CN110185386A - Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum - Google Patents

Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum Download PDF

Info

Publication number
CN110185386A
CN110185386A CN201910565780.7A CN201910565780A CN110185386A CN 110185386 A CN110185386 A CN 110185386A CN 201910565780 A CN201910565780 A CN 201910565780A CN 110185386 A CN110185386 A CN 110185386A
Authority
CN
China
Prior art keywords
concrete
rotary
incompact
hole
drilling rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910565780.7A
Other languages
Chinese (zh)
Inventor
刘大华
耿立才
周清学
何平
徐建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road and Bridge (Group) Co Ltd
Original Assignee
Sichuan Road and Bridge (Group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Road and Bridge (Group) Co Ltd filed Critical Sichuan Road and Bridge (Group) Co Ltd
Priority to CN201910565780.7A priority Critical patent/CN110185386A/en
Publication of CN110185386A publication Critical patent/CN110185386A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a rotary excavating rapid hole forming method for a concrete retaining wall of a loosely accumulated stratum, which mainly comprises the following construction steps: measuring a lofting embedding hole steel pile casing, constructing by adopting a rotary drilling rig, and after drilling a pile hole depth of about 2m into a loose soil layer, lifting out a drilling bucket of the rotary drilling rig; pouring small stone concrete into the pile hole, and putting a drilling bucket of the rotary drilling rig into the pile hole to repeatedly impact and extrude the concrete downwards so that the small stone concrete or slurry is pressed into a surrounding loose accumulation body under the action of certain impact pressure; and (3) initially setting for 1-2 days, after the small stone concrete or slurry reaches a certain strength, constructing by using the rotary drilling rig again, rotary drilling and removing the concreted concrete in the previous drilled hole, and extruding the concreted concrete into the surrounding loose accumulation body and the concreted concrete adhered to the hole wall to form a circle of concrete concreted body retaining wall. The invention can realize effective drilling of the rotary drilling rig in the stratum of the loose rock-soil accumulation body, quickens the construction progress, avoids the phenomena of hole collapse, drill jamming and the like, and ensures the hole forming quality.

Description

A kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method
Technical field
The present invention relates to a kind of rotary digging fast pore-creating methods, are specifically a kind of incompact-deposit bodies stratum concrete guard walls Rotary digging fast pore-creating technology.
Background technique
Rotary digging stake generally refers to the pile foundation by rotary drilling rig drilling and forming hole and concrete perfusion construction molding, full name churning driven Hole pouring pile, abbreviation rotary digging stake in engineering.Due to using mechanical work, worker's number is required seldom, construction safety is convenient, ground Layer applicability is wide, and construction efficiency is high, and mechanization degree is high and is promoted rapidly.
Rotary drilling rig efficiency in general argillic horizon, powder soil horizon, strong-weathered rock rock layers is very high, and difficulty of construction is lower, but If encounter incompact-deposit bodies stratum, work surface hole wall is excavated in rotary digging stake cannot be certainly steady, if arranging without retaining wall measure or retaining wall When applying weaker, easily collapse hole, pile quality are difficult to ensure repeatedly for appearance, will also result in the delay of duration and the increase of cost.For Rotary digging drilled as holes in incompact-deposit bodies stratum generally makees retaining wall using all steel casing and carries out drilling and forming hole, but in pile foundation filling process In, steel pile casting can not be extracted substantially, will be wholly embedded into pile body, drilling construction higher cost, and steel pile casting is pressed into constructing operation It is not efficient and convenient.
Summary of the invention
Therefore, in order to solve above-mentioned deficiency, the present invention provides a kind of construction under incompact-deposit bodies formation condition herein Fastly, quality height, a kind of concrete guard wall rotary digging fast pore-creating technology at low cost, easy to operate, save the cost accelerate the duration, Phenomena such as avoiding the occurrence of collapse hole repeatedly, it is ensured that hole quality.
The invention is realized in this way a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method is constructed, It constructs suitable for incompact-deposit bodies stratum such as sandy pear variety, crushed gravel layer, argillic horizons, it is characterised in that: walked including following construction It is rapid:
(1), surveying and locating excavates embedded 1.5~2m long of steel pile casting to aperture section using excavator, and casing is bigger by 20 than design aperture ~30cm, 30cm above ground level or so;
(2), then rotary drilling rig construct in place, along guide pile dot center be drilled down into 2m or so stake holes depth after (if hole wall from Surely ability is slightly good can be deeper), propose rotary drilling digger;
(3), micro aggregate concrete (C15~C20) is perfused into stake holes by concrete conveyance conduit;
(4), it is put into the drilling bucket of rotary drilling rig into stake holes, by repeated stock, extruded concrete, makes micro aggregate concrete or slurry Liquid is under the conditions of certain pressure along native stone gap indentation surrounding incompact-deposit bodies;
(5), concrete initial set 1-2 days are constructed using rotary drilling rig again after concrete or slurries reach some strength, will It has previously consolidated concrete churning driven in drilling to remove, the consolidation concrete squeezing into incompact-deposit bodies around and being bonded on hole wall will A circle concrete induration retaining wall is formed, to play support action;
(6), it repeats the above steps, continues subsequent cycle construction, until rotary drilling rig is drilled into design hole depth.
A kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to the present invention, feature exist In;In step (2), using the max. output torque of large-scale rotary drilling rig is 285kNm or 360kNm.
A kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to the present invention, feature exist In;In step (2), the depth that rotary drilling rig is drilled down into generally each is circulated in 2m or so range, with specific reference to stratum feelings Phenomena such as too deep to prevent drilling depth depending on condition, incompact-deposit bodies self-stable ability is insufficient, generates collapse hole bit freezing.
A kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to the present invention, feature exist In;In step (3), the micro aggregate concrete grade being perfused is C15~C20,180~220mm of the slump, and is mixed with certain ratio The early strength agent of example improves drilling progress to accelerate the concrete setting retaining wall time.
A kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to the present invention, feature exist In;In step (4), using the drilling bucket repeated stock of rotary drilling rig, extruded concrete, impacting micro aggregate concrete or slurries Pressure acts in lower edge soil stone gap indentation surrounding incompact-deposit bodies, forms a circle concrete consolidation in borehole circumference after consolidating Body retaining wall prevents collapse hole to play support action.
A kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to the present invention, feature exist In;In step (5), since third step mixes the effect with early strength agent, micro aggregate concrete initial set is consolidated into substantially after 1-2 days Shape, and there is some strength, bore the concrete except drill center filling consolidation downwards again by rotary drilling rig, then still further below 2m or so depth is pierced, continues to repeat above-mentioned construction procedure, until rotary digging is to designing hole depth.
The present invention has the advantage that structure of the invention is simple, easy to operate, save the cost accelerates the duration, guarantee at Quality of pile solves under incompact-deposit bodies strata condition, and work surface is excavated in rotary digging stake cannot be certainly steady, if without retaining wall measure or shield When wall measure is weaker, easily there is collapse hole repeatedly, a series of problems, such as pile quality is difficult to ensure.Economic serviceability is strong, have compared with Good application value.
Make compared with retaining wall carries out drilling and forming hole with generalling use all steel casing, incompact-deposit bodies of the invention ground layer concrete The advantages of retaining wall rotary digging fast pore-creating technology, is:
(1), this method is suitable for the incompact-deposit bodies stratum such as sandy pear variety, crushed gravel layer, argillic horizon;
(2), drilling construction step designs reasonable, easy to operate, save the cost;
(3), by carrying out rotary digging after concrete guard wall supporting, collapse hole and other issues is effectively prevented, guarantees hole quality.
Detailed description of the invention
Fig. 1-Fig. 4 is the incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating technical operating procedure that the present invention is implemented Schematic diagram.
Wherein: steel pile casting 1, concrete guard wall circle 2, casting concrete 3.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 4, the present invention is described in detail, technical solution in the embodiment of the present invention into Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work Every other embodiment, shall fall within the protection scope of the present invention.
The present invention provides a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method by improving herein, fits It constructs for incompact-deposit bodies stratum such as sandy pear variety, crushed gravel layer, argillic horizons, it is characterised in that: including following construction procedure:
(1), surveying and locating excavates embedded 1.5~2m long of steel pile casting to aperture section using excavator, and casing is bigger by 20 than design aperture ~30cm, 30cm above ground level or so;
(2), then rotary drilling rig construct in place, along guide pile dot center be drilled down into 2m or so stake holes depth after (if hole wall from Surely ability is slightly good can be deeper), propose rotary drilling digger;
(3), micro aggregate concrete (C15~C20) is perfused into stake holes by concrete conveyance conduit;
(4), it is put into the drilling bucket of rotary drilling rig into stake holes, by repeated stock, extruded concrete, makes micro aggregate concrete or slurry Liquid is under the conditions of certain pressure along native stone gap indentation surrounding incompact-deposit bodies;
(5), concrete initial set 1-2 days are constructed using rotary drilling rig again after concrete or slurries reach some strength, will It has previously consolidated concrete churning driven in drilling to remove, the consolidation concrete squeezing into incompact-deposit bodies around and being bonded on hole wall will A circle concrete induration retaining wall is formed, to play support action;
(6), it repeats the above steps, continues subsequent cycle construction, until rotary drilling rig is drilled into design hole depth.
Wherein, in step (2), using the max. output torque of large-scale rotary drilling rig is 285kNm or 360kNm. In addition, the depth that rotary drilling rig is drilled down into generally each circulates in 2m or so range, depending on strata condition, with Phenomena such as anti-drilling depth is too deep, and incompact-deposit bodies self-stable ability is insufficient, generates collapse hole bit freezing.
In step (3), the micro aggregate concrete grade being perfused is C15~C20,180~220mm of the slump, and mixes and match A certain proportion of early strength agent improves drilling progress to accelerate the concrete setting retaining wall time.
In step (4), using the drilling bucket repeated stock of rotary drilling rig, extruded concrete, make micro aggregate concrete or slurries Around surge effect lower edge soil stone gap is pressed into incompact-deposit bodies, a circle coagulation is formed in borehole circumference after consolidating Native induration retaining wall prevents collapse hole to play support action.
It is substantially solid after micro aggregate concrete initial set 1-2 days since third step mixes the effect with early strength agent in step (5) Form shape, and there is some strength, bores the concrete except drill center filling consolidation downwards again by rotary drilling rig, then again It is drilled down into 2m or so depth, continues to repeat above-mentioned construction procedure, until rotary digging is to designing hole depth.
The invention discloses a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating technologies, use rotary drilling rig Construct suitable for incompact-deposit bodies stratum such as sandy pear variety, crushed gravel layer, argillic horizons, main construction procedure is as follows: measurement is put Sample buries aperture steel pile casting, is constructed using rotary drilling rig, after piercing 2m or so stake holes depth to loose soil bed, proposes rotary digging machine drill Bucket;Micro aggregate concrete (C15~C20) is perfused into stake holes, and is put into the drilling bucket of rotary drilling rig downward impact extruded is mixed repeatedly Solidifying soil makes micro aggregate concrete or slurries around the effect of certain impact pressure is pushed down into incompact-deposit bodies;Pre-hardening 1-2 days, After micro aggregate concrete or slurries reach some strength, again using rotary drilling rig construct, will previously drill in consolidated it is mixed Solidifying soil churning driven removes, and the consolidation concrete squeezing into incompact-deposit bodies around and being bonded on hole wall will form a circle concrete consolidation Body retaining wall, to play support action;Continue to repeat the above steps until design hole depth.Loose rock soil accumulation body of the invention Layer concrete retaining wall rotary digging fast pore-creating technology, than general full-steel cylinder-wall protecting drilling and forming hole method have it is easy to operate, save at This, is able to achieve effective drilling of the rotary drilling rig in loose rock soil accumulation body stratum, accelerates construction speed, avoid collapse hole card Phenomena such as brill, it is ensured that hole quality.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (6)

1. a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method is suitable for sandy pear variety, crushed gravel layer, glues The incompact-deposit bodies such as soil layer stratum construction, it is characterised in that: including following construction procedure:
(1), surveying and locating excavates embedded 1.5~2m long of steel pile casting to aperture section using excavator, and casing is bigger by 20 than design aperture ~30cm, 30cm above ground level or so;
(2), then rotary drilling rig construct in place, along guide pile dot center be drilled down into 2m or so stake holes depth after (if hole wall from Surely ability is slightly good can be deeper), propose rotary drilling digger;
(3), micro aggregate concrete (C15~C20) is perfused into stake holes by concrete conveyance conduit;
(4), it is put into the drilling bucket of rotary drilling rig into stake holes, by repeated stock, extruded concrete, makes micro aggregate concrete or slurry Liquid is under the conditions of certain pressure along native stone gap indentation surrounding incompact-deposit bodies;
(5), concrete initial set 1-2 days are constructed using rotary drilling rig again after concrete or slurries reach some strength, will It has previously consolidated concrete churning driven in drilling to remove, the consolidation concrete squeezing into incompact-deposit bodies around and being bonded on hole wall will A circle concrete induration retaining wall is formed, to play support action;
(6), it repeats the above steps, continues subsequent cycle construction, until rotary drilling rig is drilled into design hole depth.
2. a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to claim 1, feature It is;In step (2), using the max. output torque of large-scale rotary drilling rig is 285kNm or 360kNm.
3. a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to claim 1, feature It is;In step (2), the depth that rotary drilling rig is drilled down into generally each is circulated in 2m or so range, with specific reference to stratum Phenomena such as too deep to prevent drilling depth depending on situation, incompact-deposit bodies self-stable ability is insufficient, generates collapse hole bit freezing.
4. a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to claim 1, feature It is;In step (3), the micro aggregate concrete grade being perfused is C15~C20,180~220mm of the slump, and is mixed with certain The early strength agent of ratio improves drilling progress to accelerate the concrete setting retaining wall time.
5. a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to claim 1, feature It is;In step (4), using the drilling bucket repeated stock of rotary drilling rig, extruded concrete, rushing micro aggregate concrete or slurries It hits in pressure effect lower edge soil stone gap indentation surrounding incompact-deposit bodies, forms a circle concrete in borehole circumference after consolidating and consolidate Knot body retaining wall prevents collapse hole to play support action.
6. a kind of incompact-deposit bodies stratum concrete guard wall rotary digging fast pore-creating method according to claim 1, feature It is;In step (5), since third step mixes the effect with early strength agent, micro aggregate concrete initial set is consolidated into substantially after 1-2 days Shape, and there is some strength, bore the concrete except drill center filling consolidation downwards again by rotary drilling rig, then still further below 2m or so depth is pierced, continues to repeat above-mentioned construction procedure, until rotary digging is to designing hole depth.
CN201910565780.7A 2019-06-27 2019-06-27 Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum Pending CN110185386A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910565780.7A CN110185386A (en) 2019-06-27 2019-06-27 Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910565780.7A CN110185386A (en) 2019-06-27 2019-06-27 Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum

Publications (1)

Publication Number Publication Date
CN110185386A true CN110185386A (en) 2019-08-30

Family

ID=67723752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910565780.7A Pending CN110185386A (en) 2019-06-27 2019-06-27 Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum

Country Status (1)

Country Link
CN (1) CN110185386A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101865A (en) * 2019-12-30 2020-05-05 深圳市盛业地下工程有限公司 High efficiency drilling equipment
CN111458179A (en) * 2020-04-16 2020-07-28 河北益坤岩土工程新技术有限公司 Rock soil sampling method
CN112282638A (en) * 2020-09-09 2021-01-29 中国水利水电第九工程局有限公司 Pipe following drilling pore-forming backfill grouting construction method
CN112411526A (en) * 2020-11-27 2021-02-26 中国建筑第四工程局有限公司 Mortar consolidation construction method for rotary drilling collapse hole in high backfill region
CN112983273A (en) * 2021-02-26 2021-06-18 何漪 Forward convex drilling device for prospecting engineering
CN113550306A (en) * 2021-07-22 2021-10-26 江西基业科技集团有限公司 Earth-rock wall protection construction method
CN113738272A (en) * 2021-11-08 2021-12-03 中建八局发展建设有限公司 Rotary drilling hole forming construction method for pile foundation in gravel area with easy hole collapse
CN114293907A (en) * 2021-12-29 2022-04-08 云南建投第五建设有限公司 Pile foundation pore-forming construction method under boulder water-out stratum condition
CN115059060A (en) * 2022-06-23 2022-09-16 东莞市恒昌建筑工程有限公司 Rotary excavating grouting wall protection construction method for complex terrain
CN115182334A (en) * 2022-07-21 2022-10-14 中国五冶集团有限公司 Construction method of rotary-excavated cast-in-place pile under miscellaneous fill high-backfill geological condition

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758430A (en) * 2012-07-31 2012-10-31 中建五局第三建设有限公司 Large-diameter rotary digging pile construction process for ultra-deep throwing and filling unconsolidated soil body
CN203821414U (en) * 2014-04-29 2014-09-10 中建四局第五建筑工程有限公司 Structure of protecting wall of hole-digging pile
CN104499479A (en) * 2014-12-19 2015-04-08 上海申元岩土工程有限公司 Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN105569041A (en) * 2015-12-14 2016-05-11 中南勘察设计院(湖北)有限责任公司 Drilling wall protection method in deep sandy pebble stratum of karst region
CN106168024A (en) * 2015-05-19 2016-11-30 五冶集团上海有限公司 A drilling construction method is dug in special formation rotation
CN108149678A (en) * 2018-01-12 2018-06-12 中铁三局集团有限公司 A kind of loess retaining wall does the construction method of operation pore-creating filling pile
CN108239986A (en) * 2016-12-27 2018-07-03 张双平 The small steel pipe dado reinforced construction method of artificial digging pile drift sand formation
CN109488202A (en) * 2018-11-05 2019-03-19 云南建投第三建设有限公司 A kind of gravel rock stratum pile foundation drilling construction engineering method containing gravel-boulder bed
CN109518677A (en) * 2018-11-26 2019-03-26 五冶集团上海有限公司 Punching Borehole Cast-in-place Concrete Pile karst cave treatment method
CN109914395A (en) * 2019-01-28 2019-06-21 中国电建集团贵阳勘测设计研究院有限公司 Rapid construction method and structure of large-diameter socketed pile

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758430A (en) * 2012-07-31 2012-10-31 中建五局第三建设有限公司 Large-diameter rotary digging pile construction process for ultra-deep throwing and filling unconsolidated soil body
CN203821414U (en) * 2014-04-29 2014-09-10 中建四局第五建筑工程有限公司 Structure of protecting wall of hole-digging pile
CN104499479A (en) * 2014-12-19 2015-04-08 上海申元岩土工程有限公司 Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN106168024A (en) * 2015-05-19 2016-11-30 五冶集团上海有限公司 A drilling construction method is dug in special formation rotation
CN105569041A (en) * 2015-12-14 2016-05-11 中南勘察设计院(湖北)有限责任公司 Drilling wall protection method in deep sandy pebble stratum of karst region
CN108239986A (en) * 2016-12-27 2018-07-03 张双平 The small steel pipe dado reinforced construction method of artificial digging pile drift sand formation
CN108149678A (en) * 2018-01-12 2018-06-12 中铁三局集团有限公司 A kind of loess retaining wall does the construction method of operation pore-creating filling pile
CN109488202A (en) * 2018-11-05 2019-03-19 云南建投第三建设有限公司 A kind of gravel rock stratum pile foundation drilling construction engineering method containing gravel-boulder bed
CN109518677A (en) * 2018-11-26 2019-03-26 五冶集团上海有限公司 Punching Borehole Cast-in-place Concrete Pile karst cave treatment method
CN109914395A (en) * 2019-01-28 2019-06-21 中国电建集团贵阳勘测设计研究院有限公司 Rapid construction method and structure of large-diameter socketed pile

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101865A (en) * 2019-12-30 2020-05-05 深圳市盛业地下工程有限公司 High efficiency drilling equipment
CN111458179A (en) * 2020-04-16 2020-07-28 河北益坤岩土工程新技术有限公司 Rock soil sampling method
CN112282638A (en) * 2020-09-09 2021-01-29 中国水利水电第九工程局有限公司 Pipe following drilling pore-forming backfill grouting construction method
CN112411526A (en) * 2020-11-27 2021-02-26 中国建筑第四工程局有限公司 Mortar consolidation construction method for rotary drilling collapse hole in high backfill region
CN112983273A (en) * 2021-02-26 2021-06-18 何漪 Forward convex drilling device for prospecting engineering
CN112983273B (en) * 2021-02-26 2024-01-30 邢台市中煤矿山器材有限公司 Forward-convex drilling device for exploratory engineering
CN113550306A (en) * 2021-07-22 2021-10-26 江西基业科技集团有限公司 Earth-rock wall protection construction method
CN113738272A (en) * 2021-11-08 2021-12-03 中建八局发展建设有限公司 Rotary drilling hole forming construction method for pile foundation in gravel area with easy hole collapse
CN114293907A (en) * 2021-12-29 2022-04-08 云南建投第五建设有限公司 Pile foundation pore-forming construction method under boulder water-out stratum condition
CN115059060A (en) * 2022-06-23 2022-09-16 东莞市恒昌建筑工程有限公司 Rotary excavating grouting wall protection construction method for complex terrain
CN115059060B (en) * 2022-06-23 2023-06-16 东莞市恒昌建筑工程有限公司 Construction method for rotary digging grouting retaining wall of complex terrain
CN115182334A (en) * 2022-07-21 2022-10-14 中国五冶集团有限公司 Construction method of rotary-excavated cast-in-place pile under miscellaneous fill high-backfill geological condition

Similar Documents

Publication Publication Date Title
CN110185386A (en) Rotary-digging rapid hole forming method for concrete retaining wall of loose accumulation body stratum
JP2022502586A (en) Grouting consolidation method of ready-made piles guided by all-casing excavation, and the ready-made piles
CN109594564A (en) A kind of anti-collapse construction method of Metro Deep Excavation open cut
CN100501011C (en) Hole drilling mudjack pile construction method
CN104988907A (en) Construction method of concrete pile
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN111472346A (en) Construction method for reinforcing soil around pile body of cast-in-place pile
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
CN107044293A (en) A kind of construction method in tunnel
CN110284885A (en) Shield inspection-pit construction method
CN104329020A (en) Reinforced long-screw rock-socketed construction equipment and process thereof
KR20100086146A (en) Construction method for composite pile using digging and hardenning
KR101057487B1 (en) Grouting Method Using Enlarged Concrete Consolidation Grouting Apparatus
CN108149672A (en) The processing method of underground karst cavity
KR101081343B1 (en) Compaction grouting system
CN102425179B (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile
CN106049467A (en) Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN216238507U (en) Dig quick pore-forming dado structure soon
US3468131A (en) Retaining structures placed into the ground and their procedures of execution
KR0148437B1 (en) Pile construction method in underground boulder zone
KR101057481B1 (en) Basic reinforcement expansion consolidation drawing method using basic reinforcement expansion consolidation drawing device
CN114991774A (en) Ground subsection descending type grouting method for crushed andesite basalt stratum
CN104032736B (en) The construction method of cement mixing method in Coral Reef Rock stratum
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190830