CN110258353A - 带承托的变高度钢-砼组合梁桥施工工艺 - Google Patents
带承托的变高度钢-砼组合梁桥施工工艺 Download PDFInfo
- Publication number
- CN110258353A CN110258353A CN201910700006.2A CN201910700006A CN110258353A CN 110258353 A CN110258353 A CN 110258353A CN 201910700006 A CN201910700006 A CN 201910700006A CN 110258353 A CN110258353 A CN 110258353A
- Authority
- CN
- China
- Prior art keywords
- steel
- varying depth
- girder
- support
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种带承托的变高度钢‑砼组合梁桥施工工艺,首先开挖基础,施工桥墩,并在位于中间的每个桥墩墩顶处修筑变高度预应力混凝土承托;然后在梁桥第一孔处搭设拼装平台,并拼装钢导梁和由多节预制钢梁节段组成的等高度钢梁;接着在变高度预应力混凝土承托上安装顶推设备,将等高度钢梁顶推到位,之后拆除顶推设备,落梁;最后拆除相关设备,进行桥面铺装。本发明采用等高度钢梁和变高度预应力混凝土承托组合的方式代替传统的变高度钢梁,不仅结构受力明确,而且避免了顶推过程中因钢梁梁底标高不断变化带来的繁琐工序,施工难度降低,安全系数高,施工工期短。
Description
技术领域
本发明涉及变高度钢-砼梁桥施工技术领域,尤其是涉及一种带承托的变高度钢-砼组合梁桥施工工艺。
背景技术
钢-砼组合梁通过在钢梁与混凝土板之间设置剪力键,使其成为整体共同工作,充分发挥钢材的抗拉性能与混凝土的抗压性能。与混凝土梁相比,钢-砼组合梁结构自重轻、抗震性能好、基础造价低,结构延性高;与钢梁相比又具有结构截面高度低、钢材用量少、结构刚度大、稳定性高、耐久性好等优点;同时, 钢-砼组合梁截面高度的降低,使结构外形更加纤巧,能够改善桥梁的景观效果,充分展示了桥梁美学。目前钢-砼组合梁桥普遍采用先钢梁后混凝土板的施工顺序,由于钢梁具有自重小、承载力强的特点,施工常用顶推法。然而当顶推法用于大跨径变高度钢-砼组合梁时,由于截面梁高呈曲线变化,导致钢梁梁底与支座接触面的竖向高度不断改变,因此顶推过程中需要不断调整支座高度来满足梁底标高要求,但目前这种调整对于常用的顶推系统而言都存在施工难度大、危险系数高、精度低、施工速度慢、工程造价高等问题。
发明内容
为了解决上述问题,本发明提供一种具有施工难度小、经济性能优等特点的带承托的变高度钢-砼组合梁桥施工工艺,具体可采取下述技术方案:
本发明所述的带承托的变高度钢-砼组合梁桥施工工艺,包括如下步骤:
第一步,开挖基础,施工桥墩,并在位于中间的每个桥墩墩顶处修筑变高度预应力混凝土承托,所述变高度预应力混凝土承托以桥墩中心线为基准分别向两侧纵向延长0.15-0.25倍跨径长度,其顶部为开设有多个预留槽的平面结构,底部为曲面结构;
第二步,在梁桥第一孔处搭设拼装平台,在拼装平台上拼装钢导梁和由多节预制钢梁节段组成的等高度钢梁,所述预制钢梁节段的底板下翼缘上设置有多组集束式剪力钉;
第三步,在变高度预应力混凝土承托上安装顶推设备,将等高度钢梁顶推到位,之后拆除顶推设备,落梁,使集束式剪力钉落于预留槽内,接着向预留槽内灌注混凝土;
第四步,拆除钢导梁、拼装平台和顶推设备,待预留槽内的混凝土达到强度后施工桥面板,并进行桥面铺装,成桥,完成施工。
本发明提供的带承托的变高度钢-砼组合梁桥施工工艺,具有以下优点:
1、采用等高度钢梁和变高度预应力混凝土承托组合的方式代替传统的变高度钢梁,不仅结构受力明确,而且避免了顶推过程中因钢梁梁底标高不断变化带来的繁琐工序,施工难度降低,安全系数高,施工工期短;
2、在中墩墩顶处设置预应力混凝土承托,不仅为钢梁顶推提供了工作平台,还能够改善墩顶负弯矩区钢梁的受压状态,缩短钢梁跨径,节约钢材,提高钢梁的经济性能。
附图说明
图1a-1f是本发明的施工过程示意图。
图2是1d中Ⅰ处的放大结构示意图。
图3是图2的A-A剖面图。
图4是图1f中Ⅱ处的放大结构示意图。
图5是图4的B-B剖面图。
具体实施方式
如图1a-1f所示,本发明所述的带承托的变高度钢-砼组合梁桥施工工艺,主要包括如下步骤:
第一步,开挖基础,施工桥墩,并在位于中间的每个桥墩(以下称为中墩1)墩顶处修筑变高度预应力混凝土承托2。上述变高度预应力混凝土承托2是顶部为平面、底部为曲面的变高度承托,其以所在中墩1的中心线为基准分别向两侧纵向延长0.15-0.25倍跨径长度,即左侧延伸段的长度为左侧桥跨长度的0.15-0.25倍,右侧延伸段的长度为右侧桥跨长度的0.15-0.25倍,并在顶部开设有多个预留槽3。
第二步,在梁桥第一孔处搭设拼装平台4,在拼装平台4上拼装钢导梁5和由多节预制钢梁节段组成的等高度钢梁6,每节预制钢梁节段的底板下翼缘上均焊接有多组集束式剪力钉7;
第三步,在变高度预应力混凝土承托2上安装顶推设备8,将等高度钢梁6顶推到位,此时,各集束式剪力钉7与预留槽3一一对应(见图2、3),之后拆除顶推设备8,落梁,使集束式剪力钉7落于预留槽3内(见图4、5),接着向预留槽3内灌注混凝土;
第四步,拆除钢导梁5、拼装平台4和顶推设备8,待预留槽4内的混凝土达到100%强度后施工桥面板,并进行桥面铺装,成桥,完成施工。
综上,本发明所述的带承托的变高度钢-砼组合梁桥施工工艺,将顶推对象由传统钢-砼组合梁中的变高度钢梁转换为等高度钢梁,因此带来了如下优点:1、省去了因梁底标高连续变化带来的繁琐施工工序,降低了施工难度,提高了施工安全稳定度,缩短了桥梁跨径,优化了经济性;2、变高度预应力混凝土承托的设置不仅为钢梁顶推提供了工作平台,还能够充分利用自身的抗压性能,改善墩顶负弯矩区钢梁底板的受压状态,避免了传统钢-砼组合梁中钢梁底板直接接触支座可能发生的局部屈曲失稳,提高了结构承载力。
Claims (1)
1.一种带承托的变高度钢-砼组合梁桥施工工艺,其特征在于:包括如下步骤:
第一步,开挖基础,施工桥墩,并在位于中间的每个桥墩墩顶处修筑变高度预应力混凝土承托,所述变高度预应力混凝土承托以桥墩中心线为基准分别向两侧纵向延长0.15-0.25倍跨径长度,其顶部为开设有多个预留槽的平面结构,底部为曲面结构;
第二步,在梁桥第一孔处搭设拼装平台,在拼装平台上拼装钢导梁和由多节预制钢梁节段组成的等高度钢梁,所述预制钢梁节段的底板下翼缘上设置有多组集束式剪力钉;
第三步,在变高度预应力混凝土承托上安装顶推设备,将等高度钢梁顶推到位,之后拆除顶推设备,落梁,使集束式剪力钉落于预留槽内,接着向预留槽内灌注混凝土;
第四步,拆除钢导梁、拼装平台和顶推设备,待预留槽内的混凝土达到强度后施工桥面板,并进行桥面铺装,成桥,完成施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910700006.2A CN110258353A (zh) | 2019-07-31 | 2019-07-31 | 带承托的变高度钢-砼组合梁桥施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910700006.2A CN110258353A (zh) | 2019-07-31 | 2019-07-31 | 带承托的变高度钢-砼组合梁桥施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258353A true CN110258353A (zh) | 2019-09-20 |
Family
ID=67912526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910700006.2A Pending CN110258353A (zh) | 2019-07-31 | 2019-07-31 | 带承托的变高度钢-砼组合梁桥施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258353A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644377A (zh) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | 滚轮式梁体顶推施工装置 |
CN110939071A (zh) * | 2019-12-27 | 2020-03-31 | 中交二公局东萌工程有限公司 | 一种装配式钢-混工字组合梁桥无支墩施工方法 |
CN112523061A (zh) * | 2020-11-24 | 2021-03-19 | 广西交通设计集团有限公司 | 一种uhpc加劲预应力混凝土箱梁桥结构及其施工工艺 |
CN114214925A (zh) * | 2022-01-10 | 2022-03-22 | 福州大学 | 适于顶推施工的变截面连续梁桥结构及施工方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU657109A1 (ru) * | 1977-09-19 | 1979-04-15 | Gil Boris M | Коробчатое пролетное строение с участками переменной высоты |
AT363509B (de) * | 1977-02-01 | 1981-08-10 | Bung Ingbuero | Langgestrecktes tragwerk aus stahl- oder spannbeton, insbesondere eine bruecke |
KR20060037644A (ko) * | 2004-10-28 | 2006-05-03 | 현대제철 주식회사 | 교량의 상부 구조물 이음 구조 |
KR20090012491A (ko) * | 2007-07-30 | 2009-02-04 | (주)한맥기술 | 시공단계에 따른 단면력을 고려한 보강구조를 구비한스플라이스 프리스트레스트 콘크리트 거더 교량 및 그시공방법 |
CN201588175U (zh) * | 2009-12-30 | 2010-09-22 | 长沙理工大学 | 顶推滑道标高调整装置 |
CN104153284A (zh) * | 2014-07-31 | 2014-11-19 | 桂林理工大学 | 部分充填式钢箱混凝土连续组合梁桥及其施工方法 |
CN106702876A (zh) * | 2016-12-14 | 2017-05-24 | 重庆交通大学 | 节段连续预制—顶推就位后联结的钢‑砼组合梁桥及其快速建造方法 |
CN206800162U (zh) * | 2017-05-10 | 2017-12-26 | 中铁第一勘察设计院集团有限公司 | 一种轨道交通变高连续u梁 |
CN207032041U (zh) * | 2017-04-24 | 2018-02-23 | 中铁七局集团武汉工程有限公司 | 变截面钢箱梁顶推组合装置 |
CN108978484A (zh) * | 2018-08-23 | 2018-12-11 | 中交路桥建设有限公司 | 一种曲线桥钢箱梁滑移法拼装施工方法 |
CN108978434A (zh) * | 2018-10-16 | 2018-12-11 | 河南省交通规划设计研究院股份有限公司 | 一种新型钢-混组合连续箱梁桥及其无支架工业化施工方法 |
CN109267470A (zh) * | 2018-10-22 | 2019-01-25 | 上海市政工程设计研究总院(集团)有限公司 | 一种装配式型钢-混凝土预弯组合连续梁桥及其施工方法 |
CN109898413A (zh) * | 2019-04-11 | 2019-06-18 | 福州大学 | 组合梁与混凝土桥面板连接结构及其施工方法 |
-
2019
- 2019-07-31 CN CN201910700006.2A patent/CN110258353A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT363509B (de) * | 1977-02-01 | 1981-08-10 | Bung Ingbuero | Langgestrecktes tragwerk aus stahl- oder spannbeton, insbesondere eine bruecke |
SU657109A1 (ru) * | 1977-09-19 | 1979-04-15 | Gil Boris M | Коробчатое пролетное строение с участками переменной высоты |
KR20060037644A (ko) * | 2004-10-28 | 2006-05-03 | 현대제철 주식회사 | 교량의 상부 구조물 이음 구조 |
KR20090012491A (ko) * | 2007-07-30 | 2009-02-04 | (주)한맥기술 | 시공단계에 따른 단면력을 고려한 보강구조를 구비한스플라이스 프리스트레스트 콘크리트 거더 교량 및 그시공방법 |
CN201588175U (zh) * | 2009-12-30 | 2010-09-22 | 长沙理工大学 | 顶推滑道标高调整装置 |
CN104153284A (zh) * | 2014-07-31 | 2014-11-19 | 桂林理工大学 | 部分充填式钢箱混凝土连续组合梁桥及其施工方法 |
CN106702876A (zh) * | 2016-12-14 | 2017-05-24 | 重庆交通大学 | 节段连续预制—顶推就位后联结的钢‑砼组合梁桥及其快速建造方法 |
CN207032041U (zh) * | 2017-04-24 | 2018-02-23 | 中铁七局集团武汉工程有限公司 | 变截面钢箱梁顶推组合装置 |
CN206800162U (zh) * | 2017-05-10 | 2017-12-26 | 中铁第一勘察设计院集团有限公司 | 一种轨道交通变高连续u梁 |
CN108978484A (zh) * | 2018-08-23 | 2018-12-11 | 中交路桥建设有限公司 | 一种曲线桥钢箱梁滑移法拼装施工方法 |
CN108978434A (zh) * | 2018-10-16 | 2018-12-11 | 河南省交通规划设计研究院股份有限公司 | 一种新型钢-混组合连续箱梁桥及其无支架工业化施工方法 |
CN109267470A (zh) * | 2018-10-22 | 2019-01-25 | 上海市政工程设计研究总院(集团)有限公司 | 一种装配式型钢-混凝土预弯组合连续梁桥及其施工方法 |
CN109898413A (zh) * | 2019-04-11 | 2019-06-18 | 福州大学 | 组合梁与混凝土桥面板连接结构及其施工方法 |
Non-Patent Citations (1)
Title |
---|
韩振勇: "《城市桥梁设计创新与实践》", 28 February 2019, 上海科学技术出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644377A (zh) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | 滚轮式梁体顶推施工装置 |
CN110939071A (zh) * | 2019-12-27 | 2020-03-31 | 中交二公局东萌工程有限公司 | 一种装配式钢-混工字组合梁桥无支墩施工方法 |
CN112523061A (zh) * | 2020-11-24 | 2021-03-19 | 广西交通设计集团有限公司 | 一种uhpc加劲预应力混凝土箱梁桥结构及其施工工艺 |
CN112523061B (zh) * | 2020-11-24 | 2022-06-14 | 广西交通设计集团有限公司 | 一种uhpc加劲预应力混凝土箱梁桥结构及其施工工艺 |
CN114214925A (zh) * | 2022-01-10 | 2022-03-22 | 福州大学 | 适于顶推施工的变截面连续梁桥结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110258353A (zh) | 带承托的变高度钢-砼组合梁桥施工工艺 | |
CN101613997B (zh) | 一种钢-混凝土组合加宽方法 | |
CN108677685B (zh) | 一种超高性能混凝土-部分钢梁组合盖梁及其施工方法 | |
CN204530418U (zh) | 一种钢板组合梁桥 | |
CN106400666A (zh) | 一种预应力混凝土‑波形腹板钢箱结合梁混合梁结构体系 | |
CN204662235U (zh) | 一种钢板组合t梁桥 | |
CN104831627A (zh) | 桥面板纵向不等强钢-混凝土组合结构桥梁及其施工方法 | |
CN102966050B (zh) | 钢-混凝土组合梁和既有钢筋混凝土t梁的纵向连接方法 | |
CN102535348B (zh) | 一种铰塔斜拉桥斜拉索的张拉方法 | |
CN104805767A (zh) | 预制装配式frp-钢筋-混凝土组合桥面板及施工方法 | |
CN104264575A (zh) | 一种预应力钢箱混凝土组合连续梁桥构造及施工工艺 | |
CN104652293A (zh) | 一种用于加固psc连续箱梁桥的斜拉桥结构及施工方法 | |
CN102268856A (zh) | 大跨度铁路斜拉桥的箱-桁组合结构主梁及其施工方法 | |
CN205242238U (zh) | 一种应用于自锚式悬索桥的主梁结构 | |
CN104313994A (zh) | 一种混合梁无背索矮塔斜拉桥 | |
CN103194963B (zh) | 一种既有简支t型梁桥连续化改造的结构及其施工方法 | |
CN203411887U (zh) | 一种波折钢腹板混合梁结构 | |
CN204589815U (zh) | 预制装配式frp-钢筋-混凝土组合桥面板 | |
CN106758773A (zh) | 一种钢混组合梁桥的剪力连接件 | |
CN104652244B (zh) | 一种用于加固psc连续箱梁桥的悬索桥结构及施工方法 | |
CN202990196U (zh) | 一种部分预应力预制薄板 | |
CN207919315U (zh) | 四线高速铁路钢桁斜拉桥 | |
CN103205930A (zh) | 一种既有简支空心板梁桥连续化改造的结构及其施工方法 | |
CN105648898B (zh) | 预制超高性能混凝土中承式梁单元、桥梁结构及施工方法 | |
CN104018427A (zh) | 一种全焊接箱桁组合节段建造方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |