CN201588175U - 顶推滑道标高调整装置 - Google Patents

顶推滑道标高调整装置 Download PDF

Info

Publication number
CN201588175U
CN201588175U CN2009203191819U CN200920319181U CN201588175U CN 201588175 U CN201588175 U CN 201588175U CN 2009203191819 U CN2009203191819 U CN 2009203191819U CN 200920319181 U CN200920319181 U CN 200920319181U CN 201588175 U CN201588175 U CN 201588175U
Authority
CN
China
Prior art keywords
jack
platform
pushing
slide rail
pushing tow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203191819U
Other languages
English (en)
Inventor
李传习
董创文
张玉平
柯红军
刘海波
曾天宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN2009203191819U priority Critical patent/CN201588175U/zh
Application granted granted Critical
Publication of CN201588175U publication Critical patent/CN201588175U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种顶推滑道标高调整装置,包括下部支撑、千斤顶、滑道梁,所述下部支撑的中部设有凸起的第一平台,两侧设有第二平台,所述千斤顶的底端安装在所述第二平台上,所述千斤顶的顶推端与滑道梁接触,所述滑道梁上方安装有不锈钢板,滑道梁与所述第一平台之间依次设有橡胶块和钢板垫块,所述不锈钢板上通过滑块与顶推梁接触,本实用新型具有安全可靠地实现无应力梁底变曲率竖曲线梁顶推过程中的滑道标高调整等优点,适用于桥梁的顶推架设施工。

Description

顶推滑道标高调整装置
技术领域
本实用新型涉及一种顶推滑道标高调整装置,适用于桥梁的顶推架设施工。
背景技术
顶推法在桥梁的架设施工中已得到了大量的应用[1-6],但大多应用于无应力梁底常曲率竖曲线(含无应力梁底直坡)梁的架设。近年来,为了精确满足桥梁的成桥设计线形为常曲率竖曲线或者梁为变高梁等特殊要求,出现了梁体底面制造曲线(即无应力曲线)为变曲率竖曲线的情况[7-10]
无应力梁底变曲率竖曲线梁的顶推,以往的方法是在与顶推滑道接触的部分梁底增设楔形垫块[7~9],使这些垫块底面尽量处于同一曲率的竖曲线上。这种方法思路较为简单,但存在诸多不足:首先,须增加大量的临时构件枛多种类型的楔形垫块,不太经济;其次,楔形垫块与顶推梁的连接构造增加了设计和施工的难度,很不方便;再次,楔形垫块的增设与拆除会影响顶推梁的构造,施工不慎时可能导致顶推梁的损坏,存在一定的安全风险。
[1]蔺锡九.逐段顶推架桥技术在我国的应用和发展[J].公路交通科技,1991,8(1):24-32;
[2]Marco Rosignoli.Bridge Launching[M].Parma,Italy,Thomas TelfordLimited,2002:1-18;
[3]李传习,周桂生.法国米约高架桥-7塔斜拉桥的设计与施工[J].世界桥梁,2005(4):18-20;
[4]李传习,刘杰,董创文等.平胜大桥斜交顶推中临时墩的受力分析[J].桥梁建设,2006(1):36-38;
[5]袁平荣.大跨度跨线钢管混凝土拱桥整体顶推施工控制研究[J].国防交通工程与技术,2008(3):49-52;
[6]涂满明,姚发海.超大跨连续钢桁梁多点顶推架设施工技术[J].交通科技,2009,232(1):19-21;
[7]  汤俊生.PC梁顶推技术的回顾与展望[J].桥梁建设,1996(1):11-14;
[8]Marco Rosignoli.Thrust and Guide Devices for Launched Bridges[J].Journal of Bridge Engineering,ASCE,1999(2):75-83;
[9]涂先行,李玉川,韩佐东.变高度曲线连续连续箱梁顶推施工研究[J].北京交通大学学报,2006,30(增刊):185-189。
[10]李传习,王俊,董创文等.联合ANSYS与MATLAB进行钢箱梁顶推施工仿真优化.交通与计算机[J],2008(6):136-142。
实用新型内容
本实用新型的目的在于克服现有技术之不足而提供一种能安全可靠地实现无应力梁底变曲率竖曲线梁顶推过程中的滑道标高调整的顶推滑道标高调整装置。
本实用新型的目的通过下述技术方案予以实现:
一种顶推滑道标高调整装置,包括下部支撑、千斤顶、滑道梁,所述下部支撑的中部设有凸起的第一平台,两侧设有第二平台,所述千斤顶的底端安装在所述第二平台上,所述千斤顶的顶推端与滑道梁接触,所述滑道梁上方安装有不锈钢板,滑道梁与所述第一平台之间依次设有橡胶块和钢板垫块,所述不锈钢板上通过滑块与顶推梁接触。
本实用新型中,所述橡胶块和钢板垫块沿顶推方向设置两组,置于第一平台两侧。所述橡胶块的弹性模量为20~80MPa。所述钢板垫块由多块薄钢板叠合组成。
本实用新型中,所述千斤顶的顶推端通过千斤顶垫箱或垫箱垫块与所述滑道梁接触。
本实用新型中,所述滑道梁的两上侧设有弧形入口。
本实用新型采用上述方案,能满足无应力梁底变曲率竖曲线梁顶推过程中的滑道标高调整的需要,进一步扩大顶推法的应用范围,本实用新型进行无应力梁底变曲率竖曲线梁顶推,不再采用楔形垫块,因此在施工时,增设与拆除不会影响顶推梁的构造,安全性提高,既能加快施工进度,又能节约施工成本,通常,可节约成本20%以上。
附图说明
图1为本实用新型的结构示意图。
图2为本实用新型顶起滑道梁的结构示意图。
图3为本实用新型调整垫块厚度的结构示意图。
图4为本实用新型放下滑道梁的结构示意图。
附图1-4中:1--下部支承、2--橡胶块、3--钢板垫块、4--滑道梁、5--不锈钢板、6--滑块、7--千斤顶、8--千斤顶垫箱、9--顶推梁、10--垫箱垫块、11--第一平台、12--第二平台。
具体实施方式
下面结合附图,来详细说明顶推滑道标高调整装置的具体实施方式。
如图1至4所示,一种顶推滑道标高调整装置,包括下部支撑1、千斤顶7、滑道梁4,所述下部支撑1的中部设有凸起的第一平台11,两侧设有第二平台12,所述千斤顶7的底端安装在所述第二平台12上,所述千斤顶7的顶推端与滑道梁4接触,所述滑道梁4上方安装有不锈钢板5,滑道梁4与所述第一平台11之间依次设有橡胶块2和钢板垫块3,所述不锈钢板5上通过滑块6与顶推梁9接触。
本实用新型中,所述橡胶块2和钢板垫块3沿顶推方向设置两组,置于第一平台11两侧。所述橡胶块2的弹性模量为20~80MPa。所述钢板垫块3由多块薄钢板叠合组成,总厚度可以调节;薄钢板厚度宜为1~20mm,其平面尺寸与设置在其下的橡胶块2的平面尺寸相等或稍大,数量根据滑道标高调整量确定。
本实用新型中,所述千斤顶7的顶推端通过千斤顶垫箱8或垫箱垫块10与所述滑道梁4接触;千斤顶垫箱8平面尺寸上面大下面小,以改善滑道梁的局部受力,也可根据实际情况设置垫箱垫块10。
本实用新型中,所述滑道梁4为局部加劲钢箱梁,其顶面为滑块布置区,滑块布置区的两端设置弧形出口和入口,以便滑块6顺利出入。
本实用新型中,千斤顶7为常规的液压千斤顶,其吨位根据滑道竖向反力的最大值确定;
本实用新型中,不锈钢板5和滑块6为顶推常用设备,不锈钢板5焊接在滑道梁4顶面,滑块6置于不锈钢板5顶面,顶推梁9由滑块6直接支承;
本实用新型中,顶推滑道标高调整装置在顶推梁9底面横向设置两组,一处滑道需千斤顶7共四个。
具体调整方法如下:
1、安装顶推滑道标高调整装置,构成钢板垫块3的薄钢板初始类型、数量和总厚度以滑道标高调整次数最少为优化目标根据计算确定;
2、当顶推梁9顶推到需要进行滑道标高调整时,暂停顶推;
3、如图2,千斤顶7进油,缓慢顶起滑道梁4,起顶过程中须保持四个千斤顶7分级同步,所有千斤顶7都完成一级起顶后方能进行下一级的起顶;
4、如图3,调整钢板垫块3的薄钢板数量和总厚度;
5、如图4,千斤顶7卸油,缓慢放下滑道梁4,下放过程中也须持四个千斤顶7分级同步;
6、重复3~5,直至该次滑道标高调整的所有分级步骤施工全部完成;
7、继续进行顶推施工;
8、重复2~7,直至顶推梁9所有梁段顶推到位。

Claims (6)

1.一种顶推滑道标高调整装置,包括下部支撑(1)、千斤顶(7)、滑道梁(4),其特征在于:所述下部支撑(1)的中部设有凸起的第一平台(11),两侧设有第二平台(12),所述千斤顶(7)的底端安装在所述第二平台(12)上,所述千斤顶(7)的顶推端与滑道梁(4)接触,所述滑道梁(4)上方安装有不锈钢板(5),滑道梁(4)与所述第一平台(11)之间依次设有橡胶块(2)和钢板垫块(3),所述不锈钢板(5)上通过滑块(6)与顶推梁(9)接触。
2.根据权利要求1所述的顶推滑道标高调整装置,其特征在于:所述橡胶块(2)和钢板垫块(3)沿顶推方向设置两组,置于第一平台(11)两侧。
3.根据权利要求1或2所述的顶推滑道标高调整装置,其特征在于:所述橡胶块(2)的弹性模量为20~80MPa。
4.根据权利要求1或2所述的顶推滑道标高调整装置,其特征在于:所述钢板垫块(3)由多块薄钢板叠合组成。
5.根据权利要求1所述的顶推滑道标高调整装置,其特征在于:所述千斤顶(7)的顶推端通过千斤顶垫箱(8)或垫箱垫块(10)与所述滑道梁(4)接触。
6.根据权利要求1所述的顶推滑道标高调整装置,其特征在于:所述滑道梁(4)的两上侧设有弧形入口。
CN2009203191819U 2009-12-30 2009-12-30 顶推滑道标高调整装置 Expired - Fee Related CN201588175U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203191819U CN201588175U (zh) 2009-12-30 2009-12-30 顶推滑道标高调整装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203191819U CN201588175U (zh) 2009-12-30 2009-12-30 顶推滑道标高调整装置

Publications (1)

Publication Number Publication Date
CN201588175U true CN201588175U (zh) 2010-09-22

Family

ID=42747946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203191819U Expired - Fee Related CN201588175U (zh) 2009-12-30 2009-12-30 顶推滑道标高调整装置

Country Status (1)

Country Link
CN (1) CN201588175U (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002914A (zh) * 2010-11-17 2011-04-06 中铁二十四局集团有限公司 钢箱梁的架设顶推装置
CN102041782A (zh) * 2010-12-10 2011-05-04 合肥中铁钢结构有限公司 大跨度钢桁梁多点顶推系统及其顶推工艺
CN103510474A (zh) * 2013-09-26 2014-01-15 中铁建设集团有限公司 一种用于顶推施工的弹性支承滑动装置
CN103556577A (zh) * 2013-11-19 2014-02-05 中铁十局集团有限公司 钢桁梁标高调整装置及调整钢桁梁标高的方法
CN105986549A (zh) * 2016-01-07 2016-10-05 中铁四局集团钢结构有限公司 公铁两用桥三桁高差变化对结构体系控制方法
CN108221710A (zh) * 2018-02-13 2018-06-29 上海工程技术大学 一种可自动调整梁底标高的桥梁顶推施工设备
CN108708294A (zh) * 2018-07-11 2018-10-26 中铁大桥局集团第六工程有限公司 用于不等节间桁架梁顶推施工的短滑道梁及顶推方法
CN110258353A (zh) * 2019-07-31 2019-09-20 河南省交通规划设计研究院股份有限公司 带承托的变高度钢-砼组合梁桥施工工艺
CN110644377A (zh) * 2019-09-30 2020-01-03 中铁二院工程集团有限责任公司 滚轮式梁体顶推施工装置
CN111549680A (zh) * 2020-04-30 2020-08-18 中冶(上海)钢结构科技有限公司 标高可调的防倾覆垫块及其使用方法
CN114561875A (zh) * 2022-03-21 2022-05-31 中铁五局集团机械化工程有限责任公司 一种钢箱梁顶推及高位落梁方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002914A (zh) * 2010-11-17 2011-04-06 中铁二十四局集团有限公司 钢箱梁的架设顶推装置
CN102041782A (zh) * 2010-12-10 2011-05-04 合肥中铁钢结构有限公司 大跨度钢桁梁多点顶推系统及其顶推工艺
CN102041782B (zh) * 2010-12-10 2013-01-23 合肥中铁钢结构有限公司 大跨度钢桁梁多点顶推系统及其顶推工艺
CN103510474A (zh) * 2013-09-26 2014-01-15 中铁建设集团有限公司 一种用于顶推施工的弹性支承滑动装置
CN103556577A (zh) * 2013-11-19 2014-02-05 中铁十局集团有限公司 钢桁梁标高调整装置及调整钢桁梁标高的方法
CN103556577B (zh) * 2013-11-19 2015-07-01 中铁十局集团有限公司 钢桁梁标高调整装置及调整钢桁梁标高的方法
CN105986549A (zh) * 2016-01-07 2016-10-05 中铁四局集团钢结构有限公司 公铁两用桥三桁高差变化对结构体系控制方法
CN108221710A (zh) * 2018-02-13 2018-06-29 上海工程技术大学 一种可自动调整梁底标高的桥梁顶推施工设备
CN108708294A (zh) * 2018-07-11 2018-10-26 中铁大桥局集团第六工程有限公司 用于不等节间桁架梁顶推施工的短滑道梁及顶推方法
CN108708294B (zh) * 2018-07-11 2023-12-12 中铁大桥局集团第六工程有限公司 用于不等节间桁架梁顶推施工的短滑道梁及顶推方法
CN110258353A (zh) * 2019-07-31 2019-09-20 河南省交通规划设计研究院股份有限公司 带承托的变高度钢-砼组合梁桥施工工艺
CN110644377A (zh) * 2019-09-30 2020-01-03 中铁二院工程集团有限责任公司 滚轮式梁体顶推施工装置
CN111549680A (zh) * 2020-04-30 2020-08-18 中冶(上海)钢结构科技有限公司 标高可调的防倾覆垫块及其使用方法
CN114561875A (zh) * 2022-03-21 2022-05-31 中铁五局集团机械化工程有限责任公司 一种钢箱梁顶推及高位落梁方法

Similar Documents

Publication Publication Date Title
CN201588175U (zh) 顶推滑道标高调整装置
CN102747685A (zh) 大跨径混合梁斜桥施工运营全过程多功能综合约束装置
CN102477717B (zh) 一种桥梁顶推施工方法
CN201183929Y (zh) 梁式桥主梁纵向限位构造
CN102041782B (zh) 大跨度钢桁梁多点顶推系统及其顶推工艺
CN102758445A (zh) 风力发电机塔架基础调平装置、基础总成及基础成型方法
CN204266134U (zh) 重载大跨度钢桁梁步履式顶推装置
CN110644377B (zh) 滚轮式梁体顶推施工装置
CN202280024U (zh) 一种双薄壁墩连续刚构桥0号块托架
CN103643637A (zh) 大跨度钢管混凝土拱桥先竖转后原位整体提升施工方法
CN104762884B (zh) 多点同步智能张拉系统的控制方法
CN110468734B (zh) 钢拱肋顶推系统及钢拱肋顶推施工方法
CN102839605A (zh) 一种小垂度基准索股垂度控制方法
CN201738305U (zh) 钢筋笼钢筋接头对接精度控制装置
CN102587280B (zh) 底座支架辅助架梁吊机架设主塔区钢桁梁方法及底座支架
CN104268308B (zh) 一种顶推变曲率竖曲线梁支点标高确定的单步模数搜索合成法
CN212477453U (zh) 一种桥梁线型调整装置
Sun et al. Research on the application of horizontal rotation construction method with flat hinge in cable-stayed bridge construction
CN211522816U (zh) 一种边跨固结-塔梁半漂浮混合体系混凝土梁斜拉桥
CN104179127B (zh) 顶推变曲率竖曲线梁支点标高确定方法
CN203160119U (zh) 分布开裂式无缝伸缩缝
CN202220438U (zh) 跳台钢模板支撑体系
CN205775812U (zh) 一种桥墩建筑体的结构体
CN206986751U (zh) 可用于大跨度钢箱梁施工的导梁上墩装置
CN103790388B (zh) 大跨悬挑屋面钢飘檐的高空安装改进方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100922

Termination date: 20161230

CF01 Termination of patent right due to non-payment of annual fee