CN110158940A - The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object - Google Patents

The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object Download PDF

Info

Publication number
CN110158940A
CN110158940A CN201910382125.8A CN201910382125A CN110158940A CN 110158940 A CN110158940 A CN 110158940A CN 201910382125 A CN201910382125 A CN 201910382125A CN 110158940 A CN110158940 A CN 110158940A
Authority
CN
China
Prior art keywords
telescopic
frame
protective frame
foot palm
scaffold board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910382125.8A
Other languages
Chinese (zh)
Inventor
白小刚
孙鹏鹏
黄国华
宋全
陈思睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201910382125.8A priority Critical patent/CN110158940A/en
Publication of CN110158940A publication Critical patent/CN110158940A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks

Abstract

The telescopic foot palm and construction method of a kind of skyscraper protective frame obstacle avoidance object of the invention, it is related to formwork system technical field, for solving the problems, such as that scaffold board in traditional scaffold is difficult to solve the structure lines in building and alien invasion variation bring operating distance is short.It in protective frame by being arranged telescopic foot palm, it includes steel mesh piece scaffold board ontology and fixed frame, and for fixed mount setting in steel mesh piece scaffold board ontology two sides, fixed frame includes the fixing groove being mutually socketed and telescopic chute, when scaffold board is in extended state, junction is fixed by bolt;When scaffold board is in retracted state, telescopic chute is sheathed on inside fixing groove, so that the fixed frame of scaffold board is respectively and in the longitudinal horizontal rod of protective frame main frame and vertical upright bar, when lifting frame body, original position is retracted by telescopic chute, guarantees that frame body accessible can be promoted;Telescopic foot palm will be stretched out when construction, construction when adapting to floor structure sideline and protective frame frame body hypertelorism.

Description

The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object
Technical field
The present invention relates to formwork system technical field, in particular to a kind of skyscraper protective frame obstacle avoidance object it is telescopic Scaffold board and construction method.
Background technique
Scaffold board traditional at present is fixed on scaffold frame body, if encountering structure lines when construction It falls in, it will cause construction personnel to have in operation with structure sideline at a distance from very big, there is very big security risk, very To being unable to reach efficient operation distance.
Therefore, how to provide it is a kind of can adapt to building in structure lines and alien invasion variation skyscraper protective frame The technical issues of telescopic foot palm and construction method of obstacle avoidance object are those skilled in the art's urgent need to resolve.
Summary of the invention
It is difficult to solve structure lines and alien invasion variation bring operation in building for scaffold board in traditional scaffold Apart from short problem, the purpose of the present invention is to provide a kind of telescopic foot palm of skyscraper protective frame obstacle avoidance object and apply Flexible scaffold board while each lifting frame body, is retracted original position by telescopic chute, guarantees frame body energy by work method Enough accessible promotions, until construction again can stretch out scaffold board when needing, so that in skyscraper after the completion of promoting work Structure lines and alien invasion variation bring operate limited problem and are addressed.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of telescopic foot palm of skyscraper protective frame obstacle avoidance object, the protective frame include main frame and telescopic Scaffold board, the main frame include longitudinal horizontal rod, horizontal rod and vertical upright bar, and the telescopic foot palm includes steel mesh Piece scaffold board ontology and fixed frame;
The fixed mount setting includes the fixation being mutually socketed in steel mesh piece scaffold board ontology two sides, the fixed frame Slot and telescopic chute, when scaffold board is in extended state, the two junction is fixed by bolt;When scaffold board is in retracted state When, the telescopic chute is sheathed on inside the fixing groove;
The connecting pin of the fixing groove is fixed in the longitudinal horizontal rod by steel tube fastener, the fixing groove and described Longitudinal horizontal rod is both secured in the vertical upright bar;
The free end of the telescopic chute is fixed by wirerope and upper layer horizontal rod oblique pull.
Compared with prior art, the present invention is beneficial has the technical effect that
One, the telescopic foot palm of skyscraper protective frame obstacle avoidance object of the invention, is stretched by being arranged in protective frame Contracting formula scaffold board, telescopic foot palm include steel mesh piece scaffold board ontology and fixed frame, and fixed mount setting is in the steel mesh piece foot Palm ontology two sides, the fixed frame includes the fixing groove being mutually socketed and telescopic chute, when scaffold board is in extended state, two Person is fixed junction by bolt;When scaffold board is in retracted state, the telescopic chute is sheathed on inside the fixing groove, is made The fixed frame of scaffold board is obtained respectively and in the longitudinal horizontal rod of protective frame main frame and vertical upright bar, to realize each hoisting frame While body, telescopic foot palm is retracted into original position by telescopic chute, guarantees that frame body accessible can be promoted;To To after the completion of promoting work, construction again can stretch out telescopic foot palm when needing, to adapt to floor structure sideline and protective frame The normal construction demand of operation layer when frame body hypertelorism.
Two, the construction method of the telescopic foot palm of skyscraper protective frame obstacle avoidance object of the invention, processing and fabricating side Just, each work layer, which is sequentially arranged the 4 telescopic foot palms, can cover a work layer, meet unconventional floor structure Protective frame installation and use.
Further, in order to draw materials conveniently, cost is saved, the fixing groove and telescopic chute are made by steel pipe, institute The cross-sectional sizes for stating fixing groove and the telescopic chute match.
Further, it is contemplated that materials convenience, and improve the usage experience of scaffold board, the steel mesh piece scaffold board sheet Body is composed of matrix pattern frame and steel mesh piece.
Further, the close mesh of steel mesh piece is 40mm × 40mm, thus under conditions of meeting construction personnel's safe construction, Materials cost is reduced, the weight of entire scaffold board is reduced.
The present invention also provides the construction methods of the telescopic foot palm of aforementioned skyscraper protective frame obstacle avoidance object, this is applied Work method includes:
S1: the main frame of protective frame is installed, and is determined according to the spacing of upright bar vertical in structural floor edge and protective frame The length stretched needed for telescopic foot palm, production telescopic foot palm are spare;
S2: when encountering structure lines protrusion during promoting protective frame frame body, telescopic chute being sheathed on inside fixing groove, So that telescopic foot palm retracts;When distance structure edge farther out when telescopic chute and fixing groove be connected, the two junction It is fixed by bolt, to give so that telescopic foot palm stretches out.
Detailed description of the invention
Fig. 1 is the retracted state plane of the telescopic foot palm of one embodiment of the invention skyscraper protective frame obstacle avoidance object Schematic diagram;
Fig. 2 is the stretching state plane of the telescopic foot palm of one embodiment of the invention skyscraper protective frame obstacle avoidance object Schematic diagram.
In figure:
1. fixing groove;2. vertical upright bar;3. longitudinal horizontal rod;4. telescopic chute;5. wirerope;6. bolt.
Specific embodiment
A kind of skyscraper protective frame obstacle avoidance object proposed by the present invention is stretched below in conjunction with the drawings and specific embodiments Contracting formula scaffold board and construction method are described in further detail.According to following explanation, advantages and features of the invention will be more clear Chu.Below will be by cited embodiment combination attached drawing, the technology contents and feature that the present invention will be described in detail.Need in addition it illustrate It is that attached drawing is all made of very simplified form and using non-accurate ratio, only to facilitate, lucidly aid in illustrating this hair The purpose of bright embodiment.For sake of convenience, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this is not The limitation of technical solution of the present invention can be become.
Embodiment one
Illustrate the structure group of the telescopic foot palm of skyscraper protective frame obstacle avoidance object of the invention in conjunction with Fig. 1 and Fig. 2 At.
Fig. 1 and Fig. 2, a kind of telescopic foot palm of skyscraper protective frame obstacle avoidance object are please referred to, protective frame includes master Frame and telescopic foot palm, main frame include longitudinal horizontal rod 3., horizontal rod and vertical upright bar 2., telescopic foot palm Including steel mesh piece scaffold board ontology and fixed frame;For fixed mount setting in steel mesh piece scaffold board ontology two sides, fixed frame includes mutual The fixing groove of socket 1. with telescopic chute 4., when scaffold board is in extended state, 6. the two junction is fixed by bolt;Work as foot When palm is in retracted state, 4. telescopic chute is sheathed on fixing groove 1. internal;The connecting pin of fixing groove 1. is solid by steel tube fastener Due to longitudinal horizontal rod 3. on, 1. 3. fixing groove is both secured in vertical upright bar 2. with longitudinal horizontal rod;The freedom of telescopic chute 4. 5. end is fixed by wirerope with upper layer horizontal rod oblique pull.
Specifically, the telescopic foot palm of skyscraper protective frame obstacle avoidance object of the invention, by protective frame Telescopic foot palm is set, and telescopic foot palm includes steel mesh piece scaffold board ontology and fixed frame, and fixed mount setting is in the steel Mesh sheet scaffold board ontology two sides, the fixed frame include the fixing groove that is mutually socketed 1. with telescopic chute 4., stretched when scaffold board is in When exhibition state, 6. the two junction is fixed by bolt;When scaffold board is in retracted state, 4. the telescopic chute is sheathed on institute It is 1. internal to state fixing groove so that the fixed frame of scaffold board respectively with the longitudinal horizontal rod of protective frame main frame 3. with vertical upright bar 2. On, so that 4. telescopic foot palm is retracted original position by telescopic chute, protected while realizing each lifting frame body Card frame body accessible can be promoted;Until after the completion of promoting work, construction can stretch out telescopic foot palm when needing, with suitable again The normal construction demand of operation layer when answering floor structure sideline and protective frame frame body hypertelorism.
In the present embodiment, it is highly preferred that saving cost to draw materials conveniently, the fixing groove is 1. 4. equal with telescopic chute It is made by steel pipe, 1. the fixing groove matches with the cross-sectional sizes of the telescopic chute 4..
In the present embodiment, more preferably, it is contemplated that materials convenience, and the usage experience of scaffold board is improved, it is described Steel mesh piece scaffold board ontology is composed of matrix pattern frame and steel mesh piece.
In the present embodiment, it is highly preferred that the close mesh of steel mesh piece is 40mm × 40mm, thus meeting construction personnel's safety Under conditions of construction, materials cost is reduced, the weight of entire scaffold board is reduced.
Embodiment two
The present invention also provides the construction methods of the telescopic foot palm of aforementioned skyscraper protective frame obstacle avoidance object, this is applied Work method includes:
S1: the main frame of protective frame is installed, and true according to structural floor edge and the spacing of upright bar 2. vertical in protective frame Determine the length stretched needed for telescopic foot palm, production telescopic foot palm is spare;
S2: when encountering structure lines protrusion during promoting protective frame frame body, 4. 1. telescopic chute is sheathed on fixing groove Inside, so that telescopic foot palm retracts;When distance structure edge farther out when 4. 1. telescopic chute is connected with fixing groove, two 6. person junction is fixed by bolt, to give so that telescopic foot palm stretches out.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (5)

1. a kind of telescopic foot palm of skyscraper protective frame obstacle avoidance object, the protective frame includes main frame and telescopic foot Palm, the main frame include longitudinal horizontal rod, horizontal rod and vertical upright bar, which is characterized in that the telescopic foot hand Plate includes steel mesh piece scaffold board ontology and fixed frame;
The fixed mount setting in steel mesh piece scaffold board ontology two sides, the fixed frame include the fixing groove that is mutually socketed and Telescopic chute, when scaffold board is in extended state, the two junction is fixed by bolt;When scaffold board is in retracted state, The telescopic chute is sheathed on inside the fixing groove;
The connecting pin of the fixing groove is fixed in the longitudinal horizontal rod by steel tube fastener, the fixing groove and the longitudinal direction Horizon bar is both secured in the vertical upright bar;
The free end of the telescopic chute is fixed by wirerope and upper layer horizontal rod oblique pull.
2. the telescopic foot palm of skyscraper protective frame obstacle avoidance object according to claim 1, which is characterized in that described Fixing groove and telescopic chute are made by steel pipe, and the cross-sectional sizes of the fixing groove and the telescopic chute match.
3. the telescopic foot palm of skyscraper protective frame obstacle avoidance object according to claim 1, which is characterized in that described Steel mesh piece scaffold board ontology is composed of matrix pattern frame and steel mesh piece.
4. the telescopic foot palm of skyscraper protective frame obstacle avoidance object according to claim 3, which is characterized in that described The close mesh of steel mesh piece is 40mm × 40mm.
5. a kind of telescopic foot palm of skyscraper protective frame obstacle avoidance object according to any one of claims 1 to 4 Construction method characterized by comprising
S1: the main frame of protective frame is installed, and is determined and is stretched according to the spacing of upright bar vertical in structural floor edge and protective frame The length stretched needed for formula scaffold board, production telescopic foot palm are spare;
S2: when encountering structure lines protrusion during promoting protective frame frame body, telescopic chute being sheathed on inside fixing groove, so that Telescopic foot palm retracts;When distance structure edge farther out when telescopic chute and fixing groove be connected, the two junction passes through Bolt is fixed, to give so that telescopic foot palm stretches out.
CN201910382125.8A 2019-05-09 2019-05-09 The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object Pending CN110158940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910382125.8A CN110158940A (en) 2019-05-09 2019-05-09 The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910382125.8A CN110158940A (en) 2019-05-09 2019-05-09 The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object

Publications (1)

Publication Number Publication Date
CN110158940A true CN110158940A (en) 2019-08-23

Family

ID=67634094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910382125.8A Pending CN110158940A (en) 2019-05-09 2019-05-09 The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object

Country Status (1)

Country Link
CN (1) CN110158940A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456404A (en) * 2020-04-20 2020-07-28 上海建工集团股份有限公司 Double-layer operation platform and construction method for avoiding attachment of tower crane
CN112982937A (en) * 2021-02-10 2021-06-18 上海建工集团股份有限公司 Guide frame climbing type working platform system for avoiding obstacles
CN113006450A (en) * 2021-02-10 2021-06-22 上海建工集团股份有限公司 Method for passing through barrier by guide frame climbing type working platform system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003066A (en) * 2010-10-29 2011-04-06 北京韬盛科技发展有限公司 Steering folded scaffold unit
CN203531344U (en) * 2013-10-18 2014-04-09 浙江固华脚手架工程有限公司 Tool type scaffold
CN104420641A (en) * 2013-09-03 2015-03-18 中铁建工集团有限公司 Extensible lifting construction platform
CN206448505U (en) * 2016-09-30 2017-08-29 山西四建集团有限公司 Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly
CN109537866A (en) * 2018-12-12 2019-03-29 北京千引力科技发展有限公司 A kind of attachment type raise scaffold and its hanging method
CN210713756U (en) * 2019-05-09 2020-06-09 上海建工一建集团有限公司 Telescopic scaffold board for high-rise building protective frame to avoid obstacles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003066A (en) * 2010-10-29 2011-04-06 北京韬盛科技发展有限公司 Steering folded scaffold unit
CN104420641A (en) * 2013-09-03 2015-03-18 中铁建工集团有限公司 Extensible lifting construction platform
CN203531344U (en) * 2013-10-18 2014-04-09 浙江固华脚手架工程有限公司 Tool type scaffold
CN206448505U (en) * 2016-09-30 2017-08-29 山西四建集团有限公司 Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly
CN109537866A (en) * 2018-12-12 2019-03-29 北京千引力科技发展有限公司 A kind of attachment type raise scaffold and its hanging method
CN210713756U (en) * 2019-05-09 2020-06-09 上海建工一建集团有限公司 Telescopic scaffold board for high-rise building protective frame to avoid obstacles

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456404A (en) * 2020-04-20 2020-07-28 上海建工集团股份有限公司 Double-layer operation platform and construction method for avoiding attachment of tower crane
CN112982937A (en) * 2021-02-10 2021-06-18 上海建工集团股份有限公司 Guide frame climbing type working platform system for avoiding obstacles
CN113006450A (en) * 2021-02-10 2021-06-22 上海建工集团股份有限公司 Method for passing through barrier by guide frame climbing type working platform system

Similar Documents

Publication Publication Date Title
CN110158940A (en) The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object
CN106894622A (en) Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN205804913U (en) A kind of lift steel platform for material unloading device being applicable to attaching scaffold
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN205100531U (en) Lift scaffold support body assembly
CN104692299A (en) Telescopic hydraulic lifting device of cable trench cover plates
CN205802864U (en) Novel architecture lowering or hoisting gear
CN218434640U (en) Telescopic tower crane escape way
CN204778237U (en) Can have enough to meet need construction elevator layer door connects material platform
CN203201149U (en) Electric lifting discharging platform
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN204802911U (en) Worker china democratic national construction association is with three capstan winch high altitudes protection hanging flower basket
CN204643664U (en) A kind of building tower crane
CN205153375U (en) Flexible safe stair of theftproof type intelligence
CN202990395U (en) Rotating horizontal protection tool for climbing scaffold
CN204400568U (en) Become span hanging basket suspension mechanism
CN2756754Y (en) Safety protective rail for lift shaft
CN206487128U (en) A kind of Guiding Support Elevating Scaffold
CN205932875U (en) Telescopic landing stage is used to steel construction integration elevator
CN204627393U (en) A kind of self-supporting folding ladder
CN207048287U (en) A kind of cradle for constructional engineering
CN204024019U (en) The angle formula gondola-hanging mechanism of sitting on the fence
CN203871663U (en) Dual-rail substation second door framework auxiliary placement system
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude
CN205000623U (en) Integrated form intelligence lift protective screen

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination