CN110223015A - Logistics Process link processing method, management system, device and storage equipment - Google Patents

Logistics Process link processing method, management system, device and storage equipment Download PDF

Info

Publication number
CN110223015A
CN110223015A CN201910464116.3A CN201910464116A CN110223015A CN 110223015 A CN110223015 A CN 110223015A CN 201910464116 A CN201910464116 A CN 201910464116A CN 110223015 A CN110223015 A CN 110223015A
Authority
CN
China
Prior art keywords
procedure links
cargo
followed
link
links
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910464116.3A
Other languages
Chinese (zh)
Other versions
CN110223015B (en
Inventor
肖伸沛
肖柳萍
李富贵
肖伸雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hiblue Logistics Co Ltd
Original Assignee
Shenzhen Hiblue Logistics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hiblue Logistics Co Ltd filed Critical Shenzhen Hiblue Logistics Co Ltd
Priority to CN201910464116.3A priority Critical patent/CN110223015B/en
Publication of CN110223015A publication Critical patent/CN110223015A/en
Application granted granted Critical
Publication of CN110223015B publication Critical patent/CN110223015B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0834Choice of carriers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0837Return transactions
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Logistics Process link processing method, management system, device and storage equipment, are related to logistics management technical field.Its Logistics Process link processing method and technology main points includes the problem to be followed up for obtaining cargo and the locating procedure links of cargo;Based on problem to be followed up, corresponding influence procedure links are obtained;Whether detection cargo downstream link belongs to influence procedure links;If it is not, cargo enters downstream link;If so, staying in current process link, the present invention has the advantages that be promoted to problem part treatment effeciency.

Description

Logistics Process link processing method, management system, device and storage equipment
Technical field
The present invention relates to logistics management technical fields, more specifically, it relates to Logistics Process link processing method, management System, device and storage equipment.
Background technique
Logistic industry is the industry being affected by the external world, and different logistics channel companies can formulate according to the characteristics of oneself Pricing rule.Therefore when client provides logistics company of the different commodity to front end, the logistics company of front end is needed according to client The characteristic of cargo is provided, selection is suitable for the logistics channel company of client.
And client is provided as the data of front end logistics company offer, and the condition of logistics channel company can not filled in, Or it fills in physical presence gap;And these gaps, the quotation for sometimes resulting in logistics channel company change, and sometimes result in Logistics channel company rejection cargo;Thus lead to that certain part can be led to the problem of in front end logistics company.
Existing front end logistics company generally has one's own logistic management system, and logistic management system is all general There is processing method before the delivery of problem part.And Logistics Process link processing is generally simple to the processing method of problem part, as long as Go wrong part, horse back is prevented to all processes of problem part, and in connection client.In order to avoid process confusion, need to inspection The problem of finding part walks all processes again after issue handling, causes the problem part processing time longer, before influencing Hold the treatment effeciency to problem part of logistics company.
Summary of the invention
Problem in view of the prior art, the first object of the present invention be to provide a kind of Logistics Process link processing method, It has the advantages that be promoted to problem part treatment effeciency.
To achieve the above object, the present invention provides the following technical scheme that a kind of Logistics Process link processing method, packet It includes:
Obtain the problem to be followed up of cargo and the locating procedure links of cargo;
Based on problem to be followed up, corresponding influence procedure links are obtained;
Whether detection cargo downstream link belongs to influence procedure links;
If it is not, cargo enters downstream link;If so, staying in current process link.
By using above-mentioned technical proposal, because being that the problem of basis is to be followed up generates influence procedure links, work as goods It there is a problem, then can be generated in follow-up problem in object treatment process;After generation problem, cargo will not stop, and will do it Judgement, if the problem to be followed up occurred not under the influence of a link, cargo also will continue to go to downstream link.Therefore working as When solving customer issue, cargo can also may continue to walk process, until the link influenced;And after Resolving probiems, cargo Problem to be followed up is solved, and influences procedure links disappearance, it will be able to realize that the process of cargo continues;To improve problem part Treatment effeciency.
The present invention is further arranged to: the problem to be followed up includes the process problem by system automatically generated and is based on The problem of manual entry part problem.
By using above-mentioned technical proposal, process problem and problem part problem are all included into problem to be followed up, so that all The execution process of cargo require to go away according to unified standard, be not necessarily to operator's specific classification, reduce at problem part The cost of reason.
The present invention is further arranged to: the influence procedure links of the problem to be followed up include single procedure links or by more The procedure links set that a procedure links are constituted.
By using above-mentioned technical proposal, the influence procedure links of problem to be followed up can be distributed according to the characteristic of problem The link of influence;When problem coverage is wider, no matter when problem is being found, the procedure links of cargo can be made to stop Get off.
The present invention is further arranged to: procedure links include necessary process and inessential process, the inessential process base It is added in manual entry.
By using above-mentioned technical proposal, procedure links can be added according to the difference of client itself product and channel Selectable process, adaptability of the Lai Shixian cargo to process.
The present invention is further arranged to: when detection cargo downstream link is to belong to influence procedure links, output is stopped Indicate information.
By using above-mentioned technical proposal, stops instruction information and provide, the interaction of information is carried out, so that operator recognizes Existing procedure links are not disposed, and play the role of instruction.
The second object of the present invention is to provide a kind of logistic management system, with the excellent of Upgrade Problem part treatment effeciency Point.
To achieve the above object, the present invention provides the following technical scheme that the logistics management system of the method for the first mesh System, it is characterised in that: include:
Procedure links database is stored with procedure links information;
Pointer unit is built-in with execution sequence and is used for so that the procedure links of procedure links database are executed according to preset order;
Detection unit, the downstream link that detection records procedure links pointed by current pointer unit and pointer is directed toward;
Issue database, for recording problem to be followed up;
Link acquiring unit is influenced, procedure links are influenced based on corresponding generate of problem to be followed up in issue database;And
Judging unit, for determining whether downstream link pointed by Pointer unit is contained in impacted procedure links In.
By using above-mentioned technical proposal, procedure links database and Pointer unit cooperation, so that the procedure links of cargo It can be carried out according to preset link;Detection unit, the pointer by detecting Pointer unit are directed toward, and obtain downstream link letter Breath;Link acquiring unit is influenced, it can be corresponding to generate impacted process according to the problem to be followed up recorded in issue database Link.Determine whether downstream link is contained in impacted procedure links by judging unit, it will be able to quick It solves, whether existing procedure links are disposed.When downstream link is unaffected, cargo is just able to enter next Link.Realize the adaptation to the processes of all cargos, when go wrong part after, problem part can also operate normally process, directly Link is influenced to reaching, to accelerate the treatment effeciency of problem part.
The present invention is further arranged to: further including for problem flag to be followed up in issue database to be moved to problem data The execution unit of the processed problem in library.
It by using above-mentioned technical proposal, is finished when problem to be followed up is processed, the problem to be followed up being disposed passes through Manual operation moves into the processed problem of issue database;Execution unit records overall process, thus when needing to cargo It, will be more convenient when overall flow information is inquired.
The present invention is further arranged to: further including for exporting the indicating unit for stopping instruction information.
By using above-mentioned technical proposal, indicating unit output stops instruction, stops so that operator knows that cargo is in Stay state.
The third object of the present invention is to provide a kind of device of Logistics Process link processing, at Upgrade Problem part The advantages of managing efficiency.
To achieve the above object, the present invention provides the following technical scheme that a kind of device of Logistics Process link processing, institute Stating device includes processor and memory;
The memory is used to store the program for supporting described device to execute method described in the first purpose, and
Storage is for realizing data involved in the described in any item methods of the first purpose;
The processor is configured to for executing the program stored in the memory.
The fourth object of the present invention is to provide a kind of removable storage device, with Upgrade Problem part treatment effeciency Advantage.
To achieve the above object, the present invention provides the following technical scheme that a kind of removable storage device, including instruction, When described instruction is run on computers, so that computer executes method described in the first purpose.
Compared with prior art, the beneficial effects of the present invention are:
It (1), will be so that cargo walks process when the problem does not influence follow-up process after cargo goes wrong;To be promoted Go wrong the treatment effeciency of cargo;
(2) some selectable processes are added according to the difference of client itself product and channel, Lai Shixian cargo fits process Ying Xing;
(3) process problem and problem part problem are all included into problem to be followed up, are not necessarily to operator's specific classification, reduced to asking Inscribe the cost of part classification processing.
Detailed description of the invention
Fig. 1 is the structural block diagram of logistic management system;
Fig. 2 is necessary procedure links schematic diagram;
Fig. 3 is the flow diagram of Logistics Process link processing method.
Appended drawing reference: 101, procedure links database;102, Pointer unit;103, detection unit;104, issue database; 105, link acquiring unit is influenced;106, execution unit;107, judging unit;108, indicating unit.
Specific embodiment
With reference to the accompanying drawings and examples, the present invention will be described in detail.
A kind of logistic management system, as shown in Figure 1, including the procedure links database 101 for being stored with procedure links information; Execution sequence is built-in with to be used for so that the Pointer unit that the procedure links of procedure links database 101 are executed according to preset order 102;Detection is presently in the detection unit 103 of downstream link pointed by procedure links and Pointer unit 102;It is stored with The problem of problem to be followed up database 104;Procedure links are influenced based on corresponding generate of problem to be followed up in issue database 104 Influence link acquiring unit 105;For problem to be followed up to be removed the execution unit 106 of issue database 104;For determining to refer to Whether downstream link pointed by needle unit 102 is contained in the judging unit 107 in impacted procedure links;And it uses The indicating unit 108 of instruction information is stopped in output.
As shown in Figure 1, being stored with the procedure links information of property stream in procedure links database 101;Procedure links letter Breath includes necessary procedure links information and inessential procedure links information.Wherein see Fig. 2, necessary procedure links information includes point Goods looks into goods, confirmation distribution of goods, system list, client's confirmation, upload information, goods putting, print label, scans bill kept on file, re-packs and shipment: and Inessential procedure links information includes detection MSDS and offer cargo type.
Specifically, being put in storage in practical procedure links to move into cargo in warehouse;Distribution of goods is based on cargo information and defeated Channel is sent to classify cargo;Goods is looked into check cargo itself, detects whether that there are contrabands and channel embargo product;Confirmation Distribution of goods is to check whether freight classification is correct;Single system is that electronic spreadsheet is made according to goods information;Client is confirmed as electronic watch It is singly sent to client, it is whether accurate by client's confirmation message;Upload information is that the information that client confirms is uploaded to server;It puts Goods is that cargo is moved to stockyard from warehouse;Print label prints bar code, and bar code is pasted on cargo;It re-packs, by goods Object is moved on snap-gauge etc. to be transported;Shipment, for cargo transport is gone out company.Whether detection MSDS provides data for detection client It is consistent with cargo.There is provided cargo type is, to customer inquiries cargo type data.
Pointer unit 102 provides procedure links instructions sequence so that only under necessary procedure links procedure links according to point Goods, look into goods, confirmation distribution of goods, system list, client's confirmation, upload information, goods putting, print label, scan bill kept on file, re-pack with shipment according to Secondary progress.And as the detection MSDS and offer cargo type that inessential procedure links are added, when the procedure links of distribution of goods execute It finishes, Pointer unit 102 can be initially directed to survey MSDS and provide cargo type to refer again to look into goods.
Detection unit 103, which passes through pointed by acquisition current pointer unit 102, and Pointer unit 102 lower one is signified obtains Obtain corresponding procedure links information;And judging unit 107 can be sent by the downstream link of acquisition.
The problem of typing waits for follow-up problem and has been disposed in issue database 104;Problem to be followed up includes by being The process problem that automatically generates of uniting and part problem the problem of based on manual entry.And system generate process problem include and on State process it is relevant to distribution of goods, goods to be checked, distribution of goods to be confirmed, wait make it is single, to client's confirmation, information to be uploaded, to goods putting, wait beat Print Label, bill kept on file to be scanned, wait re-pack, to shipment, MSDS to be detected and cargo type to be supplied.And the problem of manual entry Part problem is included in distribution of goods procedure links, look into goods procedure links or client confirms link, and operator's discovery and typing are asked Topic, problem part problem include that cargo is embargoed, cargo has price difference, Return Application etc..
Influencing link acquiring unit 105 influences procedure links based on corresponding generate of the follow-up problem in issue database 104 Impacted procedure links;All problems to be followed up all are preset with corresponding influence procedure links, and it includes single for influencing procedure links A procedure links or the procedure links set being made of multiple procedure links.
Specifically, the influence procedure links to distribution of goods are to look into goods procedure links, the influence procedure links of goods to be checked are confirmation Distribution of goods procedure links, the influence procedure links of distribution of goods to be confirmed are single process link processed, are upper wait make single influence procedure links Communication ceases procedure links, and the influence procedure links to client's confirmation are upload information procedure links, the influence stream of information to be uploaded Cheng Huanjie is printing Label procedure links, and the influence procedure links to goods putting are printing Label procedure links, Label to be printed Influence procedure links be scanning bill kept on file procedure links, the influence procedure links of bill kept on file to be scanned are the procedure links that re-pack, wait beat The influence procedure links of plate are shipment procedure links, do not influence procedure links, the influence process ring of MSDS to be detected to shipment Section is single process link processed, and the influence procedure links of cargo type to be supplied are single process link processed.The influence stream of cargo embargo Cheng Huanjie is all procedure links, and the influence procedure links that cargo has price difference are that single process link processed and client confirm process ring Section, the influence procedure links of Return Application are all procedure links.Therefore include in influence link acquiring unit 105 is impacted Procedure links by the problem to be followed up that is included influence procedure links set.
Execution unit 106, by the way that the problem to be followed up being disposed in issue database 104 addition is disposed Label, and move into being disposed in problem classification of issue database 104;Further, in order to more comprehensively obtain The information being disposed is taken, issue database 104 can add the founder's information and creation time for creating problem to be followed up Information;And the processing people's information that this waits for follow-up problem that is disposed, and processing temporal information;To reach comprehensive record, Easy-to-look-up purpose.
Judging unit 107 is for determining whether downstream link pointed by Pointer unit 102 is contained in impacted In procedure links, if being contained in impacted procedure links, exports and execute signal to indicating unit 108, so that instruction is single 108 output of member stops instruction, and the pointer of Pointer unit 102 is made to be held in existing procedure link.If not by comprising, So that the downstream link of the direction of Pointer unit 102.
Indicating unit 108 carries out stop instruction by exporting display window.
Logistics Process link processing method, as shown in Figure 3, comprising:
The locating procedure links of S1, the problem to be followed up for obtaining cargo and cargo;
Wherein the problem to be followed up of cargo is obtained based on issue database 104, and procedure links locating for cargo pass through detection unit Procedure links database 101 pointed by 103 detection Pointer units 102 obtains.It is non-adding due to using Pointer unit 102 When necessary links, it also only need to directly be grabbed out of procedure links database 101 just, without independent addition, adapt to various processes Link.
S2, based on problem to be followed up, obtain corresponding influence procedure links;
Influence link acquiring unit 105 and obtain problem to be followed up in issue handling unit, and according to the problem to be followed up of typing and The corresponding relationship of procedure links is influenced, corresponding influence procedure links set is exported.
Whether S3, detection cargo downstream link belong to influence procedure links, if it is not, cargo enters downstream ring Section, if so, output stops instruction;
Detection unit 103 is obtained by detecting 101 procedure links of procedure links database that next pointer of Pointer unit 102 is directed toward ?.Judging unit 107 to downstream link pointed by Pointer unit 102 whether be contained in impacted procedure links into Row compares one by one;Identical procedure links if it exists indicate that cargo downstream link belongs to influence procedure links, then output stops Stay instruction.Stopping instruction can be display output window.Identical procedure links if it does not exist indicate cargo downstream link It is not belonging to influence procedure links, cargo enters downstream link.
And in issue database 104 after the problem of following up is solved, operator can by execution unit 106, will The problem to be followed up being disposed removes issue database 104;So that being somebody's turn to do the corresponding influence process of problem to be followed up Link is removed from influence link acquiring unit 105.Make the procedure links for originally belonging to influence procedure links, from influence process ring It is detached from section, the continuation of implementation process link.
S4, detect whether that there are downstream links, if terminating process if not into S5;
Detection unit 103 is obtained by detecting 101 procedure links of procedure links database that next pointer of Pointer unit 102 is directed toward It obtains and whether there is follow-up process link;When it be not present, then it represents that the procedure links of cargo are all covered.
S5, downstream link is entered, and returns to S1.
The procedure links for jumping to next pointer and being directed toward of Pointer unit 102.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or its any combination real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.The computer program Product includes one or more computer instructions.It is all or part of when loading on computers and executing the computer instruction Ground is generated according to process or function described in the embodiment of the present invention.The computer can be general purpose computer, special purpose computer, Computer network or other programmable devices.The computer instruction can store to be set in computer-readable mobile storage In standby.
Those of ordinary skill in the art will appreciate that realizing that all or part of the steps of above-described embodiment can pass through hardware It completes, relevant hardware can also be instructed to complete by program, the program can store in a kind of computer-readable In removable storage device, removable storage device mentioned above can be USB flash disk, SSD or mechanical hard disk etc..
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of Logistics Process link processing method, it is characterised in that: include:
Obtain the problem to be followed up of cargo and the locating procedure links of cargo;
Based on problem to be followed up, corresponding influence procedure links are obtained;
Whether detection cargo downstream link belongs to influence procedure links;
If it is not, cargo enters downstream link;If so, staying in current process link.
2. Logistics Process link processing method according to claim 1, it is characterised in that: the problem to be followed up include by The process problem of system automatically generated and be based on manual entry the problem of part problem.
3. Logistics Process link processing method according to claim 1, it is characterised in that: the influence of the problem to be followed up Procedure links include single procedure links or the procedure links set that is made of multiple procedure links.
4. Logistics Process link processing method according to claim 1, it is characterised in that: procedure links include necessary process With inessential process, the inessential process is added based on manual entry.
5. Logistics Process link processing method according to claim 1, it is characterised in that: when detection cargo downstream ring Section is to belong to influence procedure links, and output stops instruction information.
6. being applied to the logistic management system of any the method for Claims 1-4, it is characterised in that: include:
Procedure links database (101), is stored with procedure links information;
Pointer unit (102) is built-in with execution sequence and is used for so that the procedure links of procedure links database (101) are according to default Sequence executes;
Detection unit (103), the lower one stream that detection records procedure links pointed by current pointer unit (102) and pointer is directed toward Cheng Huanjie;
Issue database (104), for recording problem to be followed up;
It influences link acquiring unit (105), process ring is influenced based on corresponding generate of problem to be followed up in issue database (104) Section;And
Judging unit (107), for determining it is impacted whether downstream link pointed by Pointer unit (102) is contained in In procedure links.
7. logistic management system according to claim 6, it is characterised in that: further include for by issue database (104) Interior problem flag to be followed up moves to the execution unit (106) of the processed problem of issue database (104).
8. logistic management system according to claim 6, it is characterised in that: further include stopping instruction information for exporting Indicating unit (108).
9. a kind of device of Logistics Process link processing, it is characterised in that: described device includes processor and memory;
The memory is used to store the program for supporting described device perform claim to require the described in any item methods of 1-5, and
Storage is for realizing data involved in the described in any item methods of claim 1-5;
The processor is configured to for executing the program stored in the memory.
10. a kind of removable storage device, it is characterised in that: including instruction, when described instruction is run on computers, make to succeed in one's scheme Calculation machine perform claim requires the described in any item methods of 1-5.
CN201910464116.3A 2019-05-30 2019-05-30 Logistics process link processing method, management system, device and storage equipment Active CN110223015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910464116.3A CN110223015B (en) 2019-05-30 2019-05-30 Logistics process link processing method, management system, device and storage equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910464116.3A CN110223015B (en) 2019-05-30 2019-05-30 Logistics process link processing method, management system, device and storage equipment

Publications (2)

Publication Number Publication Date
CN110223015A true CN110223015A (en) 2019-09-10
CN110223015B CN110223015B (en) 2023-02-28

Family

ID=67819069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910464116.3A Active CN110223015B (en) 2019-05-30 2019-05-30 Logistics process link processing method, management system, device and storage equipment

Country Status (1)

Country Link
CN (1) CN110223015B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111400742A (en) * 2020-04-09 2020-07-10 上海东普信息科技有限公司 Problem piece information processing method and device, equipment and storage medium
CN114254978A (en) * 2021-12-22 2022-03-29 华中科技大学同济医学院附属协和医院 Aging tracking method of fresh preparation, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1862582A (en) * 2006-06-20 2006-11-15 清华大学 Method based on value engineering for diagnosing production flow of discrete medium-sized and small automobile Fitting enterprise
CN106845903A (en) * 2016-12-23 2017-06-13 天津联兴科技技术有限公司 A kind of Foreign Trade Logistics processing system and method with instantly prompting function
CN109064088A (en) * 2018-07-10 2018-12-21 顺丰速运有限公司 The self-service processing system of problem part, method and self-service processing shelf

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1862582A (en) * 2006-06-20 2006-11-15 清华大学 Method based on value engineering for diagnosing production flow of discrete medium-sized and small automobile Fitting enterprise
CN106845903A (en) * 2016-12-23 2017-06-13 天津联兴科技技术有限公司 A kind of Foreign Trade Logistics processing system and method with instantly prompting function
CN109064088A (en) * 2018-07-10 2018-12-21 顺丰速运有限公司 The self-service processing system of problem part, method and self-service processing shelf

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111400742A (en) * 2020-04-09 2020-07-10 上海东普信息科技有限公司 Problem piece information processing method and device, equipment and storage medium
CN114254978A (en) * 2021-12-22 2022-03-29 华中科技大学同济医学院附属协和医院 Aging tracking method of fresh preparation, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN110223015B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
CN112801579B (en) Distribution task abnormity monitoring method, distribution task abnormity monitoring device, computer equipment and storage medium
US20070152047A1 (en) Product managing system and method using rfid technology
CN108681856A (en) A kind of Warehouse Management System and storage management method
US9663294B2 (en) Receiving items into inventory
US20110218843A1 (en) Non intrusive system and method for monitoring business processes
JP2014529125A (en) Automated logistics system using trigger transfer device
CN114511334B (en) Full-process traceability visualization method and system based on data identification and electronic tag
CN111191991A (en) Intelligent management system for reagent consumables in clinical laboratory
CN110223015A (en) Logistics Process link processing method, management system, device and storage equipment
US7161487B1 (en) System, method, and logic for processing raw data comprising tag identifiers
CN112215370A (en) Electronic inspection system and mobile terminal
US20090256682A1 (en) Product managing system and method using rfid technology
CN116582558B (en) Automatic order interception method and electronic commerce ERP
WO2022136927A1 (en) Systems and methods for automated information collection and processing
EP3764291B1 (en) Method of examining a product inspection
Kafi et al. Essential of RFID technology in supply chain management: A review on digital perspective
CN116569118A (en) Information management method and device
CN113706079A (en) Logistics warehousing processing method and device, terminal equipment and medium
Au Warehouse management system and business performance: Case study of a regional distribution centre
KR20220074313A (en) System for distribution management based on artificial intelligence
CN109540467A (en) Optical fiber automatic test system based on industry internet platform
US10891453B1 (en) Method of examining the product inspection
CN110009420A (en) The ticket system and ticket drawing method of value-added service
CN110502404B (en) Early warning processing method based on data management platform and related equipment
CN113762434B (en) Rechecking method, device and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant