Background technique
Currently, with railway, highway, the raising of railway construction standard and difficulty of construction increasing, mountain tunnel institute accounting
Weight is larger.The main deficiency of profile steel frame used by previous has:
1, fashioned iron quality is big, processing when consumptive material it is big, it is at high cost;
2, processing profile steel frame needs the large scale equipments such as fashioned iron bending machine, plate shearing machine, takes up an area larger.
3, profile steel frame is set up difficult, be not easy with excavation face it is closely connected, it is easy to form behind in profile steel frame after gunite concrete
Cavity, gunite concrete leakiness.
And grillage light weight is used, installation speed is fast, and steel using amount is few, can be mixed with injection well using grillage
Solidifying soil good combination, cooperative bearing, and stress is small, stress distribution is uniform.When tunnel's entrance and exit is provided with station, interchange area
When, tunnel cross-section widens variation frequently, when country rock is poor, causes grillage processing quantity more, and tooling transformation frequently, processes
At rear stacking tooling occupied ground, larger, waste of material, cost payout increase.
Summary of the invention
Technical problem solved by the present invention is grillage processing quantity is more, tooling transformation frequently, is stacked after processing is completed
The problem of tooling occupied ground is larger and waste of material.
In order to solve the technical problem, the present invention takes following technical scheme:
1. grillage processing tool is adjusted for tunnel in one kind, it is characterised in that: every Pin grillage is by multiple lists
Member composition, each unit are individual Adjustable tool, fixing tool (1) that Adjustable tool is pre-set by bottom, can
Adjust fixation steel plate (2), junction steel plate (3), vertical steel plate (4), grillage fixing steel plate (5), connection bolt (6) composition.
2. adjustable grillage processing tool device according to claim 1, pre-set fixing tool (1)
Bent using I-steel according to standard section radian, be adjusted fixation steel plate (2), junction steel plate (3), vertical steel plate (4),
Fixing steel plate (5) and adjustable fixation steel plate (2) and pre-set fixing tool (1) are soldered to the wing plate on I-steel both sides
On, vertical steel plate (4) lower edge and fixing connection steel plate (3) using groove welding solder type at " T " font, on vertical steel plate (4)
Edge and (5) three face of grillage fixing steel plate are welded, and thereafter, fixing connection steel plate (4) and adjustable fixation steel plate pass through spiral shell
It tethers and connects.
3. grillage Adjustable tool apparatus structure in tunnel according to claim 1, it is characterised in that: grille arch
Frame Adjustable tool bottom fixing tool (1) is bent using I-steel according to set radian, should be noted that value is widened in tunnel when bending
Different situations, fixedly adjustable section steel plate length control thereon (prevents from toppling) within 50~70cm, fluting, slot in the middle part of steel plate
Mouth width degree 3cm, mobile convenient for top tool, grillage fixing steel plate (5) considers processing size, arch master according to design size
Muscle position grooving, notch width are greater than arch main reinforcement diameter+1cm and are advisable, and in order to arch taking-up, the above material takes on the spot
Material, for grillage of the same race, it is only necessary to process a set of standard frock can solve difference widen value section grillage processing,
It saves place, reduce waste of material, reduce labour cost, can effectively reduce cost payout.
4. tunnel grillage according to claim 2 processes Adjustable tool device, it is characterised in that: tunnel lattice
Grid arch Adjustable tool bottom fixing tool (1) is placed directly on processed ground, and fixation steel plate (2) spot welding is adjusted
On fixing tool, fluting in the middle part of fixation steel plate is adjusted, slotting length is width 3cm at steel plate edge 10cm;It connects thereon
Steel plate (3) and vertical steel plate (4) are welded into T-shape structure, position auger shell bolt of the junction steel plate at the 5cm~10cm of end
Hole, vertical steel plate (4) and grillage fixing steel plate side are welded, and shape is integral, thereafter according to the radius of design requirement, arc
The long position determined on adjustable fixation steel plate (2), marking, then junction steel plate (3) and I-steel top are adjustable solid
Determine steel plate (2) and be connected by screw bolts simultaneously fixation, completes tooling adjustment.
Beneficial effects of the present invention:
Every kind of lining section widens value according to difference and only needs to process a set of Adjustable tool, reaches and saves material, reduces
The purpose of cost.This is reasonable in design, simple and practical, easy to operate, gathers materials on the spot, and lining section difference of the same race widens value
Arch processing, which only needs to process a set of Adjustable tool, can be solved, can effectively solve existing arch tooling processing take a lot of work, be time-consuming, work
The phenomenon that people's large labor intensity, reduces place and waste of material, reduces construction cost.
Specific embodiment
With reference to the accompanying drawing and the present invention is described further in specific embodiment.
The embodiment of the present invention:
Every Pin grillage is composed of multiple units, and each unit is individual Adjustable tool, and Adjustable tool is the bottom of by
Fixing tool (1) that portion is pre-set, adjustable fixation steel plate (2), junction steel plate (3), vertical steel plate (4), grillage
Fixing steel plate (5), connection bolt (6) composition.
Pre-set fixing tool (1) is bent using I-steel according to standard section radian, and fixed steel is adjusted
Plate (2), junction steel plate (3), vertical steel plate (4), fixing steel plate (5) and adjustable fixation steel plate (2) and pre-set fixation
Tooling (1) is soldered on the wing plate on I-steel both sides, and vertical steel plate (4) lower edge and fixing connection steel plate (3) use groove welding
Solder type is welded at " T " font, vertical steel plate (4) top edge and (5) three face of grillage fixing steel plate, thereafter, is fixedly connected
Steel plate (4) is bolted with adjustable fixation steel plate.
Grillage Adjustable tool bottom fixing tool (1) is bent using I-steel according to set radian, is needed when bending
Noticing that the different situations of value are widened in tunnel, fixedly adjustable section steel plate length control (prevents from toppling) within 50~70cm thereon,
Fluting in the middle part of steel plate, width of rebate 3cm is mobile convenient for top tool, and grillage fixing steel plate (5) considers according to design size
Size, arch main reinforcement position grooving are processed, notch width is greater than arch main reinforcement diameter+1cm and is advisable, in order to which arch takes out, with
Upper material is gathered materials on the spot, for grillage of the same race, it is only necessary to which difference can be solved to widen value disconnected by processing a set of standard frock
Grillage processing in face saves place, reduces waste of material, reduces labour cost, can effectively reduce cost payout.
Tunnel grillage Adjustable tool bottom fixing tool (1) is placed directly on processed ground, is adjusted
Fixation steel plate (2) point is welded on fixing tool, be adjusted fixation steel plate in the middle part of fluting, slotting length be steel plate edge 10cm at,
Width 3cm;Junction steel plate (3) and vertical steel plate (4) are welded into T-shape structure thereon, and junction steel plate is apart from end 5cm~10cm
The position drill bolt hole at place, vertical steel plate (4) and grillage fixing steel plate side are welded, and shape is integral, thereafter according to setting
Count desired radius, arc length determines position on adjustable fixation steel plate (2), marking, then junction steel plate (3) and I-shaped
Fixation steel plate (2) are adjusted at the top of steel and are connected by screw bolts simultaneously fixation, complete tooling adjustment.
Adjustable grid steel frame processes construction method, method includes the following steps:
(1) it counts first and determines that entire tunnel or the identical lining style difference in several tunnels widen value section and (widen value 0
~140cm), the corresponding grid steel frame model (such as H130, H150, H180, H230) of lining style is chosen according to design, accordingly
The type processed required for selection determines that difference is widened among value and widens value as standard section.
(2) excavation method is determined according to design drawing or surrounding rock type, determines steelframe unit merogenesis unit, processing unit can
It is decomposed into 3 A units, 2 unit Bs, 2 C cells, 2 D units, 1 E unit, same unit only processes a set of adjustable work
Dress.
(3) live material and great preparation: I-steel steel plate, forming mill, welding rod, bolt etc..
(4) I16 I-steel can be used in bottom fixing tool, according to unit merogenesis length, is bent into scheduled unit radian.
(5) processing of 2cm thick steel plate, the fixed steel of crossbeam can be used in lateral fixation steel plate, connection steel and vertical fixation steel plate
Plate 2 700~850mm of length, width 200mm, centre fluting, width of rebate 20mm, length to steel plate edge are reserved at 100mm.
(6) lateral fixation steel plate 2 is welded on fixed at the top of I16 I-steel wing plates on two sides using groove welding.
(7) junction steel plate 3 and vertical steel plate 4, which weld, forms T-shape, drill bolt hole on lateral steel plate 3, diameter phi 24mm,
Convenient for being bolted lateral connection steel plate 3 and fixation steel plate 2.
(8) processing grid steel frame reinforcing bar main reinforcement limits steel plate 5, and steel plate top and middle part are opened according to grid steel frame main reinforcement size
Slot, using bar diameter+2cm as standard, limit steel plate 5 is welded with T-type fixation steel plate main reinforcement position otch size after processing is completed
It connects to form entirety.
(9) bolt 6 is used, lateral fixation steel plate 2 is connected with lateral connection steel plate 3 below T-steel plate and forms a unit
3 groups of processing tools are arranged in tooling, each unit, and 1 Pin arch merogenesis need to individually process unit work when being five units of A, B, C, D, E
Fill 5 sets of compositions.
(10) in set Working position, bottom I16 I-steel tooling two sides are fixed on using reinforcing bar, according to required processing lattice
Grid arch size, adjustment lateral connection steel plate and lateral fixation steel plate position, reach and enter the processing of unit tooling after telling somebody what one's real intentions are size
Program.
(11) it is inserted into grid main reinforcement in limit steel plate 5, temporary spot-welded " 8 " word muscle, " mouth " word muscle etc. are processed respectively
Complete 1 Pin unit grid steel frame.
(12) manual work makes grid reinforcing bar be detached from tooling notch, hangs out machined cell using processing factory's gantry crane
Grid are spare, continue other same unit grid processing, other unit grids are processed using corresponding tooling.
(10) (11) step is repeated, examination spelling in the venue after 1 Pin grid steel frame is completed the process, it is complete after meeting specification error
It is welded at unit grillage, starts mass production.