CN110169308A - A kind of high mountain hills area wind power plant sandy soil greening recovery construction method - Google Patents

A kind of high mountain hills area wind power plant sandy soil greening recovery construction method Download PDF

Info

Publication number
CN110169308A
CN110169308A CN201910598637.8A CN201910598637A CN110169308A CN 110169308 A CN110169308 A CN 110169308A CN 201910598637 A CN201910598637 A CN 201910598637A CN 110169308 A CN110169308 A CN 110169308A
Authority
CN
China
Prior art keywords
soil
side slope
centimetres
slope
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910598637.8A
Other languages
Chinese (zh)
Inventor
刘斌
闫华
马义平
唐绍卿
丁兆斌
肖虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201910598637.8A priority Critical patent/CN110169308A/en
Publication of CN110169308A publication Critical patent/CN110169308A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C1/00Apparatus, or methods of use thereof, for testing or treating seed, roots, or the like, prior to sowing or planting
    • A01C1/06Coating or dressing seed
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • A01G13/0256Ground coverings
    • A01G13/0268Mats or sheets, e.g. nets or fabrics
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • A01G20/10Pre-cultivated sod or turf; Apparatus therefor
    • A01G20/18Apparatus for laying sods or turfs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Structural Engineering (AREA)
  • Toxicology (AREA)
  • General Health & Medical Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Cultivation Of Plants (AREA)

Abstract

It is afforested the invention discloses a kind of high mountain hills area wind power plant sandy soil and restores construction method, this method includes by the planting soil leveling in side slope, and the plantation soil thickness is not less than 30 centimetres;It is formed on the planting soil and sets plantation foundation structure in level distribution by the side slope top to the side slope lower part;Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure.Wind power plant sandy soil greening in high mountain hills area provided by the present application restores construction method, by sowing means and the measures such as grass-seed, covering non-woven fabrics, ecological vegetation carpet and spraying and seeding afforesting, because environmental disruption caused by construction reason and vegetation damage to have obtained effective control and recovery, the sustainable development of environment ensure that while economic construction.

Description

A kind of high mountain hills area wind power plant sandy soil greening recovery construction method
Technical field
The present invention relates to greening construction technical fields, afforest more particularly to a kind of high mountain hills area wind power plant sandy soil Restore construction method.
Background technique
The kinetic energy kept watch is transformed into mechanical kinetic energy, then mechanical energy is converted into electric power kinetic energy, and here it is wind-power electricity generations.Wind-force The principle of power generation is to drive air vane to rotate using wind-force, then promote the speed of rotation through booster engine, to promote to generate electricity Machine power generation.According to current windmill technology, three meters of gentle breeze speed (degree of gentle breeze) about per second can start to send out Electricity.Wind-power electricity generation just forms one upsurge in the world, because wind-power electricity generation is not needed using fuel, will not generate radiation Or air pollution.
The construction of wind power plant inevitably impacts local ecology, during Construction of Wind Power, for protection Wind power plant environment avoids soil erosion, carries out greening recovery in time after the completion of wind power plant road and blower hoisting platform are constructed Construction.Wind power plant can choose height above sea level in the high mountain hills of 1800m~1900m, high mountain hills site region when addressing is built For interior vegetation based on short forest, shrub and barren hill, surface roughness is relatively small, small to air speed influence when air-flow passes through, wind Energy resources supplIes are relatively preferable.But due to the usual fertile soil thinner thickness in high mountain hills place, average thickness about 20cm or so, Maximum gauge is no more than 30cm, minimum thickness only about 8cm, and essentially sandy soil matter, respective road segment below road fertile soil is in field Rock, hoisting platform excavation slope are sandy soil, severely-weathered~weak weathering geology, and sandy soil class geology is without fertility, and water-retaining property is poor, Revegetation is extremely difficult.
Summary of the invention
It is afforested the present invention provides a kind of high mountain hills area wind power plant sandy soil and restores construction method.
The present invention provides following schemes:
A kind of high mountain hills area wind power plant sandy soil greening recovery construction method, comprising:
By the planting soil leveling in side slope, the plantation soil thickness is not less than 30 centimetres;
It is formed on the planting soil and sets plantation basis knot in level distribution by the side slope top to the side slope lower part Structure;
Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;
The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure, every layer of plantation foundation structure is broadcast Completion is spread in the gluey slurries successively mulching plant soil and non-woven fabrics;Fixation is respectively adopted in every non-woven fabrics end to end Object is fixed, and the lap-joint between adjacent non-woven fabrics is no less than 15 centimetres.
Preferably: the side slope is that the cubic meter of stone backfills side slope, and the planting soil is backfill earthing, the thickness of the backfill earthing It is 30-60 centimetres.
Preferably: the plantation foundation structure is 4-6 centimetres of depth, the planting groove foundation trench structure of 8-12 centimetres of width, institute The row's spacing for stating foundation trench structure is 18-22 centimetres.
Preferably: the plantation foundation structure is foundation pit structure, and row's spacing of the foundation pit structure is 18-22 centimetres and is in Quincuncial arrangement.
Preferably: the side slope is husky soil-slope, and the planting soil is side slope original sandy soil matter soil, plantation basis knot Structure is foundation pit structure, and row's spacing of the foundation pit structure is 18-22 centimetres and is in quincuncial arrangement.
A kind of high mountain hills area wind power plant sandy soil greening recovery construction method, which comprises
By the planting soil leveling in side slope, the plantation soil thickness is not less than 30 centimetres;
It is formed on the planting soil and sets plantation basis knot in level distribution by the side slope top to the side slope lower part Structure;
Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;
The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure, in all plantation foundation structures Successively mulching plant soil, ecological blanket and non-woven fabrics after sowing;Fixture is respectively adopted in every non-woven fabrics end to end It is fixed, the lap-joint between adjacent non-woven fabrics is no less than 15 centimetres.
Preferably: the ecological blanket is extended to the slope foot of the side slope, adjacent two ecology by the top of the slope of the side slope The lap width of blanket is not less than 10 centimetres.
Preferably: 20-40 centimetres of top of the slope one end that the ecological blanket is located at the side slope is embedded in soil.
Preferably: the ecological blanket is fixed using the timber wedge or bamboo nail of 40-60 centimeter length;On the slope of the side slope Top, ecological blanket and ecological blanket lap-joint are followed closely with Bower Anchor and are fixed;Slope surface rest part is fixed using auxiliary holdfast;Positioned at the side slope Top of the slope holdfast spacing be 80 centimetres, positioned at slope surface holdfast spacing be 100 centimetres.
Preferably: the non-woven fabrics is followed closely using iron wire or bamboo stick realizes the fixation with the side slope.
The specific embodiment provided according to the present invention, the invention discloses following technical effects:
By the invention it is possible to realize that a kind of high mountain hills area wind power plant sandy soil greening restores construction method, in a kind of reality Under existing mode, this method may include by the planting soil leveling in side slope, and the plantation soil thickness is not less than 30 centimetres;Described It is formed on planting soil and sets plantation foundation structure in level distribution by the side slope top to the side slope lower part;By grass-seed, Compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;By the gluey slurries Layering from top to bottom is sowed in the plantation foundation structure, and every layer of plantation foundation structure sows completion in the gluey slurry Liquid successively mulching plant soil and non-woven fabrics;The fixture that is respectively adopted end to end of the every non-woven fabrics is fixed, adjacent nothing Lap-joint between woven fabric is no less than 15 centimetres.Wind power plant sandy soil greening in high mountain hills area provided by the present application restores construction Method, by sowing means and the measures such as grass-seed, covering non-woven fabrics, ecological vegetation carpet and spraying and seeding afforesting, caused by construction reason Environmental disruption and vegetation damage to have obtained effective control and recovery, ensure that the sustainable of environment while economic construction Development.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is that the method that embodiment 1 provided in an embodiment of the present invention provides is constructed the structural representation of the greening structure to be formed Figure;
Fig. 2 is that the method that embodiment 2 provided in an embodiment of the present invention provides is constructed the structural schematic diagram of the greening structure to be formed.
In figure: side slope 1, planting soil 2, plantation foundation structure 3, gluey slurries 4, mulching plant soil 5, non-woven fabrics 6, ecological blanket 7。
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
The embodiment of the present application can provide a kind of high mountain hills area wind power plant sandy soil greening recovery construction method, described Method includes:
By the planting soil leveling in side slope, the plantation soil thickness is not less than 30 centimetres;
It is formed on the planting soil and sets plantation basis knot in level distribution by the side slope top to the side slope lower part Structure;
Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;
The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure, every layer of plantation foundation structure is broadcast Completion is spread in the gluey slurries successively mulching plant soil and non-woven fabrics;Fixation is respectively adopted in every non-woven fabrics end to end Object is fixed, and the lap-joint between adjacent non-woven fabrics is no less than 15 centimetres.
This method is directed to the side slope of different structure, and planting soil can have different selections, for example, the side slope is returned for the cubic meter of stone Fill out side slope, the planting soil is backfill earthing, the backfill earthing with a thickness of 30-60 centimetres.The plantation foundation structure is 4-6 centimetres of depth, the planting groove foundation trench structure of 8-12 centimetres of width, row's spacing of the foundation trench structure are 18-22 centimetres.It is described Plantation foundation structure is foundation pit structure, and row's spacing of the foundation pit structure is 18-22 centimetres and is in quincuncial arrangement.For another example The side slope is husky soil-slope, and the planting soil is side slope original sandy soil matter soil, and the plantation foundation structure is foundation pit structure, institute The row's spacing for stating foundation pit structure is 18-22 centimetres and in quincuncial arrangement.
The embodiment of the present application can also provide a kind of high mountain hills area wind power plant sandy soil greening recovery construction method, institute The method of stating includes:
By the planting soil leveling in side slope, the plantation soil thickness is not less than 30 centimetres;
It is formed on the planting soil and sets plantation basis knot in level distribution by the side slope top to the side slope lower part Structure;
Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;
The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure, in all plantation foundation structures Successively mulching plant soil, ecological blanket and non-woven fabrics after sowing;Fixture is respectively adopted in every non-woven fabrics end to end It is fixed, the lap-joint between adjacent non-woven fabrics is no less than 15 centimetres.
Further, the ecological blanket is extended to the slope foot of the side slope, adjacent two life by the top of the slope of the side slope The lap width of state blanket is not less than 10 centimetres.20-40 centimetres of top of the slope one end that the ecological blanket is located at the side slope is embedded in soil In.The ecological blanket is fixed using the timber wedge or bamboo nail of 40-60 centimeter length;In the top of the slope, ecological blanket and life of the side slope Tai Tan lap-joint is followed closely with Bower Anchor and is fixed;Slope surface rest part is fixed using auxiliary holdfast;Positioned at the holdfast of the top of the slope of the side slope Spacing be 80 centimetres, positioned at slope surface holdfast spacing be 100 centimetres.The non-woven fabrics using iron wire follow closely or bamboo stick realize with The fixation of the side slope.
Below by application of this method in Guangxi Ziyuan County ten through the ages field wind power plant engineering to side provided by the present application Method is described in detail.
Wind power plant engineering in field is high mountain hills wind power plant through the ages for Guangxi Ziyuan County ten, to protect wind power plant environment, avoiding water Soil flow is lost, and carries out greening in time after the completion of wind power plant road and blower hoisting platform are constructed and restores construction.According to ten fields through the ages The geological conditions and weather conditions of wind power plant high mountain hills area, greening, which restores mainly to use, sows grass-seed and mode of sowing grass seeds by duster.
Field wind power plant is high mountain hills wind power plant, height above sea level 1800m~1900m, in the region of site through the ages for Guangxi Ziyuan County ten For vegetation based on short forest, shrub and barren hill, surface roughness is relatively small, small to air speed influence when air-flow passes through, wind energy Resources supplIes are relatively preferable.Ziyuan County region belongs to middle subtropical zone monsoon climate, makes a clear distinction between the four seasons, has a moderate climate.In solar radiation, greatly Under compression ring stream and underlying surface comprehensive function, there are the climatic characteristics such as precipitation is plentiful, dry and wet is clearly demarcated.
Field wind power plant is II equal big (2 type) engineering through the ages for Guangxi Ziyuan County ten, and total installation of generating capacity 150MW mainly includes 60 Platform single-machine capacity is the installation of 2.5MW Wind turbines, road and 220kV booster stations in 48km.Greening restores to be suitable for wind-force hair In electric field fan hoisting platform side slope and field road slope occur all Slope levelings, finishing, earthing, sow grass-seed, sow grass seeds by duster Deng, construction meet environment-protective water protect and acceptance requirement.
Construction material
Grass-seed: according to conditions such as the height above sea level, temperature, weather of high mountain knob, the grass-seed of suitable growth is selected, this engineering uses Festuca Arundinacea, rye grass, Bermuda grass and clover mixed seeding.
Fertilizer: N+P is selected2O5+ K2O compound fertilizer and organic fertilizer, urea.
Fertile soil: the fertile soil for excavating stockpiling is selected.
Covering: non-woven fabrics 200g/m2And 140g/m2, plant fiber ecological blanket, vegetation grass planting bag.
Fixture: bamboo stick, iron wire, ties up silk etc. at reinforcing bar.
Construction equipment and Work tool
Hydraulic backhoe, removed-earth jet sowing machine (applied to the professional equipment of slope greening, by soil matrix, greening grass-seed, are protected Aqua, adhesive, fertilizer wind, are mixed into gelatinous slurries with water in hydroseeder agitator tank, are sowed grass seeds by duster with slush pump in slope On face.Due to containing water-keeping material, bonding material, various nutrients, the water needed for it ensure that plant growth and other in slurries Destruction of the rain drop erosion to material of sowing grass seeds by duster is effectively prevent while nutriment source, so plant can health, promptly at It is long), roller hack screening machine, dump truck, sprinkling truck, spade, creeper, hoe, trolley etc..
Construction technology process
Cleaning, finishing slope surface → artificial grooving or dig pit → material (compound fertilizer, organic fertilizer, fertile soil etc.) is uniform with vegetable seeds It puddles → manually sows mix → manually and cover non-woven fabrics → late maintaining, maintenance.
Embodiment 1
Sow grass-seed, covering non-woven fabric greening restores construction method.
(1) preparation of construction
1. technique preparation: before construction, carrying out safe practice to personnel first and tell somebody what one's real intentions are, keep the operating personnel into scene clearly existing Field construction risk source and Construction Points.
2. material prepares: non-woven fabrics, grass-seed, compound fertilizer, organic fertilizer, fertile soil, the fixed non-woven fabrics of recovery will be afforested The preparations such as bamboo stick in place, and will be stand-by after grass-seed, compound fertilizer, organic fertilizer, fertile soil uniform mixing.
3. equipment prepares: cubic meter of stone backfill side slope cover the hydraulic backhoe of planting soil, dump truck by construction intensity and Progress carries out reasonable arrangement, and the artificial soil, the spade for grooving of digging pit, hoe etc. of shoveling is made adequate preparation in place.
(2) cubic meter of stone backfill side slope covers planting soil
It is taken native (native position is taken to be specified by owner, management scene) using hydraulic backhoe excavation, hydraulic backhoe dress Vehicle, dumper are transported to needing earthing position to stack to roadside, manually use spade by planting soil from scraper at the top of side slope to side It is covered on slope, thickness of earth covering 30cm~60cm is differed, and is manually substantially flattened to earthing side slope after side slope earthing.
(3) artificial grooving is sowed grass-seed greening and is restored
The manually roadside uniform mixing by grass-seed, compound fertilizer and fertile soil at the top of side slope, Stone side slope cover planting soil completion The manually grooving in side slope afterwards, the manually grooving directly in side slope of husky soil-slope, grooving array pitch about 20cm, by grass-seed, compound Fertilizer, organic fertilizer and the artificial uniform mixing of fertile soil, manually sow mix in the slot dug.Layering is broadcast from top to bottom for segmentation Grass-seed, covering non-woven fabrics are spread until slope greening restores construction completion.Late maintaining uses sprinkling truck, and late maintaining is using watering Vehicle sprays after mixing in proportion urea or nitrogenous fertilizer with water.
(4) manually dig pit and sow grass-seed greening recovery
Manually the roadside uniform mixing by grass-seed, compound fertilizer, organic fertilizer and fertile soil at the top of side slope, Stone side slope cover plantation It manually digs pit in side slope after the completion of soil, husky soil-slope is manually directly digged pit in side slope, array pitch about 20cm, quincunx cloth Hole, grass-seed, compound fertilizer, organic fertilizer and fertile soil mix are manually sowed in the hole dug.Often sow one layer of grass-seed, people Work covers layer of non-woven fabric, and grass-seed is sowed in segmentation layering from top to bottom, covering non-woven fabrics is completed up to slope greening restores construction. Late maintaining uses sprinkling truck, sprays after urea or nitrogenous fertilizer are mixed in proportion with water.
(5) non-woven fabrics is covered
Grass seeds covers non-woven fabrics immediately after the completion of manually sowing.The head of non-woven fabrics lap-joint (no less than 15cm) and every non-woven fabrics Tail is fixed with iron wire fourth or bamboo stick, and side slope bottom can be used stone and carry out gland, and sprinkle a small amount of fine sand or fine earth Flanging.The main function of non-woven fabrics is to reduce the evaporation of slope surface moisture, improves germination growing environment, prevents bird from pecking at kind Son, while precipitation (heavy rain) can also be mitigated, seed is washed away.15 days or so are about spent, when 3~5 centimetres of careless Miao Changzhi Take advantage of the cloudy day or when afternoon 3 after, lift non-woven fabrics in time, mention seedling through dew, seedling is enable to adapt to the weather ring of the Nature as early as possible Border.Non-woven fabrics cannot be raised too early, and early because the tender solar exposure and harsh weather of being unable to undergo of careless seedling children influences, raising can make too late Deformity is grown at careless seedling.The greening structure of formation is as shown in Figure 1.
(6) top dressing
After emergence 15 days, in order to promote careless Miao Shengchang, sprayed after urea or nitrogenous fertilizer (5g/m2) are mixed in proportion with water It spills once, once after 10 Tian Shi compound fertilizers (15g/m2), and is suitably watered according to climatic condition.
Embodiment 2
Sow grass-seed, ecological vegetation carpet greening restores arrangement and method for construction.
(1) smooth location
1. according to live ratio of slope slope surface brush slope, flatness meets the requirements.
2. removing the impurity of the unfavorable slope protection grass-seed growth such as the weeds in slope surface, grass roots, construction rubbish.
(2) place mat planting technique soil
In construction slope surface layer overlay greening soil, organic fertilizer is properly added according to on-site soil actual conditions.
(3) planting groove is excavated
In construction slope surface horizontal cross cutting depth about 5cm, width about 10cm planting groove, planting groove is spaced about 20cm.
(4) seed is manually sowed
Manually grass-seed, compound fertilizer, organic fertilizer and fertile soil mixture are uniformly sprinkling upon in planting groove and earthing covers.
(5) it is laid with, fixed ecological blanket
1. be laid with ecological blanket, ecological blanket top of the slope extend 20~40cm be buried in the earth, then tiling arrive slope foot, ecological blanket it Between mutually overlap, lap width be not less than 10cm, ecological blanket will be close to slope surface, and sufficiently contact with slope surface, ecological blanket be laid with not It is excessively tight, smooth beautiful, corrugationless and hanging phenomenon.
2. ecological blanket is fixed: selecting the timber wedge of 40~60cm or bamboo nail to be fixed, in top of the slope, ecological blanket and ecological blanket Lap-joint is followed closely with Bower Anchor and is fixed, and slope surface rest part is fixed using auxiliary holdfast;Top of the slope portion holdfast spacing is 80cm, slope surface holdfast Spacing is 100cm, and holdfast is close to slope surface with ecological blanket after fixing.The greening structure of formation is as shown in Figure 2.
(6) place mat covering
Ecological blanket covers non-woven fabrics after being laid with watering.
(7) water and conserve
After non-woven fabrics is fixed, instant sprinkling maintenance, maintenance watering early period preferably it is a small amount of repeatedly, when watering should using the shape pouring that drenches with rain, It prevents from washing away grass seeds.
For coombe side slope position, to guarantee stability of slope and greening recovery effects, scene is by owner, management and construction three Side determines, the mode for piling up grass-planting ecological bag can be used, and plays the effect of slope greening recovery and firm side slope.
In short, wind power plant sandy soil greening in high mountain hills area provided by the present application restores construction method, by sowing grass Means and the measure such as seed, covering non-woven fabrics, ecological vegetation carpet and spraying and seeding afforesting, because of environmental disruption and vegetation caused by construction reason Damage has obtained effective control and recovery, ensure that the sustainable development of environment while economic construction.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention, are all contained in protection scope of the present invention It is interior.

Claims (10)

1. a kind of high mountain hills area wind power plant sandy soil greening restores construction method, which is characterized in that the described method includes:
By the planting soil leveling in side slope, the plantation soil thickness is not less than 30 centimetres;
It is formed on the planting soil and sets plantation basis knot in level distribution by the side slope top to the side slope lower part Structure;
Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;
The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure, every layer of plantation foundation structure is broadcast Spread completion successively mulching plant soil and non-woven fabrics on the outside of the gluey slurries;Every non-woven fabrics is respectively adopted end to end Fixture is fixed, and the lap-joint between adjacent non-woven fabrics is no less than 15 centimetres.
2. wind power plant sandy soil greening in high mountain hills area according to claim 1 restores construction method, which is characterized in that The side slope be the cubic meter of stone backfill side slope, the planting soil be backfill earthing, it is described backfill earthing with a thickness of 30-60 centimetres.
3. wind power plant sandy soil greening in high mountain hills area according to claim 2 restores construction method, which is characterized in that The plantation foundation structure is 4-6 centimetres of depth, the planting groove foundation trench structure of 8-12 centimetres of width, between the row of the foundation trench structure Away from being 18-22 centimetres.
4. wind power plant sandy soil greening in high mountain hills area according to claim 2 restores construction method, which is characterized in that The plantation foundation structure is foundation pit structure, and row's spacing of the foundation pit structure is 18-22 centimetres and is in quincuncial arrangement.
5. wind power plant sandy soil greening in high mountain hills area according to claim 1 restores construction method, which is characterized in that The side slope is husky soil-slope, and the planting soil is side slope original sandy soil matter soil, and the plantation foundation structure is foundation pit structure, institute The row's spacing for stating foundation pit structure is 18-22 centimetres and in quincuncial arrangement.
6. a kind of high mountain hills area wind power plant sandy soil greening restores construction method, which is characterized in that the described method includes:
By the planting soil leveling in side slope, the plantation soil thickness is not less than 30 centimetres;
It is formed on the planting soil and sets plantation basis knot in level distribution by the side slope top to the side slope lower part Structure;
Grass-seed, compound fertilizer, organic fertilizer, water-retaining agent, adhesive and fertile soil are uniformly mixed the gluey slurries of acquisition;
The gluey slurries are layered from top to bottom and are sowed in the plantation foundation structure, in all plantation foundation structures Successively mulching plant soil, ecological blanket and non-woven fabrics after sowing;Fixture is respectively adopted in every non-woven fabrics end to end It is fixed, the lap-joint between adjacent non-woven fabrics is no less than 15 centimetres.
7. wind power plant sandy soil greening in high mountain hills area according to claim 6 restores construction method, which is characterized in that The ecological blanket is extended to the slope foot of the side slope by the top of the slope of the side slope, and the lap width of adjacent two ecological blanket is not small In 10 centimetres.
8. wind power plant sandy soil greening in high mountain hills area according to claim 7 restores construction method, which is characterized in that 20-40 centimetres of top of the slope one end that the ecological blanket is located at the side slope is embedded in soil.
9. wind power plant sandy soil greening in high mountain hills area according to claim 8 restores construction method, which is characterized in that The ecological blanket is fixed using the timber wedge or bamboo nail of 40-60 centimeter length;In the top of the slope, ecological blanket and ecological blanket of the side slope Lap-joint is followed closely with Bower Anchor and is fixed;Slope surface rest part is fixed using auxiliary holdfast;Between the holdfast of the top of the slope of the side slope Away from being 80 centimetres, the spacing positioned at the holdfast of slope surface is 100 centimetres.
10. wind power plant sandy soil greening in high mountain hills area according to claim 6 restores construction method, feature exists In the non-woven fabrics is followed closely using iron wire or bamboo stick realizes the fixation with the side slope.
CN201910598637.8A 2019-07-04 2019-07-04 A kind of high mountain hills area wind power plant sandy soil greening recovery construction method Pending CN110169308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910598637.8A CN110169308A (en) 2019-07-04 2019-07-04 A kind of high mountain hills area wind power plant sandy soil greening recovery construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910598637.8A CN110169308A (en) 2019-07-04 2019-07-04 A kind of high mountain hills area wind power plant sandy soil greening recovery construction method

Publications (1)

Publication Number Publication Date
CN110169308A true CN110169308A (en) 2019-08-27

Family

ID=67699732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910598637.8A Pending CN110169308A (en) 2019-07-04 2019-07-04 A kind of high mountain hills area wind power plant sandy soil greening recovery construction method

Country Status (1)

Country Link
CN (1) CN110169308A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102498875A (en) * 2011-11-01 2012-06-20 北京师范大学 Method for constructing shrub and grass plant communities on rocky slope and application thereof
CN102511272A (en) * 2011-12-12 2012-06-27 大千生态景观股份有限公司 Revegetation method for mine slopes
CN103535129A (en) * 2013-10-09 2014-01-29 中国科学院华南植物园 Method for greening limestone slope
CN105075635A (en) * 2015-09-06 2015-11-25 沈阳大学 Ecological restoration method of iron mine steep slope waste rock field in northern area
CN106171502A (en) * 2016-08-31 2016-12-07 中国科学院重庆绿色智能技术研究院 A kind of greening method of vegetation module slope
CN108625381A (en) * 2018-06-05 2018-10-09 康莱德国际环保植被(北京)有限公司 High-steep slope protection administering method and safeguard structure
CN109169014A (en) * 2018-09-21 2019-01-11 大连地拓环境科技有限公司 A kind of the Northeast's magnesite mining junkyard temporarily plants raw restorative procedure
CN210275361U (en) * 2019-07-04 2020-04-10 中国水利水电第四工程局有限公司 Mountain hilly area wind-powered electricity generation field sandy soil afforestation resumes construction structures

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102498875A (en) * 2011-11-01 2012-06-20 北京师范大学 Method for constructing shrub and grass plant communities on rocky slope and application thereof
CN102511272A (en) * 2011-12-12 2012-06-27 大千生态景观股份有限公司 Revegetation method for mine slopes
CN103535129A (en) * 2013-10-09 2014-01-29 中国科学院华南植物园 Method for greening limestone slope
CN105075635A (en) * 2015-09-06 2015-11-25 沈阳大学 Ecological restoration method of iron mine steep slope waste rock field in northern area
CN106171502A (en) * 2016-08-31 2016-12-07 中国科学院重庆绿色智能技术研究院 A kind of greening method of vegetation module slope
CN108625381A (en) * 2018-06-05 2018-10-09 康莱德国际环保植被(北京)有限公司 High-steep slope protection administering method and safeguard structure
CN109169014A (en) * 2018-09-21 2019-01-11 大连地拓环境科技有限公司 A kind of the Northeast's magnesite mining junkyard temporarily plants raw restorative procedure
CN210275361U (en) * 2019-07-04 2020-04-10 中国水利水电第四工程局有限公司 Mountain hilly area wind-powered electricity generation field sandy soil afforestation resumes construction structures

Similar Documents

Publication Publication Date Title
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN105484275B (en) A kind of high steep waste side slope reinforcement anchoring Ecosystem restoration system of mountain area wind power plant
CN101761086B (en) Three-dimensional net greening technique for roadbed side slope
CN210275361U (en) Mountain hilly area wind-powered electricity generation field sandy soil afforestation resumes construction structures
CN104805845B (en) A kind of flexible bank protecting method of feldspathic sandstone natural slope
CN103340114B (en) The multilayer vegetation bag that a kind of burlap is made
CN107382608A (en) A kind of vegetation is multiple green to sow grass seeds by duster auxiliary material, sow grass seeds by duster material and the multiple green construction method of vegetation without native composite fibre
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN102138508B (en) Method for greening and protecting steep road side slope by using biological crust
CN101818499A (en) Revegetation system on steep rocky slopes and implementing method thereof
CN110984189A (en) Slope ecological restoration system and method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN107100176B (en) A kind of expressway slope greening system
CN102535484A (en) Greening method of cement mortar anchoring and shotcreting side slope
CN107018777A (en) Side slope vegetation planting and establishing method
CN109322314A (en) High altitudes and cold area roadbed side slope turf skeleton grass planting means of defence
CN109392582A (en) A kind of massif slope surface implantation methods
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN107237334A (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN101457525B (en) Loess slope heavy layer flaking diseases treatment method
CN202954277U (en) Three-dimensional geonet ecological roadbed side ditch
CN207277345U (en) A kind of roadbed side slope flexible stereo curtain broadcasts safeguard structure
CN104762946A (en) Filler and method for ecologically repairing damaged mountain
CN212896409U (en) Three-dimensional geotechnique's net pad grass planting slope protection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination