CN104652284A - Reverse splicing construction method for steel box girder - Google Patents

Reverse splicing construction method for steel box girder Download PDF

Info

Publication number
CN104652284A
CN104652284A CN201510012261.XA CN201510012261A CN104652284A CN 104652284 A CN104652284 A CN 104652284A CN 201510012261 A CN201510012261 A CN 201510012261A CN 104652284 A CN104652284 A CN 104652284A
Authority
CN
China
Prior art keywords
steel box
splicing
girder
welding
box girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510012261.XA
Other languages
Chinese (zh)
Inventor
王涛
杨毅
唐绪好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASCG Co Ltd
Original Assignee
ASCG Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASCG Co Ltd filed Critical ASCG Co Ltd
Priority to CN201510012261.XA priority Critical patent/CN104652284A/en
Publication of CN104652284A publication Critical patent/CN104652284A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a reverse splicing construction method for a steel box girder. A reverse splicing method is adopted for splicing the steel box girder, a front jig frame of a bridge deck is manufactured according to parameters of a three-dimensional model diagram of the steel box girder, and workpieces of the steel box girder are reversely spliced on the front jig frame. The method comprises the following specific splicing steps: reversely splicing the bridge deck, piecewise spot-welding the bridge deck into a whole after the bridge deck is spliced, scribing the bridge deck to mark the workpiece positions of partition plates, webs, U-shaped ribs and a rib plate, splicing the middle web, the partition plates, the webs on the two sides and the U-shaped ribs, splicing a bridge bottom plate, and finally splicing the rib plate; after the workpieces are spliced, piecewise performing weld reinforcement treatment on the steel box girder. According to the method, an upward splicing manner for the workpieces is replaced by a downward splicing manner, and overhead welding is replaced by flat welding, so that the splicing and welding working efficiency of the steel box girder is improved, and the labor intensity of a technical worker is reduced.

Description

The anti-assembling and construction method of steel box-girder
Technical field
The present invention relates to steel box-girder and make field, specifically belong to the anti-assembling and construction method of steel box-girder.
Background technology
Present steel box girder assembling adopts positive spelling, and assembled step is: make fetal membrane-bridge base plate-dividing plate-web-bridge deck-U-shaped rib-floor, assembled complete carry out welding, the operation such as anticorrosion, installation.The general base plate of width of bridge is less than panel, forms web outward-dipping, and middle every 2 ~ 4m has membrane support, the large inefficiency of the assembled difficulty of web; Bridge deck lower plane generally arranges 8 ~ 15 U-shaped ribs in road, causes U-shaped rib upwards assembled, the large inefficiency of assembled difficulty.Bridge weld seam 30% ~ 40% is overhead welding, and speed of welding is slow, ratio of defects is high, requires welder technology higher level and labour intensity is large.
Summary of the invention
The object of this invention is to provide the anti-assembling and construction method of a kind of steel box-girder, on moulding bed assembled for first base plate rear board change first panel into after base plate assembled, overhead welding is changed into downhand welding, improves the operating efficiency of steel box girder assembling and welding, reduce the labour intensity of skilled worker.
Technical scheme of the present invention is as follows:
Steel box girder assembling adopts anti-spelling, the front moulding bed of bridge deck is made according to steel box-girder threedimensional model graph parameter, anti-workpiece of spelling steel box-girder on the moulding bed of front, its concrete assembled step is: elder generation is counter spells bridge deck, assembledly bridge deck waypoint is welded into entirety, at bridge floor lining out afterwards: the location of workpiece marking dividing plate, web, U-shaped rib, floor, more assembled median ventral plate, dividing plate, both sides web, U-shaped rib, then assembled bridge base plate, last assembled floor; Assembled complete after each section of steel box-girder carry out weld seam consolidation process, then carry out full-bridge and formally weld, weld according to the welding sequence of downhand welding after first vertical position welding, first intermediate and then both sides; Steel box-girder lifting is stood up, then welds remaining downhand welding.
After described downhand welding completes, carry out the operation constructions such as anticorrosion, installation.
The present invention changes into upwards assembled for workpiece assembled downwards, overhead welding is changed into downhand welding, improves the operating efficiency of steel box girder assembling and welding, reduce the labour intensity of skilled worker.Make a 320t steel box-girder, U-shaped rib from top assembled become bottom assembled, save artificial 20 work days, former overhead welding becomes downhand welding, saves artificial 65 work days, reduces the labour intensity of skilled worker simultaneously.
Accompanying drawing explanation
Fig. 1 is assembled schematic diagram of the present invention.
Detailed description of the invention
According to equipment capability and the road transport condition of factory, steel box-girder is sectional making in factory, after integral assembling acceptance(check), disintegrates and transports erecting bed to, and segmentation erection is spliced into entirety.See accompanying drawing, steel box girder assembling adopts anti-spelling, the front moulding bed 6 of bridge deck is made according to steel box-girder threedimensional model graph parameter, anti-workpiece of spelling steel box-girder on the moulding bed of front, its concrete assembled step is: first instead spell bridge deck 1, assembledly rear bridge deck 1 waypoint is welded into entirety, bridge deck 1 are rule: the location of workpiece marking dividing plate 2, web 3, U-shaped rib 4, floor 5, assembled median ventral plate, dividing plate, both sides web, U-shaped rib again, then assembled bridge base plate, last assembled floor; Assembled complete after each section of steel box-girder carry out weld seam consolidation process, then carry out full-bridge and formally weld, weld according to the welding sequence of downhand welding after first vertical position welding, first intermediate and then both sides; Steel box-girder lifting is stood up, then welds remaining downhand welding, after downhand welding completes, carries out the operation constructions such as anticorrosion, installation.

Claims (2)

1. the anti-assembling and construction method of steel box-girder, it is characterized in that, the front moulding bed of bridge deck is made according to steel box-girder threedimensional model graph parameter, anti-workpiece of spelling steel box-girder on the moulding bed of front, its concrete assembled step is: first instead spells bridge deck, assembledly rear bridge deck waypoint is welded into entirety, at bridge floor lining out: the location of workpiece marking dividing plate, web, U-shaped rib, floor, assembled median ventral plate, dividing plate, both sides web, U-shaped rib again, then assembled bridge base plate, last assembled floor; Assembled complete after each section of steel box-girder carry out weld seam consolidation process, then carry out full-bridge and formally weld, weld according to the welding sequence of downhand welding after first vertical position welding, first intermediate and then both sides; Steel box-girder lifting is stood up, then welds remaining downhand welding.
2. the anti-assembling and construction method of steel box-girder according to claim 1, is characterized in that, after described downhand welding completes, carries out the operation constructions such as anticorrosion, installation.
CN201510012261.XA 2015-01-09 2015-01-09 Reverse splicing construction method for steel box girder Pending CN104652284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510012261.XA CN104652284A (en) 2015-01-09 2015-01-09 Reverse splicing construction method for steel box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510012261.XA CN104652284A (en) 2015-01-09 2015-01-09 Reverse splicing construction method for steel box girder

Publications (1)

Publication Number Publication Date
CN104652284A true CN104652284A (en) 2015-05-27

Family

ID=53243880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510012261.XA Pending CN104652284A (en) 2015-01-09 2015-01-09 Reverse splicing construction method for steel box girder

Country Status (1)

Country Link
CN (1) CN104652284A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702902B (en) * 2015-11-18 2018-12-14 上海宝冶集团有限公司 Docking grafting construction method for hanging is put down between a kind of bridge steel box girder segment
CN110170799A (en) * 2019-06-04 2019-08-27 上海绿地建筑钢结构有限公司 Steel box-girder manufacture craft
CN110205947A (en) * 2019-07-06 2019-09-06 中铁二十五局集团第五工程有限公司 A kind of overline bridge steel box girder construction method
CN110258288A (en) * 2019-05-07 2019-09-20 中交一公局桥隧工程有限公司 Steel box-girder and steel box-girder processing method
CN110541349A (en) * 2019-09-06 2019-12-06 中国五冶集团有限公司 Space curved surface special-shaped steel box girder bridge section and accurate welding processing forming method thereof
CN111560855A (en) * 2020-05-25 2020-08-21 武船重型工程股份有限公司 Construction method of orthotropic steel bridge
CN111790995A (en) * 2020-05-17 2020-10-20 北京市政建设集团有限责任公司 Construction process for welding steel beam
CN112536542A (en) * 2020-12-11 2021-03-23 洛阳豫安金属结构有限公司 Manufacturing method of ramp steel box girder
CN112719795A (en) * 2020-12-17 2021-04-30 江苏恒睿杰钢结构工程有限公司 Manufacturing method of large steel box girder
CN114164770A (en) * 2022-02-10 2022-03-11 中铁山桥(南通)有限公司 Assembling method for forward and reverse combination of ultra-wide framing steel box girder

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0160824B1 (en) * 1995-07-24 1998-12-15 윤원석 Successive assembly method of box girder for steel plate bridge
CN201172796Y (en) * 2008-04-03 2008-12-31 长安大学 Steel box beam bridge deck structure with longitudinal ribs on
CN102814592A (en) * 2011-06-08 2012-12-12 大连船舶重工集团装备制造有限公司 Welding precision control design of large-scale steel structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0160824B1 (en) * 1995-07-24 1998-12-15 윤원석 Successive assembly method of box girder for steel plate bridge
CN201172796Y (en) * 2008-04-03 2008-12-31 长安大学 Steel box beam bridge deck structure with longitudinal ribs on
CN102814592A (en) * 2011-06-08 2012-12-12 大连船舶重工集团装备制造有限公司 Welding precision control design of large-scale steel structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
方键等: "沈阳南站市政交通工程钢箱梁制作技术", 《钢结构》 *
郑成浩等: "韩国仁川二桥钢箱梁分段反装法探究", 《’2013中国钢结构行业大会论文集》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702902B (en) * 2015-11-18 2018-12-14 上海宝冶集团有限公司 Docking grafting construction method for hanging is put down between a kind of bridge steel box girder segment
CN110258288A (en) * 2019-05-07 2019-09-20 中交一公局桥隧工程有限公司 Steel box-girder and steel box-girder processing method
CN110170799A (en) * 2019-06-04 2019-08-27 上海绿地建筑钢结构有限公司 Steel box-girder manufacture craft
CN110205947A (en) * 2019-07-06 2019-09-06 中铁二十五局集团第五工程有限公司 A kind of overline bridge steel box girder construction method
CN110541349A (en) * 2019-09-06 2019-12-06 中国五冶集团有限公司 Space curved surface special-shaped steel box girder bridge section and accurate welding processing forming method thereof
CN111790995A (en) * 2020-05-17 2020-10-20 北京市政建设集团有限责任公司 Construction process for welding steel beam
CN111560855A (en) * 2020-05-25 2020-08-21 武船重型工程股份有限公司 Construction method of orthotropic steel bridge
CN112536542A (en) * 2020-12-11 2021-03-23 洛阳豫安金属结构有限公司 Manufacturing method of ramp steel box girder
CN112719795A (en) * 2020-12-17 2021-04-30 江苏恒睿杰钢结构工程有限公司 Manufacturing method of large steel box girder
CN114164770A (en) * 2022-02-10 2022-03-11 中铁山桥(南通)有限公司 Assembling method for forward and reverse combination of ultra-wide framing steel box girder
CN114164770B (en) * 2022-02-10 2022-04-29 中铁山桥(南通)有限公司 Assembling method for forward and reverse combination of ultra-wide framing steel box girder

Similar Documents

Publication Publication Date Title
CN104652284A (en) Reverse splicing construction method for steel box girder
CN107059626A (en) A kind of rapid constructing method of the horizontal piecemeal longitudinal divisionses of overhead road of city steel box girder bridge
CN102240863B (en) Method for welding box-shaped column
CN103132649A (en) Steel box girder matched with cellular steel web plate
CN204781322U (en) Steel core concrete column and outsourcing U -shaped steel -concrete composite beam connected node
CN202380391U (en) Separation type intermediate crossbeam block structure for steel box girder
CN111058367B (en) Oval box girder and manufacturing method thereof
CN104018429B (en) A kind of soft base place semi girder straightway construction bracket system and erection method thereof
CN103321324A (en) Truss nodal region super-thick steel plate wall and building method thereof
CN103321302B (en) Complex welded steel tube support node including prestressed cable and assembling method thereof
CN104028875B (en) Aluminum electrolytic cell manufacturing method
CN109317911A (en) A kind of cross column welding production line
CN104607815A (en) Method for manufacturing and controlling camber of crane main girder
CN105414892A (en) Method for welding and manufacturing H-shaped steel with cellular holes in web through ship position model
CN203640122U (en) Node structure of elevation difference of floor carrier plates of rebar trusses
CN110562387A (en) construction method of floating oil storage platform pipe bundle unit
CN102888989B (en) Technology for processing complex irregularly-shaped honeycomb steel frame joints and steel frame joints
CN102839671A (en) Concrete supporting reinforced cage prefabricated assembling technology and construction method
CN108544260A (en) One kind being based on ship Numerical control cutting plate platform and its application method
CN208067827U (en) One kind being based on ship Numerical control cutting plate platform
CN204235053U (en) Yi word pattern steel pipe bundle structural elements automatic turning device
CN204321594U (en) The automated production equipment of steel pipe bundle combining structure component
CN203863275U (en) Die frame for welding embedded bolts of railway box girder
CN204876088U (en) High ductility beam column node of prefabricated assembled of box post - I -beam
CN205242849U (en) A interim shaped steel stand for supporting lid digs board and props

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150527