entire arch ribs are constructed using shoring, and then piers and bridges (stiffening girders) are constructed, and a method of overhanging erection that does not require shoring is used. There is. As shown in Japanese Patent Publication No. 60-15763, the present inventors erected a steel pipe in advance at the arch rib construction position, and filled the steel pipe with concrete to increase rigidity.
The arch ribs are pre-built by surrounding the steel pipe with cast concrete, and the arch ribs are used as supports to provide a method of constructing a concrete arch bridge in which a pier and a stiffening girder are constructed. This arch bridge construction method does not require any support such as temporary supports or framed scaffolds.
【0003】上記構築方法の一例を図12〜14に示し
た。図12は、アーチ橋100の全体側面図で両岸のア
ーチアバット(橋台)101間にアーチリブ102を構
築し、そのアーチリブ102上に橋脚103を立設し、
補剛桁(橋体)104を架設する図を示している、図1
3、14はそれぞれ図10のH−H矢視図、I−I矢視
図で、アーチリブ102は最初に架け渡した鋼管105
を内蔵している。One example of the above construction method is shown in FIGS. FIG. 12 is an overall side view of an arch bridge 100, in which an arch rib 102 is constructed between arch abutments (bridges) 101 on both sides, and a pier 103 is erected on the arch rib 102.
FIG. 1 shows a view of erection of a stiffening girder (bridge) 104.
3 and 14 are views taken along the arrows HH and II in FIG. 10, respectively. The arch ribs 102 are steel pipes 105 that are initially bridged.
Built-in.
【0004】さらに、本出願人は、上記技術の関連技術
として、特公平5−46406号公報、特開平8−13
4847号公報などに、鋼管アーチの架設方法やコンク
リートの巻立て方法を提供している。Further, the present applicant has disclosed Japanese Patent Publication No. Hei 5-46406 and Japanese Patent Laid-Open Publication No.
Japanese Patent No. 4847 and the like provide a method of erection of a steel pipe arch and a method of laying concrete.
【0005】[0005]
【発明が解決しようとする課題】本発明者らが開発した
上記アーチリブ構築方法は、すぐれた多くの利点を有す
るが、次の問題があった。本来アーチリブは完成構造系
では圧縮部材であるが、上記アーチリブ構築方法では、
施工途中でアーチリブに曲げが作用し、完成後もアーチ
リブに曲げモーメントが残留することである。そのため
に、曲げ応力に抵抗するコンクリート断面及び鉄筋量を
増やしておく必要があった。このことは特にアーチ支間
が長大化する場合に著しくなる。The arch rib construction method developed by the present inventors has many excellent advantages, but has the following problems. Originally the arch rib is a compression member in the completed structural system, but in the above arch rib construction method,
Bending acts on the arch rib during construction, and a bending moment remains on the arch rib even after completion. Therefore, it was necessary to increase the concrete section and the amount of rebar that resist bending stress. This is particularly noticeable when the length of the arch span is long.
【0006】本発明は上記問題点を解決し、アーチリブ
に残留する曲げモーメントを減少させるように改善し、
経済的な断面設計を可能にし、鋼材量の増加を抑制し、
軽量化による耐震性の向上などを企図した技術を提供す
ることを目的とするものである。[0006] The present invention solves the above problems and has been improved to reduce the bending moment remaining in the arch ribs.
Enables economical cross-sectional design, suppresses the increase in steel material,
It is an object of the present invention to provide a technology designed to improve seismic resistance by reducing the weight.
【0007】[0007]
【課題を解決するための手段】本発明は、コンクリート
アーチ橋のアーチリブの構築にあたり、両支持点間にア
ーチ状の鋼管を掛け渡し、該鋼管内部にコンクリートを
充填し、その後該鋼管外周を囲繞して巻き立てコンクリ
ートを打設してアーチリブを構築する方法において、ア
ーチ状に掛け渡した鋼管の天頂接合部間にジャッキを介
装すると共に、天頂接合部を添接板で仮接続して、前記
鋼管に両支持点から天頂部に向かって段階的に前記巻き
立てコンクリートを打設してゆき、一定位置までの巻立
てが終了し該コンクリートの強度発現後、ジャッキを作
動させながら天頂部接続ボルトを緩め、前記アーチリブ
に軸圧縮力を導入した後、前記接続ボルトを緊締して前
記添接板を本接続し、残余の巻立てコンクリートを打設
することを特徴とするコンクリートアーチ橋のアーチリ
ブ構築方法である。ここでいう一定位置とは、支持点か
ら天頂部に向かって段階的に複数のブロックに分けてコ
ンクリートを巻立ててゆく段階で設計上鋼管に生じる曲
げモーメントが過大になると想定される位置を指す。こ
の位置は設計により異なり、厳密に定めることが好まし
いが、簡便的に、天頂部近傍としてもよい。According to the present invention, in constructing an arch rib of a concrete arch bridge, an arched steel pipe is bridged between both support points, concrete is filled in the steel pipe, and then the outer periphery of the steel pipe is surrounded. In a method of constructing an arch rib by casting a rolled concrete, a jack is interposed between the zenith joints of the steel pipe bridged in an arch shape, and the zenith joint is temporarily connected with an attachment plate, The rolled concrete is poured into the steel pipe in a stepwise manner from both support points toward the zenith, and after the winding to a certain position is completed and the strength of the concrete is developed, the zenith is connected while operating the jack. After loosening a bolt and introducing an axial compressive force to the arch rib, the connection bolt is tightened to fully connect the attachment plate, and the remaining rolled concrete is poured. It is a Achiribu construction method of that concrete arch bridge. The fixed position here refers to a position where the bending moment generated in the steel pipe by design is assumed to be excessive at the stage where concrete is wound up in a plurality of blocks stepwise from the support point toward the zenith. . This position depends on the design and is preferably determined strictly, but it may be conveniently located near the zenith.
【0008】ジャッキによる水平力(軸圧縮力)の付加
は巻立コンクリートやその後の荷重(特に地震荷重)に
よって増加するアーチリブの曲げモーメントによるアー
チリブの引張応力を軽減し、この引張応力に抵抗するた
めに必要としていた鋼材量やコンクリート断面を軽減す
るものである。The addition of the horizontal force (axial compression force) by the jack reduces the tensile stress of the arch rib due to the bending moment of the arch rib, which is increased by the rolled concrete and the subsequent load (especially the seismic load), and resists this tensile stress. It is intended to reduce the amount of steel material and concrete cross-section required for construction.
【0009】[0009]
【発明の実施の形態】以下、図面を参照して、本発明の
コンクリートアーチ橋のアーチリブ構築方法を詳細に説
明する。本例は、図12〜14に示したコンクリートア
ーチ橋と同様な形式のものである。本例は、支持点(ア
ーチアバット)から天頂部に向かって段階的に巻立てコ
ンクリートを打設してゆき、天頂部の一部を残して軸圧
縮力を導入した例で説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an arch rib construction method for a concrete arch bridge according to the present invention will be described in detail with reference to the drawings. This example is of the same type as the concrete arch bridge shown in FIGS. In this example, an example is described in which concrete is rolled up stepwise from a support point (arch abutment) toward the zenith and an axial compressive force is introduced while leaving a part of the zenith.
【0010】図9は本発明の構築方法によるアーチリブ
10の側面図、図10はそのG−G矢視断面図である。
図10に示すような、複数列(本例では3列)の鋼管1
1を図9に示すように、橋台(アーチアバット)21間
に架け渡し、その鋼管11内にコンクリート12を充填
し、その鋼管11を囲繞して巻立コンクリート13を打
設してアーチリブ10を構築する(図10参照)。その
後橋脚31、補剛桁41を架設してアーチ橋を架設する
(図9参照)。アーチリブ10は内部にコンクリート1
2が充填された複数列(3列)の鋼管11を繋ぎ材14
で結合し、その周囲を巻立コンクリート13で巻立てら
れている。FIG. 9 is a side view of the arch rib 10 according to the construction method of the present invention, and FIG. 10 is a sectional view taken along the line GG of FIG.
As shown in FIG. 10, a plurality of rows (three rows in this example) of steel pipes 1
9, as shown in FIG. 9, a bridge abutment (arch abutment) 21 is bridged between the abutments 21, the concrete 12 is filled in the steel pipe 11, and the steel pipe 11 is surrounded with a rolled concrete 13 to cast the arch rib 10. Construct (see FIG. 10). Thereafter, the pier 31 and the stiffening girder 41 are erected to construct the arch bridge (see FIG. 9). The arch rib 10 has concrete 1 inside.
A connecting member 14 for connecting a plurality of rows (three rows) of steel pipes 11 filled with 2
And the periphery thereof is wrapped with a wrapping concrete 13.
【0011】図11にアーチリブの鋼管を架設する方法
の一例を示した。図11はロアリング法と称する架設方
法の説明図である。図11では、円弧状の鋼管ブロック
15を三本づつを接合して鋼管ブロックアセンブリ16
としたものを示している。この鋼管ブロックアセンブリ
16を各アーチアバット(橋台)21上に、アーチ軸方
向に傾倒可能にヒンジ係合し、橋台21の後方にアンカ
ー32をとり、ジャッキなどでPCストランド33など
を繰り出して鋼管ブロックアセンブリ16をアーチ軸線
まで傾倒する。対岸から同様に傾倒した鋼管ブロックア
センブリ16とアーチ天頂部(クラウン部)35で結合
する。図11に示すロアリング法は一例であって、アー
チリブの鋼管の架設は、その他公知の方法で架け渡すこ
ととしてもよい。また、コンクリートの巻立ては前述し
た本出願人の提案した方法などによって施工すれば好適
である。FIG. 11 shows an example of a method for erection of a steel pipe having an arch rib. FIG. 11 is an explanatory diagram of a erection method called a lowering method. In FIG. 11, three arc-shaped steel pipe blocks 15 are joined by three to form a steel pipe block assembly 16.
Are shown. This steel pipe block assembly 16 is hinged on each arch abutment (abutment) 21 so as to be tiltable in the arch axis direction, an anchor 32 is provided behind the abutment 21, and a PC strand 33 or the like is fed out with a jack or the like, and the steel pipe block is drawn out. Tilt the assembly 16 to the arch axis. The steel pipe block assembly 16 similarly tilted from the opposite shore is connected to the arch top part (crown part) 35. The lowering method shown in FIG. 11 is an example, and the construction of the steel pipe of the arch rib may be bridged by another known method. Further, it is preferable that the concrete is laid by the method proposed by the present applicant.
【0012】本発明は、以上のアーチリブ構築方法にお
いてアーチ状に掛け渡した鋼管の天頂接合部にジャッキ
を介装する。図1はこの天頂接合部(クラウン部)の平
面図である。対向する鋼管11同士の間にジャッキ51
が介装されると共に鋼管11同士は添接版61で仮接続
されている。添接版61は鋼管の軸方向(矢印52方
向)に長い長孔63を設けボルト62で接続されてい
る。According to the present invention, a jack is interposed at the zenith joint of the steel pipe spanned like an arch in the above-described arch rib construction method. FIG. 1 is a plan view of the zenith joint (crown). Jack 51 between the opposed steel pipes 11
And the steel pipes 11 are temporarily connected to each other by the attachment plate 61. The attachment plate 61 is provided with a long slot 63 in the axial direction of the steel pipe (in the direction of the arrow 52) and is connected by bolts 62.
【0013】図2は図1のA−A矢視図で、天頂接合部
(クラウン部)の鋼管接続部の詳細図である。鋼管11
は添接版61で仮接続されている。添接版61は、長孔
を有し、アーチ軸方向寸法を調整して固定可能である。
鋼管11の内部にはコンクリートが充填されている。図
3は図1のB−B矢視図であり、鋼管11の端部相互間
に、ジャッキ51を装入している。図4は図3のC−C
矢視断面図で、鋼管11の端面間にジャッキ51を装入
して継手ボルト62を緩めて鋼管11の端面間を押し広
げる。FIG. 2 is a view taken in the direction of arrows AA in FIG. 1 and is a detailed view of a steel pipe connecting portion at a zenith joint (crown portion). Steel pipe 11
Are temporarily connected by an attachment plate 61. The attachment plate 61 has a long hole, and can be fixed by adjusting the dimension in the arch axis direction.
The inside of the steel pipe 11 is filled with concrete. FIG. 3 is a view taken in the direction of arrows BB in FIG. 1, and a jack 51 is inserted between the ends of the steel pipe 11. FIG. 4 is a sectional view taken along the line CC of FIG.
In the sectional view taken in the direction of the arrow, the jack 51 is inserted between the end faces of the steel pipe 11, the joint bolt 62 is loosened, and the gap between the end faces of the steel pipe 11 is expanded.
【0014】次に本発明の施工方法を手順に従って説明
する。Next, the construction method of the present invention will be described according to the procedure.
【0015】a)工場で製作された鋼管ブロック15を
現地に搬入し、図11で示すように一端をアーチアバッ
ト21にヒンジ固定し、鋼管ブロック15を接続して半
アーチ分の鋼管ブロックアセンブリ16を柱状に組立て
る。アーチアバット21の前後方にアンカー32をとっ
てPCストランド33などで鋼管ブロックアセンブリ1
6支持する。同様に対岸の橋台上にも半アーチ分の鋼管
ブロックアセンブリ16を組み立てる。この時、複数列
の鋼管を横方法に繋ぎ材で結合しながら組立てもよい
し、後から結合することとしてもよい。A) A steel pipe block 15 manufactured in a factory is carried into a site, one end is fixed to an arch abutment 21 by a hinge as shown in FIG. 11, and the steel pipe block 15 is connected to connect a steel pipe block assembly 16 for a half arch. Is assembled into a pillar shape. Anchor 32 is attached to the front and rear of the arch bat 21, and the steel pipe block assembly 1 is connected to the PC strand 33 or the like.
6 Support. Similarly, a half-arch steel pipe block assembly 16 is assembled on the abutment on the opposite shore. At this time, the steel pipes in a plurality of rows may be assembled while being connected by a connecting member in a horizontal manner, or may be connected later.
【0016】b)アーチアバット21後方のアンカー3
2からのPCストランド33などを、ジャッキなどで把
持しつつ緩め、半アーチ状鋼管ブロックアセンブリ16
を対岸に向かって、所定アーチ軸線になるまで傾倒す
る。対岸からも同様に傾倒し、アーチ天頂接合部35
で、両岸から傾倒した鋼管ブロックアセンブリ16を添
接板で仮接合する。以上のa)、b)工程は、ロアリン
グ法によるものを示したが、他の方法によってもよい。B) Anchor 3 behind arch abutment 21
The PC strand 33 from 2 is loosened while being held by a jack or the like, and the semi-arched steel pipe block assembly 16 is loosened.
Is tilted toward the opposite shore until the predetermined arch axis is reached. Also tilt from the opposite shore, and the arch zenith joint 35
Then, the steel pipe block assembly 16 tilted from both banks is temporarily joined by the attachment plate. Although the steps a) and b) described above are performed by the lowering method, other methods may be used.
【0017】c)両岸から傾倒して架設した鋼管内に、
天頂の鋼管接続部の一部を残してコンクリートを充填す
る。コンクリートの充填は左岸、右岸からバランスをと
りながら行う。C) In a steel pipe erected from both banks,
The concrete is filled except for a part of the steel pipe connection at the zenith. Concrete filling is performed from the left bank and the right bank while maintaining the balance.
【0018】d)鋼管内部のコンクリートが硬化した
ら、天頂部閉合部を残して鋼管を囲繞して巻立てコンク
リートを施工する。コンクリートの巻立ては公知の方法
によればよい。D) When the concrete inside the steel pipe has hardened, the concrete is wound around the steel pipe except for the closed top part. Concrete wrapping may be performed by a known method.
【0019】e)天頂部閉合部コンクリートの施工に先
立ち、鋼管端面間または巻立てコンクリート端面間にジ
ャッキを挿入し、ジャッキを作動させながら徐々に仮接
合のボルトを緩め、アーチリブに軸圧縮力を導入する。
この軸圧縮力は、アーチリブ全体を支保工上で支える場
合の曲げモーメントに対応する軸力に相当する値とする
の方法もあるが、それ以下の小さい値であってもよい。
なおジャッキは天頂部の仮接合の前に予め対向する端面
の一端に取付けておく方法としてもよい。E) Prior to the construction of the concrete at the zenith-closed part, a jack is inserted between the steel pipe end faces or between the wrapped concrete end faces, and while the jack is being operated, the bolts for the temporary joining are gradually loosened to apply an axial compressive force to the arch ribs. Introduce.
The axial compression force may be set to a value corresponding to the axial force corresponding to the bending moment when the entire arch rib is supported on the shoring, but may be a smaller value.
The jack may be attached to one end of the opposite end surface before the temporary bonding of the zenith.
【0020】f)所定の軸圧縮力が導入されたら、緩め
ておいた仮接合ボルトを緊締し本締めする。F) When a predetermined axial compression force is introduced, the loosened temporary joining bolts are tightened and fully tightened.
【0021】g)次いで、残余の閉合部(天頂接合部)
にコンクリートを打設する。G) Next, the remaining closed part (zenith joint part)
Pour concrete in.
【0022】h)その後、橋脚及び補剛桁を構築しコン
クリートアーチ橋が完成する。H) Thereafter, the pier and the stiffening girder are constructed, and the concrete arch bridge is completed.
【0023】図5は図1に対する別の実施例で、図1が
鋼管端面間にジャッキ51を介装したのに対し、隣り合
う鋼管11の間の対向する巻立てコンクリート13端面
間にジャッキ51を介装して、鋼管の継手ボルトを62
を緩めて端面間を押し広げ、アーチリブに軸圧縮力を付
与する方法である。FIG. 5 shows another embodiment corresponding to FIG. 1. In FIG. 1, a jack 51 is interposed between steel pipe end faces, whereas a jack 51 is provided between opposed steel pipe concrete end faces between adjacent steel pipes 11. With the steel pipe joint bolts 62
This is a method of loosening and pushing apart between the end faces to apply an axial compressive force to the arch rib.
【0024】図6は図5のD−D矢視図、図7は図6の
E−E矢視図でジャッキ51が巻立てコンクリート13
端面間に挿入されている配置図である。FIG. 6 is a view taken along the line DD in FIG. 5, and FIG. 7 is a view taken along the line EE in FIG.
It is an arrangement view inserted between end faces.
【0025】図8は本発明に好適に用いられるジャッキ
51の図である。ジャッキ51はフラットジャッキと称
される、薄鉄板で袋状に形成されていて、その内部に注
入孔70より加圧流体を注入し袋を膨らませることで揚
程を得、注入圧力と受圧面積で揚量を得る構造のもので
ある。注入流体は非硬化性、硬化性のいずれでもよい
が、一般的にセメントミルクや合成樹脂モルタルなどの
硬化性流体を注入して使用後そのまま埋設することが多
い。図8(a)は、その断面図でジャッキの膨厚作動面
に支圧板71を挟装して構造物間に装入し、注入孔70
より、圧力流体を注入する。図8(b)は圧力流体72
を注入した後の状態を示し、図8(a)の寸法wが図8
(b)のWまでの揚程を得ることが可能である。図8
(c)は図8(a)のF−F矢視図で円形のジャッキ5
1を示している。FIG. 8 is a diagram of a jack 51 suitably used in the present invention. The jack 51 is formed of a thin iron plate in a bag shape called a flat jack, and a pressurized fluid is injected into the inside of the jack 51 from the injection hole 70 to inflate the bag, thereby obtaining a head. It is of a structure that obtains the lift. The injection fluid may be either non-hardening or hardening. In general, however, it is often the case that a hardening fluid such as cement milk or synthetic resin mortar is injected and buried as it is after use. FIG. 8 (a) is a cross-sectional view of the jack, in which a pressure plate 71 is sandwiched on the thickened working surface of the jack and inserted between the structures, and the injection hole 70
More pressure fluid is injected. FIG. 8B shows a pressure fluid 72.
FIG. 8 (a) shows the state after the implantation of FIG.
(B) It is possible to obtain a head up to W. FIG.
(C) is a circular jack 5 viewed from the arrow FF in FIG.
1 is shown.
【0026】この実施例では、円形のジャッキを例示し
たが、正方形や矩形のものも市販されていて適宜使い分
ければよい。更にこれと類似のものに鋼繊維で強化され
た合成ゴムで袋状に形成されたバッグジャッキと称され
るものがあるが同様に好適に使用可能である。In this embodiment, a circular jack is illustrated, but a square or rectangular jack is also commercially available and may be used properly. Further, there is a similar one called a bag jack formed in a bag shape with synthetic rubber reinforced with steel fiber, but it can be suitably used similarly.
【0027】本例は、支持点(アーチアバット)から天
頂に向かって段階的に巻立てコンクリートを打設してゆ
き、天頂部の一部を残して軸圧縮力を導入した例を説明
したが、支持点から天頂部に向かって段階的に複数のブ
ロックに分けてコンクリートを巻立ててゆく段階で設計
上鋼管に生じる曲げモーメントが過大になると想定され
る時点で軸圧縮力を導入すればよいので、場合によって
は段階毎に複数回に分けてジャッキを作動させてもよ
い。その場合はジャッキに注入する圧力流体は非硬化性
の水や油を使用することが好ましい。In this embodiment, an example is described in which concrete is laid stepwise from a support point (arch abutment) toward the zenith and an axial compressive force is introduced while leaving a part of the zenith. It is sufficient to introduce an axial compressive force at a point in time when it is assumed that the bending moment generated in the steel pipe by design will be excessively large at the stage where concrete is divided into a plurality of blocks in a stepwise manner from the support point toward the zenith, and is assumed to be excessive. Therefore, in some cases, the jack may be operated a plurality of times for each stage. In that case, it is preferable to use non-hardening water or oil as the pressure fluid to be injected into the jack.
【0028】以上の実施例では鋼管の架設にロアリング
法を採用したが、これに限定される訳ではなく、ケーブ
ルクレーンを使用する方法、ピロンを使用しワイヤロー
プで斜め吊りするなど公知の方法で行うことは可能であ
る。In the above embodiment, the lowering method is adopted for erection of the steel pipe. However, the present invention is not limited to this, and a known method such as a method using a cable crane or a method using a pillon and hanging diagonally with a wire rope is used. It is possible to do.
【0029】[0029]
【発明の効果】本発明はコンクリートアーチ橋のアーチ
リブの構築にあたり、天頂接合部にジャッキを介装しこ
れを作動させてアーチリブに軸圧縮力を導入するので、
アーチリブ架設工程で発生する曲げモーメントを減少し
アーチリブの断面力を改善することが可能となった。特
に、長大スパンを有するアーチリブの場合に、コンクリ
ート量、鉄筋量の増大を抑制することができ、軽量化、
経済性の向上に寄与する効果は多大である。According to the present invention, when constructing an arch rib of a concrete arch bridge, a jack is interposed at a zenith joint and operated to introduce an axial compressive force to the arch rib.
It has become possible to reduce the bending moment generated in the arch rib laying process and to improve the sectional force of the arch rib. In particular, in the case of an arch rib having a long span, it is possible to suppress an increase in the amount of concrete and the amount of reinforcing steel, and to reduce the weight,
The effects contributing to the improvement of economic efficiency are enormous.
【図面の簡単な説明】[Brief description of the drawings]
【図1】実施例の天頂接合部の平面図である。FIG. 1 is a plan view of a zenith joint of an embodiment.
【図2】図1のA−A矢視図である。FIG. 2 is a view taken along the line AA of FIG. 1;
【図3】図1のB−B矢視図である。FIG. 3 is a view taken in the direction of arrows BB in FIG. 1;
【図4】図3のC−C矢視図である。FIG. 4 is a view taken in the direction of arrows CC in FIG. 3;
【図5】別の実施例の天頂接合部の平面図である。FIG. 5 is a plan view of a zenith joint of another embodiment.
【図6】図5のD−D矢視図である。FIG. 6 is a view as seen from the direction of the arrow DD in FIG. 5;
【図7】図6のE−E矢視図である。FIG. 7 is a view as seen in the direction of arrows EE in FIG. 6;
【図8】ジャッキの動作説明図である。FIG. 8 is a diagram illustrating the operation of the jack.
【図9】アーチリブの側面図である。FIG. 9 is a side view of the arch rib.
【図10】図9のG−G矢視図である。FIG. 10 is a view taken in the direction of arrows GG in FIG. 9;
【図11】アーチリブ鋼管の架設方法の説明図である。FIG. 11 is an explanatory view of a method of erection of an arch rib steel pipe.
【図12】アーチ橋の全体側面図である。FIG. 12 is an overall side view of an arch bridge.
【図13】図12のH−H矢視図である。FIG. 13 is a view taken in the direction of arrows HH in FIG. 12;
【図14】図12のI−I矢視図である。FIG. 14 is a view taken along the arrow II in FIG. 12;
10 アーチリブ 11 鋼管 12 コンクリート 13 巻立てコンクリート 14 繋ぎ材(継手) 15 鋼管ブロック 16 鋼管ブロックアセンブリ 21 橋台(アーチアバット) 31 橋脚 32 アンカー 33 PCストランド 34 アーチ軸線 35 アーチ天頂接合部(クラウン部) 41 補剛桁 51 ジャッキ 61 添接板 62 ボルト 63 長孔 70 注入孔 71 支圧板 72 圧力流体 100 アーチ橋 101 アーチアバット(橋台) 102 アーチリブ 103 橋脚 104 補剛桁(橋体) DESCRIPTION OF SYMBOLS 10 Arch rib 11 Steel pipe 12 Concrete 13 Rolled concrete 14 Connecting material (joint) 15 Steel pipe block 16 Steel pipe block assembly 21 Abutment (Arch abut) 31 Pier 32 Anchor 33 PC strand 34 Arch axis 35 Arch zenith joint (Crown part) 41 Supplement Rigid girder 51 Jack 61 Abutment plate 62 Bolt 63 Elongated hole 70 Injection hole 71 Support plate 72 Pressure fluid 100 Arch bridge 101 Arch butt (Abutment) 102 Arch rib 103 Bridge pier 104 Stiffening girder (bridge body)
Claims (1)
し、該鋼管内部にコンクリートを充填し、その後該鋼管
外周を囲繞して巻き立てコンクリートを打設してアーチ
リブを構築する方法において、アーチ状に掛け渡した鋼
管の天頂接合部間にジャッキを介装すると共に該天頂接
合部を添接板で仮接続して、前記鋼管に両支持点から天
頂部に向かって段階的に前記巻き立てコンクリートを打
設してゆき、一定位置までの巻立てが終了し該コンクリ
ートの強度発現後、ジャッキを作動させながら天頂部接
続ボルトを緩め、前記アーチリブに軸圧縮力を導入した
後、前記接続ボルトを緊締して前記添接板を本接続し、
残余の巻立てコンクリートを打設することを特徴とする
コンクリートアーチ橋のアーチリブ構築方法。1. A method of constructing an arch rib by bridging an arched steel pipe between both support points, filling the inside of the steel pipe with concrete, and then surrounding the outer circumference of the steel pipe and pouring concrete into the steel pipe. A jack is interposed between the zenith joints of the arched steel pipe and the zenith joint is temporarily connected by an attachment plate, and the steel pipe is wound in a stepwise manner from both support points toward the zenith. Pile concrete is poured, winding up to a certain position is completed, and after the strength of the concrete is developed, the zenith connection bolt is loosened while operating the jack and an axial compression force is introduced into the arch rib, and then the connection is made. Tighten the bolt and fully connect the contact plate,
A method of constructing an arch rib of a concrete arch bridge, which comprises placing remaining rolled concrete.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28177899A JP2001098514A (en) | 1999-10-01 | 1999-10-01 | Method for constructing arch rib of concrete arch bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28177899A JP2001098514A (en) | 1999-10-01 | 1999-10-01 | Method for constructing arch rib of concrete arch bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2001098514A true JP2001098514A (en) | 2001-04-10 |
Family
ID=17643855
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP28177899A Withdrawn JP2001098514A (en) | 1999-10-01 | 1999-10-01 | Method for constructing arch rib of concrete arch bridge |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2001098514A (en) |
Cited By (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101865739A (en) * | 2010-06-22 | 2010-10-20 | 湖南科技大学 | Dynamic Monitoring System of Pre-tightening Force in Pre-stressed Anchor Reinforcement Engineering |
| JP5419115B1 (en) * | 2013-09-05 | 2014-02-19 | 極東鋼弦コンクリート振興株式会社 | Injection material |
| CN103711080A (en) * | 2013-12-26 | 2014-04-09 | 中国一冶集团有限公司 | Method for locating arch ribs of steel tube arch bridge through coordinate correlation method |
| CN106087755A (en) * | 2016-04-27 | 2016-11-09 | 郑勤民 | Spliced bridging structure and erection method thereof |
| CN107503287A (en) * | 2017-08-24 | 2017-12-22 | 广西路桥工程集团有限公司 | A kind of steel tube arch rib section deviation correcting device and method for correcting error |
| CN109214099A (en) * | 2018-09-20 | 2019-01-15 | 中建三局基础设施建设投资有限公司 | A kind of arch rib steel pipe location Calculation and construction method |
| CN109826096A (en) * | 2018-12-03 | 2019-05-31 | 中铁上海工程局集团有限公司 | A kind of three-dimensional accurate adjustment positioning mechanism of large-scale steel pipe arch rib space closure |
| CN110258357A (en) * | 2019-07-09 | 2019-09-20 | 中铁二院成都勘察设计研究院有限责任公司 | A kind of construction method that steel tube arch rib segment connects in the air |
| CN110700109A (en) * | 2019-10-30 | 2020-01-17 | 贵州省公路工程集团有限公司 | Construction process of concrete arch ring of steel pipe stiff skeleton of bridge |
| CN111501520A (en) * | 2020-05-08 | 2020-08-07 | 重庆交通大学 | Pouring process for preventing concrete filled steel tube from being emptied |
| CN112982200A (en) * | 2021-03-30 | 2021-06-18 | 中建三局基础设施建设投资有限公司 | An Underpinning Method for Existing Continuous Bridges |
| CN113073559A (en) * | 2021-03-29 | 2021-07-06 | 中交路桥建设有限公司 | Movable platform system and method for construction of large-span steel pipe concrete arch |
| CN113186796A (en) * | 2021-04-30 | 2021-07-30 | 广州文船重工有限公司 | Connecting joint and connecting method for closure opening of arch bridge |
| CN113502921A (en) * | 2021-07-19 | 2021-10-15 | 郑州大学 | Construction method of concrete filled steel tube arch rib |
| CN114775437A (en) * | 2022-05-05 | 2022-07-22 | 中铁大桥局集团第一工程有限公司 | A fast closing method of arch rib of top-loaded steel tube arch bridge |
| CN115288006A (en) * | 2022-08-31 | 2022-11-04 | 重庆交通大学 | Novel connecting structure and method for main arch welded at less height |
| CN115323900A (en) * | 2022-08-31 | 2022-11-11 | 重庆交通大学 | External connection structure and method for main arch for less high-altitude operation |
| CN115450102A (en) * | 2022-10-19 | 2022-12-09 | 林同棪国际工程咨询(中国)有限公司 | Half-supported network suspension rod arch bridge and its construction method |
| CN115787505A (en) * | 2022-12-20 | 2023-03-14 | 中铁上海工程局集团第一工程有限公司 | Construction method of lower arch rib of flying swallow type arch bridge |
| CN115821774A (en) * | 2022-12-02 | 2023-03-21 | 台州台中轨道交通有限公司 | Accurate positioning device for space linear arch rib arch foot and construction method |
| CN116065490A (en) * | 2022-12-29 | 2023-05-05 | 广西交通设计集团有限公司 | Temporary inter-rib support device for a rigid skeleton arch bridge and its application method |
| CN116676853A (en) * | 2023-05-16 | 2023-09-01 | 湖北省交通规划设计院股份有限公司 | Device and method for connecting single-tube horizontal brace and dumbbell-shaped arch rib |
| CN116837744A (en) * | 2023-05-19 | 2023-10-03 | 中国十九冶集团有限公司 | Block construction method, device, computer equipment and storage medium |
| CN117188335A (en) * | 2023-07-31 | 2023-12-08 | 中交一公局集团有限公司 | A construction method for installing and constructing arch ribs of large-span upward-supporting arch bridges |
-
1999
- 1999-10-01 JP JP28177899A patent/JP2001098514A/en not_active Withdrawn
Cited By (31)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101865739A (en) * | 2010-06-22 | 2010-10-20 | 湖南科技大学 | Dynamic Monitoring System of Pre-tightening Force in Pre-stressed Anchor Reinforcement Engineering |
| JP5419115B1 (en) * | 2013-09-05 | 2014-02-19 | 極東鋼弦コンクリート振興株式会社 | Injection material |
| CN103711080A (en) * | 2013-12-26 | 2014-04-09 | 中国一冶集团有限公司 | Method for locating arch ribs of steel tube arch bridge through coordinate correlation method |
| CN103711080B (en) * | 2013-12-26 | 2016-04-20 | 中国一冶集团有限公司 | Utilize the method for locating between coordinate method of comparison determination steel pipe arch bridge arch rib |
| CN106087755A (en) * | 2016-04-27 | 2016-11-09 | 郑勤民 | Spliced bridging structure and erection method thereof |
| CN107503287A (en) * | 2017-08-24 | 2017-12-22 | 广西路桥工程集团有限公司 | A kind of steel tube arch rib section deviation correcting device and method for correcting error |
| CN109214099A (en) * | 2018-09-20 | 2019-01-15 | 中建三局基础设施建设投资有限公司 | A kind of arch rib steel pipe location Calculation and construction method |
| CN109214099B (en) * | 2018-09-20 | 2023-06-09 | 中建三局基础设施建设投资有限公司 | Arch rib steel pipe positioning and construction method |
| CN109826096A (en) * | 2018-12-03 | 2019-05-31 | 中铁上海工程局集团有限公司 | A kind of three-dimensional accurate adjustment positioning mechanism of large-scale steel pipe arch rib space closure |
| CN110258357A (en) * | 2019-07-09 | 2019-09-20 | 中铁二院成都勘察设计研究院有限责任公司 | A kind of construction method that steel tube arch rib segment connects in the air |
| CN110700109A (en) * | 2019-10-30 | 2020-01-17 | 贵州省公路工程集团有限公司 | Construction process of concrete arch ring of steel pipe stiff skeleton of bridge |
| CN111501520B (en) * | 2020-05-08 | 2021-08-24 | 重庆交通大学 | Pouring Technology for Preventing Cavitation of Concrete Filled Steel Tubes |
| CN111501520A (en) * | 2020-05-08 | 2020-08-07 | 重庆交通大学 | Pouring process for preventing concrete filled steel tube from being emptied |
| CN113073559B (en) * | 2021-03-29 | 2024-04-19 | 中交路桥建设有限公司 | Mobile platform system and method for construction of large-span steel pipe concrete arch |
| CN113073559A (en) * | 2021-03-29 | 2021-07-06 | 中交路桥建设有限公司 | Movable platform system and method for construction of large-span steel pipe concrete arch |
| CN112982200A (en) * | 2021-03-30 | 2021-06-18 | 中建三局基础设施建设投资有限公司 | An Underpinning Method for Existing Continuous Bridges |
| CN112982200B (en) * | 2021-03-30 | 2022-09-02 | 中建三局基础设施建设投资有限公司 | Underpinning method of existing continuous bridge |
| CN113186796A (en) * | 2021-04-30 | 2021-07-30 | 广州文船重工有限公司 | Connecting joint and connecting method for closure opening of arch bridge |
| CN113502921A (en) * | 2021-07-19 | 2021-10-15 | 郑州大学 | Construction method of concrete filled steel tube arch rib |
| CN113502921B (en) * | 2021-07-19 | 2022-11-08 | 郑州大学 | Construction method of concrete filled steel tube arch rib |
| CN114775437A (en) * | 2022-05-05 | 2022-07-22 | 中铁大桥局集团第一工程有限公司 | A fast closing method of arch rib of top-loaded steel tube arch bridge |
| CN115323900A (en) * | 2022-08-31 | 2022-11-11 | 重庆交通大学 | External connection structure and method for main arch for less high-altitude operation |
| CN115288006A (en) * | 2022-08-31 | 2022-11-04 | 重庆交通大学 | Novel connecting structure and method for main arch welded at less height |
| CN115450102A (en) * | 2022-10-19 | 2022-12-09 | 林同棪国际工程咨询(中国)有限公司 | Half-supported network suspension rod arch bridge and its construction method |
| CN115821774A (en) * | 2022-12-02 | 2023-03-21 | 台州台中轨道交通有限公司 | Accurate positioning device for space linear arch rib arch foot and construction method |
| CN115787505A (en) * | 2022-12-20 | 2023-03-14 | 中铁上海工程局集团第一工程有限公司 | Construction method of lower arch rib of flying swallow type arch bridge |
| CN116065490A (en) * | 2022-12-29 | 2023-05-05 | 广西交通设计集团有限公司 | Temporary inter-rib support device for a rigid skeleton arch bridge and its application method |
| CN116065490B (en) * | 2022-12-29 | 2025-08-29 | 广西交通设计集团有限公司 | Temporary inter-rib support device for rigid skeleton arch bridge and method of using the same |
| CN116676853A (en) * | 2023-05-16 | 2023-09-01 | 湖北省交通规划设计院股份有限公司 | Device and method for connecting single-tube horizontal brace and dumbbell-shaped arch rib |
| CN116837744A (en) * | 2023-05-19 | 2023-10-03 | 中国十九冶集团有限公司 | Block construction method, device, computer equipment and storage medium |
| CN117188335A (en) * | 2023-07-31 | 2023-12-08 | 中交一公局集团有限公司 | A construction method for installing and constructing arch ribs of large-span upward-supporting arch bridges |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101080534B (en) | Manufacturing method for prestressed steel composite girder | |
| JP2002201609A (en) | Construction method for concrete arch bridge | |
| JP3844743B2 (en) | Box girder bridge structure and its construction method | |
| JP2000064227A (en) | Bridge construction method | |
| CN115045413A (en) | Resettable local post-cast connection concrete shear wall and connection method | |
| JPH07292783A (en) | Connective structure of prestressed concrete members | |
| JP2000291181A (en) | Construction method of precast shear wall | |
| CN208981316U (en) | Variable-section steel pipe concrete column structure is connect on a kind of steel core concrete column | |
| JP2003138523A (en) | Construction method for tension string girder bridge | |
| KR101157607B1 (en) | Prestressed steel composite girder with prestressed non-introducing portions provided at both ends of lower flange casing concrete, manufacturing method thereof, and Rahmen structure and construction method thereof | |
| KR20060023915A (en) | Construction Method of Slab-Outer Wall Simultaneous Placement Using Basement File Without Edge Beam | |
| JP2009019356A (en) | Structure and method for joining pier and footing | |
| CN107905123A (en) | A kind of multi-joint continuous rigid frame end bay temporary T structure cantilever construction transforming methods of structural system | |
| CN111560836A (en) | Construction method of main arch of an arch bridge and construction method of prefabricated arch bridge | |
| KR20030006681A (en) | Apparatus and method for reinforcing a construction by enlarging its' size | |
| KR200263281Y1 (en) | Apparatus for reinforcing a construction by enlarging its' size | |
| KR101576865B1 (en) | Construction method of slab for bridge without support bar using converse T-type beams | |
| JP2004011300A (en) | PC composite structure, PC bridge and method for introducing prestress | |
| JPH06248614A (en) | High bridge pier and construction thereof | |
| JP7788586B1 (en) | Method for constructing underground structures | |
| CN113897912B (en) | Rock-fill concrete masonry structure and construction method thereof | |
| CN221702747U (en) | Assembly type beam column adjustable support joint for railway overhead structure | |
| JPH116162A (en) | Construction method for reinforced concrete underground external wall | |
| CN117211149B (en) | A steel-concrete composite beam with a simple-supported-then-continuous structure and its construction method | |
| JPH05156605A (en) | Construction method of arch concrete by arch form support. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20061205 |