CN109707414A - A kind of adjustable grillage processing tool in tunnel - Google Patents

A kind of adjustable grillage processing tool in tunnel Download PDF

Info

Publication number
CN109707414A
CN109707414A CN201811637519.5A CN201811637519A CN109707414A CN 109707414 A CN109707414 A CN 109707414A CN 201811637519 A CN201811637519 A CN 201811637519A CN 109707414 A CN109707414 A CN 109707414A
Authority
CN
China
Prior art keywords
steel plate
grillage
adjustable
tool
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811637519.5A
Other languages
Chinese (zh)
Inventor
刘治勃
雷建华
苏桂杰
王金宝
杨悦
谢三镇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau, China Railway No 5 Engineering Group Co Ltd filed Critical Mechanization Engineering Co Ltd Of Group Of Zhongtie No5 Bureau
Priority to CN201811637519.5A priority Critical patent/CN109707414A/en
Publication of CN109707414A publication Critical patent/CN109707414A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses one kind to process structure for grid steel frame in railway, Optimization of Expressway Tunnel Construction.Every Pin grillage is composed of multiple units (3 A units, 2 unit Bs, 2 C cells, 2 D units, 1 E unit), each unit junction is connected using junction steel plate (angle steel), each unit is individual Adjustable tool, and fixing tool (1) that Adjustable tool is pre-set by bottom, adjustable fixation steel plate (2), junction steel plate (3), vertical steel plate (4), grillage fixing steel plate (5), connection bolt (6) form.The present invention can effectively solve the processing of existing arch tooling take a lot of work, be time-consuming, the phenomenon that labor intensity of workers is big, reduce place and waste of material, reduce construction cost.

Description

A kind of adjustable grillage processing tool in tunnel
Technical field
The present invention relates to a kind of tunnel grillage processing unit (plant)s, are related to the tunnel constructions such as highway, railway, municipal administration.
Background technique
Currently, with railway, highway, the raising of railway construction standard and difficulty of construction increasing, mountain tunnel institute accounting Weight is larger.The main deficiency of profile steel frame used by previous has:
1, fashioned iron quality is big, processing when consumptive material it is big, it is at high cost;
2, processing profile steel frame needs the large scale equipments such as fashioned iron bending machine, plate shearing machine, takes up an area larger.
3, profile steel frame is set up difficult, be not easy with excavation face it is closely connected, it is easy to form behind in profile steel frame after gunite concrete Cavity, gunite concrete leakiness.
And grillage light weight is used, installation speed is fast, and steel using amount is few, can be mixed with injection well using grillage Solidifying soil good combination, cooperative bearing, and stress is small, stress distribution is uniform.When tunnel's entrance and exit is provided with station, interchange area When, tunnel cross-section widens variation frequently, when country rock is poor, causes grillage processing quantity more, and tooling transformation frequently, processes At rear stacking tooling occupied ground, larger, waste of material, cost payout increase.
Summary of the invention
Technical problem solved by the present invention is grillage processing quantity is more, tooling transformation frequently, is stacked after processing is completed The problem of tooling occupied ground is larger and waste of material.
In order to solve the technical problem, the present invention takes following technical scheme:
1. grillage processing tool is adjusted for tunnel in one kind, it is characterised in that: every Pin grillage is by multiple lists Member composition, each unit are individual Adjustable tool, fixing tool (1) that Adjustable tool is pre-set by bottom, can Adjust fixation steel plate (2), junction steel plate (3), vertical steel plate (4), grillage fixing steel plate (5), connection bolt (6) composition.
2. adjustable grillage processing tool device according to claim 1, pre-set fixing tool (1) Bent using I-steel according to standard section radian, be adjusted fixation steel plate (2), junction steel plate (3), vertical steel plate (4), Fixing steel plate (5) and adjustable fixation steel plate (2) and pre-set fixing tool (1) are soldered to the wing plate on I-steel both sides On, vertical steel plate (4) lower edge and fixing connection steel plate (3) using groove welding solder type at " T " font, on vertical steel plate (4) Edge and (5) three face of grillage fixing steel plate are welded, and thereafter, fixing connection steel plate (4) and adjustable fixation steel plate pass through spiral shell It tethers and connects.
3. grillage Adjustable tool apparatus structure in tunnel according to claim 1, it is characterised in that: grille arch Frame Adjustable tool bottom fixing tool (1) is bent using I-steel according to set radian, should be noted that value is widened in tunnel when bending Different situations, fixedly adjustable section steel plate length control thereon (prevents from toppling) within 50~70cm, fluting, slot in the middle part of steel plate Mouth width degree 3cm, mobile convenient for top tool, grillage fixing steel plate (5) considers processing size, arch master according to design size Muscle position grooving, notch width are greater than arch main reinforcement diameter+1cm and are advisable, and in order to arch taking-up, the above material takes on the spot Material, for grillage of the same race, it is only necessary to process a set of standard frock can solve difference widen value section grillage processing, It saves place, reduce waste of material, reduce labour cost, can effectively reduce cost payout.
4. tunnel grillage according to claim 2 processes Adjustable tool device, it is characterised in that: tunnel lattice Grid arch Adjustable tool bottom fixing tool (1) is placed directly on processed ground, and fixation steel plate (2) spot welding is adjusted On fixing tool, fluting in the middle part of fixation steel plate is adjusted, slotting length is width 3cm at steel plate edge 10cm;It connects thereon Steel plate (3) and vertical steel plate (4) are welded into T-shape structure, position auger shell bolt of the junction steel plate at the 5cm~10cm of end Hole, vertical steel plate (4) and grillage fixing steel plate side are welded, and shape is integral, thereafter according to the radius of design requirement, arc The long position determined on adjustable fixation steel plate (2), marking, then junction steel plate (3) and I-steel top are adjustable solid Determine steel plate (2) and be connected by screw bolts simultaneously fixation, completes tooling adjustment.
Beneficial effects of the present invention:
Every kind of lining section widens value according to difference and only needs to process a set of Adjustable tool, reaches and saves material, reduces The purpose of cost.This is reasonable in design, simple and practical, easy to operate, gathers materials on the spot, and lining section difference of the same race widens value Arch processing, which only needs to process a set of Adjustable tool, can be solved, can effectively solve existing arch tooling processing take a lot of work, be time-consuming, work The phenomenon that people's large labor intensity, reduces place and waste of material, reduces construction cost.
Detailed description of the invention
Fig. 1 is 1 Pin grid steel frame unit merogenesis schematic diagram;
Fig. 2 is adjustable grid steel frame tooling cell floor plan;
Fig. 3 is adjustable grid steel frame unit tooling sectional view.
Specific embodiment
With reference to the accompanying drawing and the present invention is described further in specific embodiment.
The embodiment of the present invention:
Every Pin grillage is composed of multiple units, and each unit is individual Adjustable tool, and Adjustable tool is the bottom of by Fixing tool (1) that portion is pre-set, adjustable fixation steel plate (2), junction steel plate (3), vertical steel plate (4), grillage Fixing steel plate (5), connection bolt (6) composition.
Pre-set fixing tool (1) is bent using I-steel according to standard section radian, and fixed steel is adjusted Plate (2), junction steel plate (3), vertical steel plate (4), fixing steel plate (5) and adjustable fixation steel plate (2) and pre-set fixation Tooling (1) is soldered on the wing plate on I-steel both sides, and vertical steel plate (4) lower edge and fixing connection steel plate (3) use groove welding Solder type is welded at " T " font, vertical steel plate (4) top edge and (5) three face of grillage fixing steel plate, thereafter, is fixedly connected Steel plate (4) is bolted with adjustable fixation steel plate.
Grillage Adjustable tool bottom fixing tool (1) is bent using I-steel according to set radian, is needed when bending Noticing that the different situations of value are widened in tunnel, fixedly adjustable section steel plate length control (prevents from toppling) within 50~70cm thereon, Fluting in the middle part of steel plate, width of rebate 3cm is mobile convenient for top tool, and grillage fixing steel plate (5) considers according to design size Size, arch main reinforcement position grooving are processed, notch width is greater than arch main reinforcement diameter+1cm and is advisable, in order to which arch takes out, with Upper material is gathered materials on the spot, for grillage of the same race, it is only necessary to which difference can be solved to widen value disconnected by processing a set of standard frock Grillage processing in face saves place, reduces waste of material, reduces labour cost, can effectively reduce cost payout.
Tunnel grillage Adjustable tool bottom fixing tool (1) is placed directly on processed ground, is adjusted Fixation steel plate (2) point is welded on fixing tool, be adjusted fixation steel plate in the middle part of fluting, slotting length be steel plate edge 10cm at, Width 3cm;Junction steel plate (3) and vertical steel plate (4) are welded into T-shape structure thereon, and junction steel plate is apart from end 5cm~10cm The position drill bolt hole at place, vertical steel plate (4) and grillage fixing steel plate side are welded, and shape is integral, thereafter according to setting Count desired radius, arc length determines position on adjustable fixation steel plate (2), marking, then junction steel plate (3) and I-shaped Fixation steel plate (2) are adjusted at the top of steel and are connected by screw bolts simultaneously fixation, complete tooling adjustment.
Adjustable grid steel frame processes construction method, method includes the following steps:
(1) it counts first and determines that entire tunnel or the identical lining style difference in several tunnels widen value section and (widen value 0 ~140cm), the corresponding grid steel frame model (such as H130, H150, H180, H230) of lining style is chosen according to design, accordingly The type processed required for selection determines that difference is widened among value and widens value as standard section.
(2) excavation method is determined according to design drawing or surrounding rock type, determines steelframe unit merogenesis unit, processing unit can It is decomposed into 3 A units, 2 unit Bs, 2 C cells, 2 D units, 1 E unit, same unit only processes a set of adjustable work Dress.
(3) live material and great preparation: I-steel steel plate, forming mill, welding rod, bolt etc..
(4) I16 I-steel can be used in bottom fixing tool, according to unit merogenesis length, is bent into scheduled unit radian.
(5) processing of 2cm thick steel plate, the fixed steel of crossbeam can be used in lateral fixation steel plate, connection steel and vertical fixation steel plate Plate 2 700~850mm of length, width 200mm, centre fluting, width of rebate 20mm, length to steel plate edge are reserved at 100mm.
(6) lateral fixation steel plate 2 is welded on fixed at the top of I16 I-steel wing plates on two sides using groove welding.
(7) junction steel plate 3 and vertical steel plate 4, which weld, forms T-shape, drill bolt hole on lateral steel plate 3, diameter phi 24mm, Convenient for being bolted lateral connection steel plate 3 and fixation steel plate 2.
(8) processing grid steel frame reinforcing bar main reinforcement limits steel plate 5, and steel plate top and middle part are opened according to grid steel frame main reinforcement size Slot, using bar diameter+2cm as standard, limit steel plate 5 is welded with T-type fixation steel plate main reinforcement position otch size after processing is completed It connects to form entirety.
(9) bolt 6 is used, lateral fixation steel plate 2 is connected with lateral connection steel plate 3 below T-steel plate and forms a unit 3 groups of processing tools are arranged in tooling, each unit, and 1 Pin arch merogenesis need to individually process unit work when being five units of A, B, C, D, E Fill 5 sets of compositions.
(10) in set Working position, bottom I16 I-steel tooling two sides are fixed on using reinforcing bar, according to required processing lattice Grid arch size, adjustment lateral connection steel plate and lateral fixation steel plate position, reach and enter the processing of unit tooling after telling somebody what one's real intentions are size Program.
(11) it is inserted into grid main reinforcement in limit steel plate 5, temporary spot-welded " 8 " word muscle, " mouth " word muscle etc. are processed respectively Complete 1 Pin unit grid steel frame.
(12) manual work makes grid reinforcing bar be detached from tooling notch, hangs out machined cell using processing factory's gantry crane Grid are spare, continue other same unit grid processing, other unit grids are processed using corresponding tooling.
(10) (11) step is repeated, examination spelling in the venue after 1 Pin grid steel frame is completed the process, it is complete after meeting specification error It is welded at unit grillage, starts mass production.

Claims (4)

1. grillage processing tool is adjusted for tunnel in one kind, it is characterised in that: every Pin grillage is by multiple unit groups It is individual Adjustable tool at, each unit, it is fixing tool (1) that Adjustable tool is pre-set by bottom, adjustable Fixation steel plate (2), junction steel plate (3), vertical steel plate (4), grillage fixing steel plate (5), connection bolt (6) composition.
2. adjustable grillage processing tool device according to claim 1, pre-set fixing tool (1) is used I-steel is bent according to standard section radian, and fixation steel plate (2), junction steel plate (3), vertical steel plate (4), positioning is adjusted Steel plate (5) and adjustable fixation steel plate (2) and pre-set fixing tool (1) are soldered on the wing plate on I-steel both sides, are erected To steel plate (4) lower edge and fixing connection steel plate (3) using groove welding solder type at " T " font, vertical steel plate (4) top edge with The welding of (5) three face of grillage fixing steel plate, thereafter, fixing connection steel plate (4) is bolted with adjustable fixation steel plate.
3. grillage Adjustable tool apparatus structure in tunnel according to claim 1, it is characterised in that: grillage can It adjusts tooling bottom fixing tool (1) to bend using I-steel according to set radian, should be noted that value is widened not in tunnel when bending Same situation, fixedly adjustable section steel plate length control (prevents from toppling) within 50~70cm thereon, fluting, slot opening in the middle part of steel plate 3cm is spent, mobile convenient for top tool, grillage fixing steel plate (5) considers processing size, arch main reinforcement position according to design size Grooving is set, notch width is greater than arch main reinforcement diameter+1cm.
4. tunnel grillage according to claim 2 processes Adjustable tool device, it is characterised in that: tunnel grille arch Frame Adjustable tool bottom fixing tool (1) is placed directly on processed ground, and adjustable fixation steel plate (2) point is welded in solid Determine in tooling, fluting in the middle part of fixation steel plate is adjusted, slotting length is width 3cm at steel plate edge 10cm;Junction steel plate thereon (3) T-shape structure is welded into vertical steel plate (4), position drill bolt hole of the junction steel plate at the 5cm~10cm of end is erected It is welded to steel plate (4) and grillage fixing steel plate side, shape is integral, true according to the radius of design requirement, arc length thereafter Surely then fixed steel is adjusted at the top of junction steel plate (3) and I-steel in the position on adjustable fixation steel plate (2), marking Plate (2) is connected by screw bolts and fixation, completes tooling adjustment.
CN201811637519.5A 2018-12-29 2018-12-29 A kind of adjustable grillage processing tool in tunnel Pending CN109707414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811637519.5A CN109707414A (en) 2018-12-29 2018-12-29 A kind of adjustable grillage processing tool in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811637519.5A CN109707414A (en) 2018-12-29 2018-12-29 A kind of adjustable grillage processing tool in tunnel

Publications (1)

Publication Number Publication Date
CN109707414A true CN109707414A (en) 2019-05-03

Family

ID=66259738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811637519.5A Pending CN109707414A (en) 2018-12-29 2018-12-29 A kind of adjustable grillage processing tool in tunnel

Country Status (1)

Country Link
CN (1) CN109707414A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242333A (en) * 2019-07-08 2019-09-17 云南省建设投资控股集团有限公司 A kind of tunnel grillage moulding bed and its processing method
CN115108292A (en) * 2022-01-21 2022-09-27 浙江交工金筑交通建设有限公司 Automatic turning device for steel arch frame machining

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073697A (en) * 1998-08-28 2000-03-07 Kumagai Gumi Co Ltd Leg pile method
CN203383835U (en) * 2013-06-28 2014-01-08 中铁上海工程局有限公司 Tunnel grille arch frame jig
CN206732025U (en) * 2017-03-23 2017-12-12 中建五局土木工程有限公司 Grid steel frame processing unit (plant)
CN207205644U (en) * 2017-05-22 2018-04-10 中国铁建大桥工程局集团有限公司 A kind of bow member connecting plate welded limiting device
CN207668781U (en) * 2017-11-29 2018-07-31 中铁五局集团第四工程有限责任公司 A kind of adjustable grating steelframe processing mold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073697A (en) * 1998-08-28 2000-03-07 Kumagai Gumi Co Ltd Leg pile method
CN203383835U (en) * 2013-06-28 2014-01-08 中铁上海工程局有限公司 Tunnel grille arch frame jig
CN206732025U (en) * 2017-03-23 2017-12-12 中建五局土木工程有限公司 Grid steel frame processing unit (plant)
CN207205644U (en) * 2017-05-22 2018-04-10 中国铁建大桥工程局集团有限公司 A kind of bow member connecting plate welded limiting device
CN207668781U (en) * 2017-11-29 2018-07-31 中铁五局集团第四工程有限责任公司 A kind of adjustable grating steelframe processing mold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242333A (en) * 2019-07-08 2019-09-17 云南省建设投资控股集团有限公司 A kind of tunnel grillage moulding bed and its processing method
CN115108292A (en) * 2022-01-21 2022-09-27 浙江交工金筑交通建设有限公司 Automatic turning device for steel arch frame machining
CN115108292B (en) * 2022-01-21 2023-06-20 浙江交工金筑交通建设有限公司 Automatic turning device of steel arch processing

Similar Documents

Publication Publication Date Title
CN104785683B (en) Reinforcement cage construction technology using vertical full-annular-direction positioning jig frame device of large-diameter pile foundation reinforcement cage
CN105804093B (en) Prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain and its construction method
CN109707414A (en) A kind of adjustable grillage processing tool in tunnel
CN206986719U (en) A kind of bridge floor anti-collision wall reinforcing bar positioning installation apparatus
CN110918838A (en) Spatial three-dimensional reinforcing mesh flexible manufacturing production line and production process thereof
CN208068549U (en) A kind of prefabricated piping lane segment framework of steel reinforcement installation molding bed rack
CN202577338U (en) Tower crane pedestal and steel cushion cap connecting device
CN211447772U (en) Turnover concrete separating device
CN110629782B (en) Adjusting method of anchor bolt offline assembly device
CN210880205U (en) Movable common steel bar positioning device for prefabricated T-shaped beam and small box girder
CN201712492U (en) Fixing structure of contact network in tunnel
CN207974833U (en) A kind of concrete column and the branch-cut bridge section big cross section grid paving structure that punches
CN207314523U (en) A kind of Novel steel-mixed bean column node constructing structure
CN106049286A (en) Integral lifting and installation construction method for prefabricated temporary steel pipe brackets
CN113700489A (en) Coal mine bottom suction roadway rapid tunneling construction process
CN206418817U (en) A kind of assembled arch steel machining shed
CN209025461U (en) A kind of Assembled universal reinforcing bar positioning tool
CN210369038U (en) Prefabricated steel reinforcement cage
CN211395731U (en) Foundation bolt off-line assembly device
CN104929656B (en) Tunnel first lining structure construction method
CN208251112U (en) A kind of detachable structural steel combination crown beam
CN207846878U (en) Positioning set for the cast-in-place medium-sized girder steel of small bore girder with rolled steel section en cased in concrete
CN206034428U (en) SMW worker method stake shaped steel positioning die
CN214264497U (en) Box culvert steel bar welding bed-jig
CN201406837Y (en) Device for positioning wall column template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 550003 No. 23, jujube Road, Yunyan District, Guizhou, Guiyang

Applicant after: CHINA RAILWAY NO.5 ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY NO.5 ENGINEERING GROUP MECHANICAL ENGINEERING CO.,LTD.

Address before: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Applicant before: CHINA RAILWAY NO.5 ENGINEERING GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY NO.5 ENGINEERING GROUP MECHANICAL ENGINEERING CO.,LTD.

CB02 Change of applicant information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503

RJ01 Rejection of invention patent application after publication