CN110154245A - A kind of auxiliary device and method for railway ballast maintenance - Google Patents

A kind of auxiliary device and method for railway ballast maintenance Download PDF

Info

Publication number
CN110154245A
CN110154245A CN201910491975.1A CN201910491975A CN110154245A CN 110154245 A CN110154245 A CN 110154245A CN 201910491975 A CN201910491975 A CN 201910491975A CN 110154245 A CN110154245 A CN 110154245A
Authority
CN
China
Prior art keywords
traction
traction mechanism
cutting part
cable
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910491975.1A
Other languages
Chinese (zh)
Other versions
CN110154245B (en
Inventor
张千里
陈锋
王鹏程
李中国
尧俊凯
郭浏卉
曾帅
王建
吕万青
江金海
田亮
魏进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
A New Constant Of Mstar Technology Ltd
Railway Engineering Research Institute of CARS
Beijing Tieke Special Engineering Technology Co Ltd
Original Assignee
A New Constant Of Mstar Technology Ltd
Railway Engineering Research Institute of CARS
Beijing Tieke Special Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by A New Constant Of Mstar Technology Ltd, Railway Engineering Research Institute of CARS, Beijing Tieke Special Engineering Technology Co Ltd filed Critical A New Constant Of Mstar Technology Ltd
Priority to CN201910491975.1A priority Critical patent/CN110154245B/en
Publication of CN110154245A publication Critical patent/CN110154245A/en
Application granted granted Critical
Publication of CN110154245B publication Critical patent/CN110154245B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/02Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
    • B28D1/08Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with saw-blades of endless cutter-type, e.g. chain saws, i.e. saw chains, strap saws
    • B28D1/082Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with saw-blades of endless cutter-type, e.g. chain saws, i.e. saw chains, strap saws consisting of chain saws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/02Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
    • B28D1/08Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with saw-blades of endless cutter-type, e.g. chain saws, i.e. saw chains, strap saws
    • B28D1/088Sawing in situ, e.g. stones from rocks, grooves in walls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers

Abstract

The present invention relates to a kind of auxiliary devices and method for railway ballast maintenance, including the first traction mechanism interconnected and the second traction mechanism, the motor section that first traction mechanism and the second traction mechanism include tractive unit, is connected on tractive unit, the motor section are equipped with cutting part;The cutting part includes bottom jib, the cutter chain being movably arranged in bottom jib, the vertical shaft in cutting part, the pentacle weel for being fixedly mounted on vertical shaft lower end;The inside of the tractive unit is equipped with take-up mechanism, the steel cable being fixedly connected in take-up mechanism.This is used for the auxiliary device and method of railway ballast maintenance, can rapidly and efficiently by rail railway roadbed and surface separation, it is convenient that maintenance is corrected to railway roadbed, and provide dual power source, so that its working efficiency is higher, and can it be maintained a relatively stable state in the process of running.

Description

A kind of auxiliary device and method for railway ballast maintenance
Technical field
The invention belongs to railroad maintenance technical fields, and in particular to a kind of auxiliary device and side for railway ballast maintenance Method.
Background technique
Railroad track, abbreviation rail, rail, track etc., be used for railway, and with railway switch cooperation, enable train without turn To that just can walk, track is usually made of two parallel rail, and rail fixation is placed on sleeper, is cut under sleeper for road;With Rail made of steel can bear bigger weight than other materials, and sleeper is also known as sleeper or road pillow, and function is rail Weight separately spread, and rail is kept to fix, maintains the gauge of rail, it is however generally that, the bottom of track is what chad was paved into Road quarrel, road quarrel are also known as ballast, rubble or railway roadbed, are to provide elasticity and drain function, rail for track to be layered on concrete On the pedestal built up, or even inside concrete, railroad track must be repaired often to maintain good operating state.
When safeguarding rail, need to be corrected rail maintenance, and rail pedestal is then to have stone etc. more Firm material mixing is laid with together made of, thus can only by after the railway roadbed of rail and surface separation can to rail into Row fine tuning correction, and be more troublesome when being cut to rail railway roadbed using artificial removal, and inefficiency, and there is no assorted at present The device for more efficiently cutting rail railway roadbed, so that the construction time of railroad maintenance engineering becomes longer, to railway operation Cause influence.
Summary of the invention
The object of the invention is that solve the above-mentioned problems and to provide a kind of structure simple, design a kind of reasonable use In the auxiliary device and method of railway ballast maintenance.
The present invention through the following technical solutions to achieve the above objectives:
A kind of auxiliary device for railway ballast maintenance, including the first traction mechanism interconnected and the second dragger The motor section that structure, first traction mechanism and the second traction mechanism include tractive unit, is connected on tractive unit, the motor Portion is equipped with cutting part, and the driving mechanism and cutting part inside the second traction mechanism are the prior art, can refer to patent CN200620167888.9;
The cutting part includes bottom jib, the cutter chain being movably arranged in bottom jib, the vertical shaft in cutting part, is fixedly mounted Pentacle weel in vertical shaft lower end;
The inside of the tractive unit is equipped with take-up mechanism, the steel cable being fixedly connected in take-up mechanism.
As a further optimization solution of the present invention, pass through connector activity between first traction mechanism and cutting part Connection, second traction mechanism are fixedly connected by connector with cutting part, and connector can use connection bolt, but not only It is limited to this, the direction of the motor section driving vertical shaft rotating in the first traction mechanism is identical as the vertical shaft in the second traction mechanism, makes Can more quickly rail railway roadbed be cut under the action of dual power source by obtaining cutter chain.
As a further optimization solution of the present invention, first traction mechanism is to care for mechanism, and the mechanism of caring for consolidates On bottom jib, the mechanism of caring for includes mounting plate, the screw hole on mounting plate, the extension being welded in the middle part of mounting plate for Dingan County Mounting plate can be fixedly mounted on bottom jib, so by hook and the traction steel rope of cable being movably connected on hook by connection bolt Afterwards by the fixed hook on a mounting board in one end of traction steel rope of cable, it is more convenient to install, and can ensure enough traction effects.
As a further optimization solution of the present invention, the length of the traction steel rope of cable is the length of the second traction mechanism and steel cable The sum of degree, the traction steel rope of cable are connected with hoist engine far from one end of hook, and the length of steel cable can be according to Practical Project The length of middle rail railway roadbed maintenance designs, and engineering can also be divided into multiple processes and operated, and hoist engine is the prior art, The identical effect for shrinking steel cable can be played with the take-up mechanism in the second traction mechanism.
As a further optimization solution of the present invention, bearing there are two being set between the vertical shaft and cutting part, described first Traction mechanism is identical as the direction of rotation of pentacle weel in the second traction mechanism, and the cutter chain in cutting part is run well And guarantee certain cutting power, prevent the phenomenon of cutting force degree deficiency occur because cutter chain is too long, can make engineering into Degree is unaffected.
A method of maintenance being corrected to rail railway roadbed using above-mentioned apparatus, comprising the following steps:
Step S1: timing is repaired to rail railway roadbed, is first drawn on rail railway roadbed and sets a perforation, then will do not connected The bottom jib connect on the cutting part of the first traction mechanism passes through perforation;
Step S2: the cutting part for passing through perforation is connect with the first traction mechanism by connector, the first traction after connection Pentacle weel in mechanism is engaged with cutter chain;
Step S3: pricking at the position of corresponding steel cable length and set up stake, and by the first traction mechanism and the second traction mechanism On steel cable one end be connected in staking out;
Step S4: starting machine after, cutting part cuts rail railway roadbed under the driving of motor section, cutting it is same When, the take-up mechanism in the first traction mechanism and the second traction mechanism will shrink steel cable and drive itself to be moved to the position of staking out It is dynamic, by rail railway roadbed and surface separation in mobile process.
As the scheme that advanced optimizes of the above method, first traction mechanism is to care for mechanism, passes through perforation Upper mounting plate is fixedly mounted on cutting part, traction steel rope of cable is flexibly connected with the hook on mounting plate, it is then that traction steel rope of cable is remote One end from hook is connected in staking out.
As the scheme that advanced optimizes of the above method, the length of the traction steel rope of cable is steel cable and the second traction mechanism The sum of length.
The beneficial effects of the present invention are:
1) present invention employs double-heading driving mechanism driving cutting parts to cut to rail railway roadbed, so that rail road Bed quickly and surface separation can substantially reduce the time of construction, and reduce the waste of manpower, substantially reduce railway school The construction time just safeguarded, and can guarantee that the stress of two traction mechanisms more balances, it is relatively stable;
2) present invention employs two kinds of forms of construction work, when the driving force of the second traction mechanism is enough, by the first dragger Structure, which is replaced with, cares for mechanism, and installation connection is more convenient, and can equally ensure enough tractive force and counterbalance effect;
3) the configuration of the present invention is simple, stability is high, and design rationally, is easy to implement.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 be the present invention care for mechanism and the second traction mechanism match view;
Fig. 3 is the schematic diagram of internal structure of the second traction mechanism of the invention;
Fig. 4 is the structural schematic diagram that the present invention cares for mechanism.
In figure: 1, the first traction mechanism;2, the second traction mechanism;21, tractive unit;211, take-up mechanism;22, motor section; 23, cutting part;231, vertical shaft;232, pentacle weel;233, bottom jib;234, cutter chain;235, connector;24, steel cable;3, machine is cared for Structure;31, traction steel rope of cable;32, it links up with;33, screw hole;34, mounting plate.
Specific embodiment
The application is described in further detail with reference to the accompanying drawing, it is necessary to it is indicated herein to be, implement in detail below Mode is served only for that the application is further detailed, and should not be understood as the limitation to the application protection scope, the field Technical staff can make some nonessential modifications and adaptations to the application according to above-mentioned application content.
Embodiment 1
As shown in Figures 1 and 3, a kind of auxiliary device for railway ballast maintenance, including the first traction interconnected Mechanism 1 and the second traction mechanism 2, the first traction mechanism 1 and the second traction mechanism 2 include tractive unit 21, are connected to tractive unit Motor section 22 on 21, the motor section 22 are equipped with cutting part 23;Cutting part 23 includes bottom jib 233, is movably arranged on bottom jib Cutter chain 234 in 233, the vertical shaft 231 in cutting part 23, the pentacle weel 232 for being fixedly mounted on 231 lower end of vertical shaft;Traction The inside in portion 21 is equipped with take-up mechanism 211, the steel cable 24 being fixedly connected in take-up mechanism 211, the first traction mechanism 1 and cutting It being flexibly connected between portion 23 by connector 235, the second traction mechanism 2 is fixedly connected by connector 235 with cutting part 23, the Tractive unit 21, motor section 22, vertical shaft 231, pentacle weel 232, take-up mechanism 211 and steel cable 24 are again provided on one traction mechanism 1, Pentacle weel 232 is engaged with cutter chain 234, is set between vertical shaft 231 and cutting part 23 there are two bearing, the first traction mechanism 1 and second The direction of rotation of pentacle weel 232 in traction mechanism 2 is identical.
Embodiment 2
As shown in Fig. 2, Fig. 3 and Fig. 4, a kind of auxiliary device for railway ballast maintenance, including interconnected first Traction mechanism 1 and the second traction mechanism 2, the second traction mechanism 2 include tractive unit 21, the motor section being connected on tractive unit 21 22, the cutting part 23 being fixedly mounted in motor section 22;Cutting part 23 includes bottom jib 233, is movably arranged on cutting in bottom jib 233 Chain 234, the vertical shaft 231 in cutting part 23, the pentacle weel 232 for being fixedly mounted on 231 lower end of vertical shaft;The inside of tractive unit 21 Equipped with take-up mechanism 211, the steel cable being fixedly connected in take-up mechanism 211 24, lead between the first traction mechanism 1 and cutting part 23 The flexible connection of connector 235 is crossed, is again provided with tractive unit 21, motor section 22, vertical shaft 231, pentacle weel on the first traction mechanism 1 232, take-up mechanism 211 and steel cable 24, pentacle weel 232 are engaged with cutter chain 234, and the first traction mechanism 1 is to care for mechanism 3, are cared for Mechanism 3 is fixedly mounted on bottom jib 233, is cared for mechanism 3 and is included mounting plate 34, the screw hole 33 on mounting plate 34, is welded on The hook 32 at 34 middle part of mounting plate and the traction steel rope of cable 31 being movably connected on hook 32, the length of traction steel rope of cable 31 are second The sum of the length of traction mechanism 2 and steel cable 24, traction steel rope of cable 31 are connected with hoist engine, vertical shaft far from one end of hook 32 Bearing there are two being set between 231 and cutting part 23, the rotation of the first traction mechanism 1 and the pentacle weel 232 in the second traction mechanism 2 Direction is identical.
It should be noted that in device in use, including step used below:
Step S1: timing is repaired to rail railway roadbed, is first drawn on rail railway roadbed and sets a perforation, then will do not connected The bottom jib 233 connect on the cutting part 23 of the first traction mechanism 1 passes through perforation;
Step S2: the cutting part 23 and the first traction mechanism 1 for passing through perforation are connect by connector 235, the after connection Pentacle weel 232 in one traction mechanism 1 is engaged with cutter chain 234, or the first traction mechanism 1 is changed to and cares for mechanism 3, will be worn It crosses and upper mounting plate 34 is fixedly mounted on the cutting part 23 of perforation, even by 32 activity of hook on traction steel rope of cable 31 and mounting plate 34 It connects, is then connected to traction steel rope of cable 31 in staking out far from one end of hook 32;
Step S3: pricking at the position of corresponding 24 length of steel cable and set up stake, and by the first traction mechanism 1 and the second dragger 24 one end of steel cable on structure 2 is connected in staking out, or one end of traction steel rope of cable 31 is connected on hoist engine, and guarantees traction The length of steel cable 31 is the sum of the length of steel cable 24 and the second traction mechanism 2, and hoist engine and staking out are each attached to identical position;
Step S4: after starting machine, cutting part 23 cuts rail railway roadbed under the driving of motor section 22, cutting Meanwhile the first take-up mechanism 211 in traction mechanism 1 and the second traction mechanism 2 will shrink steel cable 24 and drive itself to staking out Position it is mobile, by rail railway roadbed and surface separation in mobile process.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.

Claims (8)

1. a kind of auxiliary device for railway ballast maintenance, including the first traction mechanism interconnected (1) and the second traction Mechanism (2), it is characterised in that: first traction mechanism (1) and the second traction mechanism (2) include tractive unit (21), connect Motor section (22) on tractive unit (21), the motor section (22) are equipped with cutting part (23);
The cutting part (23) includes bottom jib (233), the cutter chain (234) being movably arranged in bottom jib (233), is set to cutting part (23) vertical shaft (231) in, the pentacle weel (232) for being fixedly mounted on vertical shaft (231) lower end;
The inside of the tractive unit (21) is equipped with take-up mechanism (211), the steel cable being fixedly connected in take-up mechanism (211) (24)。
2. a kind of auxiliary device for railway ballast maintenance according to claim 1, it is characterised in that: described first leads Draw and be flexibly connected between mechanism (1) and cutting part (23) by connector (235), second traction mechanism (2) passes through connection Part (235) is fixedly connected with cutting part (23).
3. a kind of auxiliary device for railway ballast maintenance according to claim 1, it is characterised in that: described first leads Drawing mechanism (1) is to care for mechanism (3), and the mechanism (3) of caring for is fixedly mounted on bottom jib (233), described to care for mechanism (3) packet It includes mounting plate (34), the screw hole (33) being set on mounting plate (34), the hook (32) being welded in the middle part of mounting plate (34) and lives The dynamic traction steel rope of cable (31) being connected on hook (32).
4. a kind of auxiliary device for railway ballast maintenance according to claim 3, it is characterised in that: the traction steel The length of rope (31) is the sum of the length of the second traction mechanism (2) and steel cable (24), and the traction steel rope of cable (31) is far from hook (32) one end is connected with hoist engine.
5. a kind of auxiliary device for railway ballast maintenance according to claim 1, it is characterised in that: the vertical shaft (231) bearing there are two being set between cutting part (23), first traction mechanism (1) and five in the second traction mechanism (2) The direction of rotation of star-wheel (232) is identical.
6. the method that -5 any described devices are corrected maintenance to rail railway roadbed according to claim 1, which is characterized in that including Following steps:
Step S1: repairing timing to rail railway roadbed, first draw on rail railway roadbed and sets a perforation, then will be not connected with the Bottom jib on the cutting part of one traction mechanism passes through perforation;
Step S2: the cutting part for passing through perforation is connect with the first traction mechanism by connector, the first traction mechanism after connection In pentacle weel engaged with cutter chain;
Step S3: it is pricked at the position of corresponding steel cable length and sets up stake, and will be on the first traction mechanism and the second traction mechanism Steel cable one end is connected in staking out;
Step S4: after starting machine, cutting part cuts rail railway roadbed under the driving of motor section, while cutting, the Take-up mechanism in one traction mechanism and the second traction mechanism will shrink steel cable and drive itself mobile to the position of staking out, mobile During by rail railway roadbed and surface separation.
7. according to claim 6 to the method for rail railway roadbed corrective maintenance, it is characterised in that: first traction mechanism is Mechanism is cared for, passes through and upper mounting plate is fixedly mounted on the cutting part of perforation, by the hook activity on traction steel rope of cable and mounting plate Then traction steel rope of cable is connected in staking out by connection far from one end of hook.
8. according to claim 7 to the method for rail railway roadbed corrective maintenance, it is characterised in that: the length of the traction steel rope of cable For the sum of steel cable and the length of the second traction mechanism.
CN201910491975.1A 2019-06-06 2019-06-06 Auxiliary device and method for railway ballast maintenance Active CN110154245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910491975.1A CN110154245B (en) 2019-06-06 2019-06-06 Auxiliary device and method for railway ballast maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910491975.1A CN110154245B (en) 2019-06-06 2019-06-06 Auxiliary device and method for railway ballast maintenance

Publications (2)

Publication Number Publication Date
CN110154245A true CN110154245A (en) 2019-08-23
CN110154245B CN110154245B (en) 2024-04-09

Family

ID=67627988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910491975.1A Active CN110154245B (en) 2019-06-06 2019-06-06 Auxiliary device and method for railway ballast maintenance

Country Status (1)

Country Link
CN (1) CN110154245B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2835555Y (en) * 2005-07-18 2006-11-08 乐山凌志建筑机械有限责任公司 Coal cutter for mining thin coal seam
CN200999612Y (en) * 2006-12-09 2008-01-02 乐山市红川机械有限责任公司 Split combination type kerving machine
CN201771493U (en) * 2010-07-12 2011-03-23 万再麟 Double-knife coal cutter
JP2013071192A (en) * 2011-09-27 2013-04-22 Shuzo Hiwaki Cutting machine
CN103966931A (en) * 2014-04-23 2014-08-06 徐州徐工铁路装备有限公司 High-speed railway ballastless track mortar layer cable saw cutting machine
CN104213478A (en) * 2014-08-29 2014-12-17 徐州徐工铁路装备有限公司 Maintenance construction method for ballast-less track of high-speed railway
CN106522956A (en) * 2015-09-10 2017-03-22 赵兵 Self-propelled hole mining wire saw
CN210679190U (en) * 2019-06-06 2020-06-05 中国铁道科学研究院集团有限公司铁道建筑研究所 Auxiliary device for maintaining railway ballast bed

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2835555Y (en) * 2005-07-18 2006-11-08 乐山凌志建筑机械有限责任公司 Coal cutter for mining thin coal seam
CN200999612Y (en) * 2006-12-09 2008-01-02 乐山市红川机械有限责任公司 Split combination type kerving machine
CN201771493U (en) * 2010-07-12 2011-03-23 万再麟 Double-knife coal cutter
JP2013071192A (en) * 2011-09-27 2013-04-22 Shuzo Hiwaki Cutting machine
CN103966931A (en) * 2014-04-23 2014-08-06 徐州徐工铁路装备有限公司 High-speed railway ballastless track mortar layer cable saw cutting machine
CN104213478A (en) * 2014-08-29 2014-12-17 徐州徐工铁路装备有限公司 Maintenance construction method for ballast-less track of high-speed railway
CN106522956A (en) * 2015-09-10 2017-03-22 赵兵 Self-propelled hole mining wire saw
CN210679190U (en) * 2019-06-06 2020-06-05 中国铁道科学研究院集团有限公司铁道建筑研究所 Auxiliary device for maintaining railway ballast bed

Also Published As

Publication number Publication date
CN110154245B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN202766937U (en) Railway sleeper replacement device
CN103696335B (en) Railway sleeper replacement vehicle
CN203716009U (en) Ballast raking and lifting machine
CN103161104A (en) Sleeper replacement device and method
CN108894065A (en) A kind of gapless line once pushes the laying method into slot
CN205444937U (en) Guide tracked conveyer of arc
CN110154245A (en) A kind of auxiliary device and method for railway ballast maintenance
RU2428337C2 (en) Mobile repair unit
CN206692960U (en) A kind of rolling type rail dials moving device
CN210679190U (en) Auxiliary device for maintaining railway ballast bed
CN210709354U (en) Tool for quickly and efficiently replacing carrier roller of belt conveyor
KR102332903B1 (en) Gravel compactor for railway repair
CN110258206A (en) The small device of the stone tiny fragments of stone, coal, etc. under a kind of cleaning railroad sleeper
CN112442929A (en) Bolt tightening and loosening device for railway steel rail fastener
CN205998572U (en) A kind of device changing support roller for belt machine
CN206522103U (en) Tunnel perforating device
CN211498989U (en) Greening engineering soil spreading and leveling device
CN108774929A (en) A kind of apparatus for leveling for railroad ballast
CN208717668U (en) A kind of clear tiny fragments of stone, coal, etc. machine of small-sized railway
CN206418532U (en) A kind of railway roadbed grooving apparatus
CN107059510A (en) Fixture is changed in a kind of sleeper movement
JPS6347401A (en) Working machine
CN214143065U (en) Switch stacker ground rail turnout device
CN110593029B (en) Floating plate lifting device for track
CN217780615U (en) Tower machine rises reel position flee and prevents spacing connection structure that became invalid of superelevation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant