CN112819214A - Access control access system based on electric power enterprise safety production wisdom management and control - Google Patents

Access control access system based on electric power enterprise safety production wisdom management and control Download PDF

Info

Publication number
CN112819214A
CN112819214A CN202110091500.0A CN202110091500A CN112819214A CN 112819214 A CN112819214 A CN 112819214A CN 202110091500 A CN202110091500 A CN 202110091500A CN 112819214 A CN112819214 A CN 112819214A
Authority
CN
China
Prior art keywords
management
control
electric power
production
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110091500.0A
Other languages
Chinese (zh)
Inventor
孔令嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongdian Xinghua Intelligent Technology Co ltd
Original Assignee
Shanghai Zhongdian Xinghua Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongdian Xinghua Intelligent Technology Co ltd filed Critical Shanghai Zhongdian Xinghua Intelligent Technology Co ltd
Priority to CN202110091500.0A priority Critical patent/CN112819214A/en
Publication of CN112819214A publication Critical patent/CN112819214A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/20Individual registration on entry or exit involving the use of a pass
    • G07C9/27Individual registration on entry or exit involving the use of a pass with central registration

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of energy intelligent safety production management control, in particular to an entrance guard access system based on intelligent management and control of electric power enterprise safety production, which comprises an entrance guard access system, an electric power production business range zoning mode, effective technical prevention measures for electric power enterprise safety production, an access method, a whole plant zoning method, implementation guarantee files, mobile application, an operation mechanism, an ERP work ticket module and a group integrated system (ERP). And on-line management and control of the butt joint safety production and real-time violation alarming are realized based on a model prediction control method, and real-time monitoring and control at a mobile terminal (such as mobile phone APP or AR glasses) are realized through an internet technology.

Description

Access control access system based on electric power enterprise safety production wisdom management and control
Technical Field
The invention relates to the technical field of energy intelligent safety production management control, in particular to an entrance guard access system based on intelligent management and control of safety production of power enterprises.
Background
The power generation group is used for twisting the safety production situation of an enterprise, the safety management level of the enterprise is improved, a dual prevention control management mode combining safety production risk prevention control and hidden danger investigation and treatment is realized, the safety management foundation of the enterprise is further tamped, and a 'smart safety supervision' construction idea is put forward in time, so that the enterprise is changed from a traditional hidden danger investigation and treatment result type management mode to a risk prevention and control process type management mode. The progress and the dynamic state of key safety and environmental protection work are mastered in real time, a method and a gripper are provided for supervising the safety production and the duty of personnel at each level, the problems of unsmooth safety management in the last kilometer and the like are solved, and the problems frequently occurring in enterprise management belong to basic management problems. The problem is found in the work, the work is divided according to the responsibility, and the basic management is actually not real according to the business process. The checking is normal work, and should be arranged regularly, not only for people, but also for affairs, management procedures and regulation. To be controllable, the work needs to be realized by means of tamping basic management, and therefore, the demand for an access control access system based on intelligent management and control of power enterprise safety production is increasing.
At present, a few electric power enterprises only have the construction of the access control system equal to the traditional concept of community property security, but neglect the functions closely related to production business, and the whole construction deviates from the theme. When the access control system is built, the management problem is avoided, and the existing security management means is not willing to be improved by means of the intelligent system, so that the access control system based on the intelligent management and control of the security production of the power enterprise is provided for solving the problem.
Disclosure of Invention
The invention aims to provide an entrance guard access system based on intelligent management and control of safety production of an electric power enterprise, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
an entrance guard access system based on intelligent management and control of electric power enterprise safety production comprises an entrance guard access system, an electric power production business range zoning mode, effective technical prevention measures for electric power enterprise safety production, an access method, a whole plant zoning method, an implementation guarantee file, mobile application, an operation mechanism, an ERP work ticket module and a group integrated system (ERP), wherein the electric power production business range zoning mode comprises the following steps: the effective technical prevention measures for the safety production of the power enterprise are based on plant area physical partition, and are organically related through the process and data of ERP (production management) or EAM (enterprise resource management), so that the dynamic management of access authority is realized, and the access management measures of key production areas are strengthened.
Preferably, the entrance guard access system based on intelligent management and control of electric power enterprise safety production is completely butted with an ERP production management system (or EAM) of an electric power enterprise, is deployed on a basic support and intelligent data integration platform (SaaS) of an electric power enterprise in a third-level unit, is developed based on an ERP platform (ORACLE EBS), and is integrally developed with business authorization of two tickets, regular work, equipment accounts, overhaul management, technical supervision, twenty-five counter measures, safety violation, contractor management and the like of the ERP system.
Preferably, the access method comprises the steps that eight areas, namely a production area, a non-production area, a main plant area, a boiler room area, a booster station area, a main transformer area, an oil depot area, a hydrogen area and an ammonia area, are physically isolated, people are separated from vehicles, and biomass identification, high-definition camera shooting, a cross revolving door, an electronic door lock, an emergency channel, an electronic screen, voice alarm and other devices are selectively arranged in each large area in a matched mode.
Preferably, the whole plant is divided into a first-level region, a second-level region and a third-level region by the whole plant dividing region method. The one-level region sets up staff approach passageway, guest passageway, vehicle passageway, and the second grade region sets up the production place in the enclosure, includes: the system comprises a booster station, a main transformer, a switch chamber, an electronic chamber, an AVR small chamber, an engineer station, a centralized control chamber, a hydrogen station, an oil depot, a pump room, a coal bunker bay and a coal conveying trestle. The three-level region is provided with a switch, a valve, a baffle, a control cabinet and other isolation operations anti-miscontrol intelligent keys and intelligent padlocks (comprising a key box, an isolation lock, a safety lock, a resident lock, a chain and the like).
Preferably, the implementation guarantee file comprises technical standards for construction of power enterprise safety production access control systems and KKS coding engineering convention and engineering index of safety production intelligent control access control operation access systems.
Preferably, the mobile application includes: a two-dimensional code or an intelligent chip is arranged on a switch cabinet or an equipment panel, dynamic information of the equipment is read in real time through a mobile phone or an iPad, and information of an equipment account, information of two tickets, equipment operation guidance, maintenance history records and the like are associated with the access and operation of safe production operation.
Preferably, the operation mechanism includes information collection, process approval and implementation improvement strategy, and the process approval includes the following steps:
7-1, collecting the service data statistics collected in the information collection step;
7-2, monitoring and counting the summarized data to supervise the working condition and obtain a safety assessment result from two aspects of personnel compliance and operation compliance;
7-3, evaluating the business association degree and the field admission management according to the safety assessment result;
7-4, obtaining a conclusion according to the evaluation, wherein the conclusion comprises analyzing a problem cause and a risk point/weak point;
and 7-5, implementing an improvement strategy according to the conclusion, wherein the improvement strategy comprises an improvement authorization mechanism and an adjustment isolation strategy.
Preferably, the ERP work ticket module is operated in association with the entrance guard access system, the system standardizes the behaviors of work responsible persons and work group members in various work tickets, and the work responsible persons are prevented from entering a workplace to work under the condition of no authorization. Before the work ticket is approved, an operation licensor with authorization authority authorizes a work ticket principal of entrance guard of a relevant area according to the requirement of work content in the work ticket. Before the permission, the authorizer can modify the area which the work responsible person enters, once the work ticket is permitted, the modification is not allowed, and the authority of the work responsible person can only be changed according to the state of the work ticket.
Preferably, the group integrated system (ERP) comprises grade maintenance, daily maintenance, equipment management, material receiving authentication, expense card control, field working time assessment, two-ticket operation, maintenance work and human resource management.
Compared with the prior art, the invention has the beneficial effects that:
aiming at the defect of the connection between the existing electric power business and the IT technology, the invention constructs a safety production intelligent control entrance guard operation access system which takes an electric power enterprise as a core and covers a plurality of energy sources such as a power grid, thermal power, nuclear power, new energy and the like, and comprises a safety production integrated platform based on enterprise basic support, intelligent equipment, electric power overhaul and operation management and 5G industrial Internet application, realizes the online control of butt joint safety production and the real-time violation alarm based on a model prediction control method, and realizes the real-time monitoring and control at a mobile terminal (such as mobile phone APP or AR glasses) through the Internet technology.
Drawings
FIG. 1 is a schematic diagram of a group integrated system (ERP) according to the present invention;
FIG. 2 is a schematic flow chart of the mechanism of operation of the present invention;
FIG. 3 is a schematic view of a first electric work ticket according to the present invention;
fig. 4 is a schematic view of a second electric work ticket according to the present invention.
Detailed Description
Example 1:
referring to fig. 1-2, the present invention provides a first technical solution:
an entrance guard access system based on intelligent management and control of electric power enterprise safety production comprises an entrance guard access system, an electric power production business range zoning mode, effective technical prevention measures for electric power enterprise safety production, an access method, a whole plant zoning method, an implementation guarantee file, mobile application, an operation mechanism, an ERP work ticket module and a group integrated system (ERP), wherein the electric power production business range zoning mode comprises the following steps: dividing according to different professional areas, dividing according to key part areas and dividing according to danger point areas, realizing professional isolation according to different professional area divisions, and preventing the professional from entering other professionals to endanger the normal operation of equipment; the isolation of workplaces can be realized according to the region division of key parts, and misoperation caused by work of unauthorized people to the key parts is prevented; the effective technical prevention measures of the safety production of the power enterprise are based on plant area physical partition, namely, the dynamic management of access permission is realized through the process and data organic association of ERP (production management) or EAM, and the measures of the access management of key production areas are strengthened.
The entrance guard access system based on intelligent management and control of electric power enterprise safety production is completely butted with an ERP production management system (or EAM) of an electric power enterprise, is deployed on an electric power enterprise basic support and intelligent data integration platform (SaaS) of a third-level unit, is developed based on an ERP platform (ORACLE EBS), is integrally developed with business authorizations of two tickets, regular work, equipment accounts, overhaul management, technical supervision, twenty-five counter measures, safety violation, contractor management and the like of the ERP system, realizes the access of a production operation area and the complete integration of operation and a safety production system, and comprises eight areas, namely a production area, a non-production area, a main factory area, a boiler room area, a booster station area, a main transformer area, an oil depot area, a hydrogen area and an ammonia area, physically isolated from human and a vehicle, and selectively set biomass identification, camera shooting and high-definition matching are carried out in each large area, Cross revolving door, electronic door lock, emergency channel, electronic screen, audio alert etc..
The whole plant area dividing method divides the whole plant into a first-level area, a second-level area and a third-level area. The one-level region sets up staff approach passageway, guest passageway, vehicle passageway, and the second grade region sets up the production place in the enclosure, includes: the system comprises a booster station, a main transformer, a switch chamber, an electronic chamber, an AVR small chamber, an engineer station, a centralized control chamber, a hydrogen station, an oil depot, a pump room, a coal bunker bay and a coal conveying trestle. The three-level region is provided with a switch, a valve, a baffle, a control cabinet and other isolation operations, and intelligent keys and intelligent padlocks (comprising a key box, an isolation lock, a safety lock, a resident lock, a chain and the like) which are prevented from being controlled by mistake, and the arrangement is favorable for hierarchical management.
Implement the guarantee file and include "electric power enterprise safety production access control system construction technical standard" and "safety production wisdom management and control entrance guard operation access system KKS coding engineering contract and engineering index" for guide and standardize the construction and the application of this system, mobile application includes: the two-dimensional code or the intelligent chip is arranged on the switch cabinet or the equipment panel, dynamic information of the equipment is read in real time through the mobile phone or the iPad, and account information, two-ticket information, equipment operation guidance, maintenance history record and the like of the equipment are related to the access and operation of safe production operation, so that the access management of key production areas is strengthened, the occurrence of accidents such as personnel mistaken access intervals, mistaken touch and touch, misoperation and illegal invasion of external personnel is prevented, and the probability of accidents caused by the personnel is effectively reduced.
The operation mechanism comprises information collection, process approval and implementation improvement strategies, and the process approval comprises the following steps:
7-1, collecting the service data statistics collected in the information collection step;
7-2, monitoring and counting the summarized data to supervise the working condition and obtain a safety assessment result from two aspects of personnel compliance and operation compliance;
7-3, evaluating the business association degree and the field admission management according to the safety assessment result;
7-4, obtaining a conclusion according to the evaluation, wherein the conclusion comprises analyzing a problem cause and a risk point/weak point;
and 7-5, implementing an improvement strategy according to the conclusion, wherein the improvement strategy comprises an improvement authorization mechanism and an adjustment isolation strategy, and the arrangement is favorable for comprehensively optimizing process approval.
The ERP work ticket module is operated in association with the entrance guard access system, the system standardizes the behaviors of work responsible persons and work group members in various work tickets, and the work responsible persons are prevented from entering a workplace to work under the condition of no authorization. Before the work ticket is approved, an operation licensor with authorization authority authorizes a work ticket principal of entrance guard of a relevant area according to the requirement of work content in the work ticket. Before the permission, the authorizer can modify the area which the work responsible person enters, once the work ticket is permitted, the modification is not allowed, and the authority of the work responsible person can be changed only according to the state of the work ticket.
The group integrated system (ERP) comprises level maintenance, daily maintenance, equipment management, material receiving authentication, expense card control, field working time assessment, two-ticket operation, maintenance work and human resource management.
Example 2:
referring to fig. 3-4, the present invention provides a second technical solution:
an entrance guard access system based on intelligent management and control of power enterprise safety production comprises an entrance guard access system, a division and authorization principle of a safety production entrance guard area, an authorization principle of a safety production entrance guard, an access authorization control mode of production field personnel and vehicles, an operation mode of the entrance guard system and an ERP work ticket module, service function requirements, a technical architecture, mobile application support and system safety requirements.
Safe production entrance guard area division and authorization principle
Division of the regions from a professional perspective:
turbine room isolation area
Boiler room isolation area
Booster station isolation region
Main transformer (starting-up transformer) isolation region
Dividing the region from the whole plant perspective:
region a-core region: the system comprises a centralized control room, an electronic room, an AVR chamber, an engineer station, a switch room, a booster station, a protection chamber, an animal battery chamber, a cable layer, a hydrogen production station, a dangerous goods warehouse, a pump room, a coal conveying trestle and other areas, and electromagnetic locks are installed.
Zone B-production site area: the steam turbine room, the boiler room, the booster station and the main transformer area (including the starting transformer) are additionally provided with a fully-closed special fence, an electric telescopic door and a revolving door are arranged, an overhaul and fire fighting channel is reserved, and an escape door is arranged.
Zone C-plant gatekeeper: installing a high-speed wing gate of a staff passage, a visitor passage, a vehicle rod and an electric retractable door.
Safety production entrance guard authorization principle
Principle one: the company production manager and the maintenance worker approved by the safety department can enter the production field, but need to handle the work ticket when entering the key part area and the dangerous point area;
principle two: an authorizer who qualifies as an individual patrol booster station and high voltage area;
principle three: the job principal qualified for the job ticket transaction can enter the authorized key area and the dangerous point area.
Production field personnel and vehicle access authorization control mode
And a card reading access control system is installed at the gate of each isolation area, and each vehicle needing to enter and exit the field distributes an access control card. While the vehicle passes, the installed camera captures the vehicle and recognizes the information of the vehicle. If the vehicle has no authority, the vehicle stopper does not act.
All data of personnel and vehicles passing in and out by swiping cards in a production field are recorded in a database in detail, and by analyzing the data, a company can master information of the personnel passing in and out the production field every day in real time, and can master the information if the personnel not meeting safety regulations pass in and out, thereby helping to reduce potential safety hazards.
Access control system and ERP work ticket module correlation operation mode
The system standardizes the behaviors of the work responsible persons and the work group members in various work tickets, and prevents the work responsible persons from entering a workplace to work under the condition of no authorization. Before the work ticket is approved, an operation licensor with authorization authority authorizes a work ticket principal of entrance guard of a relevant area according to the requirement of work content in the work ticket. Before the permission, the authorizer can modify the area which the work responsible person enters, once the work ticket is permitted, the modification is not allowed, and the authority of the work responsible person can only be changed according to the state of the work ticket.
A. It is evident from fig. 3 that the job principal in this first electric job ticket obtains access authorization by means of the ticket, and the ticket is finally successfully finalized.
B. As is apparent from fig. 4, the second electric work ticket undergoes the process of approval, return, recovery and termination of the work ticket, and the access right of the job principal also undergoes the whole process of acquisition, recovery, re-acquisition and re-recovery.
Business function requirements
1. Device management
The intelligent management and control of safety production needs to fully utilize the management capability based on the full life cycle of equipment, optimize the establishment and accumulation methods of various professional accounts, fault code libraries, standard working libraries and work execution standards, provide an optimization model from the aspects of organization, management mode, management means and business process, ensure the normalization and effective maintenance of various equipment basic data, optimize the daily maintenance and fault removal business work of the equipment, make a reasonable and effective combination contract of equipment patrol inspection plan and an authorization mechanism of safety access, and effectively avoid equipment damage caused by unauthorized operators.
2. Operation management
Based on the requirement of 'two tickets and three systems', the admittance of a production area is strictly controlled, the mistaken entering of an isolation area and the mistaken operation are prevented, the existing management mode is optimized by utilizing the mobile application and the intelligent inspection technology, various operation management works are further refined, the management modes of 'post responsibility programming, dangerous point analysis pre-control normalization, operation tabulation and operation training systematization' are supported as targets, the efficient operation of operation management is ensured, and the power generation equipment is ensured to be in a good operation state.
3. Security management
The design and optimization of the safety management business model should follow 58 elements of 13 units of the security ring of a national household appliance delivery group company, the HSE system of the group company is established as a main line, the specific requirements of the 58 elements of the 13 units are deeply analyzed, and safety management resources and current situations of all levels are combined to further refine and standardize the safety production admission management business process, so that various risks in the production process are discovered, analyzed and eliminated, personal and equipment accidents are prevented, and the safety and health of operators are guaranteed.
4. Contractor management
According to the business requirements, the qualification prereview function of the contractor is required to be realized in the outer network, and other functions are realized in the inner network. The contractor submits safety qualification information to the corresponding project in the external network, the submitted information is synchronized to the internal network through the network gate, and the safety supervision personnel check and verify the information and automatically distribute and authorize the service. When the external network is realized, the safety management requirements of the internal and external isolation networks of the power generation group need to be met.
Technical architecture
The medium-rise power enterprise basic support and intelligent data integration platform (SaaS) is an information platform for realizing enterprise-level development, operation, management, monitoring and maintenance based on a JavaEE application server and an application software, and based on an SOA architecture and standard specifications, can support the whole application software system, and provides a standardized software full-life-cycle development and management platform for the application software system.
The SaaS is based on JavaEE, Eclipse, IEDA and other open technologies and platforms, provides complete support for covering the full life cycle of SOA application for customers through modular, graphical and integrated platform products, and is from design, development, debugging and deployment to operation, maintenance, management and control and treatment. The enterprise application software development platform can really help enterprise clients and various organizations to realize the development strategy of the unified safe production architecture, and achieve the aim of constructing SOA application and service with low cost, high quality, flexibility and easy management and control. Until the business development vision and IT implementation strategy of Enterprise clients and various organizations 'Enterprise-on-Service' are realized.
The SaaS platform is established on the basis of a safety production management concept, can be assisted by each safety production management system and can be used as a unified information service platform. Based on the WebService standard, information authorization, exchange and sharing are realized among enterprise-level applications such as Oracle EBS, SAP, Maximo and the like. The platform analyzes and processes the collected static and dynamic data to implement safety monitoring and production management control, thereby further perfecting the safety production management concept. The construction of the whole platform is designed according to the actual needs of the business and in combination with the information sharing requirements, firstly, the requirements of business departments, including system structures, functions, content requirements on information, information processing, issuing and other contents, are considered; secondly, the requirement of information sharing is considered, and a large number of data interfaces with other systems are reserved on the platform.
Mobile application support
1) Support for multiple operating systems: IOS, android system;
2) support for general purpose mobile devices including but not limited to cell phones, pads, etc.;
3) providing an offline function, namely, a mobile solution can be normally used when no network exists, but data synchronization is realized when a network exists;
4) the data security and accuracy are ensured, and the terminal user can not modify the time for taking the picture;
5) the realization function can be configured, and the data authority and the function authority of the user can be configured.
System safety requirements
1) The system should have a perfect authority authentication mechanism
2) The system needs to have a safety mechanism to ensure that data is not leaked and that data is not leaked when each unit uploads data.
3) The system needs to provide a security control scheme for preventing non-authenticated users from accessing various data, provide a perfect data backup and recovery scheme, and ensure the security of various data.
The system design integrally meets the requirements of grade protection and group internal and external network isolation.
The task pushing is realized through a big data mobile application means, the message is reminded to all levels of posts, the working mode conversion from 'people finding things' to 'things finding people' is realized, a closed-loop management mechanism is formed, and the 'people' and 'technical defense' levels are improved. The data management which is scattered and can not be shared in the past is shifted to the information platform management which is uniformly shared. Management personnel at each level of a second-level unit and a third-level unit of the power generation group can master the progress of safety access and check operation of each service of a production site in time, uniformly bring discovered problems into a problem management mechanism, push the problems to relevant responsible persons, carry out graded acceptance check and evaluation management, strengthen responsibility tracing, improve and implement circulation, and integrally improve the closed-loop management capability of the service.
After the system is built and put into use, a safe and harmonious production and operation order is created for power enterprises through a high-technology monitoring and management means. The management personnel can master the human factor events occurring on the site in time, and strive for time for making a decision as early as possible, so that the event processing efficiency is improved, and the occurrence of safety accidents is effectively avoided. Provides safety guarantee for the safe production and operation of the power enterprise, improves the management level and the whole image of the enterprise
The principles and embodiments of the present invention are explained herein using specific examples, which are presented only to assist in understanding the method and its core concepts of the present invention. The foregoing is only a preferred embodiment of the present invention, and it should be noted that there are objectively infinite specific structures due to the limited character expressions, and it will be apparent to those skilled in the art that a plurality of modifications, decorations or changes may be made without departing from the principle of the present invention, and the technical features described above may be combined in a suitable manner; such modifications, variations, combinations, or adaptations of the invention using its spirit and scope, as defined by the claims, may be directed to other uses and embodiments.

Claims (9)

1. An entrance guard access system based on intelligent management and control of electric power enterprise safety production comprises an entrance guard access system, an electric power production business range regional division mode, effective technical prevention measures of electric power enterprise safety production, an access method, a whole plant regional division method, an implementation guarantee file, mobile application, an operation mechanism, an ERP work ticket module and a group integrated system (ERP), and is characterized in that: the method for dividing the electric power production service range into regions comprises the following steps: the effective technical prevention measures for the safety production of the power enterprise are based on plant area physical partition, and are organically related through the process and data of ERP (production management) or EAM (enterprise resource management), so that the dynamic management of access authority is realized, and the access management measures of key production areas are strengthened.
2. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the entrance guard access system based on intelligent management and control of safety production of the electric power enterprise is completely butted with an ERP production management system (or EAM) of the electric power enterprise, is deployed on a basic support and intelligent data integration platform (SaaS) of the electric power enterprise in a third-level unit, is developed based on the ERP platform (ORACLE EBS), and is integrally developed with business authorization of two tickets, regular work, equipment accounts, overhaul management, technical supervision, twenty-five counter measures, safety violation of regulations, contractor management and the like of the ERP system.
3. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the access method comprises the steps that eight areas, namely a production area, a non-production area, a main plant area, a boiler room area, a booster station area, a main transformer area, an oil depot area, a hydrogen area and an ammonia area are physically isolated, people are separated from vehicles, and biomass identification, high-definition camera shooting, a cross revolving door, an electronic door lock, an emergency channel, an electronic screen, voice alarm and other devices are selectively arranged in each large area in a matched mode.
4. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the whole plant area dividing method divides the whole plant into a first-level area, a second-level area and a third-level area. The one-level region sets up staff approach passageway, guest passageway, vehicle passageway, and the second grade region sets up the production place in the enclosure, includes: the system comprises a booster station, a main transformer, a switch chamber, an electronic chamber, an AVR small chamber, an engineer station, a centralized control chamber, a hydrogen station, an oil depot, a pump room, a coal bunker bay and a coal conveying trestle. The three-level region is provided with a switch, a valve, a baffle, a control cabinet and other isolation operations anti-miscontrol intelligent keys and intelligent padlocks (comprising a key box, an isolation lock, a safety lock, a resident lock, a chain and the like).
5. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the implementation guarantee file comprises technical standards for construction of power enterprise safety production access control systems and KKS coding engineering convention and engineering index of safety production intelligent control access control operation access systems.
6. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the mobile application includes: a two-dimensional code or an intelligent chip is arranged on a switch cabinet or an equipment panel, dynamic information of the equipment is read in real time through a mobile phone or an iPad, and information of an equipment account, information of two tickets, equipment operation guidance, maintenance history records and the like are associated with the access and operation of safe production operation.
7. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the operation mechanism comprises information collection, process approval and implementation improvement strategies, and the process approval comprises the following steps:
7-1, collecting the service data statistics collected in the information collection step;
7-2, monitoring and counting the summarized data to supervise the working condition and obtain a safety assessment result from two aspects of personnel compliance and operation compliance;
7-3, evaluating the business association degree and the field admission management according to the safety assessment result;
7-4, obtaining a conclusion according to the evaluation, wherein the conclusion comprises analyzing a problem cause and a risk point/weak point;
and 7-5, implementing an improvement strategy according to the conclusion, wherein the improvement strategy comprises an improvement authorization mechanism and an adjustment isolation strategy.
8. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the ERP work ticket module is operated in association with the entrance guard access system, the system standardizes the behaviors of work responsible persons and work group members in various work tickets, and the work responsible persons are prevented from entering a workplace to work under the condition of no authorization. Before the work ticket is approved, an operation licensor with authorization authority authorizes a work ticket principal of entrance guard of a relevant area according to the requirement of work content in the work ticket. Before the permission, the authorizer can modify the area which the work responsible person enters, once the work ticket is permitted, the modification is not allowed, and the authority of the work responsible person can only be changed according to the state of the work ticket.
9. The entrance guard admission system based on electric power enterprise safety production wisdom management and control of claim 1 which characterized in that: the group integrated system (ERP) comprises level maintenance, daily maintenance, equipment management, material receiving authentication, expense card control, field working time assessment, two-ticket operation, maintenance work and human resource management.
CN202110091500.0A 2021-01-23 2021-01-23 Access control access system based on electric power enterprise safety production wisdom management and control Pending CN112819214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110091500.0A CN112819214A (en) 2021-01-23 2021-01-23 Access control access system based on electric power enterprise safety production wisdom management and control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110091500.0A CN112819214A (en) 2021-01-23 2021-01-23 Access control access system based on electric power enterprise safety production wisdom management and control

Publications (1)

Publication Number Publication Date
CN112819214A true CN112819214A (en) 2021-05-18

Family

ID=75858990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110091500.0A Pending CN112819214A (en) 2021-01-23 2021-01-23 Access control access system based on electric power enterprise safety production wisdom management and control

Country Status (1)

Country Link
CN (1) CN112819214A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116600251A (en) * 2023-07-17 2023-08-15 福州智创通信技术有限公司 Nuclear power security management method and system based on multipath communication technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116600251A (en) * 2023-07-17 2023-08-15 福州智创通信技术有限公司 Nuclear power security management method and system based on multipath communication technology
CN116600251B (en) * 2023-07-17 2023-11-24 福州智创通信技术有限公司 Nuclear power security management method and system based on multipath communication technology

Similar Documents

Publication Publication Date Title
CN108510248B (en) Construction project environment approval system capable of achieving comprehensive monitoring
CN108133527A (en) Wisdom garden access control system and its entrance guard authentication method and gate inhibition's method of control
CN102867350B (en) Prison AB door safety management method based on face recognition technology
CN102521905A (en) Intelligent access control system of transformer substation and control method thereof
CN201828978U (en) Double-door system for bank
CN101950271A (en) Modeling technology-based software security test method
CN103941652A (en) Method and device suitable for security protection and security audit of various DCS production control systems
CN109801416A (en) A kind of total dimension computer lab management method of building together based on big data analysis
CN101127133A (en) Door access remote management method
CN108985977B (en) Property intelligent supervision and management system
CN113298405A (en) Intelligent chemical industry park emergency comprehensive management system based on BIM and GIS
CN106155023A (en) The anti-misoperation system of a kind of universal scattered control system and method thereof
CN112819214A (en) Access control access system based on electric power enterprise safety production wisdom management and control
CN112307502A (en) Information security work quantitative evaluation system and method based on block chain
CN210895551U (en) Floating population management system
Xenakis et al. Procedural security in electronic voting
CN105117822A (en) Electric power system basic data lean processing method
CN111667243A (en) Business audit system based on ERP system
CN116563991A (en) Intelligent management and control system and method for field personnel in electric power communication machine room
CN116882729A (en) Security management platform based on 5g wisdom power plant
Li et al. Research on near-miss incidents monitoring and early warning system for building construction sites based on blockchain technology
CN206193981U (en) Security system of 220kV transformer substation
CN114360136A (en) Intelligent safety access control management method and system for power grid operation
CN204926242U (en) Entrance guard's security protection system
CN113541959A (en) Construction project management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination