CN104153284A - 部分充填式钢箱混凝土连续组合梁桥及其施工方法 - Google Patents

部分充填式钢箱混凝土连续组合梁桥及其施工方法 Download PDF

Info

Publication number
CN104153284A
CN104153284A CN201410375206.2A CN201410375206A CN104153284A CN 104153284 A CN104153284 A CN 104153284A CN 201410375206 A CN201410375206 A CN 201410375206A CN 104153284 A CN104153284 A CN 104153284A
Authority
CN
China
Prior art keywords
district
construction method
bridge deck
concrete
deck plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410375206.2A
Other languages
English (en)
Inventor
郑艳
莫时旭
周迎春
周晓冰
张堃
席季柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin University of Technology
Original Assignee
Guilin University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin University of Technology filed Critical Guilin University of Technology
Priority to CN201410375206.2A priority Critical patent/CN104153284A/zh
Publication of CN104153284A publication Critical patent/CN104153284A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及部分充填式钢箱混凝土连续组合梁桥及其施工方法。该施工方法,包括:步骤1,架设钢箱连续梁;步骤2,在中支座区部分灌注混凝土;步骤3,在跨中区浇筑第一钢筋混凝土桥面板;步骤4,在中间支座区浇筑第二钢筋混凝土桥面板。通过上述方法,本发明将桥面板分段施工,其目的是为了提高中支座区钢筋混凝土桥面板的抗裂性能,跨中区段的桥面板先浇筑、拼装,可以使其自重不会在后浇筑的中支座区桥面板中产生拉应力,而改善中支座区钢筋混凝土桥面板的抗裂性能。

Description

部分充填式钢箱混凝土连续组合梁桥及其施工方法
技术领域
本发明涉及建筑领域,特别是涉及一种部分充填式钢箱混凝土连续组合梁桥的施工方法。
背景技术
连续梁的内力分布主要特点是在中支座区同时很大的负弯矩和剪力作用,而传统钢-混凝土连续组合梁桥的中支座区在负弯矩作用下,桥面板位于受拉区,其开裂退出工作后,对截面抗弯能力和抗剪能力贡献不大,而导致中支座截面抗弯能力和抗剪能力较低。
部分充填式钢箱-混凝土连续组合梁桥具有如下优点:(1)负弯矩区受力性能得到改善,克服了传统连续组合梁抗弯能力跨中富余而中支座区不足的状况,其截面承载能力更适应连续梁的内力分布特点;(2)中支座区钢箱内屈受充填混凝土限制,局部稳定性大大提高,可减少腹板、底板加劲肋的布置。
发明内容
本发明的目的是提供一种部分充填式钢箱混凝土连续组合梁桥的施工方法,以解决中支座区钢筋混凝土桥面板的抗裂性能的问题。
为解决上述技术问题,作为本发明的一个方面,提供了一种部分充填式钢箱混凝土连续组合梁桥的施工方法,包括:步骤1,架设钢箱连续梁;步骤2,在中支座区部分灌注混凝土;步骤3,在跨中区浇筑第一钢筋混凝土桥面板;步骤4,在中间支座区浇筑第二钢筋混凝土桥面板。
进一步地,步骤1采用顶推施工法、悬臂拼装施工法、吊装、支架拼装法等连续梁桥施工方法。
进一步地,在步骤2中,在中支座区的钢箱下部箱室的一端设置灌注孔,另一端设置出气孔,用混凝土泵向中支座区灌注自密实微膨胀混凝土。
进一步地,步骤3包括:待灌注的混凝土强度达到设计强度后,在跨中区的钢箱梁上搭设支架、模板,布置钢筋,然后在跨中区浇筑第一钢筋混凝土桥面板。
进一步地,步骤3包括:在钢箱梁栓钉处预留拼接带,将预应力混凝土桥面板吊装就位,再浇筑拼接带,从而完成第一钢筋混凝土桥面板的安装。
进一步地,步骤4包括:待跨中区的第一钢筋混凝土桥面板的混凝土养护达到设计强度后,在中间支座区的钢箱梁上搭设支架、模板,布置钢筋,然后在中间支座区浇筑形成第二钢筋混凝土桥面板。
作为本发明的第二个方面,提供了一种部分充填式钢箱混凝土连续组合梁桥,其特征在于,由上述的方法制成。
通过上述方法,本发明将桥面板分段施工,其目的是为了提高中支座区钢筋混凝土桥面板的抗裂性能,跨中区段的桥面板先浇筑、拼装,可以使其自重不会在后浇筑的中支座区桥面板中产生拉应力,而改善中支座区钢筋混凝土桥面板的抗裂性能。
附图说明
图1示意性示出了本发明中的施工方法的步骤1的示意图;
图2示意性示出了本发明中的施工方法的步骤2的示意图;
图3示意性示出了本发明中的施工方法的步骤3的示意图;
图4示意性示出了本发明中的施工方法的步骤4的示意图。
图中附图标记:1、钢箱连续梁;2、中支座区;3、跨中区;4、中间支座区;5、第一钢筋混凝土桥面板;6、第二钢筋混凝土桥面板。
具体实施方式
以下对本发明的实施例进行详细说明,但是本发明可以由权利要求限定和覆盖的多种不同方式实施。
请参考图1至图4,本发明提供了一种部分充填式钢箱混凝土连续组合梁桥的施工方法,包括:步骤1,架设钢箱连续梁1;步骤2,在中支座区2部分灌注混凝土;步骤3,在跨中区3浇筑第一钢筋混凝土桥面板5;步骤4,在中间支座区4浇筑第二钢筋混凝土桥面板6。
通过上述方法,本发明将桥面板分段施工,其目的是为了提高中支座区钢筋混凝土桥面板的抗裂性能,跨中区段的桥面板先浇筑、拼装,可以使其自重不会在后浇筑的中支座区桥面板中产生拉应力,而改善中支座区钢筋混凝土桥面板的抗裂性能。
优选地,为进一步改善中支座区2的钢筋混凝土桥面板的抗裂性能,还可以采取以下措施:(1)提高钢筋混凝土板的配筋率;(2)采用顶升法施工;(3)中支座区混凝土采用微膨胀混凝土;(4)对中支座区桥面板混凝土施加预应力。
优选地,步骤1采用顶推施工法、悬臂拼装施工法、吊装、支架拼装法等连续梁桥施工方法。
优选地,在步骤2中,在中支座区2的钢箱下部箱室的一端设置灌注孔,另一端设置出气孔,用混凝土泵向中支座区2灌注自密实微膨胀混凝土。
优选地,步骤3包括:待灌注的混凝土强度达到设计强度后,在跨中区3的钢箱梁上搭设支架、模板,布置钢筋,然后在跨中区3浇筑第一钢筋混凝土桥面板5。
优选地,步骤3包括:在钢箱梁栓钉处预留拼接带,将预应力混凝土桥面板吊装就位,再浇筑拼接带,从而完成第一钢筋混凝土桥面板5的安装。
优选地,步骤4包括:待跨中区3的第一钢筋混凝土桥面板5的混凝土养护达到设计强度后,在中间支座区4的钢箱梁上搭设支架、模板,布置钢筋,然后在中间支座区4浇筑形成第二钢筋混凝土桥面板6。
进一步地,本发明还提供了一种部分充填式钢箱混凝土连续组合梁桥,其由上述的方法制成。
综上所述,本发明中,通过钢箱与钢筋混凝土桥面板组合、钢箱与充填混凝土的组合的双重组合作用,使部分充填式钢箱-混凝土连续组合梁桥解决了以下技术问题:
(1)跨中正弯矩区由槽形钢箱与钢筋混凝土桥面板的组合作用,可以充分利用钢材和混凝土两种材料,提高截面抵抗正弯矩的承载能力,减轻了结构重量;
(2)中支座负弯矩区钢箱与充填混凝土的组合作用,提高了中支座区截面抵抗负弯矩和剪力的能力,同时,提高了中支座区钢箱局部稳定性,可减少钢箱腹板、底板加劲肋的布置,方便施工也可减小钢箱焊接残余应力;
(3)结构重量的减轻、结构延性的提高,改善了结构抗震性能和钢箱的抗疲劳性能;
(4)中支座截面抗弯能力和抗剪能力的提高,使其比传统的钢-混凝土组合连续梁桥更好地适应连续梁结构内力分布特点。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (7)

1.一种部分充填式钢箱混凝土连续组合梁桥的施工方法,其特征在于,包括:
步骤1,架设钢箱连续梁(1);
步骤2,在中支座区(2)部分灌注混凝土;
步骤3,在跨中区(3)浇筑第一钢筋混凝土桥面板(5);
步骤4,在中间支座区(4)浇筑第二钢筋混凝土桥面板(6)。
2.根据权利要求1所述的施工方法,其特征在于,所述步骤1采用顶推施工法、悬臂拼装施工法、吊装、支架拼装法等连续梁桥施工方法。
3.根据权利要求1所述的施工方法,其特征在于,在所述步骤2中,在所述中支座区(2)的钢箱下部箱室的一端设置灌注孔,另一端设置出气孔,用混凝土泵向所述中支座区(2)灌注自密实微膨胀混凝土。
4.根据权利要求1所述的施工方法,其特征在于,所述步骤3包括:
待灌注的混凝土强度达到设计强度后,在所述跨中区(3)的钢箱梁上搭设支架、模板,布置钢筋,然后在所述跨中区(3)浇筑所述第一钢筋混凝土桥面板(5)。
5.根据权利要求1所述的施工方法,其特征在于,所述步骤3包括:
在钢箱梁栓钉处预留拼接带,将预应力混凝土桥面板吊装就位,再浇筑拼接带,从而完成所述第一钢筋混凝土桥面板(5)的安装。
6.根据权利要求1所述的施工方法,其特征在于,所述步骤4包括:待所述跨中区(3)的第一钢筋混凝土桥面板(5)的混凝土养护达到设计强度后,在所述中间支座区(4)的钢箱梁上搭设支架、模板,布置钢筋,然后在所述中间支座区(4)浇筑形成所述第二钢筋混凝土桥面板(6)。
7.一种部分充填式钢箱混凝土连续组合梁桥,其特征在于,由所述权利要求1至6中任一项所述的方法制成。
CN201410375206.2A 2014-07-31 2014-07-31 部分充填式钢箱混凝土连续组合梁桥及其施工方法 Pending CN104153284A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410375206.2A CN104153284A (zh) 2014-07-31 2014-07-31 部分充填式钢箱混凝土连续组合梁桥及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410375206.2A CN104153284A (zh) 2014-07-31 2014-07-31 部分充填式钢箱混凝土连续组合梁桥及其施工方法

Publications (1)

Publication Number Publication Date
CN104153284A true CN104153284A (zh) 2014-11-19

Family

ID=51878900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410375206.2A Pending CN104153284A (zh) 2014-07-31 2014-07-31 部分充填式钢箱混凝土连续组合梁桥及其施工方法

Country Status (1)

Country Link
CN (1) CN104153284A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594192A (zh) * 2014-12-03 2015-05-06 华东交通大学 一种梯度结构组合桥面板
CN105002816A (zh) * 2015-07-29 2015-10-28 广西交通科学研究院 预制拼装的鱼腹工字型预应力钢混组合连续梁桥及施工方法
CN105064196A (zh) * 2015-07-29 2015-11-18 广西交通科学研究院 预制拼装的鱼腹工字型预应力钢混组合简支梁桥及其施工方法
CN105178165A (zh) * 2015-10-09 2015-12-23 西藏自治区交通勘察设计研究院 受拉面层复合增强的钢筋混凝土连续刚构桥及其施工方法
CN105484148A (zh) * 2015-12-30 2016-04-13 中铁第四勘察设计院集团有限公司 部分钢箱桁组合连续梁桥及其施工方法
CN105484147A (zh) * 2015-12-30 2016-04-13 中铁第四勘察设计院集团有限公司 钢箱桁组合连续梁桥及其施工方法
CN105951574A (zh) * 2016-05-06 2016-09-21 中铁大桥勘测设计院集团有限公司 钢梁节段、连续组合梁桥及连续组合梁桥的施工方法
CN108221636A (zh) * 2018-03-28 2018-06-29 北京市市政工程设计研究总院有限公司 中跨采用无支架方案施工的钢混组合梁桥及成桥方法
CN108978434A (zh) * 2018-10-16 2018-12-11 河南省交通规划设计研究院股份有限公司 一种新型钢-混组合连续箱梁桥及其无支架工业化施工方法
CN110258353A (zh) * 2019-07-31 2019-09-20 河南省交通规划设计研究院股份有限公司 带承托的变高度钢-砼组合梁桥施工工艺
CN112832111A (zh) * 2021-01-14 2021-05-25 中铁七局集团第二工程有限公司 一种预应力钢混组合连续箱梁桥结构体系

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6470524B1 (en) * 1998-03-04 2002-10-29 Benjamin Mairantz Composite bridge superstructure with precast deck elements
CN201933398U (zh) * 2010-12-10 2011-08-17 清华大学 纵向可滑动的钢-混凝土抗掀起连接件
CN102425112A (zh) * 2011-09-30 2012-04-25 李勇 预应力钢-混凝土组合桥梁制造方法
CN102505624A (zh) * 2011-10-17 2012-06-20 武汉理工大学 负弯矩区抗裂的钢-混凝土组合连续梁桥
CN203462394U (zh) * 2013-08-22 2014-03-05 中铁第一勘察设计院集团有限公司 一种支点处底板加固的连续钢箱梁

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6470524B1 (en) * 1998-03-04 2002-10-29 Benjamin Mairantz Composite bridge superstructure with precast deck elements
CN201933398U (zh) * 2010-12-10 2011-08-17 清华大学 纵向可滑动的钢-混凝土抗掀起连接件
CN102425112A (zh) * 2011-09-30 2012-04-25 李勇 预应力钢-混凝土组合桥梁制造方法
CN102505624A (zh) * 2011-10-17 2012-06-20 武汉理工大学 负弯矩区抗裂的钢-混凝土组合连续梁桥
CN203462394U (zh) * 2013-08-22 2014-03-05 中铁第一勘察设计院集团有限公司 一种支点处底板加固的连续钢箱梁

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
叶建龙等: "钢-混凝土组合结构在跨线桥中的应用", 《公路》 *
张振学等: "钢_混凝土连续组合桁梁桥受力性能优化", 《桥梁建设》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594192A (zh) * 2014-12-03 2015-05-06 华东交通大学 一种梯度结构组合桥面板
CN105002816A (zh) * 2015-07-29 2015-10-28 广西交通科学研究院 预制拼装的鱼腹工字型预应力钢混组合连续梁桥及施工方法
CN105064196A (zh) * 2015-07-29 2015-11-18 广西交通科学研究院 预制拼装的鱼腹工字型预应力钢混组合简支梁桥及其施工方法
CN105178165A (zh) * 2015-10-09 2015-12-23 西藏自治区交通勘察设计研究院 受拉面层复合增强的钢筋混凝土连续刚构桥及其施工方法
CN105484147B (zh) * 2015-12-30 2017-06-20 中铁第四勘察设计院集团有限公司 钢箱桁组合连续梁桥及其施工方法
CN105484148A (zh) * 2015-12-30 2016-04-13 中铁第四勘察设计院集团有限公司 部分钢箱桁组合连续梁桥及其施工方法
CN105484147A (zh) * 2015-12-30 2016-04-13 中铁第四勘察设计院集团有限公司 钢箱桁组合连续梁桥及其施工方法
CN105951574A (zh) * 2016-05-06 2016-09-21 中铁大桥勘测设计院集团有限公司 钢梁节段、连续组合梁桥及连续组合梁桥的施工方法
CN108221636A (zh) * 2018-03-28 2018-06-29 北京市市政工程设计研究总院有限公司 中跨采用无支架方案施工的钢混组合梁桥及成桥方法
CN108978434A (zh) * 2018-10-16 2018-12-11 河南省交通规划设计研究院股份有限公司 一种新型钢-混组合连续箱梁桥及其无支架工业化施工方法
CN108978434B (zh) * 2018-10-16 2024-02-20 河南省交通规划设计研究院股份有限公司 一种钢-混组合连续箱梁桥的无支架工业化施工方法
CN110258353A (zh) * 2019-07-31 2019-09-20 河南省交通规划设计研究院股份有限公司 带承托的变高度钢-砼组合梁桥施工工艺
CN112832111A (zh) * 2021-01-14 2021-05-25 中铁七局集团第二工程有限公司 一种预应力钢混组合连续箱梁桥结构体系

Similar Documents

Publication Publication Date Title
CN104153284A (zh) 部分充填式钢箱混凝土连续组合梁桥及其施工方法
CN103266574B (zh) 一种斜缆加固简支箱梁桥的方法
CN204185755U (zh) 一种波形钢腹板后张法预应力混凝土t梁
CN103556565B (zh) 一种不同性能混凝土梁的连接构造
CN102966050B (zh) 钢-混凝土组合梁和既有钢筋混凝土t梁的纵向连接方法
CN106988200B (zh) 纵向不抗剪开孔钢板抗拔连接件及其施工方法
CN104131652A (zh) 装配式rpc-钢-混凝土混合梁结构
CN104695341A (zh) 一种用于加固大跨度连续梁桥的非自平衡张弦梁结构
CN103114524A (zh) 轻型波形钢-高强活性粉末混凝土组合桥面板
Ban et al. Available rotation capacity of composite beams with high-strength materials under sagging moment
CN106894346B (zh) 一种连续梁桥施工方法
CN107587417A (zh) 混合组合梁三跨连续悬索桥
CN104831627A (zh) 桥面板纵向不等强钢-混凝土组合结构桥梁及其施工方法
CN102877407B (zh) 一种曲线桥用波形钢腹板混凝土连续箱梁
CN103898834A (zh) 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法
CN102561591A (zh) 缓粘结预应力型钢混凝土梁
CN205530888U (zh) 一种利用nz内置支撑管模的现浇混凝土楼盖结构
CN203593939U (zh) 一种不同性能混凝土梁的连接构造
KR101335382B1 (ko) 내부힌지를 활용한 복합트러스 거더교의 시공법
CN103726440B (zh) 一种圆管腹梁及其制备方法
CN108396632A (zh) 减小pk组合梁斜拉桥辅助墩墩顶主梁负弯矩的方法
CN104294752A (zh) 一种带端横梁的空心板桥构造及其施工方法
CN204151663U (zh) 一种混合梁无背索矮塔斜拉桥
CN105603890A (zh) 矮塔斜拉式体外拉索加固梁式桥
CN204000573U (zh) 一种铁路活性粉末混凝土薄壁箱梁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141119