CN110242333A - A kind of tunnel grillage moulding bed and its processing method - Google Patents
A kind of tunnel grillage moulding bed and its processing method Download PDFInfo
- Publication number
- CN110242333A CN110242333A CN201910611015.4A CN201910611015A CN110242333A CN 110242333 A CN110242333 A CN 110242333A CN 201910611015 A CN201910611015 A CN 201910611015A CN 110242333 A CN110242333 A CN 110242333A
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- main reinforcement
- grillage
- steel plate
- beam frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000465 moulding Methods 0.000 title claims abstract description 53
- 238000003672 processing method Methods 0.000 title claims abstract description 13
- 230000002787 reinforcement Effects 0.000 claims abstract description 57
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- 238000003466 welding Methods 0.000 claims abstract description 17
- 238000013461 design Methods 0.000 claims abstract description 13
- 238000012545 processing Methods 0.000 claims description 15
- 238000000034 method Methods 0.000 claims description 7
- 238000012790 confirmation Methods 0.000 claims description 3
- 238000007596 consolidation process Methods 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 abstract description 10
- 238000002360 preparation method Methods 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/003—Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
- E21D11/183—Supporting means for arch members, not provided for in E21D11/22
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of tunnel grillage moulding beds, and moulding bed support frame 3, the i-beam frame 2 positioned at middle part and the superposed main reinforcement fixing steel plate 1 by being located at lower part form;The moulding bed support frame 3 is arranged one every a length according to the design length of grillage.The i-beam frame 2 is identical as the design lines shape parameter of grillage.The main reinforcement fixing steel plate 1 is divided into 9 sections of positioning according to 2 length of i-beam frame.Support frame as described above 3, the connection between the i-beam frame 2 and superposed main reinforcement fixing steel plate 1 at middle part are welding.The invention also discloses a kind of processing methods of tunnel grillage moulding bed, it is characterised in that checked comprising preparation, surveying setting-out, moulding bed assembling, moulding bed and etc..Fixation for frame moulding bed to reinforcing bar of the invention, accurate positioning, welding quality is good, reduces unqualified arch quantity, reduces waste, has saved cost.
Description
Technical field
The invention discloses a kind of tunnel grillage moulding bed and its processing method, specifically a kind of Tunnel institute
With grillage moulding bed and its processing method, belong to highway tunnel construction technical field.
Background technique
Traditional grillage processing flow are as follows:
Arch full-page proof → welding stirrup and other components → scene examination spelling → check are put in preparation of construction → debugging forming mill →
→ installation.
From above-mentioned grillage traditional processing process, it can be found that:
1) setting-out is repeated.Carry out arch processing every time and be required to relay arch full-page proof, and full-page proof cannot to reinforcing bar into
Row is effectively fixed;
2) of poor quality.In welding process, arch top bars are easy to shake, and the welding is not firm, and easy deviation, quality are not easy
Guarantee;
3) limited space.To place space requirement height during setting-out, it is easy to be limited by processing factory space;
4) inefficiency.For guarantee reinforcing rib quantity, there can only be a worker successively to weld reinforcing rib from left to right every time,
According to each reinforcing rib size, rough estimate reinforcing rib position;
5) at high cost, processing quality is not easy to guarantee.Easily cause main reinforcement deviation, stirrup position skew, reinforcing rib spacing inclined
Technical requirements are not met greatly and cause phenomenon of doing over again, and are generated the wasting phenomenon in artificial and financial resources, are unfavorable for cost control.
In conclusion traditional grillage processing due to repeating setting-out, causes, work efficiency is low, quality is difficult to ensure.
Summary of the invention
The technical problem to be solved by the present invention is being provided in order to avoid above-mentioned conventional grates arch processes existing deficiency
It is a kind of can the pinpoint moulding bed of main reinforcement and its processing method to grillage.
The technical solution of present invention solution above-mentioned technical problem are as follows:
A kind of tunnel grillage moulding bed, by being located at the moulding bed support frame 3 of lower part, positioned at the i-beam frame 2 at middle part and position
Main reinforcement fixing steel plate 1 in top forms.
The main reinforcement fixing steel plate 1 on the top is processed to be formed together according to the quantity and geometric dimension of grillage spacer bar
The width of the main reinforcement locating slot 4 of quantity, same parameter, main reinforcement locating slot 4 is identical as the diameter of grillage main reinforcement.
The moulding bed support frame 3 is arranged one every certain length according to the design length of grillage, sets 4~6 altogether.
The i-beam frame 2 is identical as the radian of grid shelf's design on arch bridge, length and width parameter.
The main reinforcement fixing steel plate 1 is divided into 7~11 sections of positioning according to 2 length of i-beam frame, and totally 6~10.
Support frame as described above 3, welding is solid between the i-beam frame 2 and superposed main reinforcement fixing steel plate 1 at middle part
It is fixed.
A kind of processing method of tunnel grillage moulding bed, it is characterised in that: the processing method comprises the steps of:
1) prepare
According to the radian of grillage design, the i-beam frame 2 of length and width parameter processing identical parameters;According to grid
Shelf's design on arch bridge width, height, bar diameter process main reinforcement fixing steel plate 1;Suitable height and i-beam frame 2 are processed according to worker
Width produce moulding bed support frame 3;
2) surveying setting-out
With total station, setting-out goes out the temporary holding location of moulding bed support frame 3 on reinforcement yard ground, in i-beam frame 2
On according to 9 equal part of carry out of length, determine the fixation position of main reinforcement fixing steel plate 1;
3) moulding bed assembles
According to setting-out position, first in processing factory's ground fixing moulding bed structure support frame 3, then welded on moulding bed support frame 3
Fixed i-beam frame 2, finally according to the fixed main reinforcement fixing steel plate 1 of Along ent on i-beam frame 2, fixed point is fixed for each main reinforcement
Position 1 lower part of steel plate and 2 junction of i-beam frame, fixing means are spot welding consolidation;
4) moulding bed is checked
After being completed, fixation position of the main reinforcement fixing steel plate 1 on i-beam frame 2 is checked, after confirmation is qualified
To the spot welding position of main reinforcement fixing steel plate 1 and i-beam frame 2 again reinforcement of weld, the processing of moulding bed is completed.
The beneficial effects of the present invention are:
1) main reinforcement fixing steel plate 1 is processed according to the design size of grillage, 1 spacing of every two pieces of main reinforcement fixing steel plates is small,
It can quick and precisely be positioned according to the relative position of reinforcing rib and main reinforcement fixing steel plate 1 when welding;
2) four main reinforcements of grillage are fixed in main reinforcement locating slot 4, are not easy to shake, are improved welding quality;
3) reinforcing rib position is quickly positioned according to steel plate position, can be welded simultaneously with several workers, be improved the life of arch
Produce efficiency;
4) moulding bed interior in a limited space can be placed, and not have to repeat setting-out space, easy to operate;
5) by fixation of the moulding bed to reinforcing bar, accurate positioning, welding quality is good, reduces unqualified arch quantity, reduces
Waste, has saved cost.
Detailed description of the invention
Fig. 1 is top view of the present invention;
Fig. 2 is skiagraph of the present invention;
Fig. 3 is cross-sectional view of the present invention;
In figure: 1- main reinforcement fixing steel plate;2- i-beam frame;3- moulding bed support frame;4- main reinforcement locating slot.
Specific embodiment
A kind of 1~3 pair of tunnel grillage moulding bed of the invention and its processing method carry out specifically with reference to the accompanying drawing
It is bright.
A kind of tunnel grillage moulding bed, by being located at the moulding bed support frame 3 of lower part, positioned at the i-beam frame 2 at middle part and position
Main reinforcement fixing steel plate 1 in top forms.
The main reinforcement fixing steel plate 1 on the top is processed to be formed together according to the quantity and geometric dimension of grillage spacer bar
The width of the main reinforcement locating slot 4 of quantity, same parameter, main reinforcement locating slot 4 is identical as the diameter of grillage main reinforcement.
The moulding bed support frame 3 is arranged one every certain length according to the design length of grillage, sets 4~6 altogether.
The i-beam frame 2 is identical as the radian of grid shelf's design on arch bridge, length and width parameter.
Preferably, the main reinforcement fixing steel plate 1 is divided into 9 sections of positioning according to 2 length of i-beam frame, and totally 8.
Support frame as described above 3, welding is solid between the i-beam frame 2 and superposed main reinforcement fixing steel plate 1 at middle part
It is fixed.
A kind of processing method of tunnel grillage moulding bed, it is characterised in that: the processing method comprises the steps of:
1) prepare
According to the radian of grillage design, the i-beam frame 2 of length and width parameter processing identical parameters;According to grid
Shelf's design on arch bridge width, height, bar diameter process main reinforcement fixing steel plate 1;Suitable height and i-beam frame 2 are processed according to worker
Width produce moulding bed support frame 3;
2) surveying setting-out
With total station, setting-out goes out the temporary holding location of moulding bed support frame 3 on reinforcement yard ground, in i-beam frame 2
On according to 9 equal part of carry out of length, determine the fixation position of main reinforcement fixing steel plate 1;
3) moulding bed assembles
According to setting-out position, first in processing factory's ground fixing moulding bed structure support frame 3, then welded on moulding bed support frame 3
Fixed i-beam frame 2, finally according to the fixed main reinforcement fixing steel plate 1 of Along ent on i-beam frame 2, fixed point is fixed for each main reinforcement
Position 1 lower part of steel plate and 2 junction of i-beam frame, fixing means are spot welding consolidation;
4) moulding bed is checked
After being completed, fixation position of the main reinforcement fixing steel plate 1 on i-beam frame 2 is checked, after confirmation is qualified
To the spot welding position of main reinforcement fixing steel plate 1 and i-beam frame 2 again reinforcement of weld, the processing of moulding bed is completed.
Grille arch moulding bed provides very big help to the production of grillage, reduces the production difficulty of arch, Gong Renshi
Work is convenient, easy to operate, improves the quality of production and production efficiency, and the construction cost of saving achieves good effect.
Claims (5)
1. a kind of tunnel grillage moulding bed, by be located at lower part moulding bed support frame (3), positioned at middle part i-beam frame (2) and
Superposed main reinforcement fixing steel plate (1) composition;It is characterized by:
The main reinforcement fixing steel plate (1) on the top is processed to form same number according to the quantity and geometric dimension of grillage spacer bar
The main reinforcement locating slot (4) of amount, same parameter, the width of main reinforcement locating slot (4) are identical as the diameter of grillage main reinforcement;
The moulding bed support frame (3) is arranged one every a length according to the design length of grillage (5), sets 4~6 altogether.
2. grillage moulding bed according to claim 1, it is characterised in that: the i-beam frame (2) sets with grillage
The radian of meter, length and width parameter are identical.
3. grillage moulding bed according to claim 1, it is characterised in that: the main reinforcement fixing steel plate (1) is according to work
Word steelframe (2) length is divided into 7~11 sections of positioning, and totally 6~10.
4. grillage moulding bed according to claim 1 or 2 or 3, it is characterised in that: support frame as described above (3) is located at middle part
I-beam frame (2) and superposed main reinforcement fixing steel plate (1) between connection be welding.
5. a kind of processing method of tunnel grillage moulding bed, it is characterised in that: the processing method comprises the steps of:
1) prepare
According to the radian of grillage design, the i-beam frame (2) of length and width parameter processing identical parameters;According to grille arch
It sets up meter width, height, bar diameter and processes main reinforcement fixing steel plate (1);Suitable height and i-beam frame are processed according to worker
(2) width produces moulding bed support frame (3);
2) surveying setting-out
With total station, setting-out goes out the temporary holding location of moulding bed support frame (3) on reinforcement yard ground, in i-beam frame (2)
On according to progress (9) equal part of length, determine the fixation position of main reinforcement fixing steel plate (1);
3) moulding bed assembles
According to setting-out position, first in processing factory's ground fixing moulding bed structure support frame (3), then welded on moulding bed support frame (3)
Fixed i-beam frame (2) (fix main reinforcement fixing steel plate (1) according to Along ent on 2, fixed point is each main reinforcement in i-beam frame
Fixing steel plate (1) lower part and i-beam frame (2) junction, fixing means are spot welding consolidation;
4) moulding bed is checked
After being completed, fixation position of the main reinforcement fixing steel plate (1) on i-beam frame (2) is checked, after confirmation is qualified
To the spot welding position of main reinforcement fixing steel plate (1) and i-beam frame (2) again reinforcement of weld, the processing of moulding bed is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910611015.4A CN110242333A (en) | 2019-07-08 | 2019-07-08 | A kind of tunnel grillage moulding bed and its processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910611015.4A CN110242333A (en) | 2019-07-08 | 2019-07-08 | A kind of tunnel grillage moulding bed and its processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110242333A true CN110242333A (en) | 2019-09-17 |
Family
ID=67891360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910611015.4A Pending CN110242333A (en) | 2019-07-08 | 2019-07-08 | A kind of tunnel grillage moulding bed and its processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110242333A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111673007A (en) * | 2020-07-14 | 2020-09-18 | 中国十七冶集团有限公司 | Device for processing main ribs of grid arch center in shallow-buried excavation method construction |
CN112570865A (en) * | 2020-12-18 | 2021-03-30 | 涪特智能装备(重庆)有限公司 | Continuous welding production method and production line for grid type arch centering |
CN115781151A (en) * | 2022-10-26 | 2023-03-14 | 中铁九局集团第三建设有限公司 | Positioning die suitable for processing of grating arch frame |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101037860B1 (en) * | 2010-07-16 | 2011-05-31 | 이병택 | A assemble type mold construction structure for tunnel building |
CN203383835U (en) * | 2013-06-28 | 2014-01-08 | 中铁上海工程局有限公司 | Tunnel grille arch frame jig |
CN206732432U (en) * | 2017-04-16 | 2017-12-12 | 中铁三局集团有限公司 | Tunnel reinforcement centering processing mold |
CN207606458U (en) * | 2017-12-27 | 2018-07-13 | 中铁十二局集团有限公司 | A kind of tunnel grillage positioning mould for processing |
CN208528386U (en) * | 2018-04-23 | 2019-02-22 | 中铁十六局集团第二工程有限公司 | It is a kind of for making the positioning device of three limb arch of railway tunnel |
CN109707414A (en) * | 2018-12-29 | 2019-05-03 | 中铁五局集团有限公司 | A kind of adjustable grillage processing tool in tunnel |
CN210317347U (en) * | 2019-07-08 | 2020-04-14 | 云南省建设投资控股集团有限公司 | Tunnel grid bow member bed-jig |
-
2019
- 2019-07-08 CN CN201910611015.4A patent/CN110242333A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101037860B1 (en) * | 2010-07-16 | 2011-05-31 | 이병택 | A assemble type mold construction structure for tunnel building |
CN203383835U (en) * | 2013-06-28 | 2014-01-08 | 中铁上海工程局有限公司 | Tunnel grille arch frame jig |
CN206732432U (en) * | 2017-04-16 | 2017-12-12 | 中铁三局集团有限公司 | Tunnel reinforcement centering processing mold |
CN207606458U (en) * | 2017-12-27 | 2018-07-13 | 中铁十二局集团有限公司 | A kind of tunnel grillage positioning mould for processing |
CN208528386U (en) * | 2018-04-23 | 2019-02-22 | 中铁十六局集团第二工程有限公司 | It is a kind of for making the positioning device of three limb arch of railway tunnel |
CN109707414A (en) * | 2018-12-29 | 2019-05-03 | 中铁五局集团有限公司 | A kind of adjustable grillage processing tool in tunnel |
CN210317347U (en) * | 2019-07-08 | 2020-04-14 | 云南省建设投资控股集团有限公司 | Tunnel grid bow member bed-jig |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111673007A (en) * | 2020-07-14 | 2020-09-18 | 中国十七冶集团有限公司 | Device for processing main ribs of grid arch center in shallow-buried excavation method construction |
CN112570865A (en) * | 2020-12-18 | 2021-03-30 | 涪特智能装备(重庆)有限公司 | Continuous welding production method and production line for grid type arch centering |
CN112570865B (en) * | 2020-12-18 | 2023-09-15 | 涪特智能装备(重庆)有限公司 | Continuous welding production method and production line for grid type arch centering |
CN115781151A (en) * | 2022-10-26 | 2023-03-14 | 中铁九局集团第三建设有限公司 | Positioning die suitable for processing of grating arch frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110242333A (en) | A kind of tunnel grillage moulding bed and its processing method | |
CN103317292B (en) | Novel connecting and assembling jig and method for pipe flanges | |
CN205058277U (en) | Prefabricated T girder iron muscle mould | |
CN104070316B (en) | A kind of assembled group of welded H section steel is to device and using method thereof | |
CN104652284A (en) | Reverse splicing construction method for steel box girder | |
CN106271461A (en) | A kind of steel plate shear force wall packaging technology | |
CN201301520Y (en) | Prestressed beam drilling bellow positioning reinforced net | |
CN113718648A (en) | Special-shaped curve structure steel-concrete combined tower segment and manufacturing process | |
CN115319911A (en) | Digital production process of concrete prefabricated part with complex shape | |
CN111636303A (en) | Cross baseline control method for block assembly manufacturing of curved steel box structure | |
CN104028875B (en) | Aluminum electrolytic cell manufacturing method | |
CN210317347U (en) | Tunnel grid bow member bed-jig | |
CN110629782B (en) | Adjusting method of anchor bolt offline assembly device | |
CN104358251A (en) | Main reinforcement distance control device during pile foundation project reinforcement cage manufacturing and pile foundation project reinforcement cage manufacturing method | |
CN204825945U (en) | A fixture for fixing buried bolt in advance | |
CN111218991A (en) | Installation method of large embedded part | |
CN104196153B (en) | A kind of slab L-shaped steel plate shear force wall post and preparation method thereof | |
CN202527885U (en) | Pedestal for manufacturing framework of subway pipe piece | |
CN209850218U (en) | Reinforcing bar net piece welding and placing integrated frame | |
CN105798479A (en) | Length-unlimited continuous H structural steel production method | |
CN108457679A (en) | Grid steel frame, the assembled device of grid steel frame examination and grid steel frame production method | |
CN106583603A (en) | Manufacturing method for sprayed concrete reinforcing mesh and bracket used in manufacturing method | |
CN210621745U (en) | Foundation bolt fixing frame assembly | |
CN206839006U (en) | A kind of processing unit (plant) of bridge reinforcement cage transverse steel circle | |
CN113732626B (en) | Manufacturing method of X-shaped waist cylindrical structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|