Summary of the invention
The main object of the present invention is to provide a kind of business electrical management method of subregion energization management, it is intended to solve existing
Energization way to manage relies on artificial realization, the low problem of intelligence degree in some business electrical management processes.
To achieve the above object, subregion proposed by the present invention is powered the business electrical management method managed applied to electricity consumption
Management system, the power consuming administrative system include platform of internet of things, connect respectively with the platform of internet of things signal several
Zone controller and several sub-regions controllers;Each zone controller is used to control the on-off of a wherein working region
Electricity, each sub-district domain controller are used to control the on-off of the wherein work subregion in a wherein working region
Electricity;The business electrical management method of the subregion energization management, includes the following steps:
Whether detecting has employee to hilllock;
When having detected the employee to hilllock, the platform of internet of things obtain the employee related job region and
Related job subregion;
Judge whether the related job region there are other association employees to reach by the platform of internet of things, and sentences
Whether the related job subregion that breaks has had other employees arrival;
It is reached when the related job region does not have also other to be associated with employees, and the sub- working region of association does not have it also
When his employee reaches, controls the corresponding zone controller in the related job region and be in energized state so that the association
Working region is powered, and controls the corresponding sub-district domain controller of the related job subregion and be in energized state so that institute
State the energization of related job subregion.
Preferably, the power consuming administrative system further includes the attendance checking system connecting with the platform of internet of things signal, described
Whether detecting has the step of employee is to hilllock, comprising:
Detect the attendance information in the attendance checking system;
Determine whether employee to hilllock according to the attendance information.
Preferably, the attendance checking system is access control system, and the attendance information is information of checking card.
Preferably, described to judge whether the related job region has had other association persons by the platform of internet of things
Work reach, and judge the related job subregion whether had other employees arrival the step of after, further includes:
It is reached when the related job region has other association employees, and the related job subregion does not have other also
When being associated with employee's arrival, controls the corresponding sub-district domain controller of the related job subregion and be in energized state so that institute
State the energization of related job subregion.
Preferably, described to judge whether the related job region has had other association persons by the platform of internet of things
Work reach, and judge the related job subregion whether had other employees arrival the step of after, further includes:
It is reached when the related job region has other association employees, and the related job subregion has other passes
When joining employee's arrival, Xiang Suoshu platform of internet of things returns to the successful prompt that has been powered.
Preferably, described to judge whether the related job region has had other association persons by the platform of internet of things
Work reach, and judge the related job subregion whether had other employees arrival the step of after, further includes:
It is reached when the related job region does not have also other to be associated with employees, and the related job subregion has other
When being associated with employee's arrival, the prompt of Xiang Suoshu platform of internet of things return information mistake.
Preferably, each zone controller is used to control the power on/off of each work floor, each subregion
Controller is used to control the power on/off of each workroom.
Preferably, the business electrical management method of the subregion energization management, further includes:
Obtain each working region to hilllock headcount;
Entered by the platform of internet of things control working region for being no more than the first setting value to hilllock headcount
First uses power mode;
It is more than first setting value by the platform of internet of things control hilllock headcount that arrives, and is no more than second
The working region of setting value enters second and uses power mode;
By platform of internet of things control it is described to hilllock headcount be more than the working region of the second setting value into the
Three use power mode.
Preferably, each power mode and working region light unlatching quantity, air-conditioning on-off electricity condition and commons
Electric module on-off electricity condition is related.
To achieve the above object, the present invention also provides a kind of power consuming administrative system, the power consuming administrative system includes Internet of Things
Net platform, several zone controllers being connect respectively with the platform of internet of things signal and several sub-regions controllers;Often
A zone controller is used to control the power on/off of a wherein working region, and each sub-district domain controller is for controlling it
In a wherein work subregion in a working region power on/off;The power consuming administrative system applies such as any of the above-described
The business electrical management method of the subregion energization management.
In technical solution of the present invention, each employee is corresponded to there are associated work subregion and associated working region,
Wherein, working region is multiple, and includes multiple work subregions, the power on/off of each working region in each working region
It is controlled by corresponding zone controller, the power on/off of each work subregion in each working region is by corresponding subregion
Controller control, platform of internet of things controls each region controller, and controls each sub-regions controller.The subregion, which is powered, manages
Whether the business electrical management method detecting of reason has employee to hilllock;When having detected the employee to hilllock, the employee is obtained
Related job subregion and related job region;Judge whether the related job region there are other association employees to arrive
It reaches, and judges whether the sub- working region of association has had other employees arrival;When the related job region does not have it also
He is associated with employee's arrival, and when the sub- working region of the association does not have other employees arrival also, controls the related job region
The corresponding zone controller is in energized state, so that the related job region is powered, and controls the related job
The corresponding sub-district domain controller of subregion is in energized state so that the related job subregion be powered, from without
It to be manually powered, advantageously account for energization way to manage in existing business electrical management process and rely on artificial realization, intelligence
The low problem of degree can be changed.Further, power control is carried out respectively to each working region, and in each working region
Work subregion power control is carried out respectively again, thus when some working region does not have associated employee to hilllock not to the work
Make region energization, some work the none of associated employee of subregion arrive hilllock when, not to the work subregion lead to
It is electric, it is advantageously implemented the administration of energy conservation in terms of electricity consumption.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its
His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention
In explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should
When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being such as related to " first ", " second " in the present invention is used for description purposes only, and should not be understood as
Its relative importance of indication or suggestion or the quantity for implicitly indicating indicated technical characteristic.Define as a result, " first ",
The feature of " second " can explicitly or implicitly include at least one of the features.In the description of the present invention, " multiple " contain
Justice is at least two, such as two, three etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " connection ", " fixation " etc. shall be understood in a broad sense,
For example, " fixation " may be a fixed connection, it may be a detachable connection, or integral;It can be mechanical connection, be also possible to
Electrical connection;It can be directly connected, the connection inside two elements or two can also be can be indirectly connected through an intermediary
The interaction relationship of a element, unless otherwise restricted clearly.It for the ordinary skill in the art, can basis
Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
It in addition, the technical solution between each embodiment of the present invention can be combined with each other, but must be general with this field
Based on logical technical staff can be realized, it will be understood that when the combination of technical solution appearance is conflicting or cannot achieve this
The combination of technical solution is not present, also not the present invention claims protection scope within.
The present invention proposes a kind of business electrical management method of subregion energization management.
Referring to Fig.1 and 2, to achieve the above object, the business electrical pipe of energization management in subregion proposed by the present invention
Reason method be applied to power consuming administrative system, the power consuming administrative system include platform of internet of things, respectively with the platform of internet of things
Several zone controllers and several sub-regions controllers of signal connection;Each zone controller is for controlling wherein
The power on/off of one working region, each sub-district domain controller are used to control the wherein work in a wherein working region
Make the power on/off of subregion;The business electrical management method of the subregion energization management, includes the following steps:
Whether step S10, detecting have employee to hilllock;
Step S20 obtains the association work of the employee in the platform of internet of things when having detected the employee to hilllock
Make region and related job subregion;
Step S30 judges whether the related job region has had other to be associated with employee by the platform of internet of things
It reaches, and judges whether the related job subregion has had other employees arrival;
Step S40, when the related job region does not have other associations employees' arrival, and the sub- working region of association also
Do not have also other employees arrival when, control the corresponding zone controller in the related job region be in energized state so that
The related job region is powered, and controls the corresponding sub-district domain controller of the related job subregion and be in energization shape
State is so that the related job subregion is powered.
In technical solution of the present invention, each employee is corresponded to there are associated work subregion and associated working region,
Wherein, working region is multiple, and includes multiple work subregions, the power on/off of each working region in each working region
It is controlled by corresponding zone controller, the power on/off of each work subregion in each working region is by corresponding subregion
Controller control, platform of internet of things controls each region controller, and controls each sub-regions controller.The subregion, which is powered, manages
Whether the business electrical management method detecting of reason has employee to hilllock;When having detected the employee to hilllock, the employee is obtained
Related job subregion and related job region;Judge whether the related job region there are other association employees to arrive
It reaches, and judges whether the sub- working region of association has had other employees arrival;When the related job region does not have it also
He is associated with employee's arrival, and when the sub- working region of the association does not have other employees arrival also, controls the related job region
The corresponding zone controller is in energized state, so that the related job region is powered, and controls the related job
The corresponding sub-district domain controller of subregion is in energized state so that the related job subregion be powered, from without
It to be manually powered, advantageously account for energization way to manage in existing business electrical management process and rely on artificial realization, intelligence
The low problem of degree can be changed.Further, power control is carried out respectively to each working region, and in each working region
Work subregion power control is carried out respectively again, thus when some working region does not have associated employee to hilllock not to the work
Make region energization, some work the none of associated employee of subregion arrive hilllock when, not to the work subregion lead to
It is electric, it is advantageously implemented the administration of energy conservation in terms of electricity consumption.
Referring to Fig. 1, power consuming administrative system may include multiple regions controller and multiple subregion controls in the present embodiment
Device processed, each zone controller and each subregion controller are connected with platform of internet of things signal respectively, for example, power consumption management system
System includes zone controller A and zone controller B, wherein sub-district domain controller A1, sub-district domain controller A2 and subregion control
The power on/off of work subregion a1, work subregion a2 and the subregion a3 that works that device A3 is orderly used in control working region a,
Sub-district domain controller B1 and sub-district domain controller B2 is orderly used to work subregion b1 and work sub-district in control working region b
The power on/off of domain b2.
Mapping table, mapping table are established for the incidence relation between employee, working region and work subregion
In include each the work subregion and employee mapping relations, and in the mapping table include each workspace
The mapping relations in domain and employee.As work subregion b1 work of the employee X in the b of working region, then employee X and working region b
There are mapping relations, and there are mapping relations by employee and work subregion b1.
In the present invention after detecting employee to hilllock, the information of employee to hilllock is sent to platform of internet of things, passes through Internet of Things
Net platform executes step S30 and S40.The step of whether can have employee to hilllock by the detecting in step S10 method can be with
There are many.For example, whether have employee to hilllock by staff's detecting, when there is employee to hilllock, staff is to power consumption management
System is issued to the employee information on hilllock;For another example, the signal by attendance checking system to power consuming administrative system input employee to hilllock;May be used also
To be signal that employee is triggered in the terminal of oneself hilllock, such as, it, can be by oneself hand when employee is close to working region
Machine is sent to the signal on hilllock to power consuming administrative system.
Further, position signal receiving module is set in working region, employee holds position signal sending module, when
When position signal receiving module detects the position signal of position signal sending module transmission, detecting has employee to hilllock.
The position signal receiving module can be Bluetooth signal receiving module, and the position signal sending module of employee can be
The bluetooth module carried in employee's mobile terminal.When first used, it needs to Bluetooth signal receiving module and employee's mobile terminal
In bluetooth module matched.
The position signal receiving module can be Wi-Fi signal receiving module, and the position signal sending module of employee can be with
It is the Wi-Fi module carried in employee's mobile terminal.
After being powered to a certain work subregion, the associated employee of the work subregion, which can according to need, starts work
Each electricity consumption module in region, for example, employee can according to need the air-conditioning or electricity opened in the work subregion after being powered
Brain.
The hilllock Zhong Dao of the present invention refers to reaching work position, includes new one to hilllock for example, reaching work subregion
The attendance period start after first time reach post, also may include in the same attendance period short time leave after arrive again
It reaches.
According to the attendance information, judge whether the employee is first entrance association work in the current attendance period
Make the employee in region;When whether the employee is first employee into the related job region in the current attendance period
When, the zone controller corresponding to the related job region is powered, so that the related job region is powered.
Further, in each attendance period, after having detected employee to hilllock each time, the pass of hilllock employee is got
Join working region and related job subregion, and the first accumulative operation carried out to on-job employee's quantity in the related job region,
Second accumulative operation is carried out to on-job employee's quantity of the related job subregion;Meanwhile detected each time employee from
Behind hilllock, related job region and the related job subregion of the employee that leaves the post are obtained, and to the on-job employee in the related job region
Quantity carries out the first decrement operations, the second decrement operations is carried out to on-job employee's quantity of the related job subregion, thus root
On-job employee's quantity that each working region is determined according to the first accumulative operation and the first decrement operations, according to the second accumulative operation and
Second decrement operations determine on-job employee's quantity of each work subregion, and the working region for being zero to on-job employee's quantity carries out
Power operation, the work subregion for being zero to on-job employee's quantity carry out power operation.
Fig. 3 is please referred to, first of the business electrical management method based on subregion energization management of the invention is implemented
Example, subregion of the invention be powered management business electrical management method second embodiment in, the power consuming administrative system with
The connection of attendance system for company signal, the step S10, comprising:
Step S11 detects the attendance information in the attendance checking system;
Step S12 determines whether employee to hilllock according to the attendance information.
According to the attendance information of each attendance period (for example, daily), to whether thering is employee to detect to hilllock.
Whether detecting has the step of employee is to hilllock, can be realized by attendance checking system.For example, detecting employee in attendance system
Attendance operation is carried out on system, that is, can determine employee to hilllock.
Further, the attendance checking system is access control system, and the attendance information is information of checking card.Fig. 1 provides gate inhibition
A kind of embodiment that system is connect with power consuming administrative system.
There are many forms of access control system, herein with no restrictions.When detect some employee by access control system to hilllock when,
Determine the employee to hilllock.The attendance information of acquisition of information employee is recorded in passing through for access control system by employee, and can be by this
Current record information determines employee whether to hilllock, so as to avoid that extra power consumption management device or Work attendance device is arranged.
The second embodiment of business electrical management method based on subregion energization management of the invention, subregion of the invention
Domain is powered in the 3rd embodiment of the business electrical management method managed, after the step S30, comprising:
Step S50 is reached when the related job region has other association employees, and the related job subregion is also
When there are not other association employees to reach, controls the corresponding sub-district domain controller of the related job subregion and be in energization shape
State is so that the related job subregion is powered.
The present embodiment is corresponding currently to have the case where other employees arrival to the related job region of hilllock employee, and is associated with work
Make subregion there are no in the case where other associations employees' arrival, therefore, related job region has been powered, but related job sub-district
Domain not yet be powered, it is only necessary to control the corresponding sub-district domain controller of the related job subregion be in energized state so that
The related job subregion is powered.
According to the attendance information, judge whether the employee is first entrance association work in the current attendance period
Make the employee of subregion;When the employee is first employee into the related job subregion in the current attendance period
When, the sub-district domain controller corresponding to the related job subregion is powered, so that the related job subregion is powered.
The record of checking card of access control system is integrated in business electrical management method of the invention, is no longer needed to by manually opening
The mode of dynamic power supply is powered the job site of employee, but is directly determined according to the information of checking card in each attendance period
Whether each working region or each work subregion have first association employee to enter, if so, to the working region into
Row is powered, and keeps power supply management more intelligent;And when certain working region is not associated with employee and enters, without power supply, energy conservation
Effect is more preferable.
Based on subregion of the invention be powered the business electrical management method of management first embodiment to 3rd embodiment,
Subregion of the invention is powered in the fourth embodiment of the business electrical management method managed, after the step S30, also wraps
It includes:
Step S60 is reached when the related job region has other association employees, and the related job subregion is
When having other association employees to reach, Xiang Suoshu platform of internet of things returns to the successful prompt that has been powered.
It is reached when the related job region has other association employees, and the related job subregion has other passes
When joining employee's arrival, do not need to be powered the related job region or related job subregion, at this point, to platform of internet of things
Return to the successful prompt that has been powered.
Based on subregion of the invention be powered the business electrical management method of management first embodiment to fourth embodiment,
Subregion of the invention is powered in the 5th embodiment of the business electrical management method managed, after the step S30, also wraps
It includes:
Step S70, when the related job region does not have other associations employees' arrival, and the related job subregion also
When having other associations employees' arrival, the prompt of Xiang Suoshu platform of internet of things return information mistake.
Further, when the related job region does not have other associations employees' arrival, and the related job sub-district also
When domain has other association employees and reaches, show the information errors of system, in order to not influence the energization in the related job region, to
After the prompt of platform of internet of things return information mistake, (hilllock employee is such as arrived to hilllock information to the association employee in related job region
Quantity) it is modified.
Preferably, each zone controller is used to control the power on/off of each work floor, each subregion
Controller is used to control the power on/off of each workroom.That is, the zone controller is floor controller, the subregion control
Device processed is room controller.Further, the sub-district domain controller is for controlling each electricity consumption in the work subregion
The power on/off of module, for example, electricity consumption module can be switch, air-conditioning, socket or big electricity electrical equipment.Certainly, region controls
Device is not limited to floor controller, and sub-district domain controller is not limited to room controller.For example, can by an office lobby according to
Setting method is divided into several working regions, and several work subregions are divided into each working region.
Based on subregion of the invention be powered the business electrical management method of management first embodiment to the 5th embodiment,
Subregion of the invention is powered in the sixth embodiment of the business electrical management method managed, the enterprise of the subregion energization management
Industry power consumption management method, further includes:
Step S80, obtain each working region arrives hilllock headcount;
Step S90 passes through the platform of internet of things control work for being no more than the first setting value to hilllock headcount
Region enters first and uses power mode;
Step S100 is more than first setting value by the platform of internet of things control hilllock headcount that arrives, and
Power mode is used into second in working region no more than the second setting value;
Step S110 arrives the workspace that hilllock headcount is more than the second setting value by the way that platform of internet of things control is described
Domain enters third power mode.
In the present embodiment, the first setting value is less than the second setting value, and the first setting value and the second setting value are positive number.
In the present embodiment, corresponding power mode can be entered to hilllock headcount according to each working region, to avoid electricity consumption
Waste.Each use power mode further can open quantity, air-conditioning on-off electricity condition and commons with working region light
Electric module on-off electricity condition is related.
First under power mode, and few to hilllock headcount, working region belongs to the public domain of each work subregion,
Therefore, the electricity consumption that can control public domain enters power save mode, for example, first under power mode, by each working region
There is the light near employee to the work subregion on hilllock to open, keeps closing without the light near the work subregion of employee to hilllock
It closes.For another example, the air-conditioning of public domain can be kept to be in off-position, and public electricity-using module (such as shared electron display screen) is protected
Hold off-position.
First under power mode, and few to hilllock headcount, working region belongs to the public domain of each work subregion,
Therefore, the electricity consumption that can control public domain enters power save mode, and electricity consumption is minimized standard.For example, the first electricity consumption
Under mode, there is the light near employee to the work subregion on hilllock to open each working region, without the work of employee to hilllock
Make the light near subregion to remain turned-off.For another example, the air-conditioning of public domain can be kept to be in off-position, and public electricity-using
Module (such as shared electron display screen) remains powered off state.
Second, under power mode, is between the first setting value and the second setting value to hilllock headcount, arrives hilllock staff number
Amount reaches the half of whole headcounts, and therefore, the electricity consumption that can control public domain enters power down mode, and electricity consumption is reached
To more power down mode, guarantee the electricity consumption comfort of employee, but does not enter normal work power mode.For example, the second electricity consumption
Under mode, the light in working region is all turned on, power supply state is in the air-conditioning of public domain, but to public electricity-using mould
Block (such as shared electron display screen) remains powered off state.
Be more than the second setting value to hilllock headcount under third power mode, i.e., major part employee is to hilllock, therefore, can be with
The electricity consumption of control public domain enters normal condition, enters operating mode to control the electricity consumption of public domain.For example, third electricity consumption
Under mode, the light in working region is all turned on, power supply state is in the air-conditioning of public domain, and to public electricity-using mould
Block (such as shared electron display screen) power supply.
In addition, referring once again to Fig. 1, to achieve the above object, the present invention also provides a kind of power consuming administrative system, the use
Electric management system includes platform of internet of things, several zone controllers connecting respectively with the platform of internet of things signal and several
Sub-regions controller;Each zone controller is used to control the power on/off of a wherein working region, each sub-district
Domain controller is used to control the power on/off of the wherein work subregion in a wherein working region;The power consumption management system
The business electrical management method of system application subregion as described in any one of the above embodiments energization management.Due to the present embodiment power consumption management
The technical side of system includes at least whole technical solutions of the business electrical management method embodiment of above-mentioned subregion energization management,
Therefore it is at least no longer repeated one by one herein with whole technical effects of above embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in one as described above
In computer readable storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions use so that a terminal device into
Enter method described in each embodiment of the present invention.
In the description of this specification, reference term " embodiment ", " another embodiment ", " other embodiments " or "
The description of one embodiment~X embodiment " etc. mean specific features described in conjunction with this embodiment or example, structure, material or
Person's feature is included at least one embodiment or example of the invention.In the present specification, to the schematic table of above-mentioned term
Stating may not refer to the same embodiment or example.Moreover, specific features, structure, material, method and step or the spy of description
Point can be combined in any suitable manner in any one or more of the embodiments or examples.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.