CN206957764U - A kind of underground mine capital construction phase temporary drainage system - Google Patents
A kind of underground mine capital construction phase temporary drainage system Download PDFInfo
- Publication number
- CN206957764U CN206957764U CN201720930868.0U CN201720930868U CN206957764U CN 206957764 U CN206957764 U CN 206957764U CN 201720930868 U CN201720930868 U CN 201720930868U CN 206957764 U CN206957764 U CN 206957764U
- Authority
- CN
- China
- Prior art keywords
- pump
- wellhole
- earth
- drainage system
- underground mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
A kind of underground mine capital construction phase temporary drainage system is the utility model is related to, belongs to underground mine roadway construction equipment technical field.Technical scheme is:Pit shaft(4)Bottom be provided with shaft bottom immersible pump(5), close to pit shaft(4)Top be provided with earth's surface pond(2)With earth's surface water pump(3), tunnel(8)It is interior to be provided with multiple catch pits(10)With a wellhole(7), the catch pit(10)It is interior to be provided with working face immersible pump(11), the wellhole(7)Close to pit shaft(4), wellhole(7)Provided with centrifugal multistage pump multiple centrifugal pump(6), the earth's surface water pump(3), shaft bottom immersible pump(5), centrifugal multistage pump multiple centrifugal pump(6)With working face immersible pump(11)Connected by discharge pipe line.The beneficial effects of the utility model are:Suitable for the drainage system of the only head construction of long range descending of underground mine capital construction phase, drainage system left unguarded is realized, saves cost of labor.
Description
Technical field
It the utility model is related to a kind of underground mine capital construction phase temporary drainage system, the especially length of underground mine capital construction phase
Apart from the drainage system of the only head driving of descending, belong to underground mine roadway construction equipment technical field.
Background technology
Underground mine is acted on by Complex Hydrogeological Conditions, need to arrange perfect underground drainage system, start up of mine production
Afterwards, water burst can be taken advantage of a situation along ditch flow into wellhole, using multistage centrifugal crouch pump concentrate drain into earth's surface.And in mine capital construction
During, condition of construction is complicated, in order to accelerate engineering construction progress, uses bull tunneling method more.Part excavation process
In, it may appear that the situation of long range descending only head construction, during construction, temporary drainage system need to be arranged, in time by water burst in tunnel
Drain into earth's surface.
Utility model content
The utility model purpose is to provide a kind of underground mine capital construction phase temporary drainage system, can be by tunnel and shaft bottom
Water burst drain into earth's surface, solve problem present in background technology.
The technical solution of the utility model is:
A kind of underground mine capital construction phase temporary drainage system, comprising earth's surface pond, earth's surface water pump, pit shaft, shaft bottom immersible pump,
Centrifugal multistage pump multiple centrifugal pump, wellhole, tunnel, catch pit and working face immersible pump, the bottom of pit shaft are provided with shaft bottom immersible pump, close to well
The top of cylinder is provided with earth's surface pond and earth's surface water pump, and multiple catch pits and a wellhole, the catch pit are provided with tunnel
Interior to be provided with working face immersible pump, for the wellhole close to pit shaft, wellhole is provided with centrifugal multistage pump multiple centrifugal pump, the earth's surface water pump,
Shaft bottom immersible pump, centrifugal multistage pump multiple centrifugal pump and working face immersible pump are connected by discharge pipe line.
Multiple catch pits in the tunnel are arranged in the side in tunnel.
Standby immersible pump is provided with the catch pit.
Sedimentation basin is equipped with the earth's surface pond and wellhole.
The centrifugal multistage pump multiple centrifugal pump is close to wellhole.
Using the utility model, during excavation, when there is the only head construction of long range descending, by catch pit
Water burst by the progressively draining of working face immersible pump, drain into tunnel in the wellhole of near wellbore, the water burst of wellbore bottom
By shaft bottom immersible pump, also drain into wellhole, finally, the water burst in wellhole is discharged into by earth's surface by centrifugal multistage pump multiple centrifugal pump
Pond.
The beneficial effects of the utility model are:Suitable for the draining of the only head construction of long range descending of underground mine capital construction phase
System, drainage system left unguarded is realized, save cost of labor.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
In figure:Outer drainage direction 1, earth's surface pond 2, earth's surface water pump 3, pit shaft 4, shaft bottom immersible pump 5, centrifugal multistage pump multiple centrifugal pump 6, well
Standage 7, tunnel 8, water (flow) direction 9, catch pit 10, working face immersible pump 11.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
Referring to the drawings 1, a kind of underground mine capital construction phase temporary drainage system, earth's surface pond 2, earth's surface water pump 3, pit shaft are included
4th, shaft bottom immersible pump 5, centrifugal multistage pump multiple centrifugal pump 6, wellhole 7, tunnel 8, catch pit 10 and working face immersible pump 11, the bottom of pit shaft 4
Portion is provided with shaft bottom immersible pump 5, is provided with earth's surface pond 2 and earth's surface water pump 3 close to the top of pit shaft 4, multiple catchment is provided with tunnel 8
Hole 10 and a wellhole 7, is provided with working face immersible pump 11 in the catch pit 10, the wellhole 7 close to pit shaft 4,
Wellhole 7 is provided with centrifugal multistage pump multiple centrifugal pump 6, the earth's surface water pump 3, shaft bottom immersible pump 5, centrifugal multistage pump multiple centrifugal pump 6 and working face immersible pump
11 are connected by discharge pipe line.
In the present embodiment, during roadway construction, in tunnel 8, one catch pit is set at interval of a segment distance
10, the distance between catch pit 10 determines according to the means of transportation and actual conditions in tunnel, and rail travel distance may be selected long one
A bit, flexible transport according to circumstances suitably reduces the distance, and guarantees normal operation.Catch pit 10 is arranged in the one of tunnel 8
Side, normal production and transportation are not influenceed.Arrangement working face immersible pump 11 in catch pit 10, working face immersible pump 11 are small-sized latent
Water pump, the drainability of compact submersible pump are greater than the water yield at this, also need to arrange reserve pump.It will be catchmented with discharge pipe line
Compact submersible pump in hole 10 connects, and progressively draining, water burst is drained into the wellhole 7 in the tunnel near pit shaft 4.
Wellhole 7 in tunnel near pit shaft 4 can take lower digging formula sump, can also use one section of interception rarely needed
Tunnel or chamber.Near wellhole 7, the centrifugal multistage pump multiple centrifugal pump 6 of suitable number of units, multistage centrifugal are arranged according to water yield size
Pump 6 is crouched pump using multistage centrifugal, and water burst is immediately discharged to earth's surface pond 2 along inside pit shaft 4 by the multistage centrifugal pump that crouches.
Shaft bottom immersible pump 5 is arranged in the shaft bottom eddies of water of pit shaft 4, water burst at this is also drained into the tunnel near pit shaft 4
Wellhole 7 in, then earth's surface pond 2 drained into by the multistage centrifugal pump that crouches.
Earth's surface water pump 3 is installed in earth's surface pond 2, water burst is drained into the position of reservation by outer discharge pipe line.
The earth's surface pond 2 and wellhole 7 are respectively provided with precipitation function.
The earth's surface water pump 3, shaft bottom immersible pump 5, centrifugal multistage pump multiple centrifugal pump 6 and working face immersible pump 11 use liquid level relay
Control, realize the left unguarded of drainage system.
Claims (5)
1. a kind of underground mine capital construction phase temporary drainage system, it is characterised in that include earth's surface pond(2), earth's surface water pump(3), well
Cylinder(4), shaft bottom immersible pump(5), centrifugal multistage pump multiple centrifugal pump(6), wellhole(7), tunnel(8), catch pit(10)Dived under water with working face
Pump(11), pit shaft(4)Bottom be provided with shaft bottom immersible pump(5), close to pit shaft(4)Top be provided with earth's surface pond(2)And earth's surface
Water pump(3), tunnel(8)It is interior to be provided with multiple catch pits(10)With a wellhole(7), the catch pit(10)It is interior to be provided with work
Face immersible pump(11), the wellhole(7)Close to pit shaft(4), wellhole(7)Provided with centrifugal multistage pump multiple centrifugal pump(6), the earth's surface
Water pump(3), shaft bottom immersible pump(5), centrifugal multistage pump multiple centrifugal pump(6)With working face immersible pump(11)Connected by discharge pipe line.
A kind of 2. underground mine capital construction phase temporary drainage system according to claim 1, it is characterised in that the tunnel(8)
Interior multiple catch pits(10)It is arranged in tunnel(8)Side.
3. a kind of underground mine capital construction phase temporary drainage system according to claim 1 or 2, it is characterised in that described to catchment
Hole(10)It is interior to be provided with standby immersible pump.
A kind of 4. underground mine capital construction phase temporary drainage system according to claim 1, it is characterised in that the surface water
Pond(2)And wellhole(7)Inside it is equipped with sedimentation basin.
A kind of 5. underground mine capital construction phase temporary drainage system according to claim 1, it is characterised in that it is described it is multistage from
Heart pump(6)Close to wellhole(7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720930868.0U CN206957764U (en) | 2017-07-28 | 2017-07-28 | A kind of underground mine capital construction phase temporary drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720930868.0U CN206957764U (en) | 2017-07-28 | 2017-07-28 | A kind of underground mine capital construction phase temporary drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206957764U true CN206957764U (en) | 2018-02-02 |
Family
ID=61381777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720930868.0U Active CN206957764U (en) | 2017-07-28 | 2017-07-28 | A kind of underground mine capital construction phase temporary drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206957764U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505599A (en) * | 2019-01-09 | 2019-03-22 | 淮南矿业(集团)有限责任公司 | It automates gang drill and considers system and method to be worth doing |
CN110578552A (en) * | 2019-10-16 | 2019-12-17 | 海南矿业股份有限公司 | Connecting structure of mine drainage shaft and drainage roadway |
CN112282033A (en) * | 2020-10-19 | 2021-01-29 | 临沂会宝岭铁矿有限公司 | Auxiliary drainage system for iron ore construction prevention and water control |
-
2017
- 2017-07-28 CN CN201720930868.0U patent/CN206957764U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505599A (en) * | 2019-01-09 | 2019-03-22 | 淮南矿业(集团)有限责任公司 | It automates gang drill and considers system and method to be worth doing |
CN109505599B (en) * | 2019-01-09 | 2024-01-23 | 淮南矿业(集团)有限责任公司 | Automatic drill chip removing system and method |
CN110578552A (en) * | 2019-10-16 | 2019-12-17 | 海南矿业股份有限公司 | Connecting structure of mine drainage shaft and drainage roadway |
CN112282033A (en) * | 2020-10-19 | 2021-01-29 | 临沂会宝岭铁矿有限公司 | Auxiliary drainage system for iron ore construction prevention and water control |
CN112282033B (en) * | 2020-10-19 | 2021-12-07 | 临沂会宝岭铁矿有限公司 | Auxiliary drainage system for iron ore construction prevention and water control |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631439B (en) | A kind of Pump breath countercirculate pile foundation construction device and method | |
CN206957764U (en) | A kind of underground mine capital construction phase temporary drainage system | |
CN110410143A (en) | A kind of reverse-slope tunnel construction drainage system | |
CN205116250U (en) | Sediment removal device of reservoir among hydraulic engineering | |
CN204457515U (en) | A kind of bored pile mud circulation treatment system | |
CN110185493A (en) | Major long tunnel counter-slope drainage and construction method under a kind of complex geological condition | |
CN105257908B (en) | A kind of pushing tow drilling construction device and method of underground piping | |
WO2021097937A1 (en) | Long tunnel water drainage system | |
CN210637109U (en) | Underground mine underground temporary drainage structure | |
CN206987885U (en) | Getting working face drain discharge corollary apparatus | |
CN104389634B (en) | A kind of mine vertical shaft sieve well shaft wall structure and controlled trapping method thereof | |
CN209099993U (en) | Clean-out machine operation at sea mud difference position recycle unit system | |
CN110593949B (en) | Mine sluicing wind shielding structure | |
CN110374124B (en) | Subway construction drainage system | |
JPH1113039A (en) | Water storage device for river | |
CN104652383A (en) | Tailings pond dam body free draining device | |
OA13109A (en) | Saltwater intrusion prevention system. | |
CN114575359B (en) | Weak-permeability soil layer side slope underground flood control method | |
CN205895309U (en) | Prevention of seepage water system for pitshaft driving | |
CN111173017A (en) | Water stopping device and water stopping method for concrete pouring at bottom of reverse operation well of cyclone well | |
CN215211400U (en) | Gravity flow drainage structure after plugging of adverse slope construction branch tunnel of nearly underground factory building | |
CN101839147B (en) | Siphon sluicing method | |
CN105604605B (en) | The complicated anti-broke-out diseases device of flood mine underground mine | |
JP2007009576A (en) | Excavated earth and sand exhausting device and shield device | |
CN105604076A (en) | Vacuum pump water-discharging device suitable for tunnel excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |