CN104631439A - Pump suction reverse circulation pile foundation construction device and method - Google Patents

Pump suction reverse circulation pile foundation construction device and method Download PDF

Info

Publication number
CN104631439A
CN104631439A CN201410853874.1A CN201410853874A CN104631439A CN 104631439 A CN104631439 A CN 104631439A CN 201410853874 A CN201410853874 A CN 201410853874A CN 104631439 A CN104631439 A CN 104631439A
Authority
CN
China
Prior art keywords
mud
pump
pile
construction
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410853874.1A
Other languages
Chinese (zh)
Other versions
CN104631439B (en
Inventor
薄晓峰
蔡怡众
姜晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201410853874.1A priority Critical patent/CN104631439B/en
Publication of CN104631439A publication Critical patent/CN104631439A/en
Application granted granted Critical
Publication of CN104631439B publication Critical patent/CN104631439B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a pump suction reverse circulation pile foundation construction device and method and belongs to the technical field of pile foundation construction. The pump suction reverse circulation pile foundation construction device comprises a rotary drilling rig, a reverse circulation gravel pump, a slag suction hose, a mud purification device, a settling pond and a circulating pool which are communicated in sequence; the rotary drilling rig comprises a drill bit, a drill pipe, a transmission rod, a rotating disk and a hydraulic motor, the drill bit is connected with a bottom flange of the drill pipe, the top end of the drill pipe is connected with a bottom flange of the transmission rod, the top end of the transmission rod penetrates through the rotating disk and is fixed, the top end of the transmission rod is connected with one side of the reverse circulation gravel pump through a swiveling union, the joint of the reverse circulation gravel pump and the slag suction hose is provided with a faucet, and the slag suction hose is fixedly connected with the faucet and the mud purification device. The construction method includes the first step of forming reverse circulation, the second step of starting drilling after reverse circulation is formed until a pile hole is formed and the third step of conducting hole cleaning construction after the pile hole is formed. The device reduces the power of the gravel pump and improves hole forming efficiency.

Description

A kind of Pump breath countercirculate pile foundation construction device and method
Technical field
The invention belongs to piling Technology field, particularly relate to a kind of Pump breath countercirculate pile foundation construction device and method.
Background technology
Bored pile is generally in ground, form stake holes by machine drilling, then in stake holes, places reinforcing cage and concrete perfusion forms.But bored pile pile foundation easily causes the phenomenon such as collapse hole, necking down in silty sand ground drilling construction process, and sand factor height also can affect pile quality.Abrasion drill Drilling by inverse circulation method is adopted to carry out drilling construction in traditional handicraft.Be illustrated in figure 1 direct circulation drilled as holes filling pile construction schematic diagram in traditional handicraft, 1.-gravel pump in figure, 2.-water tap, 3.-hollow drill, 4.-rig slewing equipment 5.-sedimentation basin, 6.-mud pit, 7.-drill bit, 8.-mud circulation direction.As can be seen from the figure: Drilling by inverse circulation method is for driving drilling rod and bit to cut broken ground by slewing equipment, and by inputting the inner chamber of hollow drill after slush pump pumping slurries, then this mud exports to bottom stake holes through the grout outlet of drill bit.During pore-forming, mud is injected by drilling rod inside, sprays, carry the boring mud be cut and upwards take out of through stake holes mouth along stake holes wall and flow into sedimentation basin bottom drilling rod, and mud after precipitation flows into mud-settling pit purification, and the mud after purification reinjects drilling rod, so circulates.But gravel pump is independently arranged in traditional handicraft, high to the power requirement of pump, whole pumped loop needs airtight, and efficiency is not high and electric quantity consumption is large.Therefore, how providing that a kind of operating efficiency is high, the Pump breath countercirculate pile foundation construction device and method of energy saving, is the technical barrier that those skilled in the art need solution badly.
Summary of the invention
The object of the present invention is to provide that a kind of pore-forming efficiency is high, pile quality good and the Pump breath countercirculate pile foundation construction device and method of energy saving, to solve in traditional handicraft because gravel pump independently arranges the power requirement of pump high, whole pumped loop needs airtight, the not high and problem that electric quantity consumption is large of pore-forming efficiency.
To achieve these goals, technical scheme of the present invention is:
A kind of Pump breath countercirculate pile foundation construction device, is applicable to carry out drilling pouring pile hole construction in deep powder sand soil, comprises the convolution rig, reacting cycle gravel pump, slag absorbing flexible pipe, mud purifying device, sedimentation basin and the circulatory pool that are communicated with successively, described convolution rig comprises drill bit, drilling rod, drive link, rotating disc and hydraulic motor, described drill bit is fixedly connected with the bottom of described drilling rod, the top of described drilling rod and the bottom of described drive link are fixed, the top of described drive link is passed described rotating disc and connects and fixes, the top of described drive link is connected by the side of swivelling union with described reacting cycle gravel pump, described reacting cycle gravel pump and described slag absorbing flexible pipe junction are provided with water tap, described slag absorbing flexible pipe respectively with described water tap, described mud purifying device is fixedly connected with, rotating disc described in described fluid motor-driven rotates.
Further, described convolution rig also comprises one and is arranged at a base above described pile foundation, and described hydraulic motor is arranged on described base, described base is also provided with the through hole passed for described drive link.
Further, also comprise a slurrying pond, described slurrying pond is communicated with described circulatory pool.
Further, described drill bit is the two waist hoop drill bits of three wings, and the diameter of described drill bit is greater than described stake diameter 20mm.
Further, described mud purifying device is sand removing machine.
A kind of bored pile pile base construction method, comprises the steps:
Step one: Pump breath countercirculate pile foundation construction device is provided;
Step 2: first described drill bit is increased to 30 ~ 50cm place at the bottom of distance stake holes, and a certain amount of mud is injected in described stake holes, then start described reacting cycle gravel pump and described rotating disc, and make described reacting cycle gravel pump idle running certain hour, until form reacting cycle;
Step 3: start to creep into after described reacting cycle to be formed, until form described stake holes;
Step 4: after described stake holes is formed, carries out hole construction clearly.
Further, when starting drilling construction in described step 3, described convolution rig gently presses slow-speed, increases and suitably increase pressure and speed along with the degree of depth, after described drill bit all enters stratum, then accelerates to creep into.
Further, stake holes inwall described in described step 3 forms mud off.
Further, in described mud off, the proportion of mud is 1.10 ~ 1.15, and viscosity is 20 ~ 25s, sand factor < 5%.
Further, in described step 4, the construction of clear hole comprises the first step and second step,
The first step: after described stake holes is formed, described drill bit is mentioned 45cm ~ 55cm, and keep the normal circulation of mud, make in proportion is 1.05 ~ 1.15, viscosity is 17 ~ 20s slurry flows hand-hole, keep described stake water level in borehole to exceed more than groundwater table 0.5m simultaneously, until fill described stake holes, complete first time clear hole construction;
Second step: until after having laid reinforcing cage and conduit in described stake holes, carries out second time clear hole construction according to the method for the described first step.
Compared with prior art, tool has the following advantages and beneficial effect in the present invention:
1, Pump breath countercirculate pile foundation construction device of the present invention, is applicable to carry out drilling pouring pile hole construction in deep powder sand soil.Pump breath countercirculate pile foundation construction device comprises the convolution rig, reacting cycle gravel pump, slag absorbing flexible pipe, mud purifying device, sedimentation basin and the circulatory pool that are communicated with successively; Convolution rig comprises drill bit, drilling rod, drive link, rotating disc, hydraulic motor and base, Flange joint is passed through in the bottom of drill bit and drilling rod, the top of drilling rod is by the bottom Flange joint of flange and drive link, the top of drive link is passed rotating disc and connects and fixes, the top of drive link is flexibly connected by the side of swivelling union with reacting cycle gravel pump, reacting cycle gravel pump and slag absorbing flexible pipe junction are provided with water tap, slag absorbing flexible pipe is fixedly connected with water tap, mud purifying device respectively, and fluid motor-driven rotating disc rotates.By be arranged at convolution rig drive link above reacting cycle gravel pump pump-absorb action convolution rig drilling rod inner chamber formed negative pressure, in stake holes under fluid column and atmospheric effect, at the bottom of the mud flow stake holes of stake holes wall and annulus, the boring mud that gets off of bit cutting of convolution rig is brought into the drilling rod inner chamber of convolution rig, then to drain into after mud purifying device carries out desanding through reacting cycle gravel pump with the mud of boring mud and enter the sedimentation basin being positioned at ground again.Remove the mud after boring mud in sedimentation basin by slush pump pump people circulatory pool, the mud after circulatory pool purification is flowed in stake holes by chute again, thus forms reacting cycle.By arranging reacting cycle gravel pump, greatly shorten whole pumped loop, reduce the power of gravel pump, improve the suction to mud in hole and boring mud, accelerate speed of fulfiling hole, thus solving in traditional normal circulation technology high to the power requirement of gravel pump, whole pumped loop needs airtight, the not high and problem that electric quantity consumption is large of pore-forming efficiency.
2, bored pile construction method provided by the invention, comprise the steps: first drill bit to be increased to a distance at the bottom of distance stake holes, and in stake holes, inject a certain amount of mud, then reacting cycle gravel pump and rotating disc is started, and make reacting cycle gravel pump idle running certain hour, until form reacting cycle; Secondly start to creep into after reacting cycle to be formed, until form stake holes; Finally after stake holes is formed, carry out hole construction clearly.In deep silty sand ground bored pile construction process, Pump breath countercirculate pile foundation construction device of the present invention is adopted to carry out pore-forming and clear hole when constructing, the pore-forming time shortens greatly, and mud balance, sand factor, sediment at the bottom of hole can better be controlled, and ensure that pile quality.
Accompanying drawing explanation
Pump breath countercirculate pile foundation construction device and method of the present invention is provided by following embodiment and accompanying drawing.
Fig. 1 is direct circulation drilled as holes filling pile construction schematic diagram in prior art;
Fig. 2 is the structural representation of one embodiment of the invention Pump breath countercirculate pile foundation construction device.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the Pump breath countercirculate pile foundation construction device and method that the present invention proposes is described in further detail.According to the following describes and claims, advantages and features of the invention will be clearer.Need to illustrate in addition, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only in order to object that is convenient, the aid illustration embodiment of the present invention lucidly.For sake of convenience, hereinafter described " on ", D score is consistent with the upper and lower direction of accompanying drawing, but this can not become the restriction of technical solution of the present invention.
In the present embodiment, pre-construction pile foundation place geological condition is shown as according to geologic report: pile foundation pass through soil thickness be 6.1 ~ 18.4m the 5. layer silty sand ground and soil thickness are the 9. layer silty sand ground of 1.65 ~ 36.75m.Therefore, the present embodiment pile foundation has aperture large (maximum pile foundation 1.8m), becomes the feature of hole depth (maximum hole depth 60m), and need between boring to pass through nearly 40 meters of silty sand ground thickness, it can thus be appreciated that, need to carry out drilling pouring pile hole construction in deep powder sand soil.Construct according to traditional positive circulating boring pile construction method, will be difficult to ensure pile quality.For foregoing problems, Pump breath countercirculate pile foundation construction device in this enforcement, is adopted to construct, thus while meeting raising pore-forming efficiency, slagging thickness at the bottom of reduce orifice and maintenance wall stability, thus guarantee that pile quality meets the requirements.
Embodiment one
Pump breath countercirculate pile foundation construction device of the present invention is described in detail below in conjunction with Fig. 2.
A kind of Pump breath countercirculate pile foundation construction device, be applicable to carry out drilling pouring pile hole construction in deep powder sand soil, comprise the convolution rig 1, reacting cycle gravel pump 2, slag absorbing flexible pipe 3, mud purifying device 4, sedimentation basin 5 and the circulatory pool 6 that are communicated with successively, convolution rig 1 comprises drill bit 10, drilling rod 11, drive link 12, rotating disc 13, hydraulic motor 14 and the base 15 be arranged at above pile foundation, base 15 is provided with the through hole passed for drive link 12, hydraulic motor 14 is arranged on base 15, drill bit 10 is fixedly connected with by flange with the bottom of drilling rod 11, the top of drilling rod 11 is fixedly connected with by flange with the bottom of drive link 12, the top of drive link 12 is passed rotating disc 13 and connects and fixes, the top of drive link 12 is flexibly connected with the side of reacting cycle gravel pump 2 by swivelling union 7, reacting cycle gravel pump 2 and slag absorbing flexible pipe 3 junction are provided with water tap 21, slag absorbing flexible pipe 3 respectively with water tap 21, mud purifying device 4 is fixedly connected with, hydraulic motor 14 drives rotating disc 13 to rotate.
Continue with reference to figure 2, specifically, in order to improve the suction to mud in stake holes and disintegrating slag (boring mud), accelerate speed of fulfiling hole, the rig 1 that circles round in the present embodiment selects moment of torsion large, the GPS-20 type engineering driller that frame is stable, and local flow improvement is carried out to the frame of this rig, between water tap 10 and swivelling union 7, set up 6BS type reacting cycle gravel pump 2.The operating principle of Pump breath countercirculate pile foundation construction device: form negative pressure at the inner chamber of drilling rod 11 by the pump-absorb action of reacting cycle gravel pump 2, in stake holes under fluid column and atmospheric effect, at the bottom of the mud flow stake holes of stake holes wall and annulus, the boring mud that drill bit 10 cuts is brought into the inner chamber of drilling rod 11, then to drain into after mud purifying device 4 carries out desanding through reacting cycle gravel pump 2 with the mud of boring mud and enter the sedimentation basin 5 being positioned at ground again.Remove the mud after boring mud in sedimentation basin 5 by slush pump (not shown) pump people circulatory pool 6, the mud fluid after circulatory pool 6 purifies is flowed in stake holes by chute (not shown) again, forms reacting cycle.The mud flowed to after circulatory pool 6 purifies in stake holes forms mud off.Mud off refers to that mud micromicro that in bored pile borehole engineering mud formed the static pressure of hole wall and mud on hole wall is with the effect effectively preventing hole wall collapse or peel off, and maintains the shape invariance of the stake holes be drilled to.In addition, mud also has the effect taking slag and cooling, lubrication rig, and the mud with certain viscosity can be taken same body refuse and discharge together.Especially, the internal diameter due to drilling rod 11 is far smaller than stake holes internal diameter, therefore passes through the pump-absorb action of reacting cycle gravel pump 2, and the speed that the mud with boring mud rises in drilling rod 11 is far away faster than normal circulation technology.And, compared with normal circulation technology, drilling pouring pile hole, the construction of clear hole is carried out by using the Pump breath countercirculate pile foundation construction device of the present embodiment, rate of penetration can not only be improved, the consumption of mud can also be reduced, also reduce the power that rotating disc 13 consumes simultaneously, make hole time clearly fast and stake holes quality that is that formed is good.By reacting cycle gravel pump 2 is arranged at above drive link 12 in the present embodiment, shorten pump and inhale path, improve pump and inhale efficiency, thus further increase the efficiency in pore-forming, clear hole.
Continue with reference to figure 2, in order to meet verticality requirement, drill bit 10 is the two waist hoop drill bits of three wings.The diameter 20mm larger than the diameter of bored pile of drill bit 10, to tackle shrinkage cavity phenomenon in sandy soil layer.Certainly, in order to draw materials conveniently, mud purifying device 4 can select sand removing machine.ZX-250 type sand removing machine is such as selected to carry out desanding to circulating mud, desanding particle grades 0.075mm, disposal ability 250m 3/ h.When trying pore-forming and soil layer grittiness is larger, between circulatory pool 6 and stake holes, be also provided with a slurrying pond (not shown), slurrying pond is communicated with circulatory pool 6.
Embodiment two
Continuing composition graphs 2 below specifically utilizes Pump breath countercirculate construction equipment to carry out the method for bored pile pile foundation construction.Bored pile pile base construction method, comprises the steps:
Step one, provide a Pump breath countercirculate pile foundation construction device, and debugging prepares, and arranges mud circulating system simultaneously.
Pump breath countercirculate pile foundation construction device comprises the convolution rig 1, reacting cycle gravel pump 2, slag absorbing flexible pipe 3, mud purifying device 4, sedimentation basin 5 and the circulatory pool 6 that are communicated with successively, convolution rig 1 comprises drill bit 10, drilling rod 11, drive link 12, rotating disc 13, hydraulic motor 14 and the base 15 be arranged at above pile foundation, base 15 is provided with the through hole passed for drive link 12, hydraulic motor 14 is located on base 15, Flange joint is passed through in the bottom of drill bit 10 and drilling rod 11, the top of drilling rod 11 and the bottom Flange joint of drive link 12, the top of drive link 12 is passed rotating disc 13 and connects and fixes, the top of drive link 12 is flexibly connected with the side of reacting cycle gravel pump 2 by swivelling union 7, reacting cycle gravel pump 2 and slag absorbing flexible pipe 3 junction are provided with water tap 21, slag absorbing flexible pipe 3 respectively with water tap 21, mud purifying device 4 is fixedly connected with, hydraulic motor 14 drives rotating disc 13 to rotate.Mud circulating system method to set up is: first arranged in sedimentation basin 5, circulatory pool 6 and slurrying pond (not shown) point storehouse, the capacity in each storehouse should meet the needs of construction period mud sediment amount, and removes sediment in storehouse in time.Secondly, circulating mud need by the mud purifying device 4 arranged above circulatory pool 6, to reduce sand factor.3rd, flowing through the length of route by increasing circulating mud, reducing the content of Extra-fine sand in mud further.So far, the preparation of drilling construction completes.
Step 2, first drill bit 10 is increased to 30 ~ 50cm place at the bottom of distance stake holes, and in stake holes, injects a certain amount of mud, then start reacting cycle gravel pump 2 and rotating disc 13, and reacting cycle gravel pump 2 is dallied certain hour, until formation reacting cycle.
Step 3: start to creep into after reacting cycle to be formed, until form stake holes.
Specifically, according to different geology characteristic, choose reasonable drilling parameter, for argillic horizon, should use medium-to-high grade, suitably reduce the pressure of the drill, accelerates rate of penetration, such as: 40 ~ 70 revs/min.For sandy soils, should use low and middle-grade, suitably increase the pressure of the drill, slow down drilling speed, such as: be less than 40 revs/min.Meanwhile, the mud flowed to after circulatory pool 6 purifies in stake holes forms mud off.The quality of quality of mud fluid directly has influence on the performance of hole quality and bearing capacity of pile foundation.Owing to intending there is thicker silty sand ground in stratum, construction drill castinplace pile pile foundation place, for reducing the situation of hole wall collapse and necking down, in mud off, the proportion of mud is 1.10 ~ 1.15, and viscosity is 20 ~ 25s, sand factor < 5%.And, when the boring mud amount that reacting cycle gravel pump 2 is discharged reduces or in water outlet, dregginess is more, should rate of penetration be controlled.The rig 1 that circles round during perforate gently presses slow-speed, increases and suitably increases pressure and speed, adopt denseer mud off, and slow down rate of penetration and rotating speed when soil property unconsolidated formation along with the degree of depth, and the slow-motion of light brill is to control collapse hole.After subject-oriented position or drill bit 10 all enter stratum, can accelerate to creep into.
Step 4: after stake holes is formed, carries out hole construction clearly.
The construction of clear hole is carried out at twice, and first time, clear hole was carried out after pore-forming, and the clear hole of second time is carried out after reinforcing cage and catheter installation.For effective cleaning hole bed mud sand, secondary pile hole cleaning all adopts Pump breath countercirculate technique.
Clear hole construction sequence:
The first step: after stake holes is formed, drill bit 10 is mentioned 45cm ~ 55cm, and keep the normal circulation of mud, the mud that proportion is 1.05 ~ 1.15, viscosity is 17 ~ 20s is made to flow in stake holes, keep stake water level in borehole to exceed more than groundwater table 0.5m simultaneously, until fill stake holes, complete first time clear hole construction.That is, carry out first time clear hole behind whole hole immediately, special messenger should be provided with in the process of clear hole and fish for boring mud, to accelerate the speed in clear hole.The clear hole time is as the criterion to have changed magma in hole, and makes mud Indexs measure at any time, and sampling should be carried out from plasma discharge mouth, the same magma of mud index.During clear hole, in boring casing, mud water level should be noted keeping stable, to prevent drill hole caves.The clear hole time determines according to measuring precipitation thickness in mud balance and clear hole process, clear hole time controling formula: h=V/Q, wherein: the h-clear hole time; V-stake holes volume, Q: reacting cycle gravel pump flow.Drill bit is carried to about 0.5m at the bottom of hole by first time clear Kong Shiying, and in the hole when of clear hole, input mud amount should not be less than reacting cycle gravel pump discharge capacity, ensures the mud amount of supplying, answers conservative control pump amount simultaneously, avoids inhaling collapse hole wall.
Second step: until after having laid reinforcing cage and conduit in stake holes, carries out second time clear hole construction according to the method for the described first step.
After completing twice clear hole, in mud off, the proportion of mud is 1.05 ~ 1.10, viscosity is 17 ~ 20s, sand factor < 1%, sediment thickness < 0.2D (D is the diameter of bored pile), vertical degree of the peg hole < 1%.
In sum, Pump breath countercirculate pile foundation construction device of the present invention, is applicable to carry out drilling pouring pile hole construction in deep powder sand soil.Pump breath countercirculate pile foundation construction device comprises the convolution rig, reacting cycle gravel pump, slag absorbing flexible pipe, mud purifying device, sedimentation basin and the circulatory pool that are communicated with successively.By be arranged at convolution rig drive link above reacting cycle gravel pump pump-absorb action convolution rig drilling rod inner chamber formed negative pressure, in stake holes under fluid column and atmospheric effect, at the bottom of the mud flow stake holes of stake holes wall and annulus, the boring mud that gets off of bit cutting of convolution rig is brought into the drilling rod inner chamber of convolution rig, then to drain into after mud purifying device carries out desanding through reacting cycle gravel pump with the mud of boring mud and enter the sedimentation basin being positioned at ground again.Remove the mud after boring mud in sedimentation basin by slush pump pump people circulatory pool, the mud after circulatory pool purification is flowed in stake holes by chute again, thus forms reacting cycle.In deep silty sand ground bored pile construction process, when adopting Pump breath countercirculate pile foundation construction device of the present invention to carry out pore-forming and clear hole, the pore-forming time shortens greatly, and mud balance, sand factor, sediment at the bottom of hole can better be controlled, and make pile quality have abundant guarantee.Bored pile construction method, by arranging reacting cycle gravel pump, greatly shorten whole pumped loop, reduce the power of gravel pump, improve the suction to mud in hole and boring mud, accelerate speed of fulfiling hole, thus solve in traditional normal circulation technology high to the power requirement of gravel pump, whole pumped loop needs airtight, the not high and problem that electric quantity consumption is large of pore-forming efficiency.
Foregoing description is only the description to present pre-ferred embodiments, any restriction not to the scope of the invention.Any change that those skilled in the art does according to above-mentioned disclosure, modification, all belong to the protection domain of claim.

Claims (10)

1. a Pump breath countercirculate pile foundation construction device, be applicable to carry out drilling pouring pile hole construction in deep powder sand soil, it is characterized in that, comprise the convolution rig, reacting cycle gravel pump, slag absorbing flexible pipe, mud purifying device, sedimentation basin and the circulatory pool that are communicated with successively, described convolution rig comprises drill bit, drilling rod, drive link, rotating disc and hydraulic motor, described drill bit is fixedly connected with the bottom of described drilling rod, the top of described drilling rod and the bottom of described drive link are fixed, the top of described drive link is passed described rotating disc and connects and fixes, the top of described drive link is connected by the side of swivelling union with described reacting cycle gravel pump, described reacting cycle gravel pump and described slag absorbing flexible pipe junction are provided with water tap, described slag absorbing flexible pipe respectively with described water tap, described mud purifying device is fixedly connected with, rotating disc described in described fluid motor-driven rotates.
2. Pump breath countercirculate pile foundation construction device as claimed in claim 1, it is characterized in that, described convolution rig also comprises one and is arranged at a base above described pile foundation, and described hydraulic motor is arranged on described base, described base is also provided with the through hole passed for described drive link.
3. Pump breath countercirculate pile foundation construction device as claimed in claim 1 or 2, it is characterized in that, also comprise a slurrying pond, described slurrying pond is communicated with described circulatory pool.
4. Pump breath countercirculate pile foundation construction device as claimed in claim 1, is characterized in that, described drill bit is the two waist hoop drill bits of three wings, and the diameter of described drill bit is greater than described stake diameter 20mm.
5. Pump breath countercirculate pile foundation construction device as claimed in claim 1, it is characterized in that, described mud purifying device is sand removing machine.
6. a bored pile pile base construction method, is characterized in that, comprises the steps:
Step one: the device of the Pump breath countercirculate pile foundation construction as described in any one of claim 1 to 5 is provided;
Step 2: first described drill bit is increased to 30 ~ 50cm place at the bottom of distance stake holes, and a certain amount of mud is injected in described stake holes, then start described reacting cycle gravel pump and described rotating disc, and make described reacting cycle gravel pump idle running certain hour, until form reacting cycle;
Step 3: start to creep into after described reacting cycle to be formed, until form described stake holes;
Step 4: after described stake holes is formed, carries out hole construction clearly.
7. bored pile pile base construction method as claimed in claim 6, it is characterized in that, when starting drilling construction in described step 3, described convolution rig gently presses slow-speed, increases and suitably increase pressure and speed along with the degree of depth, after described drill bit all enters stratum, then accelerate to creep into.
8. bored pile pile base construction method as claimed in claim 6, is characterized in that, stake holes inwall described in described step 3 forms mud off.
9. bored pile pile base construction method as claimed in claim 8, it is characterized in that, in described mud off, the proportion of mud is 1.10 ~ 1.15, and viscosity is 20 ~ 25s, sand factor < 5%.
10. bored pile pile base construction method as claimed in claim 6, is characterized in that, in described step 4, the construction of clear hole comprises the first step and second step,
The first step: after described stake holes is formed, described drill bit is mentioned 45cm ~ 55cm, and keep the normal circulation of mud, make in proportion is 1.05 ~ 1.15, viscosity is 17 ~ 20s slurry flows hand-hole, keep described stake water level in borehole to exceed more than groundwater table 0.5m simultaneously, until fill described stake holes, complete first time clear hole construction;
Second step: until after having laid reinforcing cage and conduit in described stake holes, carries out second time clear hole construction according to the method for the described first step.
CN201410853874.1A 2014-12-31 2014-12-31 A kind of Pump breath countercirculate pile foundation construction device and method Active CN104631439B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410853874.1A CN104631439B (en) 2014-12-31 2014-12-31 A kind of Pump breath countercirculate pile foundation construction device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410853874.1A CN104631439B (en) 2014-12-31 2014-12-31 A kind of Pump breath countercirculate pile foundation construction device and method

Publications (2)

Publication Number Publication Date
CN104631439A true CN104631439A (en) 2015-05-20
CN104631439B CN104631439B (en) 2016-08-17

Family

ID=53210640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410853874.1A Active CN104631439B (en) 2014-12-31 2014-12-31 A kind of Pump breath countercirculate pile foundation construction device and method

Country Status (1)

Country Link
CN (1) CN104631439B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484688A (en) * 2015-11-23 2016-04-13 贵州航天天马机电科技有限公司 Anchoring drilling machine reverse circulation apparatus
CN105672877A (en) * 2016-03-24 2016-06-15 天津市勘察院 Underwater drilling rig used for direct circulation slag removal and hole forming technique
CN105735923A (en) * 2016-03-24 2016-07-06 上海市机械施工集团有限公司 Slurry circulation treatment system
CN105839619A (en) * 2016-06-14 2016-08-10 江苏燕宁建设工程有限公司 Construction method for drilling pile under bad geological conditions
CN106498936A (en) * 2016-12-09 2017-03-15 中铁六局集团广州工程有限公司 A kind of cast-in-situ bored pile mud desanding system
CN107386999A (en) * 2017-09-14 2017-11-24 中地君豪建筑工程有限公司 A kind of rotary digging drilling hole reacting cycle hole cleaning device
CN107575249A (en) * 2017-10-31 2018-01-12 河南理工大学 A kind of high-pressure slurry wall protecting method and device
CN107816324A (en) * 2017-09-30 2018-03-20 中铁大桥局集团有限公司 A kind of tiltedly steel-pipe pile borehole cleaning and the construction method and system for reducing sediment thickness
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108825154A (en) * 2018-07-10 2018-11-16 中铁局集团第二工程有限公司 Mechanical piling mud circulating system and construction method in hole
CN109723398A (en) * 2018-12-29 2019-05-07 国网河北省电力有限公司经济技术研究院 Rotary digging bored concrete pile drilling cleaning plant
CN110159186A (en) * 2019-05-24 2019-08-23 中国建筑第五工程局有限公司 Slurry drilled pile drilling construction method
CN111677439A (en) * 2020-06-24 2020-09-18 中建四局土木工程有限公司 Drilling hole forming method of reverse circulation rotary drilling machine
CN112502614A (en) * 2020-12-07 2021-03-16 黄河勘测规划设计研究院有限公司 Reverse seepage flow wall protection process for loose stratum pipe well construction
CN112576210A (en) * 2020-12-15 2021-03-30 中铁北京工程局集团有限公司 Clear hole device of drilling bored concrete pile
CN113309479A (en) * 2021-07-12 2021-08-27 中国地质科学院勘探技术研究所 Efficient coring drilling device and method for shallow sea reef limestone
CN113585992A (en) * 2021-07-22 2021-11-02 深圳市工勘岩土集团有限公司 Pump suction reverse circulation drilling structure of super-thick covering layer large-diameter rock-socketed cast-in-place pile
CN113738294A (en) * 2021-09-30 2021-12-03 浙江易通特种基础工程股份有限公司 Pore-forming device of full hydraulic drilling machine and construction method thereof
CN113756736A (en) * 2021-08-30 2021-12-07 南京东土建设科技有限公司 Pile foundation post-grouting system based on drilling slag recycling and construction method
CN114855800A (en) * 2022-06-16 2022-08-05 河南中原金太阳技术有限公司 Automatic cleaning device of hole bottom after pile foundation construction
CN114887514A (en) * 2022-05-17 2022-08-12 山东交通学院 Slurry preparation equipment and slurry treatment process in hole forming of reverse circulation drilling machine
CN115559667A (en) * 2022-11-17 2023-01-03 湖南路桥建设集团有限责任公司 Rotary drill for reverse circulation pore-forming grouting pile and construction process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86209909U (en) * 1986-12-10 1987-12-05 陕西省地下水工作队 Pumping up anti-circulation drill suitable for hydrographic and water well drilling
RU2254438C2 (en) * 2001-10-30 2005-06-20 Общество с ограниченной ответственностью "Сибироника" Method for drilling wells on depression
JP4693730B2 (en) * 2006-09-19 2011-06-01 杉崎基礎株式会社 Circulation type drilling rig
CN202249851U (en) * 2011-10-26 2012-05-30 北京中交通华科技有限公司 Reverse circulation hole forming equipment for cast-in-place pile
CN103174131A (en) * 2013-02-07 2013-06-26 北京建工集团有限责任公司 Underground engineering guiding-cavity-excavating small-diameter pile construction complete equipment system
CN203821373U (en) * 2014-05-13 2014-09-10 中铁上海工程局集团有限公司 Slurry gas lift reverse circulation slag removing device
CN204040021U (en) * 2013-02-07 2014-12-24 北京建工集团有限责任公司 Large diameter pile construction equipment system in city underground engineering tunneling pilot tunnel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86209909U (en) * 1986-12-10 1987-12-05 陕西省地下水工作队 Pumping up anti-circulation drill suitable for hydrographic and water well drilling
RU2254438C2 (en) * 2001-10-30 2005-06-20 Общество с ограниченной ответственностью "Сибироника" Method for drilling wells on depression
JP4693730B2 (en) * 2006-09-19 2011-06-01 杉崎基礎株式会社 Circulation type drilling rig
CN202249851U (en) * 2011-10-26 2012-05-30 北京中交通华科技有限公司 Reverse circulation hole forming equipment for cast-in-place pile
CN103174131A (en) * 2013-02-07 2013-06-26 北京建工集团有限责任公司 Underground engineering guiding-cavity-excavating small-diameter pile construction complete equipment system
CN204040021U (en) * 2013-02-07 2014-12-24 北京建工集团有限责任公司 Large diameter pile construction equipment system in city underground engineering tunneling pilot tunnel
CN203821373U (en) * 2014-05-13 2014-09-10 中铁上海工程局集团有限公司 Slurry gas lift reverse circulation slag removing device

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484688B (en) * 2015-11-23 2018-06-05 贵州航天天马机电科技有限公司 A kind of anchoring drilling machine reacting cycle device
CN105484688A (en) * 2015-11-23 2016-04-13 贵州航天天马机电科技有限公司 Anchoring drilling machine reverse circulation apparatus
CN105735923B (en) * 2016-03-24 2019-04-19 上海市机械施工集团有限公司 A kind of mud circulating treating system
CN105672877A (en) * 2016-03-24 2016-06-15 天津市勘察院 Underwater drilling rig used for direct circulation slag removal and hole forming technique
CN105735923A (en) * 2016-03-24 2016-07-06 上海市机械施工集团有限公司 Slurry circulation treatment system
CN105839619A (en) * 2016-06-14 2016-08-10 江苏燕宁建设工程有限公司 Construction method for drilling pile under bad geological conditions
CN106498936A (en) * 2016-12-09 2017-03-15 中铁六局集团广州工程有限公司 A kind of cast-in-situ bored pile mud desanding system
CN107386999A (en) * 2017-09-14 2017-11-24 中地君豪建筑工程有限公司 A kind of rotary digging drilling hole reacting cycle hole cleaning device
CN107386999B (en) * 2017-09-14 2023-12-29 广州君豪岩土工程有限公司 Reverse circulation hole cleaning device for rotary drilling
CN107816324A (en) * 2017-09-30 2018-03-20 中铁大桥局集团有限公司 A kind of tiltedly steel-pipe pile borehole cleaning and the construction method and system for reducing sediment thickness
CN107575249A (en) * 2017-10-31 2018-01-12 河南理工大学 A kind of high-pressure slurry wall protecting method and device
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108825154A (en) * 2018-07-10 2018-11-16 中铁局集团第二工程有限公司 Mechanical piling mud circulating system and construction method in hole
CN109723398A (en) * 2018-12-29 2019-05-07 国网河北省电力有限公司经济技术研究院 Rotary digging bored concrete pile drilling cleaning plant
CN109723398B (en) * 2018-12-29 2021-11-30 国网河北省电力有限公司经济技术研究院 Dig bored concrete pile drilling cleaning device soon
CN110159186A (en) * 2019-05-24 2019-08-23 中国建筑第五工程局有限公司 Slurry drilled pile drilling construction method
CN111677439A (en) * 2020-06-24 2020-09-18 中建四局土木工程有限公司 Drilling hole forming method of reverse circulation rotary drilling machine
CN112502614A (en) * 2020-12-07 2021-03-16 黄河勘测规划设计研究院有限公司 Reverse seepage flow wall protection process for loose stratum pipe well construction
CN112576210A (en) * 2020-12-15 2021-03-30 中铁北京工程局集团有限公司 Clear hole device of drilling bored concrete pile
CN112576210B (en) * 2020-12-15 2022-11-04 中铁北京工程局集团有限公司 Clear hole device of drilling bored concrete pile
CN113309479A (en) * 2021-07-12 2021-08-27 中国地质科学院勘探技术研究所 Efficient coring drilling device and method for shallow sea reef limestone
CN113585992A (en) * 2021-07-22 2021-11-02 深圳市工勘岩土集团有限公司 Pump suction reverse circulation drilling structure of super-thick covering layer large-diameter rock-socketed cast-in-place pile
CN113756736A (en) * 2021-08-30 2021-12-07 南京东土建设科技有限公司 Pile foundation post-grouting system based on drilling slag recycling and construction method
CN113738294A (en) * 2021-09-30 2021-12-03 浙江易通特种基础工程股份有限公司 Pore-forming device of full hydraulic drilling machine and construction method thereof
CN113738294B (en) * 2021-09-30 2024-05-28 浙江易通特种基础工程股份有限公司 Pore-forming device of full-hydraulic drilling machine and construction method thereof
CN114887514A (en) * 2022-05-17 2022-08-12 山东交通学院 Slurry preparation equipment and slurry treatment process in hole forming of reverse circulation drilling machine
CN114855800A (en) * 2022-06-16 2022-08-05 河南中原金太阳技术有限公司 Automatic cleaning device of hole bottom after pile foundation construction
CN114855800B (en) * 2022-06-16 2023-12-12 河南中原金太阳技术有限公司 Automatic cleaning device for hole bottoms after pile foundation construction
CN115559667A (en) * 2022-11-17 2023-01-03 湖南路桥建设集团有限责任公司 Rotary drill for reverse circulation pore-forming grouting pile and construction process

Also Published As

Publication number Publication date
CN104631439B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104631439B (en) A kind of Pump breath countercirculate pile foundation construction device and method
CN203655190U (en) Hole cleaning equipment for cast-in-place bored pile
CN105804059A (en) Cast-in-situ bored pile hole-forming device and method
CN101761072B (en) Construction process for bored pile close to flood wall through riprap layer
CN110359921A (en) Wear the construction method of building in a kind of shield short distance side
CN107119691B (en) Square deep foundation pit suitable for high bearing pressure of water-rich sand egg layer and excavation method thereof
CN205714026U (en) A kind of water injection type drilling machine drilling rod
CN203570230U (en) Pile bottom sediment cleaning system
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN201605577U (en) Borehole cleaning device for mechanical-boring cast-in-place pile
CN106869113A (en) A kind of circulating high pressure water clears up the device and method of pile tube stake holes
CN107083932A (en) The installation method of steel pipe column in the clean cycle equipment that drills and pilot tunnel
CN203403404U (en) High-efficiency cast-in-place pile device
CN103603339A (en) Method for long spiral drilling machine grouting retaining wall hole forming and system thereof
CN114960626A (en) Positive and negative bidirectional circulation one-time hole cleaning, drilling and expanding disc pile hole forming construction method
CN102787815A (en) Positive and negative circulation construction technology of ultra-deep bored piles
CN103015408A (en) Cast-in-place pile synchronous casing hole-forming constructing method
CN106592544A (en) Device for assisting in side slope water drainage through wave energy
CN104278679A (en) Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN104929514A (en) Raise-boring machine construction method
CN206957764U (en) A kind of underground mine capital construction phase temporary drainage system
CN104141300A (en) Foundation pile hole drilling construction process
CN203603145U (en) Long spiral drilling machine grouting retaining wall hole forming system
CN202249851U (en) Reverse circulation hole forming equipment for cast-in-place pile
CN202467652U (en) High speed rotary drilling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant