CN108122308A - Power plant safety produces access control system - Google Patents
Power plant safety produces access control system Download PDFInfo
- Publication number
- CN108122308A CN108122308A CN201611072909.3A CN201611072909A CN108122308A CN 108122308 A CN108122308 A CN 108122308A CN 201611072909 A CN201611072909 A CN 201611072909A CN 108122308 A CN108122308 A CN 108122308A
- Authority
- CN
- China
- Prior art keywords
- power plant
- access control
- control system
- gate inhibition
- gate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C9/00—Individual registration on entry or exit
- G07C9/20—Individual registration on entry or exit involving the use of a pass
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C9/00—Individual registration on entry or exit
- G07C9/30—Individual registration on entry or exit not involving the use of a pass
- G07C9/32—Individual registration on entry or exit not involving the use of a pass in combination with an identity check
- G07C9/37—Individual registration on entry or exit not involving the use of a pass in combination with an identity check using biometric data, e.g. fingerprints, iris scans or voice recognition
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The present invention provides a kind of power plant safety production access control system, and including multiple gate inhibition's units, the power plant safety production access control system further includes:Support system, the support system are used to dock power plant safety production access control system with power plant operation system, and job order according to power plant's operation system and operation generation gate inhibition's authorized order OR gate at operation scene are prohibited releasing authorized to instruct;Receiving module prohibits mandate releasing instruction for receiving gate inhibition's authorized order OR gate;Logic judgment module releases instruction progress authority logic analysis for prohibiting to authorize to gate inhibition's authorized order OR gate of reception;Sending module, the sending module are configured as issuing the taboo mandate releasing instruction of gate inhibition's authorized order OR gate to gate inhibition's unit;And mobile device end, for supporting system interaction, the operation at feedback operation scene simultaneously to receive the data of support system.Power plant safety according to the present invention produces access control system, can improve operation management in power plant efficiency, and effectively prevent the generation of security incident.
Description
Technical field
The present invention relates to electric power and security technology area, and in particular, to a kind of power plant safety produces access control system.
Background technology
Recently, with the development of sensing card technique and biological identification technology, access control system is applied, existing gate inhibition
System can be used as gateway and key to use, and be played in the Administrations such as working environment management, personnel attendance management
Certain effect.
Usually enterprise of power plant is larger, but administrative staff, which are short of, and produce, repair many links generally entrusts outsourcing
Unit is completed, therefore causes enterprise industry personnel numerous and diverse, and mobility is larger.How power plant safety Effec-tive Function and people are solved
The contradiction that member's complicated component is brought, is a problem in the urgent need to address.Current existing access control system can not be directly from it
Permissions data is directly acquired in his system, such as the safety production system of power plant, can not especially realize real-time information sharing,
Therefore cause that the enterprise operation efficiency of management is low, and there are security risks.
The content of the invention
The defects of it is an object of the invention to overcome the prior art, provides a kind of power plant safety production access control system so that
Operation management in power plant efficiency is improved.
The present invention also aims to provide a kind of power plant safety for effectively preventing security incident generation to produce access control system.
The present invention also aims to provide a kind of power plant safety production access control system, simplify the behaviour of permission in access control system
Make complexity and actual effect, improve level of security and the level of IT application.
In order to achieve the above objectives or the first purpose, technical solution of the invention are as follows:
According to an embodiment of the invention, it is proposed that a kind of power plant safety produces access control system, including multiple gate inhibition's units, institute
Power plant safety production access control system is stated to further include:
Support system, the support system is used to power plant safety producing access control system docks with power plant operation system, and
Prohibit to authorize according to the job order of power plant's operation system and operation generation gate inhibition's authorized order OR gate at operation scene and release instruction;
Receiving module prohibits mandate releasing instruction for receiving gate inhibition's authorized order OR gate;
Logic judgment module releases instruction progress authority logic point for prohibiting to authorize to gate inhibition's authorized order OR gate of reception
Analysis;
Sending module, the sending module are configured as issuing the taboo mandate releasing of gate inhibition's authorized order OR gate to gate inhibition's unit
Instruction;And
Mobile device end, for supporting system interaction, the operation at feedback operation scene simultaneously to receive the data of support system.
According to a preferred embodiment of the present invention, the support system includes:
Linkage interface module, the linkage interface module are configured as receiving work ticket and the behaviour that power plant's operation system issues
Make ticket data, and to the data message of power plant's operation system feedback power plant safety production access control system, the mobile device end is led to
Linkage interface module is crossed with supporting system interaction;
Management module, the management module are configured as management work ticket and operation ticket data;And
Link authorization module, and the linkage authorization module, which performs logical analysis and generates gate inhibition's authorized order OR gate, prohibits mandate
Release instruction.
According to a preferred embodiment of the present invention, the linkage interface module includes:
Work ticket receiving submodule, for receiving work ticket from power plant's operation system;
Operation order receiving submodule, for receiving operation order from power plant's operation system;
Data sub-module stored, for interim storage work ticket and operation ticket data;And
Data forwarding submodule, the data forwarding submodule be configured as to power plant's operation system, mobile device end and/
Or the receiving module sends data or instruction, and receive the data from mobile device end and/or the receiving module.
According to a preferred embodiment of the present invention, the linkage interface module further includes data encryption submodule.
According to a preferred embodiment of the present invention, the management module includes:Data query submodule, for inquiring about work
Make ticket and operation ticket data;Submodule is shown with information, for showing work ticket and operation ticket data.
According to a preferred embodiment of the present invention, the linkage authorization module includes authorization logic analyzing sub-module, with
It performs logical analysis and generates gate inhibition's authorized order OR gate and prohibit mandate releasing instruction.
According to a preferred embodiment of the present invention, the mobile device end includes:Barcode scanning equipment, shows for scan operation
The Quick Response Code of field;And communication equipment, the communication equipment are interacted with the data forwarding submodule of linkage interface module.
According to a preferred embodiment of the present invention, the mobile device end further includes data query submodule and information exhibition
Show submodule.
According to a preferred embodiment of the present invention, the power plant safety production access control system further includes memory module, uses
Prohibit to authorize in gate inhibition's authorized order OR gate that storage receives and release instruction.
According to a preferred embodiment of the present invention, each in the multiple gate inhibition's unit includes entrance guard device, knows
Other device and access controller.
According to a preferred embodiment of the present invention, the access controller of gate inhibition's unit is received under the sending module
Gate inhibition's authorized order OR gate of hair, which is prohibited to authorize, releases instruction, performs the opening and closing operation of entrance guard device.
According to a preferred embodiment of the present invention, the identification device includes scanner, card reader, recognition of face dress
It puts, fingerprint identification device and/or RF Reader.
Power plant safety using the present invention produces access control system, the personnel into each place of power plant can be carried out effective
Management improves the enterprise operation efficiency of management, and effectively prevents security incident.According to the present invention, door is produced in power plant safety
Support system is set in access control system so that power plant safety produces access control system and docked with power plant operation system, therefore power plant safety
Production access control system can receive the job order (work ticket and operation order) of power plant's operation system, and power plant safety production gate inhibition
Mobile device end is additionally provided in system, mobile device end is capable of the operation data at feedback operation scene, supports system according to electricity
The opening and closing of the job order of factory's operation system and the operation access control unit at operation scene.It can be seen that according to this
The power plant safety production access control system of invention can be directly acquired from power plant's operation system (for example, safe production management system)
Permissions data, realizes real-time information sharing, and is turned on and off gate inhibition's unit in real time according to the confirmation at operation scene, therefore
The security of power plant's disengaging management is greatly enhanced.Further, since the permissions data quilt in power plant safety production management system
It is issued in real time in access control system, has reached what the access control system when power plant's operation system generates new data can timely respond to
Demand enormously simplifies the Operating Complexity and actual effect of permission in access control system, improves level of security and the level of IT application.
Description of the drawings
Fig. 1 is the schematic diagram that access control system is produced according to the power plant safety of the embodiment of the present invention;And
Fig. 2 is the Sheet Sample according to the embodiment of the present invention.
Specific embodiment
The exemplary embodiment of the present invention is described below in detail.In addition, in the following detailed description, for ease of solution
It releases, elaborates many concrete details to provide the comprehensive understanding to present disclosure embodiment.It is it should be apparent, however, that one or more real
Applying example can also be carried out without these specific details.In other cases, well known construction and device is to scheme
The mode shown embodies to simplify attached drawing.
Present general inventive concept according to the present invention, it is intended to a kind of power plant safety production access control system is provided, by effective
Informationization technology means provide effective control management to the personnel in each place of Entry Firm, to improve enterprise operation management
Efficiency prevents security incident.
It can increase gate inhibition's unit according to power plant safety criterion in production district various regions, realize production on gate inhibition's principle of delegation
Area's closing, the separation of people's vehicle, production district are separated with nonproductive area, each professional section separation of production district, such as between all power distribution stations, electronics
Gate inhibition's unit is respectively provided with, for the isolation of particular place using area (using fence), configuration bracelet can also be used, utilized
Bracelet carries out locating and monitoring and prompting.The empowerment management of access control system can be divided into two classes by region, first, the gate inhibition of production district awards
Power management, can be by power plant safety management between main each electronics including production scene, power distribution station, the Workplaces such as engineer station
The gate inhibition in these places of department liable authorizes;Second is that gate inhibition's empowerment management in nonproductive area, mainly includes plant area gate, office
Regions are waited, can be authorized by the gate inhibition in comprehensive these places of department liable.Principle of delegation may be employed region and post is combined
Authorization.Power plant production management personnel and operating personnel through the approval of safety supervision department can enter authorized region inspection, but open
Exhibition work on the spot must handle work ticket.
So-called work ticket is a kind of working mechanism used in power plant's operation system, and operation is concurrently further included with work ticket
They can be interpreted as job order by ticket, as in power plant's operation system (for example, power plant safety production management system) and other
The workflow transferred in system or action can be generated and issued in power plant's operation system, represent a job
Task.Fig. 2 gives a kind of example of work ticket, and Fig. 2 shows the work ticket for the completion that terminated in certain period of time, in
Holding includes work draft bank, work ticket type, target, action, teams and groups, completion status, the director etc. of execution work
Information.Operation order is similar, but operation order includes and performs a job or the more specific information of task, it can be understood as relates to
And to operation content or the information of step, such as perform Single Maintenance task and may relate to following information:Which tool stopped
Which unit is the safety measure of the station of body close, which inspection and maintenance step carried out.These specific steps and content
The content of operation order may be formed.Work ticket and operation order with the spreadsheet format in computer system or can be printed as
The form of paper exists.Carry out the introduction of power plant safety production access control system below in conjunction with work ticket and operation order.
Consider the present invention is based on following, using power plant's existing ERP (Enterprise Resources Planning) systems or MAXIMO systems into
Row information is shared, and personnel that analysis task list is related to, the unit type being related to, two tickets (work ticket and operation order) being related to are appointed
Business etc., support is provided for authorization control and tasks carrying;It takes into full account and is merged with power plant existing safe production management system,
The bridge of information communication is formed between ERP and access control system so that the real-time data sharing of power plant safety production system to door
In access control system, with unnecessary work before saving, safety management regulation and standardization, scientific level are improved, and then is improved
Level of security, production efficiency, the level of IT application of entire power plant.Will be seen that by the description below, using after the present invention effectively
It is not smooth and because work efficiency is low caused by not smooth between system, safety is without ensureing the problems such as to solve information.
Power plant safety production access control system according to an embodiment of the invention, first, gate inhibition system are described below with reference to Fig. 1
System is arranged to include multiple gate inhibition's units, and the multiple gate inhibition's unit can include production district gate inhibition unit and nonproductive area door
Prohibit unit, for example, between electronics, power distribution station, engineer station, plant area gate and office gate inhibition's unit can be set.The electricity
Factory's safety in production access control system further includes:Support system, the support system are used for power plant safety production access control system and electricity
The docking of factory operation system, and job order according to power plant's operation system and operation generation gate inhibition's authorized order at operation scene or
Gate inhibition, which authorizes, releases instruction;Receiving module prohibits mandate releasing instruction for receiving gate inhibition's authorized order OR gate;Logic judgment mould
Block releases instruction progress authority logic analysis for prohibiting to authorize to gate inhibition's authorized order OR gate of reception;Sending module, the hair
Module is sent to be configured as issuing the taboo mandate releasing instruction of gate inhibition's authorized order OR gate to gate inhibition's unit;And mobile device end, it uses
In with supporting system interaction, the operation at feedback operation scene simultaneously receives the data of support system.Wherein, power plant's operation system
It can include ERP system and power plant safety production management system.
To realize gate function, each in the multiple gate inhibition's unit includes entrance guard device, identification device and gate inhibition
Controller is awarded wherein the access controller of gate inhibition's unit receives gate inhibition's authorized order OR gate taboo that the sending module issues
Power releases instruction, performs the opening and closing operation of entrance guard device.Preferably, the identification device include scanner, card reader,
Face identification device, fingerprint identification device and/or RF Reader.It, can be to entering power plant and phase using gate inhibition's unit
The people in pass region, vehicle, article carry out management and control, and scanner can be used for scanning and identifying article, such as the two dimension of scanned item
Code or bar code, card reader can be used for reading and identify the information of contactless card, and face identification device and fingerprint identification device can
For identifying the identity information of people, RF Reader can scan number plate of vehicle or special identifier.Pass through above-mentioned identification device
Pair it can run relevant people with power plant, vehicle, article are effectively identified.Furthermore, it is possible to be staffing positioning bracelet, it is right
Personnel into power plant are positioned and are tracked.
Wherein, for realize power plant safety produce access control system and power plant operation system dock and interaction, support system and
The interaction of other units or module in power plant safety production access control system and the interaction for supporting system and mobile device end,
This invention takes following technological means:
The support system includes:Linkage interface module, the linkage interface module are configured as receiving business system of power plant
It unites the work ticket that issues and operation ticket data, and believes to the data of power plant's operation system feedback power plant safety production access control system
Breath, the mobile device end is by linkage interface module with supporting system interaction;Management module, the management module are configured as
Management work ticket and operation ticket data;And linkage authorization module, the linkage authorization module perform logical analysis and generate door
Prohibit authorized order OR gate and prohibit mandate releasing instruction.
The linkage interface module includes:Work ticket receiving submodule, for receiving work ticket from power plant's operation system;Behaviour
Make ticket receiving submodule, for receiving operation order from power plant's operation system;Data sub-module stored, for interim storage work ticket
With operation ticket data;And data forwarding submodule, the data forwarding submodule are configured as to power plant's operation system, movement
Equipment end and/or the receiving module send data or instruction, and receive from mobile device end and/or the receiving module
Data.The linkage interface module further includes data encryption submodule.
The management module includes:Data query submodule, for inquiring about work ticket and operation ticket data;It is shown with information
Submodule, for showing work ticket and operation ticket data.
The linkage authorization module includes authorization logic analyzing sub-module, is referred to performing logical analysis and generating gate inhibition and authorize
OR gate is made to prohibit and authorizes releasing instruction.
For mobile device end, including:Barcode scanning equipment, for the Quick Response Code at scan operation scene;And communication equipment, institute
Communication equipment is stated to interact with the data forwarding submodule of linkage interface module.The mobile device end further includes data query submodule
Block and information displaying submodule.
According to a preferred embodiment of the present invention, the power plant safety production access control system further includes memory module, uses
Prohibit to authorize in gate inhibition's authorized order OR gate that storage receives and release instruction.
According to above-mentioned technical proposal, a basic course of work of power plant safety production access control system can for example be retouched
State for:By power plant's operation system (ERP and/or power plant safety production management system), assign a task list, and system is supported to receive task
Work ticket and operation ticket data in list, the operator for holding mobile device end is forwarded the data to using data forwarding module
Member, i.e., notify operating personnel by task, and then operating personnel reach corresponding place according to work ticket and operation order information
(e.g., the place of equipment to be repaired), operating personnel can utilize the barcode scanning equipment barcode scanning operation of mobile device end existing after arrival
Quick Response Code, and by the ready information of operating personnel by communication equipment be sent to linkage interface module data forwarding son
Module, while operating personnel should also carry out identification on the identification device of corresponding gate inhibition's unit, such as recognition of face is carried out,
The identification information is sent to data forwarding submodule again by communication equipment, and data forwarding submodule again by these data and
Information is sent to power plant's operation system, and whether identity identification information first is judged qualified, and by rear, power plant's operation system can permit
Perhaps work ticket handles Job Operations license formality.Corresponding instruction is sent to by data forwarding submodule in linkage authorization module
Authorization logic analyzing sub-module, judge whether should to issue gate inhibition through logical analysis and OR gate authorized to prohibit to authorize and release instruction, then
Gate inhibition's authorized order OR gate is issued to gate inhibition's unit by sending module and prohibits mandate releasing instruction.
The power plant safety production management of Fig. 1 supports two ticket linkage function structure chart of system to describe power plant safety production management
The composition and data exchange process of two ticket of support system linkage correlation module.Two tickets linkage business processing Core Feature be:
By two ticket linkage interface associated services systems (source systems of two tickets), two ticket datas of acquisition, at the collaboration by each function
On the one hand reason realizes the linkage (with reference to Service control gate inhibition access right) of two ticket business and gate inhibition's mandate, on the one hand realizes
The linkage of two ticket business and mobile terminal barcode scanning (stopping peace with reference to business realizing arranges (stopping safety measure) link barcode scanning to confirm, from
And effectively prevent from going to the wrong way the generation of spacing case).
Power plant safety production management supports the main functional modules of system to include:
1), two ticket linkage interface module:Be responsible for and ERP system, power plant safety production management system etc. generate work ticket and
The system of operation order carries out data docking, and after related simple process, data are transmitted to mobile device end and branch respectively
Hold two ticket management modules of internal system.
2), two ticket management module:Two ticket information can be intuitively shown to foreground to inquire about for user, and user can basis
The job site (equipment place such as to be repaired) of two tickets carries out two ticket mandates of relevant range, and licensing mode is awarded using major-minor card
Power pattern, such as arranged the execution stage in work ticket peace, for main card to perform the operations staff that peace is arranged, vice card is work ticket director.
3), link authorization module:Specific authorization logic is handled, and the instruction with de-authorization will be authorized to be issued to gate inhibition
Unit.
Power plant safety production access control system is also the executable portion of gate inhibition's authorization logic, is responsible for the access controller to hardware
Authorize and issue.Power plant safety production supports that the major function of System Mobile device version (equipment end) is to run people for convenience
Member and work ticket director can perform onsite application mobile terminal in work ticket and relevant inquire about, check, stop pacifying and arrange barcode scanning
The functions such as confirmation.
Power plant safety produces access control system and two ticket modules of ERP or MAXIMO systems combine, and realizes to work ticket and behaviour
Make Whole Course Management of the ticket after date of draft in implementation procedure, checking including work ticket (operation order), work ticket (operation order) calls
Mobile terminal performs (with reference to identification auxiliary), work ticket result feedback etc. function.
After support system receives two tickets, job information is pushed to relevant administrative staff by support system automatically, is reminded
Administrative staff are on duty in place in time, and administrative staff do not forbid carrying out great Job Operations in place, and working group director is overhauling
Scanned the two-dimensional code before equipment/RFID codes after illustrate Yi Dao hilllocks, system just allows work ticket to handle Job Operations license formality, so
Work group member is equally to repair apparatus barcode scanning afterwards, when equipment 2 D code information is consistent with the task device code on this work ticket
When, prompting can carry out operation, can so prevent from going to the wrong way the generation of the unsafe incidents caused by equipment interval, while operator
Member can check history record of examination and the repair process information for this equipment by mobile terminal, after the completion of operation, work composition
Member can take pictures to the equipment after the completion of maintenance, and photo, procedural information, mobile terminal position location are pushed to support together
System, then send power plant's operation system to, administrative staff's examination & verification is waited, is needed in this process work group member and work director
To field scan device code, the situation of equipment is checked, if leave object, if had no problem, can allow to handle work
Ticket terminates formality;The work ticket that cannot handle for not carrying out key point charge book terminates formality.Note:The access control system of the present invention is same
System work ticket (operation order) of the sample supporting interface in addition to ERP system.
Power plant safety using the present invention produces access control system, the personnel into each place of power plant can be carried out effective
Management improves the enterprise operation efficiency of management, and effectively prevents security incident.According to the present invention, door is produced in power plant safety
Support system is set in access control system so that power plant safety produces access control system and docked with power plant operation system, therefore power plant safety
Production access control system can receive the job order (work ticket and operation order) of power plant's operation system, and power plant safety production gate inhibition
Mobile device end is additionally provided in system, mobile device end is capable of the operation data at feedback operation scene, supports system according to electricity
The opening and closing of the job order of factory's operation system and the operation access control unit at operation scene.It can be seen that according to this
The power plant safety production access control system of invention can be directly acquired from power plant's operation system (for example, safe production management system)
Permissions data, realizes real-time information sharing, and is turned on and off gate inhibition's unit in real time according to the confirmation at operation scene, therefore
The security of power plant's disengaging management is greatly enhanced.Further, since the permissions data quilt in power plant safety production management system
It is issued in real time in access control system, has reached what the access control system when power plant's operation system generates new data can timely respond to
Demand enormously simplifies the Operating Complexity and actual effect of permission in access control system, improves level of security and the level of IT application.
Intelligentized power plant safety production access control system is for following situation:Power plant management personnel are few at present, produce
It repairs many links all to complete using commission other unit, causes that power plant internal staff is numerous and diverse, mobility is larger.Use pin
After the intelligent access control system of power plant ERP exploitations, it is not smooth and cause because obstructed between system effectively to solve information
The problems such as work efficiency is low, safety is without ensureing.By effective informationization technology means, provide each to Entry Firm
The personnel in place control effectively the solution of management, improve the enterprise operation efficiency of management, effectively prevent security incident
Occur.
Further or preferably, the present invention has also made other aspects improvement, such as:
Card producing system
Power plant employee can combine public affairs according to the template construct access card (contactless card) of Uniting, the design of template
The corporate culture of department and the requirement on mark system.The fabrication information of external unit in charge of construction personnel is by Corporate Safety Mgmt Dept door
It is responsible for examination & verification, and arranges to carry out corresponding safety training and examination, special work post certification will be audited to special work post, and completed
Information gathering.Card producing system receives the basic data for personnel's fabrication information that safety management department is sent and is entered into access control system
In, make access card by corresponding template.
The main card maker of card producing system includes computer, access control system client, card printer, digital camera
Deng specific lectotype selection can be determines according to actual conditions.Card producing system is responsible for the base of the access card of all disengaging personnel of full factory
Plinth data inputting, access card makes, provides, reporting the loss, mending card, cancellation etc. and the relevant work of access card, all complete in card producing system
Into.
Entrance guard management
According to field condition, gate inhibition's scheme is divided according to following principle:By different majors region division (specialty isolation);It presses
Keypoint part region division (workplace isolation);By dangerous spot region division (dangerous spot isolation).
It prevents from being strayed into other professional areas when those skilled in the art from working and jeopardizing equipment normal operation;Prevent unauthorized personnel from arriving
Key area work causes maloperation;Prevent unauthorized personnel from entering danger zone and bringing security risk.
Gate inhibition develops
For implement project to outsource management method and keep the safety in production prevention standards requirements, design, develop, install it is a set of
The safety in production access control system of specification ensures the reliability of access control system entirety, the especially reliability of recognition of face, judgement rate
Deng preventing from causing to slip up;Pass through the fine-grained management to contractor, Migrant women and vehicle, specification contractor workflow, prison
It superintends and directs contractor's working condition, ensure that the safety check link risk related with contractor is effectively controlled, ensure construction safety, realize
The informationization of contractor's safety management;Plant area, the gate inhibition of production area come in and go out except being capable of recognition access control system card, it is also necessary to backer
The identification of face, fingerprint effectively prevents someone from usurping other people access card;When passing in and out production district, personnel need to carry out recognition of face
With swipe the card
Further, according to an embodiment of the invention, antisubmarine return device is provided on the entrance guard device, it is antisubmarine to realize
Return function, prevent rolling gate back through.It is further preferred that it is provided with video acquisition device and report on the entrance guard device
Alarm device, the personnel's number entered by videograph, if swipe the card with gate inhibition carry out if number difference by warning device into
Row alarm, prevents from trailing.
Gate inhibition's personal management
Repair and maintenance personnel:Work ticket is handled according to need of work, corresponding authority is authorized after work ticket examination & verification, during this permission
Between examined according to work ticket subject to the time, automatic camera achieves and generates record during disengaging;
Emergency personnel:According to prediction scheme of speedily carrying out rescue work, different zones are come in and gone out using different stage, different modes control related personnel,
It may also set up special passage of speedily carrying out rescue work;
Producers:Authorize permission according to affiliated working region, this permission only it is on duty effectively, automatic camera achieves during disengaging
And generate record;
In Migrant women management aspect:At company's gate entry, realize that work pass is associated with access control system, outsourcing list
Position construction personnel carries out multiple identification using recognition of face, fingerprint, work pass information and screens, and possesses statistical function and (respectively apply
Work order position number, age bracket statistics, work post etc.), outsourcing construction personnel " allows into factory " information, can be handled out as access control system
Enter the foundation of card, outsourcing construction personnel " allows from factory " information, and the foundation for moving back card information can be handled as access control system.In company
Personnel's attribute of clerks or staff members in a department's work and " resident " and " interim " embodies in personnel's attribute,
Historical information memory module and historical information enquiry module, the historical information are further included in the support system
Memory module passes through the authorization module that links for storing all historical records for entering and leaving the region in power plant and power plant
Authorization logic analyzing sub-module inquires about the historical record, and is analyzed, and provides mandate and suggests.Therefore, when personnel enter factory and office's reason
It is required to check safety education exam information, the historical information inquiry (including history item, violation record etc.) of Migrant women can
Inquiry is associated by personnel identity card number.Outsourcing construction personnel " violating the regulations to freeze " information, can forbid disobeying as access control system
Rule personnel more than breaking rules and regulations three times, add in blacklist, all engineerings are marched into the arena after forbidding into the foundation of factory.Certificate sets the term of validity,
It goes beyond the time limit and ceases to be in force automatically.
Pass in and out period control and real time monitoring
The people of the passage can be passed in and out by setting passes in and out in the range of at what time, system can store all disengaging records,
State recording can be inquired about by different querying conditions.System manager can be with the disengaging feelings of each door area personnel of real time inspection
Condition (while thering is photo to show), the state in each door area (switch including door, various abnormal condition alarms etc.);It can also be
The state of emergency opens or closes all door areas.
Fire-fighting link
The access control system of the present invention has taken into full account security, the reliability during its application, in burst in emergency circumstances,
It links with monitoring system, fire-fighting system, and can realize that a key releases gate inhibition or fire protection warning or other emergencies occur
When the corresponding gate inhibition of automatic linkage.Correspondingly, the access control system further includes:Fire information receiving module, for receiving fire-fighting letter
Breath;Fire-fighting link execution module, for being sent according to the fire information that fire information receiving module receives to all gate inhibition's units
Release the instruction of gate inhibition.Further, the access control system further includes fire protection module, and the fire protection module includes language
Fire information when speech recognition equipment detects the sound of fire alarm, is sent to fire information receiving module by sound identification device.
, can be when fire information receiving module be triggered for some reason by the setting, Active report fire information.
Other systems interface
The access control system of the present invention is also reserved with the interface with attendance checking system, to facilitate realization and access control system shared data
To realize staff attendance function.
After producing access control system using intelligentized power plant safety, safety management standardization, standard can be effectively improved
Change, scientific level, and then improve power plant's general safety level, production efficiency, the level of IT application.Specifically include following two sides
Face:
Standardization:The use step of intelligentized power plant safety production access control system is known compared to hand-manipulated before, artificial
Not, the operations such as hair fastener, specification hair fastener and the flow authorized, according to different majors regional compartmentalization, keypoint part regional compartmentalization, danger
Danger point regional compartmentalization.Those skilled in the art's work is prevented to be strayed into other specialties and jeopardize equipment normal operation;Prevent unauthorized personnel
It works to key area and causes maloperation, prevent unauthorized personnel from entering danger zone and bringing security risk so that whole flow process
More specification.
Security:The original ERP system of power plant is combined with access control system, makes information Real-time Feedback in ERP system extremely
In access control system, the step of reducing intermediate manual setting permission, while the fault rate of manual operation is decreased, and own
Equipment and accessory also are compliant with related safety standard, and can have under non-ideal environment while performance safety reliably operates
Imitate work.Powerful real-time monitoring and control and linkage function fully ensures that the security of user's environment.
The information that the application field of the present invention carries out for power plant safety production system, especially operation system with access control system
In terms of Real-Time Sharing, by with the application of the invention, the work safety level of entire power plant, work efficiency and information-based water can be improved
Equality realizes that solid foundation is established in informationization for power plant.
The present invention possesses wide application prospect, and manpower can be effectively saved by producing access control system in power plant safety
Cost, and then preferable economic and social benefit is brought, implementation of the invention can accelerate the development speed of information in power plant level
Degree, while improve power plant's general safety level, production efficiency, the level of IT application.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can be changed these embodiments.The applicable model of the present invention
It encloses and is defined by the appended claims and the equivalents thereof.
Claims (12)
1. a kind of power plant safety produces access control system, including multiple gate inhibition's units, which is characterized in that the power plant safety produces door
Access control system further includes:
Support system, the support system is used to power plant safety producing access control system docks with power plant operation system, and foundation
The job order of power plant's operation system and operation generation gate inhibition's authorized order OR gate at operation scene, which are prohibited to authorize, releases instruction;
Receiving module prohibits mandate releasing instruction for receiving gate inhibition's authorized order OR gate;
Logic judgment module releases instruction progress authority logic analysis for prohibiting to authorize to gate inhibition's authorized order OR gate of reception;
Sending module, the sending module are configured as issuing gate inhibition's authorized order OR gate taboo to gate inhibition's unit and authorizing to release referring to
Order;And
Mobile device end, for supporting system interaction, the operation at feedback operation scene simultaneously to receive the data of support system.
2. power plant safety according to claim 1 produces access control system, which is characterized in that the support system includes:
Linkage interface module, the linkage interface module are configured as receiving work ticket and operation order that power plant's operation system issues
Data, and to the data message of power plant's operation system feedback power plant safety production access control system, the mobile device end passes through connection
Mobile interface module is with supporting system interaction;
Management module, the management module are configured as management work ticket and operation ticket data;And
Link authorization module, and the linkage authorization module performs logical analysis and generates the taboo mandate of gate inhibition's authorized order OR gate and releases
Instruction.
3. power plant safety according to claim 2 produces access control system, which is characterized in that the linkage interface module bag
It includes:
Work ticket receiving submodule, for receiving work ticket from power plant's operation system;
Operation order receiving submodule, for receiving operation order from power plant's operation system;
Data sub-module stored, for interim storage work ticket and operation ticket data;And
Data forwarding submodule, the data forwarding submodule are configured as to power plant's operation system, mobile device end and/or institute
It states receiving module and sends data or instruction, and receive the data from mobile device end and/or the receiving module.
4. power plant safety according to claim 3 produces access control system, which is characterized in that the linkage interface module is also wrapped
Include data encryption submodule.
5. power plant safety according to claim 4 produces access control system, which is characterized in that the management module includes:Number
It is investigated that submodule is ask, for inquiring about work ticket and operation ticket data;Submodule is shown with information, for showing work ticket and operation
Ticket data.
6. power plant safety according to claim 5 produces access control system, which is characterized in that the linkage authorization module includes
Authorization logic analyzing sub-module prohibits mandate releasing instruction to perform logical analysis and generate gate inhibition's authorized order OR gate.
7. power plant safety according to claim 6 produces access control system, which is characterized in that the mobile device end includes:
Barcode scanning equipment, for the Quick Response Code at scan operation scene;And communication equipment, the communication equipment and the data of linkage interface module
Forward submodule interaction.
8. power plant safety according to claim 7 produces access control system, which is characterized in that the mobile device end further includes
Data query submodule and information displaying submodule.
9. power plant safety according to any one of claim 1 to 8 produces access control system, which is characterized in that the power plant
Safety in production access control system further includes memory module, and instruction is released for storing the gate inhibition's authorized order OR gate received taboo mandate.
10. power plant safety according to any one of claim 1 to 8 produces access control system, which is characterized in that the multiple
Each in gate inhibition's unit includes entrance guard device, identification device and access controller.
11. power plant safety according to claim 10 produces access control system, which is characterized in that the gate inhibition of gate inhibition's unit
Controller receives gate inhibition's authorized order OR gate that the sending module issues and prohibits mandate releasing instruction, performs the unlatching of entrance guard device
And shutoff operation.
12. power plant safety according to claim 10 produces access control system, which is characterized in that the identification device includes sweeping
Retouch instrument, card reader, face identification device, fingerprint identification device and/or RF Reader.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611072909.3A CN108122308A (en) | 2016-11-29 | 2016-11-29 | Power plant safety produces access control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611072909.3A CN108122308A (en) | 2016-11-29 | 2016-11-29 | Power plant safety produces access control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108122308A true CN108122308A (en) | 2018-06-05 |
Family
ID=62225571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611072909.3A Pending CN108122308A (en) | 2016-11-29 | 2016-11-29 | Power plant safety produces access control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108122308A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109523667A (en) * | 2018-11-13 | 2019-03-26 | 国家电网公司 | A kind of access control system applied to computer room |
CN109598351A (en) * | 2018-11-23 | 2019-04-09 | 国网湖北省电力有限公司孝感供电公司 | Safe early warning managing and control system and method for substation equipment fortune inspection |
CN110135768A (en) * | 2019-06-19 | 2019-08-16 | 华翔翔能电气股份有限公司 | The business electrical management method and power consuming administrative system of subregion energization management |
CN110910555A (en) * | 2019-12-09 | 2020-03-24 | 国电龙源电气有限公司 | Safety management method for intelligent operation ticket |
CN111027932A (en) * | 2019-12-09 | 2020-04-17 | 国电龙源电气有限公司 | Safety management method for intelligent work ticket |
CN111123775A (en) * | 2019-12-20 | 2020-05-08 | 太原重工股份有限公司 | Safety protection system for straightener and control method thereof |
CN111260324A (en) * | 2020-01-16 | 2020-06-09 | 易谷网络科技股份有限公司 | Work ticket management and control system and method based on biological recognition |
CN111340400A (en) * | 2020-03-25 | 2020-06-26 | 江苏安泰信息科技发展有限公司 | Chemical enterprise safety risk partition grading system and operation method |
CN112200952A (en) * | 2020-09-24 | 2021-01-08 | 珠海华伟电气科技股份有限公司 | Entrance guard and work ticket interaction method and system |
CN112712333A (en) * | 2020-12-25 | 2021-04-27 | 中用科技有限公司 | Automatic business work order management system and method |
CN113053006A (en) * | 2021-03-10 | 2021-06-29 | 神州数码融信云技术服务有限公司 | Real-time access control dynamic authorization management system of data center |
CN114120515A (en) * | 2021-11-12 | 2022-03-01 | 国网冀北电力有限公司唐山供电公司 | Transformer substation multifunctional access control system based on Internet of things and use method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710432A (en) * | 2009-12-07 | 2010-05-19 | 王柳 | Fingerprint access control system of unattended operation transformer station and control method thereof |
CN202196459U (en) * | 2011-09-19 | 2012-04-18 | 国网技术学院 | Centralized control safety protection management system |
CN103208140A (en) * | 2012-01-12 | 2013-07-17 | 国家电网公司 | Substation access control authorization method and system |
CN104008583A (en) * | 2014-04-29 | 2014-08-27 | 云南电网公司 | Method for implementation of access control on electric power machine room based on two-dimensional code and radio frequency identification technology |
CN105046791A (en) * | 2015-08-19 | 2015-11-11 | 温州职业技术学院 | Intelligent entrance guard system for controlling unlocking through mobile terminal |
US20160196704A1 (en) * | 2015-02-12 | 2016-07-07 | EdgeConneX, Inc. | System for vitualizing and centralizing the security guard functions of authorization and authentication of entrants at unmanned sites |
-
2016
- 2016-11-29 CN CN201611072909.3A patent/CN108122308A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710432A (en) * | 2009-12-07 | 2010-05-19 | 王柳 | Fingerprint access control system of unattended operation transformer station and control method thereof |
CN202196459U (en) * | 2011-09-19 | 2012-04-18 | 国网技术学院 | Centralized control safety protection management system |
CN103208140A (en) * | 2012-01-12 | 2013-07-17 | 国家电网公司 | Substation access control authorization method and system |
CN104008583A (en) * | 2014-04-29 | 2014-08-27 | 云南电网公司 | Method for implementation of access control on electric power machine room based on two-dimensional code and radio frequency identification technology |
US20160196704A1 (en) * | 2015-02-12 | 2016-07-07 | EdgeConneX, Inc. | System for vitualizing and centralizing the security guard functions of authorization and authentication of entrants at unmanned sites |
CN105046791A (en) * | 2015-08-19 | 2015-11-11 | 温州职业技术学院 | Intelligent entrance guard system for controlling unlocking through mobile terminal |
Non-Patent Citations (1)
Title |
---|
何建民: "《新编电业应用文书写作》", 31 March 2007 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109523667A (en) * | 2018-11-13 | 2019-03-26 | 国家电网公司 | A kind of access control system applied to computer room |
CN109598351A (en) * | 2018-11-23 | 2019-04-09 | 国网湖北省电力有限公司孝感供电公司 | Safe early warning managing and control system and method for substation equipment fortune inspection |
CN110135768A (en) * | 2019-06-19 | 2019-08-16 | 华翔翔能电气股份有限公司 | The business electrical management method and power consuming administrative system of subregion energization management |
CN110910555A (en) * | 2019-12-09 | 2020-03-24 | 国电龙源电气有限公司 | Safety management method for intelligent operation ticket |
CN111027932A (en) * | 2019-12-09 | 2020-04-17 | 国电龙源电气有限公司 | Safety management method for intelligent work ticket |
CN111123775A (en) * | 2019-12-20 | 2020-05-08 | 太原重工股份有限公司 | Safety protection system for straightener and control method thereof |
CN111260324A (en) * | 2020-01-16 | 2020-06-09 | 易谷网络科技股份有限公司 | Work ticket management and control system and method based on biological recognition |
CN111340400A (en) * | 2020-03-25 | 2020-06-26 | 江苏安泰信息科技发展有限公司 | Chemical enterprise safety risk partition grading system and operation method |
CN112200952A (en) * | 2020-09-24 | 2021-01-08 | 珠海华伟电气科技股份有限公司 | Entrance guard and work ticket interaction method and system |
CN112712333A (en) * | 2020-12-25 | 2021-04-27 | 中用科技有限公司 | Automatic business work order management system and method |
CN113053006A (en) * | 2021-03-10 | 2021-06-29 | 神州数码融信云技术服务有限公司 | Real-time access control dynamic authorization management system of data center |
CN114120515A (en) * | 2021-11-12 | 2022-03-01 | 国网冀北电力有限公司唐山供电公司 | Transformer substation multifunctional access control system based on Internet of things and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108122308A (en) | Power plant safety produces access control system | |
CN103390255B (en) | A kind of building site digital management system and its application process | |
CN102183937B (en) | Intelligent monitoring system for confidential documents based on radio frequency identification (RFID) | |
US11836557B2 (en) | Systems and methods for foreign material exclusion accountability | |
CN105279419A (en) | Intrinsic safety type electronic operation plate system | |
CN201667086U (en) | Door lock controller and door lock control system using the same | |
CN107659572A (en) | Intelligent and safe managing and control system based on information fusion | |
WO2020264033A1 (en) | Site supervisor system for construction sites | |
CN109034404A (en) | A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses | |
CN111445610B (en) | System for managing work ticket isolation key | |
JP2009098767A (en) | Entrance/exit management system and entrance/exit management method | |
CN105701612A (en) | Overhauling isolation management system | |
CN109801416A (en) | A kind of total dimension computer lab management method of building together based on big data analysis | |
CN113379370A (en) | Segment production informatization management system | |
CN203311459U (en) | Civil aviation airport group information integration cloud service platform | |
WO2023116250A1 (en) | Vehicle maintenance method and system | |
Thomas et al. | A Business Case for Advanced Outage Management | |
CN116563991A (en) | Intelligent management and control system and method for field personnel in electric power communication machine room | |
CN104751377A (en) | Integrated operation management system suitable for multiple fields | |
AU2006252035A1 (en) | Access Management System | |
CN113033739A (en) | Port equipment safety confirmation system and method | |
CN108256652A (en) | Plant maintenance method based on mobile terminal | |
CN112819214A (en) | Access control access system based on electric power enterprise safety production wisdom management and control | |
CN115809863B (en) | Work management method and system based on block chain | |
CN112687032B (en) | Method and system for monitoring work task by using mechanical lock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180605 |
|
RJ01 | Rejection of invention patent application after publication |