China
Prior art keywords
stake holes
stirring pool
stake
hole
drill machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910442023.0A
Other languages
Chinese (zh)
Inventor
章程
施旭光
任艳涛
王孔文
姜波
王宇
韦盛辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201910442023.0A priority Critical patent/CN110159186A/en
Publication of CN110159186A publication Critical patent/CN110159186A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives for drilling, used in the borehole
    • E21B4/04Electric drives

Abstract

The present invention gives a kind of slurry drilled pile drilling construction methods, comprising the following steps: cuts out stake holes topsoil;Digging on the ground of stake holes side has sedimentation basin and stirring pool;High-quality bentonite, nitrous acid spent pulping liquor, coal-alkali reagent, sodium hydroxide, defoaming agent and water are added in stirring pool, stirs completely, forms mixed serum;Boring action is carried out in stake position using diving drill machine, the mixed serum in stirring pool is pumped into stake holes using slush pump, is drilled into predetermined depth under diving drill machine;Boring action is repeated, until arriving again at predetermined depth;Clear up the slurries in stake holes.Hole in stake holes inner hole wall soil layer seeps packing reality, avoids leak in hole, keeps stable water pressure in casing;Specific gravity of mud is big, increases the water pressure in hole, can consolidate hole wall, prevent collapse hole;It is discharged after the mudstone slag of cutting can be suspended by circulating mud, plays the role of taking sand, casting.

Description

Slurry drilled pile drilling construction method
Technical field
The present invention relates to a kind of slurry drilled pile drilling construction methods.
Background technique
General filling pile construction generallys use rotary drilling rig construction, solves the problems, such as collapse hole caused by conventional construction method, certain Bored concrete pile reaches 40 meters in a little engineerings, pours and completes the vast sky stake holes that still there is nearly 8m in upper back, if using traditional rotary drilling rig Construction, easily generation stake holes are collapsed.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of construction procedures rationally, the benefit that hole wall is not easy to collapse after pore-forming With the slurry drilled pile drilling construction method of mud off.
In order to solve the above technical problems, the present invention provides a kind of slurry drilled pile drilling construction methods, including with Lower step:
A) unwrapping wire positions at the scene, cuts out stake holes topsoil by stake position;
B) digging on the ground of stake holes side has sedimentation basin and stirring pool, and stake holes top and stirring pool top are passed through overflow Canal connection, sedimentation basin top are connected to stirring pool top by draining canal;
C) high-quality bentonite, nitrous acid spent pulping liquor, coal-alkali reagent, sodium hydroxide, defoaming agent and water are added in stirring pool, Stirring completely forms mixed serum, and the mixed serum according to every 1000L includes high-quality bentonite, the 30~50kg of 90~110kg Nitrous acid spent pulping liquor, the coal-alkali reagent of 10~30kg, the sodium hydroxide of 5~15kg, the defoaming agent of 5~15kg, surplus be water, The total volume of mixed serum is the 2 times or more of single stake holes predetermined volume;
D) boring action is carried out in stake position using diving drill machine, the mixed serum in stirring pool is pumped by stake using slush pump In hole, predetermined depth is drilled under diving drill machine;
E) diving drill machine is promoted to initial position, is again started up diving drill machine, is repeated boring action, until arriving again at pre- Depthkeeping degree;
F) diving drill machine is removed, the slurries in stake holes are cleared up, completes the operation of lagging pile pore-forming;
Wherein in boring action, mud and mixed serum in stake holes successively pass through sedimentation basin, stirring pool is again introduced into In stake holes, move in circles.
As the preferred of this method, casing is buried in the step a) on the stake position for removing topsoil.
As the preferred of this method, diving drill machine is drilled using direct circulation method for discharging residue in the step c);
Stake holes top is connected to sedimentation basin top by draining canal in the step d), on sedimentation basin top and stirring pool Portion is arranged in stirring pool by drainage canal connection, slush pump, and slush pump passes through defeated slurry sebific duct for the mixed serum in stirring pool It inputs in stake holes.
As the preferred of this method, diving drill machine is drilled using reacting cycle method for discharging residue in the step c);
Stake holes top is connected to stirring pool top by draining canal in the step d), on sedimentation basin top and stirring pool Portion is arranged in stake holes by drainage canal connection, slush pump, and slush pump is by deslagging sebific duct by the slurry transportation in stake holes to heavy In the pond of shallow lake.
After such method, the hole in stake holes inner hole wall soil layer seeps packing reality, avoids leak in hole, keeps casing Interior stable water pressure;Specific gravity of mud is big, increases the water pressure in hole, can consolidate hole wall, prevent collapse hole;By recycling mud Slurry is discharged after the mudstone slag of cutting can suspend, and plays the role of taking sand, casting.
Detailed description of the invention
Fig. 1 is the usage state diagram of this slurry drilled pile drilling construction embodiment of the method one.
Fig. 2 is the usage state diagram of this slurry drilled pile drilling construction embodiment of the method two.
Specific embodiment
Embodiment one
As shown in Figure 1
This slurry drilled pile drilling construction method, comprising the following steps:
A) unwrapping wire positions at the scene, cuts out stake holes 4a topsoil by stake position, and casing is buried on the stake position for removing topsoil, High 2m of casing or so, top set 2 extravasating holes, and casing is the cylinder made of thickness 4mm steel plate, and internal diameter should be greater than drill bit 11a Diameter 200mm, the effect of casing are the positions fixed stake holes 4a, protect aperture, prevent the surface water from flowing into, and increase hole internal water pressure, Prevent collapse hole, when pore-forming guides the direction of drill bit 11a.
B) digging on the ground of stake holes 4a side has sedimentation basin 2a and stirring pool 3a, by high 2 of the top stake holes 4a casing Extravasating hole is connected to the top stirring pool 3a by overflow canal, and the top sedimentation basin 2a is connected to the top stirring pool 3a by draining canal.
C) be added in stirring pool 3a high-quality bentonite, nitrous acid spent pulping liquor, coal-alkali reagent, sodium hydroxide, defoaming agent and Water stirs completely, forms mixed serum, the mixed serum according to every 1000L includes the Asia of the high-quality bentonite of 100kg, 40kg Nitric acid spent pulping liquor, the coal-alkali reagent of 20kg, the sodium hydroxide of 10kg, 10kg defoaming agent, surplus is water, the specific gravity of mixed serum It is 1.3, the total volume of mixed serum is 2 times of single stake holes 4a predetermined volume (or groundwater increment).
D) boring action is carried out in stake position using diving drill machine 1a, using slush pump 5a by the mixed serum in stirring pool 3a It is pumped into stake holes 4a, is drilled into predetermined depth under diving drill machine 1a;
Diving drill machine 1a is a kind of rotary drill, and waterproof machine gear and drill bit 11a are sealed, by Can dive into water after pile frame and drilling rod positioning, drill in mud, inject after mud by direct circulation method for discharging residue will be cut in hole grogs, Rock ballast drains into outside hole;
In boring procedure, after broken body refuse is cut pulp by the drill bit 11a of rotation, slush pump 5a force feed high pressure mud is utilized Slurry is sent to the bottom drill bit 11a strength through drill central pipe, bifurcated pipe and sprays, mixes, carry with the broken body refuse of cutting pulp Soil is moved upwards along hole wall, is entered in precipitation hole from the overflow hole of casing;
Mixed serum makes the hole in stake holes 4a inner hole wall soil layer seep packing reality, avoids leak in hole, keeps water in casing Pressure is stablized;Specific gravity of mud is big, increases the water pressure in hole, can consolidate hole wall, prevent collapse hole, can by circulating mud It is discharged after the mudstone slag of cutting is suspended, plays the role of taking sand, casting;
In boring action, mud and mixed serum in stake holes 4a successively pass through sedimentation basin 2a, stirring pool 3a again into Enter in stake holes 4a, moves in circles.
E) diving drill machine 1a is promoted to initial position, is again started up diving drill machine 1a, is repeated boring action, until arriving again Up to predetermined depth;
Equally, in boring action, mud and mixed serum in stake holes 4a successively pass through sedimentation basin 2a, stirring pool 3a again It is secondary to enter in stake holes 4a, it moves in circles.
F) diving drill machine 1a is removed, the slurries in stake holes 4a are cleared up, completes the operation of lagging pile pore-forming.
It is verified again to stake holes 4a, borehole cleaning operation, verifying is that stake position, diameter, depth and hole chanting of folk tales to the accompaniment of simple percussion instruments are checked with detector Condition, borehole cleaning, that is, cleaning hole bottom sediment, mud surface dust improve bearing capacity to reduce the settling amount of pile foundation;
When mud off pore-forming borehole cleaning, the stake holes 4a to collapse, available air suction dredge borehole cleaning, gas are preferably not easy for soil property Pressure is 0.5MPa, gushes the powerful high pressure draught of formation in pipe upwards, while constantly supplying clear water, the body refuse being stirred is with air-flow On gush from spout be discharged, until spraying clear water;
The hole wall poor for stability should use mud round-robin method borehole cleaning or draw tube deslagging.
Embodiment two
As shown in Figure 2
This slurry drilled pile drilling construction method, comprising the following steps:
A) unwrapping wire positions at the scene, cuts out stake holes 4b topsoil by stake position, and casing is buried on the stake position for removing topsoil, High 2m of casing or so, top set 1 extravasating hole, and casing is the cylinder made of thickness 6mm steel plate, and internal diameter should be greater than drill bit 11b Diameter 200mm, the effect of casing are the positions fixed stake holes 4b, protect aperture, prevent the surface water from flowing into, and increase hole internal water pressure, Prevent collapse hole, when pore-forming guides the direction of drill bit 11b.
B) digging on the ground of stake holes 4b side has sedimentation basin 2b and stirring pool 3b, will be on the top stake holes 4b and stirring pool 3b Portion is connected to by overflow canal, and the top sedimentation basin 2b is connected to the top stirring pool 3b by draining canal.
C) be added in stirring pool 3b high-quality bentonite, nitrous acid spent pulping liquor, coal-alkali reagent, sodium hydroxide, defoaming agent and Water stirs completely, forms mixed serum, the mixed serum according to every 1000L includes the nitrous of the high-quality bentonite of 90kg, 50kg Sour spent pulping liquor, the coal-alkali reagent of 30kg, the sodium hydroxide of 5kg, 5kg defoaming agent, surplus is water, and the specific gravity of mixed serum is 1.1, the total volume of mixed serum is 2.5 times of single stake holes 4b predetermined volume (or groundwater increment).
D) boring action is carried out in stake position using diving drill machine 1b, slush pump 5b is arranged in stake holes 4b, using slush pump Mixed serum in stirring pool 3b is pumped into stake holes 4b by 5b, is drilled into predetermined depth under diving drill machine 1b;
Diving drill machine 1b is a kind of rotary drill, and waterproof machine gear and drill bit 11b are sealed, by Can dive into water after pile frame and drilling rod positioning, drill in mud, inject after mud by reacting cycle method for discharging residue will be cut in hole grogs, Rock ballast drains into outside hole;
In boring procedure, after broken body refuse is cut pulp by the drill bit 11b of rotation, slush pump 5b force feed high pressure mud is utilized Slurry is sent to the bottom drill bit 11b strength through drill central pipe, bifurcated pipe and sprays, with the broken mud for cutting pulp to sedimentation basin 2b Slag mixing carries soil and moves upwards along hole wall;
Mixed serum makes the hole in stake holes 4b inner hole wall soil layer seep packing reality, avoids leak in hole, keeps water in casing Pressure is stablized;Specific gravity of mud is big, increases the water pressure in hole, can consolidate hole wall, prevent collapse hole, can by circulating mud It is discharged after the mudstone slag of cutting is suspended, plays the role of taking sand, casting;
In boring action, mud and mixed serum in stake holes 4b successively pass through sedimentation basin 2b, stirring pool 3b again into Enter in stake holes 4b, moves in circles.
E) diving drill machine 1b is promoted to initial position, is again started up diving drill machine 1b, is repeated boring action, until arriving again Up to predetermined depth;
Equally, in boring action, mud and mixed serum in stake holes 4b successively pass through sedimentation basin 2b, stirring pool 3b again It is secondary to enter in stake holes 4b, it moves in circles.
F) diving drill machine 1b is removed, the slurries in stake holes 4b are cleared up, completes the operation of lagging pile pore-forming.
It is subsequent, then verified to stake holes 4b, borehole cleaning operation, verifying is to check stake position, diameter, depth and hole with detector Road situation, borehole cleaning, that is, cleaning hole bottom sediment, mud surface dust improve bearing capacity to reduce the settling amount of pile foundation;
When mud off pore-forming borehole cleaning, the stake holes 4b to collapse, available air suction dredge borehole cleaning, gas are preferably not easy for soil property Pressure is 0.5MPa, gushes the powerful high pressure draught of formation in pipe upwards, while constantly supplying clear water, the body refuse being stirred is with air-flow On gush from spout be discharged, until spraying clear water;
The hole wall poor for stability should use mud round-robin method borehole cleaning or draw tube deslagging.
Embodiment three
This slurry drilled pile drilling construction method, comprising the following steps:
A) unwrapping wire positions at the scene, cuts out stake holes 4b topsoil by stake position, and casing is buried on the stake position for removing topsoil, High 2m of casing or so, top set 2 extravasating holes, and casing is the cylinder made of thickness 8mm steel plate, and internal diameter should be greater than drill bit 11b Diameter 200mm, the effect of casing are the positions fixed stake holes 4b, protect aperture, prevent the surface water from flowing into, and increase hole internal water pressure, Prevent collapse hole, when pore-forming guides the direction of drill bit 11b.
B) digging on the ground of stake holes 4b side has sedimentation basin 2b and stirring pool 3b, will be on the top stake holes 4b and stirring pool 3b Portion is connected to by overflow canal, and the top sedimentation basin 2b is connected to the top stirring pool 3b by draining canal.
C) be added in stirring pool 3b high-quality bentonite, nitrous acid spent pulping liquor, coal-alkali reagent, sodium hydroxide, defoaming agent and Water stirs completely, forms mixed serum, the mixed serum according to every 1000L includes the Asia of the high-quality bentonite of 110kg, 30kg Nitric acid spent pulping liquor, the coal-alkali reagent of 10kg, the sodium hydroxide of 15kg, 15kg defoaming agent, surplus is water, the specific gravity of mixed serum It is 1.5, the total volume of mixed serum is 2.8 times of single stake holes 4b predetermined volume (or groundwater increment).
D) boring action is carried out in stake position using diving drill machine 1b, slush pump 5b is arranged in stake holes 4b, using slush pump Mixed serum in stirring pool 3b is pumped into stake holes 4b by 5b, is drilled into predetermined depth under diving drill machine 1b;
Diving drill machine 1b is a kind of rotary drill, and waterproof machine gear and drill bit 11b are sealed, by Can dive into water after pile frame and drilling rod positioning, drill in mud, inject after mud by reacting cycle method for discharging residue will be cut in hole grogs, Rock ballast drains into outside hole;
In boring procedure, after broken body refuse is cut pulp by the drill bit 11b of rotation, slush pump 5b force feed high pressure mud is utilized Slurry is sent to the bottom drill bit 11b strength through drill central pipe, bifurcated pipe and sprays, mixes, carry with the broken body refuse of cutting pulp Soil is moved upwards along hole wall, is entered in precipitation hole from the overflow hole of casing;
Mixed serum makes the hole in stake holes 4b inner hole wall soil layer seep packing reality, avoids leak in hole, keeps water in casing Pressure is stablized;Specific gravity of mud is big, increases the water pressure in hole, can consolidate hole wall, prevent collapse hole, can by circulating mud It is discharged after the mudstone slag of cutting is suspended, plays the role of taking sand, casting;
In boring action, mud and mixed serum in stake holes 4b successively pass through sedimentation basin 2b, stirring pool 3b again into Enter in stake holes 4b, moves in circles.
E) diving drill machine 1b is promoted to initial position, is again started up diving drill machine 1b, is repeated boring action, until arriving again Up to predetermined depth;
Equally, in boring action, mud and mixed serum in stake holes 4b successively pass through sedimentation basin 2b, stirring pool 3b again It is secondary to enter in stake holes 4b, it moves in circles.
F) diving drill machine 1b is removed, the slurries in stake holes 4b are cleared up, completes the operation of lagging pile pore-forming.
It is subsequent, then verified to stake holes 4b, borehole cleaning operation, verifying is to check stake position, diameter, depth and hole with detector Road situation, borehole cleaning, that is, cleaning hole bottom sediment, mud surface dust improve bearing capacity to reduce the settling amount of pile foundation;
When mud off pore-forming borehole cleaning, the stake holes 4b to collapse, available air suction dredge borehole cleaning, gas are preferably not easy for soil property Pressure is 0.5MPa, gushes the powerful high pressure draught of formation in pipe upwards, while constantly supplying clear water, the body refuse being stirred is with air-flow On gush from spout be discharged, until spraying clear water;
The hole wall poor for stability should use mud round-robin method borehole cleaning or draw tube deslagging.
Above-described is only three kinds of embodiments of the invention, it is noted that for those of ordinary skill in the art For, without departing from the principle of the present invention, several variations and modifications can also be made, these also should be regarded as belonging to this hair Bright protection scope.

Claims (4)

1. a kind of slurry drilled pile drilling construction method, comprising the following steps:
A) unwrapping wire positions at the scene, cuts out stake holes topsoil by stake position;
B) digging on the ground of stake holes side has sedimentation basin and stirring pool, and stake holes top is connected with stirring pool top by overflow canal Logical, sedimentation basin top is connected to stirring pool top by draining canal;
C) high-quality bentonite, nitrous acid spent pulping liquor, coal-alkali reagent, sodium hydroxide, defoaming agent and water are added in stirring pool, completely Stirring forms mixed serum, and the mixed serum according to every 1000L includes the Asia of the high-quality bentonite of 90~110kg, 30~50kg Nitric acid spent pulping liquor, the coal-alkali reagent of 10~30kg, the sodium hydroxide of 5~15kg, the defoaming agent of 5~15kg, surplus are water, mixing The total volume of slurries is the 2 times or more of stake holes predetermined volume;
D) boring action is carried out in stake position using diving drill machine, the mixed serum in stirring pool is pumped by stake holes using slush pump It is interior, predetermined depth is drilled under diving drill machine;
E) diving drill machine is promoted to initial position, is again started up diving drill machine, is repeated boring action, until arriving again at pre- depthkeeping Degree;
F) diving drill machine is removed, the slurries in stake holes are cleared up, completes the operation of lagging pile pore-forming;
Wherein in boring action, mud and mixed serum in stake holes successively pass through sedimentation basin, stirring pool is again introduced into stake holes It is interior, it moves in circles.
2. slurry drilled pile drilling construction method according to claim 1, it is characterized in that:
Casing is buried in the step a) on the stake position for removing topsoil.
3. slurry drilled pile drilling construction method according to claim 1, it is characterized in that:
Diving drill machine is drilled using direct circulation method for discharging residue in the step c);
Stake holes top is connected to sedimentation basin top by draining canal in the step d), sedimentation basin top and stirring pool top are logical The connection of drainage canal is crossed, slush pump is arranged in stirring pool, and slush pump is inputted the mixed serum in stirring pool by defeated slurry sebific duct In stake holes.
4. slurry drilled pile drilling construction method according to claim 1, it is characterized in that:
Diving drill machine is drilled using reacting cycle method for discharging residue in the step c);
Stake holes top is connected to stirring pool top by draining canal in the step d), sedimentation basin top and stirring pool top are logical The connection of drainage canal is crossed, slush pump is arranged in stake holes, and slush pump passes through deslagging sebific duct for the slurry transportation in stake holes to sedimentation basin It is interior.
CN201910442023.0A 2019-05-24 2019-05-24 Slurry drilled pile drilling construction method Pending CN110159186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910442023.0A CN110159186A (en) 2019-05-24 2019-05-24 Slurry drilled pile drilling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910442023.0A CN110159186A (en) 2019-05-24 2019-05-24 Slurry drilled pile drilling construction method

Publications (1)

Publication Number Publication Date
CN110159186A true CN110159186A (en) 2019-08-23

Family

ID=67632927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910442023.0A Pending CN110159186A (en) 2019-05-24 2019-05-24 Slurry drilled pile drilling construction method

Country Status (1)

Country Link
CN (1) CN110159186A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502614A (en) * 2020-12-07 2021-03-16 黄河勘测规划设计研究院有限公司 Reverse seepage flow wall protection process for loose stratum pipe well construction
CN113756736A (en) * 2021-08-30 2021-12-07 南京东土建设科技有限公司 Pile foundation post-grouting system based on drilling slag recycling and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4919218A (en) * 1989-01-25 1990-04-24 Williams James M Process for reestablishing circulation in a lost return zone
CN101109179A (en) * 2007-06-21 2008-01-23 河北建设勘察研究院有限公司 Gas lifting reverse circulation porus cleaning construction method for slurry bulkhead cast-in-situ bored pile
CN203655190U (en) * 2013-09-29 2014-06-18 深圳市工勘岩土工程有限公司 Hole cleaning equipment for cast-in-place bored pile
CN104120716A (en) * 2013-04-28 2014-10-29 杨哲 Slurry wall protection construction method for bored pile
CN104631439A (en) * 2014-12-31 2015-05-20 上海市机械施工集团有限公司 Pump suction reverse circulation pile foundation construction device and method
CN107524142A (en) * 2017-09-20 2017-12-29 中国二十冶集团有限公司 A kind of holing with slurry wall protection cast-in-place pile construction method
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN207260136U (en) * 2017-04-26 2018-04-20 广州中煤江南基础工程公司 Ultra-deep bored pile borehole cleaning system
CN108505514A (en) * 2018-04-11 2018-09-07 中铁四局集团第四工程有限公司 A kind of construction method of bad ground pile foundation slurry retaining wall

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4919218A (en) * 1989-01-25 1990-04-24 Williams James M Process for reestablishing circulation in a lost return zone
CN101109179A (en) * 2007-06-21 2008-01-23 河北建设勘察研究院有限公司 Gas lifting reverse circulation porus cleaning construction method for slurry bulkhead cast-in-situ bored pile
CN104120716A (en) * 2013-04-28 2014-10-29 杨哲 Slurry wall protection construction method for bored pile
CN203655190U (en) * 2013-09-29 2014-06-18 深圳市工勘岩土工程有限公司 Hole cleaning equipment for cast-in-place bored pile
CN104631439A (en) * 2014-12-31 2015-05-20 上海市机械施工集团有限公司 Pump suction reverse circulation pile foundation construction device and method
CN207260136U (en) * 2017-04-26 2018-04-20 广州中煤江南基础工程公司 Ultra-deep bored pile borehole cleaning system
CN107524142A (en) * 2017-09-20 2017-12-29 中国二十冶集团有限公司 A kind of holing with slurry wall protection cast-in-place pile construction method
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108505514A (en) * 2018-04-11 2018-09-07 中铁四局集团第四工程有限公司 A kind of construction method of bad ground pile foundation slurry retaining wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姜波等: "砂石少土地区钻孔灌注桩护壁钻井液的制备", 《黑龙江交通科技》 *
杨明等: "钻孔泥浆配比及性能试验要点", 《建材世界》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502614A (en) * 2020-12-07 2021-03-16 黄河勘测规划设计研究院有限公司 Reverse seepage flow wall protection process for loose stratum pipe well construction
CN113756736A (en) * 2021-08-30 2021-12-07 南京东土建设科技有限公司 Pile foundation post-grouting system based on drilling slag recycling and construction method
CN113756736B (en) * 2021-08-30 2023-04-28 南京东土建设科技有限公司 Pile foundation post grouting system based on drill slag recycling and construction method

Similar Documents

Publication Publication Date Title
US11214938B2 (en) Construction method for pouring concrete in karst cave
CN202337976U (en) In-hole impact high-pressure jet grouting equipment
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN101109179A (en) Gas lifting reverse circulation porus cleaning construction method for slurry bulkhead cast-in-situ bored pile
CN104846810A (en) Self-circulating posterior grouting bored pile construction method
CN107338789B (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
CN103114577A (en) Rotary excavating hole-forming construction method for building pile foundation
CN108166483A (en) Bored pile construction method
KR100886220B1 (en) High-pressure injection soil improvement system and method of construction
CN109853571A (en) Local air lift reversing port bottom slag cleaning device and method before a kind of cast-in-situ bored pile concrete pouring
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN111236216A (en) Construction method of bridge drilled pile
CN110159186A (en) Slurry drilled pile drilling construction method
CN110144887A (en) Vast sky stake bored pile construction method
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN104141300A (en) Foundation pile hole drilling construction process
CN208563316U (en) A kind of large-section in-situ concrete pile pile-end sediment sediment processing unit
CN104452776B (en) Meet with the one construction Treatment Methods of diaphragm wall during boulder
CN106049467A (en) Method for treating slurry leakage of bored pile through percussion drill under complex geology
JP4916758B2 (en) Ground improvement method by high-pressure jet agitation
KR100944284B1 (en) Pile construction methode for minimizing remaining volume of slime
CN107604904A (en) A kind of rotary digging pile construction method
CN103711121B (en) The underlying original state in stake top fetches earth the construction method of cast-with-pressure concrete pile
CN110984149A (en) Construction method for pile body pretreatment in shield pile grinding process
CN109881696A (en) A kind of HPPG back cover construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823