CN104018427A - 一种全焊接箱桁组合节段建造方法 - Google Patents

一种全焊接箱桁组合节段建造方法 Download PDF

Info

Publication number
CN104018427A
CN104018427A CN201410202918.4A CN201410202918A CN104018427A CN 104018427 A CN104018427 A CN 104018427A CN 201410202918 A CN201410202918 A CN 201410202918A CN 104018427 A CN104018427 A CN 104018427A
Authority
CN
China
Prior art keywords
girder
combined segments
main truss
welded
novel box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410202918.4A
Other languages
English (en)
Other versions
CN104018427B (zh
Inventor
高宗余
张敏
徐伟
肖海珠
张燕飞
彭振华
郑清刚
徐力
张建强
罗扣
何东升
苑仁安
侯健
刘厚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Group Co Ltd
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN201410202918.4A priority Critical patent/CN104018427B/zh
Publication of CN104018427A publication Critical patent/CN104018427A/zh
Application granted granted Critical
Publication of CN104018427B publication Critical patent/CN104018427B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种全焊接箱桁组合节段建造方法,具体步骤如下:将主梁按两节间长作为一个新型箱桁组合节段划分,制作组成节段的各单元件的板单元,将主桁下弦杆与下层桥面钢箱焊接、主桁上弦杆与上层桥面板焊接、将向联结系与主桁竖杆焊接、主桁竖杆和斜杆与主桁下、上弦杆焊接,形成新型箱桁组合节段;在预设的试装平台上对相邻新型箱桁组合节段进行试拼装,外表面进行防腐涂装。在架桥工地按照施工顺序将各新型全焊箱桁组合焊接到位。本发明将主梁设计成全焊接箱桁组合节段,吊装单元少、提高主梁的耐久性,减少后期养护工作量,简化现场施工,提高作业效率,安装周期短;外形美观、耐久性好;本发明已成功应用于沪通铁路长江公铁两用大桥工程。

Description

一种全焊接箱桁组合节段建造方法
技术领域
本发明涉及一种全焊接箱桁组合节段建造方法。
背景技术
现有钢桁斜拉桥,主桁施工方法主要有散拼方式、桁片架设方式、单节间整体架设方式。这些施工方法现场采用大量的高强度螺栓连接,主桁与桥面板现场也采用大量的焊缝连接。随着跨度的增大,主桁构件及桥面板单元数量剧增,现场拼接工作量巨大。
沪通铁路长江大桥位于沿海区域,恶劣气象条件时有发生。沪通长江大桥是沪通铁路工程上的一项重大节点工程,主桥是一座公铁两用特大跨度斜拉桥,主跨1092米,全长2296米。该桥采用钢箱钢桁组合结构主梁,上层共布置6车道高速公路,下层4线铁路,2线I级铁路,两线客运专线。该桥主跨跨度超大,主梁超长,采用常规的安装技术,一方面不能够满足沪通铁路建设工期的需要;另一方面也大大增加了施工过程的风险性。
如何采用全新的主梁截面及设计构造来解决传统连接所面临的难题是这一超大跨度斜拉桥主梁技术上的首要问题。
发明内容
本发明的目的是针对上述现状,旨在提供一种技术含量高、造价节省、施工方便、构造简洁、造型美观的新型主梁节段的全焊接箱桁组合节段建造方法。
本发明目的的实现方式为,一种全焊接箱桁组合节段建造方法,具体步骤如下:
1)依据安装的先后顺序,将主梁按两节间长作为一个新型箱桁组合节段进行划分,
2)新型箱桁组合节段制作:
①制作板单元:制作组成箱桁组合节段的各单元件的板单元,板单元有主桁下弦杆、主桁上弦杆、上层桥面板、下层桥面钢箱、主桁竖杆、斜杆及横向联结系板单元;
②组合节段单元件焊接:将主桁下弦杆与下层桥面钢箱2焊接、主桁上弦杆与上层桥面板焊接、将横向联结系与主桁竖杆焊接、主桁竖杆和斜杆与主桁下弦杆及主桁上弦杆焊接,形成新型箱桁组合节段;
3)新型箱桁组合节段试拼装:新型箱桁组合节段制作完成后,在预设的试装平台上对相邻新型箱桁组合节段进行试拼装,
4)新型箱桁组合节段防腐涂装:新型箱桁组合节段的外表面进行防腐涂装。
本发明将主梁设计成全焊接箱桁组合节段,并成为整体吊装单元,减少主梁构件间的连接螺栓,提高主梁的耐久性,减少主梁后期养护工作量,简化现场施工,提高作业效率,有效地缩短安装工期。
本发明将超大跨度斜拉桥主梁截面设计成箱桁组合结构,满足受力要求的前提下,通过下层桥面钢箱和上层正交异性钢桥面参与总体受力,使主桁弦杆的组成板件厚度大幅度减小,从而充分发挥主梁全截面材料的承载能力。本发明已成功应用于沪通铁路长江公铁两用大桥工程,
附图说明
图1是本发明结构示意图,
图2是图1的A-A向视图,
图3是本发明在沪通长江大桥主桥上的应用状态图。
具体实施方式
参照图1、图2,本发明的具体施工步骤如下:
1)依据安装的先后顺序,将主梁按两节间长作为一个新型箱桁组合节段进行划分,
2)新型箱桁组合节段制作:
①制作板单元:制作组成箱桁组合节段的各单元件的板单元,板单元有主桁下弦杆、主桁上弦杆、上层桥面板、下层桥面钢箱、主桁竖杆、斜杆及横向联结系板单元;
②组合节段单元件焊接:将主桁下弦杆1与下层桥面钢箱2焊接、主桁上弦杆6与上层桥面板7焊接、将横向联结系3与主桁竖杆4焊接、主桁竖杆4和斜杆5与主桁下弦杆1及主桁上弦杆6焊接,形成新型箱桁组合节段;
下层桥面钢箱2与主桁下弦杆1之间采用熔透焊。
3)节段试拼装:新型箱桁组合节段制作完成后,在预设的试装平台上对相邻新型箱桁组合节段进行试拼装,
4)新型箱桁组合节段防腐涂装:新型箱桁组合节段的外表面进行防腐涂装。
新型箱桁组合节段的外表面防腐涂装后应用到本申请人同日申请的《一种新型钢桁梁安装方法》进行架桥安装。即涂装后的新型箱桁运送到工地预拼厂,利用架设设备采用新型钢桁梁安装技术,按照拼装顺序将杆件各节段拼装到位,新型箱桁组合节段8在接缝9处(见图3)进行节段对接,然后焊接为一体。
本发明新型箱桁组合节段8已成功应用于沪通铁路长江公铁两用大桥工程。

Claims (2)

1.一种全焊接箱桁组合节段建造方法,其特征在于具体步骤如下:
1)依据安装的先后顺序,将主梁按两节间长作为一个新型箱桁组合节段进行划分,
2)新型箱桁组合节段制作:
①制作板单元:制作组成箱桁组合节段的各单元件的板单元,板单元有主桁下弦杆、主桁上弦杆、上层桥面板、下层桥面钢箱、主桁竖杆、斜杆及横向联结系板单元;
②组合节段单元件焊接:将主桁下弦杆与下层桥面钢箱2焊接、主桁上弦杆与上层桥面板焊接、将横向联结系与主桁竖杆焊接、主桁竖杆和斜杆与主桁下弦杆及主桁上弦杆焊接,形成新型箱桁组合节段;
3)新型箱桁组合节段试拼装:新型箱桁组合节段制作完成后,在预设的试装平台上对相邻新型箱桁组合节段进行试拼装,
4)新型箱桁组合节段防腐涂装:新型箱桁组合节段的外表面进行防腐涂装。
2.根据权利要求1所述的一种全焊接箱桁组合节段建造方法,其特征在于下层桥面钢箱(2)与主桁下弦杆(1)之间采用熔透焊。
CN201410202918.4A 2014-05-14 2014-05-14 一种全焊接箱桁组合节段建造方法 Active CN104018427B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410202918.4A CN104018427B (zh) 2014-05-14 2014-05-14 一种全焊接箱桁组合节段建造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410202918.4A CN104018427B (zh) 2014-05-14 2014-05-14 一种全焊接箱桁组合节段建造方法

Publications (2)

Publication Number Publication Date
CN104018427A true CN104018427A (zh) 2014-09-03
CN104018427B CN104018427B (zh) 2016-06-08

Family

ID=51435400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410202918.4A Active CN104018427B (zh) 2014-05-14 2014-05-14 一种全焊接箱桁组合节段建造方法

Country Status (1)

Country Link
CN (1) CN104018427B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735129A (zh) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 一种全焊桁架节段模块化拼装方法
CN109702363A (zh) * 2018-12-26 2019-05-03 江苏中铁山桥重工有限公司 一种全焊钢桁拱桥焊接方法
CN111794080A (zh) * 2020-07-01 2020-10-20 浙江省衢州市交通建设集团有限公司 一种钢桥箱形特大压力杆件的新型加劲构造及其施工方法
CN113047153A (zh) * 2021-02-07 2021-06-29 中铁四局集团有限公司 一种全焊接u型钢结构渡槽制造方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3322951A1 (de) * 1983-06-25 1985-01-03 Johannes Dörnen, Stahlbauwerk, 4600 Dortmund Fachwerkbruecke und verfahren zu deren herstellung
NO20055973L (no) * 2003-06-06 2006-01-31 Pedro Alvares Ribeiro Pacheco Brokran med autojusterende forspenning
ES2352023A1 (es) * 2008-04-03 2011-02-15 Structural Research, S.L. Procedimiento de montaje de dinteles prefabricados de hormigón.
CN102352604A (zh) * 2011-08-05 2012-02-15 中铁大桥局股份有限公司 一种钢桁梁桁片单元和钢桁梁结构及其安装方法
CN102776841A (zh) * 2012-08-02 2012-11-14 贵州桥梁建设集团有限责任公司 一种大跨度钢桁梁悬索桥合龙方法及装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3322951A1 (de) * 1983-06-25 1985-01-03 Johannes Dörnen, Stahlbauwerk, 4600 Dortmund Fachwerkbruecke und verfahren zu deren herstellung
NO20055973L (no) * 2003-06-06 2006-01-31 Pedro Alvares Ribeiro Pacheco Brokran med autojusterende forspenning
ES2352023A1 (es) * 2008-04-03 2011-02-15 Structural Research, S.L. Procedimiento de montaje de dinteles prefabricados de hormigón.
CN102352604A (zh) * 2011-08-05 2012-02-15 中铁大桥局股份有限公司 一种钢桁梁桁片单元和钢桁梁结构及其安装方法
CN102776841A (zh) * 2012-08-02 2012-11-14 贵州桥梁建设集团有限责任公司 一种大跨度钢桁梁悬索桥合龙方法及装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735129A (zh) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 一种全焊桁架节段模块化拼装方法
CN109702363A (zh) * 2018-12-26 2019-05-03 江苏中铁山桥重工有限公司 一种全焊钢桁拱桥焊接方法
CN111794080A (zh) * 2020-07-01 2020-10-20 浙江省衢州市交通建设集团有限公司 一种钢桥箱形特大压力杆件的新型加劲构造及其施工方法
CN113047153A (zh) * 2021-02-07 2021-06-29 中铁四局集团有限公司 一种全焊接u型钢结构渡槽制造方法

Also Published As

Publication number Publication date
CN104018427B (zh) 2016-06-08

Similar Documents

Publication Publication Date Title
CN104988844B (zh) 二次张拉预应力装配式波形钢腹板组合梁
CN110700103B (zh) 一种连续性组合梁施工方法
CN203514196U (zh) 一种波折钢腹板组合梁斜拉桥索梁锚固结构
CN205205654U (zh) 一种混凝土预制节段式桥梁的接缝构造
CN104100037A (zh) 组合扁梁
CN103306189A (zh) 钢桁架预应力混凝土桥面板组合桥梁及其施工方法
CN104018427A (zh) 一种全焊接箱桁组合节段建造方法
CN104060542A (zh) 组合梁斜拉桥横桥向预应力施加装置及其施加方法
CN104018426A (zh) 一种钢桁梁安装方法
CN103883054A (zh) 一种索杆肋梁组合楼盖及其施工方法
CN110230268A (zh) 先连续后简支的钢桁组合梁桥施工方法
CN112458925A (zh) 一种节段预制梁结构及其拼装组合桥梁的施工方法
CN203947421U (zh) 组合梁斜拉桥横桥向预应力施加装置
CN114892552A (zh) 一种箱梁式桥梁改造施工方法
CN104264584A (zh) 预应力混凝土斜拉桥梁顶组合式索梁锚固结构
WO2020253099A1 (zh) 一种装配式部分填充组合框架-支撑结构及其施工方法
CN104895231A (zh) 一种装配式组合楼板及其制造方法
CN101435237A (zh) 一种新型空心组合板
CN103334375B (zh) 一种桥墩及其施工方法
CN112012105A (zh) 一种斜拉桥的齿块拉杆组合型索塔锚固结构
CN205259072U (zh) 一种铁路空心墩封顶模板支撑系统
CN104047223A (zh) 轻型组合结构桥梁及其施工方法
CN110185159A (zh) 一种劲性柱与框架梁钢筋节点连接结构
CN215593647U (zh) 一种采用钢桁-砼预制结合梁段的梁拱组合结构
CN202830732U (zh) 一种混合式缆索承重桥梁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160415

Address after: 430050 Hanyang Road, Hubei, Wuhan, No. 34

Applicant after: China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd.

Applicant after: CHINA RAILWAY CORPORATION

Address before: 430050 Hanyang Road, Hubei, Wuhan, No. 34

Applicant before: China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant