CN218404953U - Cement pouring equipment - Google Patents

Cement pouring equipment Download PDF

Info

Publication number
CN218404953U
CN218404953U CN202222462655.3U CN202222462655U CN218404953U CN 218404953 U CN218404953 U CN 218404953U CN 202222462655 U CN202222462655 U CN 202222462655U CN 218404953 U CN218404953 U CN 218404953U
Authority
CN
China
Prior art keywords
guard plate
mixture
cement
frame
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222462655.3U
Other languages
Chinese (zh)
Inventor
欧阳雪梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quan Guoxing
Quan Guozhi
Original Assignee
Quan Guoxing
Quan Guozhi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quan Guoxing, Quan Guozhi filed Critical Quan Guoxing
Priority to CN202222462655.3U priority Critical patent/CN218404953U/en
Application granted granted Critical
Publication of CN218404953U publication Critical patent/CN218404953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a cement placement technical field just discloses a cement placement equipment, which comprises a frame, the bottom of frame is equipped with the motor, one side of frame is equipped with the mixture guard plate, one side that the frame was kept away from to the mixture guard plate is equipped with the cement guard plate, one side that the frame was kept away from the mixture guard plate is equipped with anterior protection piece, the bottom of support is equipped with the tire, the bottom through connection spare of advancing the pull rod, advancing pull rod and connecting piece swing joint, one side of advancing the pull rod is equipped with the speed pull rod, the both ends that frame one side was kept away from to anterior protection piece are equipped with the operation handle, operation handle and anterior protection piece fixed connection, when pouring, carry out the open-ended adjustment because of the big or small specification difference of mixture, make the intermixing of mixture and cement accord with the standard, make its bedding more smooth-going, more level and smooth-going of road surface, the great improvement of life.

Description

Cement pouring equipment
Technical Field
The utility model relates to a cement pouring technical field, more specifically relate to a cement pouring equipment.
Background
The cement pavement mainly refers to a pavement with cement concrete as a main material, and is called a concrete pavement for short. Commonly known as white pavement, which is a high-grade pavement. The concrete block pavement includes various pavements such as plain concrete, reinforced concrete, continuous reinforced concrete, prestressed concrete and the like.
The concrete pavements in China are mostly formed by pouring plain concrete according to a single layer in situ, and few concrete pavements adopt prefabricated slabs or are made into double-layer concrete pavements or are provided with reinforcing steel bars. The most widely adopted in China is the in-situ cast common concrete, and the road surface is not provided with reinforcing steel bars except for a joint area and a local range and is commonly called as a plain concrete road surface. The road surface structure cast in situ by plain concrete has convenient construction and low cost. The plain concrete pavement is provided with a shrinkage joint every 5-6 meters along the longitudinal direction, so that the requirement of winter shrinkage crack is met.
The concrete pavement construction generally comprises the following steps: installing a side die, a seam embedding strip, a dowel bar, a reinforcing mesh and the like; mixing the concrete mixture and transporting to a construction site; spreading and vibrating the concrete mixture; leveling the surface of the concrete and brushing or carving small anti-skid grooves; curing and joint filling, and also using the processes of vacuum water absorption, vibration rolling and the like in the concrete pavement construction.
At present, plain concrete is mostly directly paved on the ground in China, but after the formwork is removed through pouring, the two sides of the road surface are raised due to the paved road, vehicles cannot be lifted up and down on the positions of the roadside without being paved, the roadside cannot be poured, most of residents nearby pull soil to fill the two sides of the road, the soil is lost due to loose soil or rain, the road surface on the vehicles is impacted greatly, the road surface is easy to lose, and the service life is greatly shortened.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the utility model provides a cement pouring equipment to solve the problem that exists among the above-mentioned background art.
The utility model provides a following technical scheme: including the frame, its characterized in that: the tire protection device comprises a rack, and is characterized in that a motor is arranged at the bottom end of the rack, a mixture protection plate is arranged on one side of the rack, the mixture protection plate is fixedly connected with the rack, a cement protection plate is arranged on one side of the mixture protection plate, the cement protection plate is fixedly connected with the mixture protection plate, a front protection block is arranged on one side of the rack away from the mixture protection plate, the front protection block is fixedly connected with the rack, a support is arranged at the bottom end of the front protection block, the support is fixedly connected with the front protection block, a tire is arranged at the bottom end of the support, a connecting piece is arranged in the middle of one side of the front protection block away from the rack, the connecting piece is fixedly connected with the front protection block, clamping columns are arranged at two ends of the connecting piece, the clamping columns are fixedly connected with the connecting piece, an advancing pull rod is arranged on one side of the connecting piece away from the front protection block, the bottom end of the advancing pull rod penetrates through the connecting piece, the advancing pull rod is movably connected with the connecting piece, a speed pull rod is arranged on the same side of the connecting piece, the speed pull rod is movably connected with the connecting piece, an operation grip block is fixedly connected with the front protection block;
further, one side of frame is equipped with the mixture guard plate, the top both sides of mixture guard plate are equipped with the baffle, baffle and mixture guard plate fixed connection, the inside mixture of having seted up in top of mixture guard plate is placed the mouth, the inside of mixture guard plate is equipped with first influx board, first influx board and mixture guard plate swing joint, bottom one side of mixture guard plate is equipped with the corase grind gasket, corase grind gasket and mixture guard plate swing joint.
Further, one side that the frame was kept away from to the mixture guard plate is equipped with the cement guard plate, the top of cement guard plate has been seted up cement and has been placed the mouth, the inside of cement guard plate is equipped with the second and flows into the board, the second flows into board and cement guard plate swing joint, the bottom of cement guard plate is equipped with the fine grinding gasket, cement guard plate and fine grinding gasket swing joint.
Furthermore, the bottom end of the front protection block is provided with a support. The front protection block is fixedly connected with the support, the bottom end of the support is provided with a spring movable protection, the support is movably connected with the spring movable protection, the outer side of the spring movable protection is provided with a compression spring, and the compression spring wraps the spring movable protection and is movably connected with the spring movable protection.
Furthermore, the bottom of compression spring is equipped with the spring cushion, the bottom swing joint of spring activity protection has the spring cushion, slotted and compression spring card is seted up at the top of spring cushion at the inslot, the bottom of spring cushion is equipped with the wheel vaulting pole, spring cushion and wheel vaulting pole fixed connection, the bottom of wheel vaulting pole is equipped with connecting bolt, connecting bolt's one end is equipped with the tire, connecting bolt runs through tire and wheel vaulting pole and swing joint.
Furthermore, the support and the tire are divided into two parts which are positioned at two sides of the front protection block and are in the same axis.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a be equipped with first inflow board and second inflow board, be favorable to carrying out the roadside when pouring, carry out the open-ended adjustment because of the big small and big specification difference of mixture, make the intermixture meet the standard of mixture and cement, make its bedding more smooth-going, level and smooth more on road surface, the great improvement of life.
2. The utility model discloses a be equipped with corase grind gasket and fine grinding gasket, be favorable to when carrying out mixture and cement and laying, carry out roughly the level and smooth of colating through the corase grind gasket earlier, carry out the level and smooth and the detail level and smooth on road surface through the fine grinding gasket after.
3. The utility model discloses a be equipped with the tire, be favorable to carrying out more smooth adjustment at the slope to the geographical position of difference and during operation, can not make to lay because of meetting the slope and go on sunkenly or outstanding.
4. The utility model discloses a be equipped with forward pull rod and speed pull rod connecting piece, be favorable to carrying out the during operation, carry out the accuse to speed and progress of laying, can not produce the hole because of too fast or lead to the fact the salient too slowly.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an explosion diagram of the overall structure of the present invention.
Fig. 3 is a schematic view of the discharge structure of the present invention.
Fig. 4 is a schematic view of the operation structure of the present invention.
The reference signs are: 1. a frame; 2. a mixture protection plate; 201. a mixture placing port; 202. a baffle plate; 203. a first inflow plate; 3. a cement guard plate; 301. a cement placing port; 302. a second inflow plate; 4. a front guard block; 5. operating the grip; 6. supporting; 601. a compression spring; 602. the spring is movably protected; 7. a tire; 701. a connecting bolt; 702. a wheel stay; 703. a spring cushion block; 8. a motor; 9. roughly grinding the gasket; 10. finely grinding the gasket; 11. clamping the column; 12. a forward pull rod; 13. a speed pull rod; 14. a connecting member.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the drawings in the present invention, and the forms of the structures described in the following embodiments are merely examples, and the present invention is not limited to the structures described in the following embodiments, and all other embodiments obtained by a person skilled in the art without creative work belong to the scope of the present invention.
Referring to fig. 1-4, the utility model provides a cement pouring equipment, including frame 1, its characterized in that: the bottom end of a rack 1 is provided with a motor 8, one side of the rack 1 is provided with a mixture protection plate 2, the mixture protection plate 2 is fixedly connected with the rack 1, one side of the mixture protection plate 2, which is far away from the rack 1, is provided with a cement protection plate 3, the cement protection plate 3 is fixedly connected with the mixture protection plate 2, one side of the rack 1, which is far away from the mixture protection plate 2, is provided with a front protection block 4, the front protection block 4 is fixedly connected with the rack 1, the bottom end of the front protection block 4 is provided with a support 6, the support 6 is fixedly connected with the front protection block 4, the bottom end of the support 6 is provided with a tire 7, the middle part of one side of the front protection block 4, which is far away from the rack 1, is provided with a connecting piece 14, the connecting piece 14 is fixedly connected with the front protection block 4, two ends of the connecting piece 14 are provided with clamping columns 11, the clamping columns 11 are fixedly connected with the connecting piece 14, one side of the connecting piece 14, the bottom end of the advancing pull rod 12 is movably connected with the connecting piece 14, one side of the advancing pull rod 13 is connected with the advancing pull rod 12, the same side of the advancing pull rod 12, the advancing pull rod 13 is arranged on the same side of the connecting piece 14 as the advancing pull rod 12, the advancing pull rod 13, one side of the front protection block 14, one side of the operating block 5, which is provided with the handle block 5, which is far away from the operating block 5, and the operating block 5;
referring to fig. 3, one side of frame 1 is equipped with mixture guard plate 2, the top both sides of mixture guard plate 2 are equipped with baffle 202, baffle 202 and 2 fixed connection of mixture guard plate, the inside mixture of having seted up in top of mixture guard plate 2 places mouth 201, the inside of mixture guard plate 2 is equipped with first influx board 203, first influx board 203 and 2 swing joint of mixture guard plate, bottom one side of mixture guard plate 2 is equipped with coarse grinding gasket 9, coarse grinding gasket 9 and 2 swing joint of mixture guard plate, make the during operation, the specification size of mixture is adjusted, the construction is more smooth-going, and the road surface is more level and smooth.
Referring to fig. 3, one side that frame 1 was kept away from to mixture guard plate 2 is equipped with cement guard plate 3, cement has been seted up on the top of cement guard plate 3 and has been placed mouth 301, the inside of cement guard plate 3 is equipped with the second and flows into board 302, the second flows into board 302 and 3 swing joint of cement guard plate, the bottom of cement guard plate 3 is equipped with fine grinding gasket 10, cement guard plate 3 and fine grinding gasket 10 swing joint, make during operation cement carry out flow control, make the ratio accord with the regulation more, the road surface life-span is increased.
Referring to fig. 2, the bottom of anterior protection piece 4 is equipped with supports 6, and anterior protection piece 4 and support 6 fixed connection support 6's bottom and be equipped with spring activity protection 602, support 6 and spring activity protection 602 swing joint, and the outside of spring activity protection 602 is equipped with compression spring 601, and compression spring 601 wraps up spring activity protection 602 and swing joint, makes more whole of machine structure, operates convenience more simply.
Referring to fig. 2, a spring cushion block 703 is arranged at the bottom end of a compression spring 601, a spring cushion block 703 is movably connected at the bottom end of a spring movable guard 602, a groove is formed in the top of the spring cushion block 703, the compression spring 601 is clamped in the groove, a wheel stay 702 is arranged at the bottom end of the spring cushion block 703, the spring cushion block 703 is fixedly connected with the wheel stay 702, a connecting bolt 701 is arranged at the bottom end of the wheel stay 702, a tire 7 is arranged at one end of the connecting bolt 701, and the connecting bolt 701 penetrates through the tire 7 and is movably connected with the wheel stay 702, so that the machine can move more smoothly without deviation.
Referring to fig. 2, the support 6 and the tire 7 are divided into two parts which are located at two sides of the front protection block 4 and are in the same axis, so that the two surfaces are uniformly stressed, and the work is smoother when a slope is generated.
The utility model discloses a theory of operation: when the device works, after the device is placed at a proper position, the first inflow plate 203 and the second inflow plate 302 are subjected to opening size to be fixed at a position which meets the requirements through a preset mixture size, then the device is started to work, the mixture and the cement are placed through the mixture placing opening 201 and the cement placing opening 301, the device is controlled through the forward pull rod 12 and the speed pull rod 13 after the placement is completed, a user pulls the operation handle 5 to move the device through the tire 7, when the device moves, the mixture and the cement fall to the ground through the opening installation specifications of the first inflow plate 203 and the second inflow plate 302, the rough leveling is performed through the rough grinding gasket 9 for the first time, the fine leveling is performed through the fine grinding gasket 10 again, then the device is moved through the tire 7, and the road edge is laid and poured continuously.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to common designs, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a cement pouring equipment, includes frame (1), its characterized in that: the bottom of frame (1) is equipped with motor (8), one side of frame (1) is equipped with mixture guard plate (2), mixture guard plate (2) and frame (1) fixed connection, one side that frame (1) was kept away from in mixture guard plate (2) is equipped with cement guard plate (3), cement guard plate (3) and mixture guard plate (2) fixed connection, one side that mixture guard plate (2) was kept away from in frame (1) is equipped with anterior protection piece (4), anterior protection piece (4) and frame (1) fixed connection, the bottom of anterior protection piece (4) is equipped with support (6), support (6) and anterior protection piece (4) fixed connection, the bottom of support (6) is equipped with tire (7), one side middle part that frame (1) was kept away from in anterior protection piece (4) is equipped with connecting piece (14), connecting piece (14) and anterior protection piece (4) fixed connection, the both ends of connecting piece (14) are equipped with clamp post (11), clamp post (11) and connecting piece (14) fixed connection, protection connecting piece (14) are equipped with the pull rod (12) that advances forward one side of anterior protection piece (4), the front protection device is characterized in that the front pull rod (12) is movably connected with the connecting piece (14), a speed pull rod (13) is arranged on one side of the front pull rod (12), the speed pull rod (13) and the front pull rod (12) are arranged on the same side of the connecting piece (14), the bottom end of the speed pull rod (13) penetrates through the connecting piece (14), the speed pull rod (13) is movably connected with the connecting piece (14), operation handles (5) are arranged at two ends, far away from one side of the rack (1), of the front protection block (4), and the operation handles (5) are fixedly connected with the front protection block (4).
2. The cement casting apparatus of claim 1, wherein: one side of frame (1) is equipped with mixture guard plate (2), the top both sides of mixture guard plate (2) are equipped with baffle (202), baffle (202) and mixture guard plate (2) fixed connection, the inside mixture of having seted up in top of mixture guard plate (2) places mouth (201), the inside of mixture guard plate (2) is equipped with first influent board (203), first influent board (203) and mixture guard plate (2) swing joint, bottom one side of mixture guard plate (2) is equipped with coarse grinding gasket (9), coarse grinding gasket (9) and mixture guard plate (2) swing joint.
3. The cement casting apparatus of claim 1, wherein: one side that frame (1) was kept away from in mixture guard plate (2) is equipped with cement guard plate (3), cement has been seted up on the top of cement guard plate (3) and has been placed mouth (301), the inside of cement guard plate (3) is equipped with second inflow board (302), second inflow board (302) and cement guard plate (3) swing joint, the bottom of cement guard plate (3) is equipped with fine grinding gasket (10), cement guard plate (3) and fine grinding gasket (10) swing joint.
4. The cement casting device according to claim 1, wherein: the bottom of anterior protection piece (4) is equipped with support (6), anterior protection piece (4) and support (6) fixed connection, the bottom of support (6) is equipped with spring activity protection (602), support (6) and spring activity protection (602) swing joint, the outside of spring activity protection (602) is equipped with compression spring (601), compression spring (601) parcel spring activity protection (602) and swing joint.
5. The cement casting apparatus of claim 4, wherein: the bottom of compression spring (601) is equipped with spring cushion block (703), the bottom swing joint of spring activity protection (602) has spring cushion block (703), slotted and compression spring (601) card is seted up at the top of spring cushion block (703) and is in the inslot, the bottom of spring cushion block (703) is equipped with wheel vaulting pole (702), spring cushion block (703) and wheel vaulting pole (702) fixed connection, the bottom of wheel vaulting pole (702) is equipped with connecting bolt (701), the one end of connecting bolt (701) is equipped with tire (7), connecting bolt (701) run through tire (7) and wheel vaulting pole (702) and swing joint.
6. The cement casting apparatus of claim 1, wherein: the support (6) and the tire (7) are divided into two parts which are positioned at two sides of the front protection block (4) and are in the same axis.
CN202222462655.3U 2022-09-17 2022-09-17 Cement pouring equipment Active CN218404953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222462655.3U CN218404953U (en) 2022-09-17 2022-09-17 Cement pouring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222462655.3U CN218404953U (en) 2022-09-17 2022-09-17 Cement pouring equipment

Publications (1)

Publication Number Publication Date
CN218404953U true CN218404953U (en) 2023-01-31

Family

ID=85032156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222462655.3U Active CN218404953U (en) 2022-09-17 2022-09-17 Cement pouring equipment

Country Status (1)

Country Link
CN (1) CN218404953U (en)

Similar Documents

Publication Publication Date Title
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
CN108193608A (en) The cast-in-place road gully of mobile moldbase and construction method
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN206553851U (en) roadbed widening structure
CN110682433A (en) Prefabricated stand column construction scheme
CN110424226A (en) Kerbstone precast assembly side form and its construction technology
CN218404953U (en) Cement pouring equipment
KR101082418B1 (en) mold apparatus for forming concrete slab of bridge
CN210086000U (en) Town road curb construction equipment
CN112814116A (en) Construction method of cast-in-situ drainage ditch
CN100570066C (en) Change the Template Location method of laminated rubber bearing on the road bridge abutment
CN215210384U (en) Slip form concrete pouring device for drainage ditch
CN209854513U (en) Town road curb mounting structure and construction equipment
CN113250047B (en) Highway bridge roadbed pavement auxiliary construction device and construction method thereof
CN212247774U (en) Novel road base layer foam light soil side form structure and side form template matched with same
CN211036655U (en) Concrete road surface joint cutting device
CN114561873A (en) Bridge high pier construction method
JPH102199A (en) Placing device of concrete in tunnel bottom
JP2874573B2 (en) Rail foundation and its repair method
CN207988637U (en) A kind of prefabricated post connection structure for being fixed temporarily, adjusting height
KR20030057840A (en) Method for dry constructing road boundary stones and road boundary stone supporting device
CN108643228A (en) A kind of logical construction technology of prefabricated car case
CN212223563U (en) Be used for road and bridge crack to restore fixing device
CN116463906B (en) Construction process and quality control method of non-joint cement concrete pavement
KR20100089984A (en) The method of curb construction by multi screw jack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant