CN205804913U - A kind of lift steel platform for material unloading device being applicable to attaching scaffold - Google Patents

A kind of lift steel platform for material unloading device being applicable to attaching scaffold Download PDF

Info

Publication number
CN205804913U
CN205804913U CN201620722018.7U CN201620722018U CN205804913U CN 205804913 U CN205804913 U CN 205804913U CN 201620722018 U CN201620722018 U CN 201620722018U CN 205804913 U CN205804913 U CN 205804913U
Authority
CN
China
Prior art keywords
brace
fixed installation
connecting plate
collet
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620722018.7U
Other languages
Chinese (zh)
Inventor
高佑家
郭起发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GAOTANG QIFA CONSTRUCTION INSTALLATION ENGINEERING Co Ltd
Original Assignee
GAOTANG QIFA CONSTRUCTION INSTALLATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GAOTANG QIFA CONSTRUCTION INSTALLATION ENGINEERING Co Ltd filed Critical GAOTANG QIFA CONSTRUCTION INSTALLATION ENGINEERING Co Ltd
Priority to CN201620722018.7U priority Critical patent/CN205804913U/en
Application granted granted Critical
Publication of CN205804913U publication Critical patent/CN205804913U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

This utility model belongs to scaffold equipment field, particularly relate to a kind of lift steel platform for material unloading device being applicable to attaching scaffold, including attachment support, described attachment support is fixed on building by through-wall bolt, on described attachment support, fixed installation is provided with track support, on described track support, fixed installation is provided with stroke dolly, and described stroke dolly is provided with material platform collet away from the side fixed installation of described track support, and on described material platform collet, fixed installation is provided with front guardrail, side rail;On described material platform collet, fixed installation is provided with the first connecting plate, the second connecting plate, it is provided with the 3rd brace by the 4th connecting bolt fixed installation on described first connecting plate, on described 3rd brace, fixed installation is provided with regulation screw mandrel, being provided with the second brace by the 3rd connecting bolt fixed installation on described second connecting plate, described second brace is connected with the first brace by brace attachment means is fixing.

Description

A kind of lift steel platform for material unloading device being applicable to attaching scaffold
Technical field
This utility model belongs to scaffold equipment technical field, particularly relates to a kind of lifting being applicable to attaching scaffold Formula steel platform for material unloading device.
Background technology
Attachment type raise scaffold equipment is the new type scaffold technology that the beginning of this century, fast development was got up, and constructs China Technological progress has material impact.High-rise working is become lower operation by it, hanging operation becomes support body inside processing, has Significantly low-carbon (LC), high-tech content and the feature such as more economical, safer, more convenient.Attached lifting scaffold refers to set up one Fixed height is also attached in engineering structure, relies on jacking equipment and the device of self, can successively climb with engineering structure or decline, There is the external scaffolding of overturn-preventing, falling proof device;Attached lifting scaffold is mainly by attached lifting scaffold frame structure, attached Bearing, anti-tilt device, falling proof device, elevating mechanism and control the compositions such as device.Wherein lift steel platform for material unloading device As important ingredient, integral device is played an important role, but traditional main frame track structure device is usually Structure underaction, in-convenience in use, often affect the work efficiency of integral device;Therefore it is badly in need of design one and is applicable to attachment The lift steel platform for material unloading device of formula scaffold.
Summary of the invention
This utility model provides a kind of lift steel platform for material unloading device being applicable to attaching scaffold, above-mentioned to solve The overall structure proposed in background technology is dumb, inconvenient problem with use.
This utility model is solved the technical problem that and is realized by the following technical solutions: this utility model provides one suitable For the lift steel platform for material unloading device of attaching scaffold, including the first brace, track support, main frame, upper lifting Seat, the second brace, side guardrail, front guardrail, expect platform collet, lower upgrade block, the 3rd brace, anti-dumping protection device, collet is even Fishplate bar, attachment support, the first connecting bolt, brace attachment means, the second connecting bolt, the 4th connecting bolt, the 3rd connects Bolt, regulates screw mandrel, the first connecting plate, the second connecting plate, track guard, stroke dolly;Described attachment support passes through spiral shell through walls Bolt is fixed on building, and on described attachment support, fixed installation is provided with track support, and on described track support, fixed installation sets Having main frame, between described track support and described main frame, fixed installation is provided with anti-dumping protection device, on described track support Fixed installation is provided with stroke dolly, and described stroke dolly is provided with material platform collet away from the side fixed installation of described track support, Fix between described material platform collet and described stroke dolly and be connected with collet connecting plate, described material platform collet fixedly mounts and sets Having front guardrail, side rail, on described main frame, fixed installation is provided with track guard;On described material platform collet, fixed installation is provided with the A plate, the second connecting plate, described first connecting plate is provided with the 3rd brace by the 4th connecting bolt fixed installation, institute Stating fixed installation on the 3rd brace and be provided with regulation screw mandrel, described 3rd brace is fixed with described main frame by lower upgrade block Connect, between described 3rd brace and described lower upgrade block, fix being connected with the second connecting bolt, described second connecting plate On by the 3rd connecting bolt fixed installation be provided with the second brace, described second brace is fixed by brace attachment means Being connected with the first brace, described first brace is connected by upper upgrade block and described main frame are fixing, described first oblique Fix between pull bar and described upper upgrade block and be connected with the first connecting bolt.
This utility model is further arranged to, and the number of described side rail is 2, and described side rail encloses with described front guardrail Rectangular in form;On described side rail, front guardrail, track guard, all fixed installation is provided with steel wire.
This utility model is further arranged to, and described side rail, front guardrail use square tube material, and described track guard uses Pipe material.
This utility model is further arranged to, and on described material platform collet, fixed installation is provided with diamond plate.
The beneficial effects of the utility model are:
1, this patent is by arranging brace and material platform collet, and is attached by upper and lower upgrade block and bolt, Not only can ensure reliable supporting role, facilitate installing/dismounting simultaneously, structure flexible design, easy to use.
2, this patent is by arranging regulation screw mandrel on brace, can carry out length adjustment according to practical situation, it is ensured that material The smoothness of platform, structure designs more flexibility and reliability.
3, this patent is by arranging anti-dumping protection device and track support, not only can realize the reliable tune of single unit system Whole, simultaneously effective ensure the stability of single unit system.
4, patent structure of the present invention is flexible, and function is excellent, easy to operate, has good market value.
Accompanying drawing explanation
Fig. 1 is structural front view of the present utility model.
Fig. 2 is structure top view of the present utility model.
Fig. 3 is material platform collet top view of the present utility model.
Fig. 4 is material platform collet front view of the present utility model.
Fig. 5 is front guardrail front view of the present utility model.
Fig. 6 is front guardrail top view of the present utility model.
Fig. 7 is side rail front view of the present utility model.
Fig. 8 is side rail top view of the present utility model.
Fig. 9 is track guard front view of the present utility model.
Figure 10 is track guard side view of the present utility model.
Figure 11 is track guard top view of the present utility model.
Figure 12 is the 3rd brace front view of the present utility model.
Figure 13 is the 3rd brace top view of the present utility model.
Below in conjunction with accompanying drawing, this utility model is described further:
In figure: 1-the first brace, 2-track support, 3-main frame, the upper upgrade block of 4-, 5-the second brace, 6-protects side Blocking, guardrail before 7-, 8-expects platform collet, upgrade block under 9-, 10-the 3rd brace, 11-anti-dumping protection device, and 12-collet connects Plate, 13-attachment support, 14-the first connecting bolt, 15-brace attachment means, 16-the second connecting bolt, 17-the 4th connects Bolt, 18-the 3rd connecting bolt, 19-regulates screw mandrel, 20-the first connecting plate, 21-the second connecting plate, 22-track guard, 23- Stroke dolly.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings, and embodiments of the present invention include but not limited to The following example.
Embodiment:
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, this enforcement Example includes the first brace 1, track support 2, main frame 3, upper upgrade block 4, the second brace 5, side guardrail 6, front guardrail 7, material Platform collet 8, lower upgrade block 9, the 3rd brace 10, anti-dumping protection device 11, collet connecting plate 12, attachment support 13, first even Connecting bolt 14, brace attachment means 15, the second connecting bolt 16, the 4th connecting bolt 17, the 3rd connecting bolt 18, regulate silk Bar 19, the first connecting plate 20, the second connecting plate 21, track guard 22, stroke dolly 23;Attachment support 13 is solid by through-wall bolt Being scheduled on building, on attachment support 13, fixed installation is provided with track support 2, and on track support 2, fixed installation is provided with main frame 3, between track support 2 and main frame 3, fixed installation is provided with anti-dumping protection device 11, and on track support 2, fixed installation is provided with row Journey dolly 23, stroke dolly 23 is provided with material platform collet 8 away from the side fixed installation of track support 2, and material platform collet 8 is little with stroke The fixing collet connecting plate 12 that is connected with between car 23, on material platform collet 8, fixed installation is provided with front guardrail 7, side rail 6, main frame On frame 3, fixed installation is provided with track guard 22;On material platform collet 8, fixed installation is provided with first connecting plate the 20, second connecting plate 21, It is provided with the 3rd brace 10 by the 4th connecting bolt 17 fixed installation, fixing peace on the 3rd brace 10 on first connecting plate 20 Being equiped with regulation screw mandrel 19, the 3rd brace 10 is connected by lower upgrade block 9 and main frame 3 is fixing, the 3rd brace 10 and under Fix between upgrade block 9 and be connected with the second connecting bolt 16, by the 3rd fixing peace of connecting bolt 18 on the second connecting plate 21 Being equiped with the second brace 5, the second brace 5 is fixed by brace attachment means 15 and is connected with the first brace 1, and first Brace 1 is connected by upper upgrade block 4 is fixing with main frame 3, fixes and be connected with between the first brace 1 and upper upgrade block 4 First connecting bolt 14.
This utility model is further arranged to, and the number of side rail 6 is 2, and side rail 6 surrounds rectangular-shaped with front guardrail 7; On side rail 6, front guardrail 7, track guard 22, all fixed installation is provided with steel wire.
This utility model is further arranged to, and side rail 6, front guardrail 7 use square tube material, track guard 22 to use pipe Material.
This utility model is further arranged to, and on material platform collet 8, fixed installation is provided with diamond plate.
Time actually used, erection sequence is: be first fixedly attached to building structure by threading bolt by attachment support 13 Position, track support 2 is inserted between the directive wheel of attachment support 13, after being well placed position, is fixed by track with bearing pin, and security protection Inclining protection device 11, debugging puts in place, is then lifted into building structure and need to pacify the position of loading platform, and is fixed on through-wall bolt and builds On building structure, fixing solid and reliable;Discharging platform main body is lain in vacant lot, with bolt by the side rail 6 of three, front guardrail 7 and brace one end assemble;Mounted material platform main hanger is loaded on mounted track support 2, firm and reliable connection;Material After platform main body is installed, attachment rail guardrail 22 and bottom lock plate bottom guide rail;Pass through after discharging platform processing and fabricating Acceptance(check) can be installed, by the above process after installation can after can use through acceptance(check), and in promoting every time and Check and accept once before declining.
Utilize technical scheme described in the utility model, or those skilled in the art is in technical solutions of the utility model Under inspiration, design similar technical scheme, and reach above-mentioned technique effect, all fall into protection model of the present utility model Enclose.

Claims (4)

1. the lift steel platform for material unloading device being applicable to attaching scaffold, it is characterised in that: include the first brace (1), track support (2), main frame (3), upper upgrade block (4), the second brace (5), side rail (6), front guardrail (7), expect platform Collet (8), lower upgrade block (9), the 3rd brace (10), anti-dumping protection device (11), collet connecting plate (12), attachment support (13), the first connecting bolt (14), brace attachment means (15), the second connecting bolt (16), the 4th connecting bolt (17), the Three connecting bolts (18), regulation screw mandrel (19), the first connecting plate (20), the second connecting plate (21), track guard (22), stroke is little Car (23);Described attachment support (13) is fixed on building by through-wall bolt, the upper fixed installation of described attachment support (13) Being provided with track support (2), the upper fixed installation of described track support (2) is provided with main frame (3), and described track support (2) is with described Between main frame (3), fixed installation is provided with anti-dumping protection device (11), and it is little that the upper fixed installation of described track support (2) is provided with stroke Car (23), described stroke dolly (23) is provided with material platform collet (8) away from the side fixed installation of described track support (2), described Fix between material platform collet (8) and described stroke dolly (23) and be connected with collet connecting plate (12), on described material platform collet (8) Fixed installation is provided with front guardrail (7), side rail (6), and the upper fixed installation of described main frame (3) is provided with track guard (22);Described The upper fixed installation of material platform collet (8) is provided with the first connecting plate (20), the second connecting plate (21), and described first connecting plate (20) is upper logical Crossing the 4th connecting bolt (17) fixed installation and be provided with the 3rd brace (10), the upper fixed installation of described 3rd brace (10) is provided with Regulation screw mandrel (19), described 3rd brace (10) fixed by lower upgrade block (9) and described main frame (3) and is connected, and described the Fix between three braces (10) and described lower upgrade block (9) and be connected with the second connecting bolt (16), described second connecting plate (21) being provided with the second brace (5) by the 3rd connecting bolt (18) fixed installation on, described second brace (5) passes through oblique pull Rod connecting device (15) is fixing is connected with the first brace (1), and described first brace (1) is by upper upgrade block (4) and institute State the fixing connection of main frame (3), fix between described first brace (1) and described upper upgrade block (4) and be connected with first even Connecting bolt (14).
A kind of lift steel platform for material unloading device being applicable to attaching scaffold the most according to claim 1, its feature Being: the number of described side rail (6) is 2, described side rail (6) surrounds rectangular-shaped with described front guardrail (7);Described side is protected On hurdle (6), front guardrail (7), track guard (22), all fixed installation is provided with steel wire.
A kind of lift steel platform for material unloading device being applicable to attaching scaffold the most according to claim 1, its feature Being: described side rail (6), front guardrail (7) use square tube material, described track guard (22) uses pipe material.
A kind of lift steel platform for material unloading device being applicable to attaching scaffold the most according to claim 1, its feature It is: the upper fixed installation of described material platform collet (8) is provided with diamond plate.
CN201620722018.7U 2016-07-10 2016-07-10 A kind of lift steel platform for material unloading device being applicable to attaching scaffold Active CN205804913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620722018.7U CN205804913U (en) 2016-07-10 2016-07-10 A kind of lift steel platform for material unloading device being applicable to attaching scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620722018.7U CN205804913U (en) 2016-07-10 2016-07-10 A kind of lift steel platform for material unloading device being applicable to attaching scaffold

Publications (1)

Publication Number Publication Date
CN205804913U true CN205804913U (en) 2016-12-14

Family

ID=58140795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620722018.7U Active CN205804913U (en) 2016-07-10 2016-07-10 A kind of lift steel platform for material unloading device being applicable to attaching scaffold

Country Status (1)

Country Link
CN (1) CN205804913U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143122A (en) * 2017-06-29 2017-09-08 来安荣盛金属制品有限公司 It is a kind of can Synchronous lifting material platform and improve thermal conductivity scaffold
CN107327149A (en) * 2017-08-10 2017-11-07 广西建工集团建筑机械制造有限责任公司 A kind of Liftable type discharging platform
CN107642241A (en) * 2017-09-05 2018-01-30 深圳前海特辰科技有限公司 The stress supporting construction and construction method of a kind of prefabricated balcony
CN108858108A (en) * 2018-07-19 2018-11-23 芜湖青悠静谧环保科技有限公司 A kind of welding for steel structure crosshead
CN113137052A (en) * 2021-04-16 2021-07-20 中国建筑第八工程局有限公司 Self-climbing safety hard protection and curtain wall circular rail hoisting integrated platform
CN114319893A (en) * 2021-12-29 2022-04-12 深圳市胜德建筑科技有限公司 Lifting type discharging platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143122A (en) * 2017-06-29 2017-09-08 来安荣盛金属制品有限公司 It is a kind of can Synchronous lifting material platform and improve thermal conductivity scaffold
CN107327149A (en) * 2017-08-10 2017-11-07 广西建工集团建筑机械制造有限责任公司 A kind of Liftable type discharging platform
CN107642241A (en) * 2017-09-05 2018-01-30 深圳前海特辰科技有限公司 The stress supporting construction and construction method of a kind of prefabricated balcony
CN108858108A (en) * 2018-07-19 2018-11-23 芜湖青悠静谧环保科技有限公司 A kind of welding for steel structure crosshead
CN113137052A (en) * 2021-04-16 2021-07-20 中国建筑第八工程局有限公司 Self-climbing safety hard protection and curtain wall circular rail hoisting integrated platform
CN114319893A (en) * 2021-12-29 2022-04-12 深圳市胜德建筑科技有限公司 Lifting type discharging platform

Similar Documents

Publication Publication Date Title
CN205804913U (en) A kind of lift steel platform for material unloading device being applicable to attaching scaffold
CN201598820U (en) Single point suspension external hanging bracket
CN212743427U (en) Climbing type discharging platform
CN106368493A (en) Two-arm hydraulic drive-in type hard capping lattice type crossing frame
CN102168484B (en) External hanging scaffold and application method thereof
CN206707237U (en) Cable-stayed type top layer construction platform for elevator installation
CN205527199U (en) Inorganic tenant ladder sedan -chair frame
CN204024013U (en) A kind of self-climbing lifting material platform
CN108590151A (en) A kind of scalable elevator hanging basket in four sides
CN209975993U (en) Suspension cage
CN202954553U (en) Full assembly tool type attachment lifting scaffold
CN215666760U (en) Sliding type horizontal wall-attached device for construction elevator
CN214424055U (en) Attached lifting scaffold platform of unloading
CN205369876U (en) Lifting foot hand frame is adhered to to dish knot formula
CN211313310U (en) Safe turnover shaping elevator shaft operation platform
CN210636781U (en) Hanging flower basket of safety support for building
CN204754150U (en) Dish -type node formula scaffold
CN208856773U (en) Mandril erecting by overhang
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN202988663U (en) Return hook suspension mechanism
CN206267513U (en) A kind of high security attaching scaffold
CN205908007U (en) Coupling assembling and external safety net device of external safety net of dish knot formula scaffold frame
CN215212258U (en) Safe and reliable elevator shaft protection operation platform convenient to layer-by-layer turnover use
CN215666502U (en) A safe lift platform for construction
CN219448937U (en) Bearing beam telescopic structure of lifting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant