CN110202322A - Concrete road pours slope control tool making method - Google Patents

Concrete road pours slope control tool making method Download PDF

Info

Publication number
CN110202322A
CN110202322A CN201910438741.0A CN201910438741A CN110202322A CN 110202322 A CN110202322 A CN 110202322A CN 201910438741 A CN201910438741 A CN 201910438741A CN 110202322 A CN110202322 A CN 110202322A
Authority
CN
China
Prior art keywords
channel steel
control tool
slope control
concrete road
steel base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910438741.0A
Other languages
Chinese (zh)
Inventor
蒋吉财
沈明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201910438741.0A priority Critical patent/CN110202322A/en
Publication of CN110202322A publication Critical patent/CN110202322A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/01Devices or auxiliary means for setting-out or checking the configuration of new surfacing, e.g. templates, screed or reference line supports; Applications of apparatus for measuring, indicating, or recording the surface configuration of existing surfacing, e.g. profilographs

Abstract

A kind of concrete road pours slope control tool making method, characterized by the following steps: a, the identical channel steel docking of two root long degree is taken to be welded into channel steel base admittedly according to design, channel steel base central point slope overhead height is determined according to design grade coefficient, b, a handle is respectively set at channel steel base both ends, c, center stand column is set in channel steel base central point upper surface, and several side columns are set in the channel steel base of center stand column two sides, it completes concrete road and pours slope control tool making.It is simple, easy to make with tool construction that concrete road of the invention pours slope control tool making method, cast in situs road grade one-pass molding, meets Design Requirement Drawing, and no seeping phenomenon occurs, the advantages of accelerating engineering construction progress, reducing engineering cost.

Description

Concrete road pours slope control tool making method
Technical field
The present invention relates to a kind of concrete roads to pour auxiliary tool, specifically, being that a kind of concrete road pours slope Degree control tool making method.
Background technique
It is built in road and municipal road construction in the garden residential project Shi Wai, concrete road or using concrete road as base The asphalt paving road surface of layer, more demanding to slope control, manual control gradient difficulty is larger in road casting process, road It is not in place to pour one-pass molding slope control, it is subsequent, be difficult to adjust, thus part no matter cell road or urban construction road Seeping phenomenon after the rain is deposited, is influenced using functional requirement, inconvenience is caused to traffic.
Therefore known concrete road slope control method there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose that a kind of safe and reliable concrete road pours slope control tool making side Method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of concrete road pours slope control tool making method, it is characterised in that the following steps are included:
A, it takes the identical channel steel docking of two root long degree to be welded into channel steel base admittedly according to design, is in docking site in welding channel steel Heart point, and form certain angle, channel steel base both ends are contacted with level ground, and channel steel base central point slope overhead height is according to setting Gradient coefficient is counted to determine;
B, a handle is set at channel steel base both ends, respectively to carry operation;
C, it is arranged in the channel steel base that center stand column and center stand column two sides are arranged in channel steel base central point upper surface several Side column, stem height >=400mm;Center stand column top to two side grips be arranged reinforcing bar connecting rod, the top of side column with Reinforcing bar connecting rod welds admittedly, and several V-shaped rests are arranged with center stand column in adjacent marginal column and side column and support, and completes mixed Solidifying dirt road road pours slope control tool making.
Concrete road of the invention pour slope control tool making method can also using technical measures below come It further realizes.
Method above-mentioned, wherein channel steel specification >=12# standard channel steel.
Method above-mentioned, wherein the handle is Steel bar rack.
Method above-mentioned, wherein the reinforcing bar connecting rod material is HRB400 φ 16mm reinforcing bar.
Method above-mentioned, wherein the center stand column material is HRB400 φ 16mm reinforcing bar.
Method above-mentioned, wherein the side column material is HRB400 φ 16mm reinforcing bar.
After adopting the above technical scheme, concrete road of the invention pours slope control tool making method with following Advantage:
1, tool construction is simple, easy to make;
2, cast in situs road grade one-pass molding, meets Design Requirement Drawing, and no seeping phenomenon occurs;
3, accelerate engineering construction progress, reduce engineering cost.
Detailed description of the invention
Fig. 1 is that the concrete road of the embodiment of the present invention pours slope control tool construction schematic diagram;
Fig. 2 is that the concrete road of the embodiment of the present invention pours slope control tool use state diagram.
In figure: 1 channel steel base, 2 handles, 3 reinforcing bar connecting rods, 4 center stand columns, 5 ground levels, 6 V-shaped rests, 7 top of the slope portions are high Degree, 8 concrete, 9 roadbeds, 10 side columns.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
The concrete road of the embodiment of the present invention pours slope control tool making and is based on outdoor road width 6000mm, and the gradient is set Situation is counted, road is between two parties to two sides with 1.5% slope.Other Project design roads width and the gradient can be adjusted suitably when there is variation It is whole.
The concrete road of the embodiment of the present invention pours slope control tool making method, comprising the following steps:
Referring now to Fig. 1, Fig. 1 is that the concrete road of the embodiment of the present invention pours slope control tool construction schematic diagram.
1,12# standard channel steel is cut into two root long degree is 3100mm, butt welding, and when welding adjusts the angle, makes to dock Position is in central point, and forms certain angle, and channel steel two ends are contacted with ground level, central point top of the slope position is liftoff 45mm (3000mm*1.5%=45mm), i.e. slope overhead height 7 are 45mm.Ensure that the gradient meets the requirement of design grade 1.5%, firm welding Channel steel base 1.
2, welding 12# channel steel is fixed, welds center rest, use 400mm long at channel steel welding central point top of the slope position HRB400 φ 16mm reinforcement welding center stand column 4.
3, in 1 liang of end measure of channel steel base away from the end position 100mm welding RB400 φ 16mm reinforcing bar connecting rod 3 and top of the slope center The welding of 4 top of column, constitutes two big triangle center rest.
4, to being formed by welding in two big triangular supports, using 1000mm as spacing, it is vertical other that two RB400 φ 16 are welded Heel post 10.
5, channel steel one it is side-draw away from column central point position 500mm at, using RB400 φ 16mm reinforcing bar by column central point Small triangle center rest is formed by welding at the top of channel steel side and column.
6, HRB400 φ 16mm steel bar welding spreading 100mm, height 80mm operating handle 2 are used in end.
7, the gradient is carried out to welding completion tool, dimensional gaughing prepares to use after qualified.
Slope control tool application method is poured for the concrete road of the embodiment of the present invention:
Fig. 2 is that the concrete road of the embodiment of the present invention pours slope control tool use state diagram.Have in road and pours After building condition, after concrete speading vibration compacting, construct from one end to other end.
Concrete road is poured slope control tool in construction to place perpendicular to road length direction, both side ends are pressed in On two side template of road, two sides operator holds two sides operating handle respectively, uniformly drags forward in parallel;
Using terminating to clear up tool, rinses, in case next time uses, receipts face quality and maintenance work are carried out to road.
The present invention has substantive distinguishing features and significant technological progress, and concrete road of the invention pours slope control work Tool uses in road concrete casting process, it is ensured that road grade is in strict accordance with Design Requirement Drawing one-pass molding.This coagulation Dirt road road, which pours, looks for slope tool making simple, convenient, and road concrete can be made to pour and can once reach in concreting process To layout design slope requirement.
Concrete road of the invention pours slope control tool making method nation's Shanghai City second phase c plot one in Qidong It is used in bid section project outdoor road engineering, cast in situs road grade one-pass molding, meets Design Requirement Drawing, no ponding is existing As occurring, significant effect obtains exploiting entity, supervisor and construction unit's abundant affirmation.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of concrete road pours slope control tool making method, it is characterised in that the following steps are included:
A, it takes the identical channel steel docking of two root long degree to be welded into channel steel base admittedly according to design, is in docking site in welding channel steel Heart point, and form certain angle, channel steel base both ends are contacted with level ground, and channel steel base central point slope overhead height is according to setting Gradient coefficient is counted to determine;
B, a handle is set at channel steel base both ends, respectively to carry operation;
C, it is arranged in the channel steel base that center stand column and center stand column two sides are arranged in channel steel base central point upper surface several Side column, stem height >=400mm;Center stand column top to two side grips be arranged reinforcing bar connecting rod, the top of side column with Reinforcing bar connecting rod welds admittedly, and several V-shaped rests are arranged with center stand column in adjacent marginal column and side column and support, and completes mixed Solidifying dirt road road pours slope control tool making.
2. concrete road as described in claim 1 pours slope control tool making method, which is characterized in that the channel steel Specification >=12# standard channel steel.
3. concrete road as described in claim 1 pours slope control tool making method, which is characterized in that the handle For Steel bar rack.
4. concrete road as described in claim 1 pours slope control tool making method, which is characterized in that the reinforcing bar Connecting rod material is HRB400 φ 16mm reinforcing bar.
5. concrete road as described in claim 1 pours slope control tool making method, which is characterized in that the center Column material is HRB400 φ 16mm reinforcing bar.
6. concrete road as described in claim 1 pours slope control tool making method, which is characterized in that the side Column material is HRB400 φ 16mm reinforcing bar.
CN201910438741.0A 2019-05-24 2019-05-24 Concrete road pours slope control tool making method Pending CN110202322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910438741.0A CN110202322A (en) 2019-05-24 2019-05-24 Concrete road pours slope control tool making method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910438741.0A CN110202322A (en) 2019-05-24 2019-05-24 Concrete road pours slope control tool making method

Publications (1)

Publication Number Publication Date
CN110202322A true CN110202322A (en) 2019-09-06

Family

ID=67788571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910438741.0A Pending CN110202322A (en) 2019-05-24 2019-05-24 Concrete road pours slope control tool making method

Country Status (1)

Country Link
CN (1) CN110202322A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6089787A (en) * 1998-05-26 2000-07-18 Allen Engineering Corp. Transformable two-person floating screed with automatic grade control
CN104264879A (en) * 2014-09-19 2015-01-07 江苏建筑职业技术学院 Bi-direction mixed cross reinforcing steel bar truss self-bearing floor supporting plate and manufacture method
CN205741796U (en) * 2016-06-12 2016-11-30 中铁十二局集团有限公司 Ballastless track of high-speed railway bedplate concreting leveling frock
CN206157539U (en) * 2016-10-11 2017-05-10 阿勒泰公路管理局福海分局 Curb side slope leveling plate
CN206737438U (en) * 2016-12-19 2017-12-12 中冶天工集团有限公司 Overhead round pool wedged bottom concrete flatness control device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6089787A (en) * 1998-05-26 2000-07-18 Allen Engineering Corp. Transformable two-person floating screed with automatic grade control
CN104264879A (en) * 2014-09-19 2015-01-07 江苏建筑职业技术学院 Bi-direction mixed cross reinforcing steel bar truss self-bearing floor supporting plate and manufacture method
CN205741796U (en) * 2016-06-12 2016-11-30 中铁十二局集团有限公司 Ballastless track of high-speed railway bedplate concreting leveling frock
CN206157539U (en) * 2016-10-11 2017-05-10 阿勒泰公路管理局福海分局 Curb side slope leveling plate
CN206737438U (en) * 2016-12-19 2017-12-12 中冶天工集团有限公司 Overhead round pool wedged bottom concrete flatness control device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李坚等: "大面积混凝土地面移动式导轨找平施工技术 ", 《施工技术》 *

Similar Documents

Publication Publication Date Title
CN104806011B (en) Raft board post poured band formwork for placing
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN108638324A (en) A kind of construction method of prefabricated case beam
CN108590008B (en) Construction method of cast-in-place concrete for folding roof
CN109057339A (en) A kind of one-time-concreting construction method of the anti-bank in toilet
CN208949693U (en) A kind of typified form for construction of cement concrete road surface
CN206173899U (en) Trapezoidal ditch of slipform method template
CN110202322A (en) Concrete road pours slope control tool making method
CN108867392A (en) Precast beam adjustable type tire construction method
CN102808375B (en) Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN206233573U (en) A kind of beam die plate reinforcing device
CN206503069U (en) trestle drainage system
CN215210384U (en) Slip form concrete pouring device for drainage ditch
CN211285172U (en) Curb slipform construction design levels device
CN106012808B (en) A kind of Wavelike steel webplate profiled sheet combination beam and its construction method
CN206189607U (en) Rag bolt location structure
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN107558606A (en) A kind of prefabricated construction construction method
CN206428583U (en) It is a kind of to be used for the guardrail prefabricated concrete board of half prefabricated reinforced concrete wall fence
CN206736881U (en) Shallow sea region measurement control point platform
CN112854609A (en) Cast-in-place reinforced concrete pouring protective layer thickness construction method and thickness control device
CN208415925U (en) A kind of PVC column-form
CN109183550B (en) Rapid turnover temporary road laying method
CN218404953U (en) Cement pouring equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906

RJ01 Rejection of invention patent application after publication