CN106155023A CN201610637595.0A CN201610637595A CN106155023A CN 106155023 A CN106155023 A CN 106155023A CN 201610637595 A CN201610637595 A CN 201610637595A CN 106155023 A CN106155023 A CN 106155023A
Authority
CN
China
Prior art keywords
operations staff
equipment
coding
work ticket
ticket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610637595.0A
Other languages
Chinese (zh)
Other versions
CN106155023B (en
Inventor
周建玉
乐凌志
吴科
王鹏
张明惠
张小刚
刘俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING GUODIAN NANZI MEIZHUO CONTROL SYSTEM CO Ltd
Original Assignee
NANJING GUODIAN NANZI MEIZHUO CONTROL SYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING GUODIAN NANZI MEIZHUO CONTROL SYSTEM CO Ltd filed Critical NANJING GUODIAN NANZI MEIZHUO CONTROL SYSTEM CO Ltd
Priority to CN201610637595.0A priority Critical patent/CN106155023B/en
Publication of CN106155023A publication Critical patent/CN106155023A/en
Application granted granted Critical
Publication of CN106155023B publication Critical patent/CN106155023B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/4184Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by fault tolerance, reliability of production system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/35Nc in input of data, input till input file format
    • G05B2219/35301On error, push button to reverse execution mode of block, stop, correct
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

The invention discloses a kind of anti-misoperation system and the method thereof of universal scattered control system, including device coding information storage database, operation order, work ticket code storage database, warning function module, operator message authentication module, operator prohibit behaviour's module, also disclose that the method for native system simultaneously.The present invention has the functions such as power plant operations staff input validation code, the operation information of Computer Automatic Recognition checking information, automatically record operations staff and maintainer.Prevent power plant operations staff from the probability of maloperation occurring during overhaul of the equipments, simultaneously also for improving the attention rate of operations staff during maintainer's repair apparatus at the scene, improve thermal power plant automation and informationalized fusion.

Description

The anti-misoperation system of a kind of universal scattered control system and method thereof
Technical field
The present invention relates to a kind of anti-misoperation system and the method thereof of universal scattered control system, belong to fired power generating unit and set The technical field that standby maintenance combines with unit operation.
Background technology
There is a lot of device damage causing due to maloperation or personal injury in recent domestic thermal power generation corporations, how can Prevent the generation of on-the-spot maloperation event in the flow process of operation, be the on-the-spot problem be badly in need of and solving.
On-the-spot overhaul of the equipments state of running is a kind of means preventing from running maloperation, but in big absolutely number scattered control system In may only realize by set one maintenance mark, forbid or open equipment operating right by way of intermediate variable.Essence is just Being to increase link reminds this equipment of operations staff to be in maintenance position, it is impossible to realize real operation order, after work ticket verification The function of open equipment operating right again.How can binding operation ticket, work ticket be mesh with the demand of overhaul of the equipments operating right Front fired power generating unit scattered control system run in the urgent need to a function preventing maloperation.
Content of the invention
In order to solve above-mentioned technical problem, the invention provides the anti-misoperation system of a kind of universal scattered control system And method.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of anti-misoperation system of universal scattered control system, it is characterised in that: include device coding information storage data Storehouse, operation order, work ticket code storage database, operator message authentication module, operator prohibits behaviour's module, warning function mould Block:
Described device coding information storage database is used to collect the coding needing repair apparatus in whole power plant, record here The device coding entering Database Systems uses KKS code;
It is automatic to repair apparatus by Power Plant Equipment Management System that described operation order, work ticket code storage database are used to storage The operation order of generation, the coding of work ticket;
Described operator message authentication module is to include the name of whole power plant operations staff, the IP address of active station, operation It is divided by the title stood and the authority of operation, it is stipulated that the operating right of operations staff is 4 grades by operations staff according to responsibility Authority, after overhaul of the equipments completes, operations staff by device reset according to authority, releases and prohibits operating state;
It is when equipment needs maintenance that described operator prohibits behaviour's module, operations staff's input operation ticket, the volume of work ticket After Ma, the equipment in monitored picture is placed in taboo behaviour position by operations staff, and by the coding mark of the operation order in database, work ticket It is designated as inspecting state position, after maintenance completes, operations staff's input operation ticket, the coding of work ticket, release equipment taboo operating state, Recover normal condition;
Described warning function module is when equipment is in inspecting state, and equipment occurs running status to change then in maintenance position Send out unit exception alarm prompt operations staff.
Further, described operation order, work ticket code storage database run with scattered control system and combine, shape The closed-loop control of forming apparatus repair process.
Further, first travel through all devices in scattered control system, and the KKS of all devices is stored in database In, the equipment KKS in the scattered control system of whole power plant is a line character string, operation order, work ticket code storage data Storehouse is gone back the explanation in Chinese of storage device.
Further, different safe classes, totally 3 safe classes, each industrial grade are divided to power plant operations staff Different passwords is set, determines that operations staff's input operation ticket, work ticket encode IP and the calculating of operated work station simultaneously Machine name, these information records are in operation order, work ticket code storage database;
Wherein safe class 0: guest, anyone must not change scattered control system intrinsic parameter;
Safe class 1: operating personnel's authority, operating personnel can input operation ticket, work ticket coding, it is also possible to taboo is placed in equipment Behaviour position;
Safe class 2: engineer's authority, when the situation occurring operation order, work ticket to lose, engineer can release equipment Prohibit behaviour position;
Safe class 3: be worth long authority, is also highest weight limit, when locked equipment occurs in the coding of operations staff's input error, then It is artificially set to genetic state position by the highest password.
A kind of method for preventing misoperation of universal scattered control system, it is characterised in that: comprise the following steps,
Step one, when equipment needs maintenance, maintainer will output operation order and work ticket in equipment management system;
Step 2, maintainer takes operation order and work ticket to Control Room, transfers to be worth long approval, after operations staff confirms, After the password of the safe class 1 of input anti-misoperation system, the safe class of anti-misoperation system is 1 grade;
Step 3, after operations staff checks required repair apparatus, inputs two tickets in the pop-up window of monitoring of tools picture After coding, equipment state is placed in taboo behaviour, monitored picture can show taboo behaviour's mark simultaneously;
Step 4, the safe class of anti-misoperation system is set to 0 by operations staff;
Step 5, after overhaul of the equipments completes, the safe class of anti-misoperation system is set to 1 by operations staff again, simultaneously Inputting the coding of two tickets, equipment releases prohibits operating state, recovers to normal operating interface.
The beneficial effect that the present invention is reached:
1st, power plant equipment-repairing management system is combined by the present invention with scattered control system, forms closing of whole repair process Ring, thus reach to prevent maloperation from causing potential safety hazard;
2nd, the operation information that invention provides for all operations staffs is all recorded in Database Systems, can facilitate and look into afterwards Ask;
3rd, present system can be listed full factory and require the device name as maintenance position, is conducive to the overhaul management to equipment;
4th, during application claims operations staff unlocker device inspecting state, the volume of the corresponding work ticket of system prompt input or operation order Code, system such as finds corresponding work ticket or operation order to encode then set corresponding maintenance position, and all data in ergodic data storehouse, as entirely Portion is the open operation releasing maintenance position of then permission without maintenance position, thus reaches the maloperation function of full power plant scope.
Brief description
Fig. 1 is the configuration diagram of present system.
Fig. 2 is the flow chart of the inventive method.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.Following example are only used for clearly illustrating the present invention Technical scheme, and can not limit the scope of the invention with this.
As it is shown in figure 1, the anti-misoperation system of a kind of universal scattered control system, it is characterised in that: include that equipment is compiled Code information storage database, operation order, work ticket code storage database, operator message authentication module, operator prohibits behaviour's mould Block, warning function module:
Described device coding information storage database is used to collect the coding needing repair apparatus in whole power plant, record here The device coding entering Database Systems uses KKS code;
It is automatic to repair apparatus by Power Plant Equipment Management System that described operation order, work ticket code storage database are used to storage The operation order of generation, the coding of work ticket;
Described operator message authentication module is to include the name of whole power plant operations staff, the IP address of active station, operation It is divided by the title stood and the authority of operation, it is stipulated that the operating right of operations staff is 4 grades by operations staff according to responsibility Authority, after overhaul of the equipments completes, operations staff by device reset according to authority, releases and prohibits operating state;
It is when equipment needs maintenance that described operator prohibits behaviour's module, operations staff's input operation ticket, the volume of work ticket After Ma, the equipment in monitored picture is placed in taboo behaviour position by operations staff, and by the coding mark of the operation order in database, work ticket It is designated as inspecting state position, after maintenance completes, operations staff's input operation ticket, the coding of work ticket, release equipment taboo operating state, Recover normal condition;
Described warning function module is when equipment is in inspecting state, and equipment occurs running status to change then in maintenance position Send out unit exception alarm prompt operations staff.
In the present embodiment, described operation order, work ticket code storage database run with scattered control system and combine, Form the closed-loop control of overhaul of the equipments flow process.
First all devices in traversal scattered control system, and be stored in the KKS of all devices in database, entirely Equipment KKS in the scattered control system of power plant is a line character string, also stores in operation order, work ticket code storage database The explanation in Chinese of equipment.There is pop-up window, when operations staff inputs behaviour when operations staff's input operation ticket, work ticket coding Make ticket, work ticket coding after, i.e. got off by data-base recording.
Divide different safe classes, totally 3 safe classes to power plant operations staff, each industrial grade arranges different Password, determines that operations staff's input operation ticket, work ticket encode IP and the computer name of operated work station, these letters simultaneously Breath record is in operation order, work ticket code storage database;
Wherein safe class 0: guest, anyone must not change scattered control system intrinsic parameter;
Safe class 1: operating personnel's authority, operating personnel can input operation ticket, work ticket coding, it is also possible to taboo is placed in equipment Behaviour position;
Safe class 2: engineer's authority, when the situation occurring operation order, work ticket to lose, engineer can release equipment Prohibit behaviour position;
Safe class 3: be worth long authority, is also highest weight limit, when locked equipment occurs in the coding of operations staff's input error, then It is artificially set to genetic state position by the highest password.
When operations staff operation order, work ticket coding input to database after, last position is labeled as prohibit operating state Position, wherein 1 expression equipment is in taboo operating state, and 0 expression equipment is not at prohibiting operating state.
After maintenance of equipment is completed by maintainer, operations staff's input operation ticket again, work ticket fgs encoder, release The taboo operating state position of equipment, recovers normal condition.
When have equipment need maintenance when, operations staff can according to maintainer provide operation order, the content of work ticket, When equipment is operated by operator station, anti-misoperation system records operations staff's name, the operator operating The IP address stood and computer name, these information all will be got off by operation order, work ticket code storage data-base recording.
When equipment is placed in quiescing position, device control panel has quiescing to mark;
When equipment is in inspecting state, if now unit operation operating mode changes, control equipment instruction from 0 become 1 or Person from 1 become 0 when, the device control panel in monitored picture shows as blinking yellow illumination.
As in figure 2 it is shown, the method for preventing misoperation of a kind of universal scattered control system, it is characterised in that: include following step Suddenly,
Step one, when equipment needs maintenance, maintainer will output operation order and work ticket in equipment management system;
Step 2, maintainer takes operation order and work ticket to Control Room, transfers to be worth long approval, after operations staff confirms, After the password of the safe class 1 of input anti-misoperation system, the safe class of anti-misoperation system is 1 grade;
Step 3, after operations staff checks required repair apparatus, inputs two tickets in the pop-up window of monitoring of tools picture After coding, equipment state is placed in taboo behaviour, monitored picture can show taboo behaviour's mark simultaneously;
Step 4, the safe class of anti-misoperation system is set to 0 by operations staff;
Step 5, after overhaul of the equipments completes, the safe class of anti-misoperation system is set to 1 by operations staff again, simultaneously Inputting the coding of two tickets, equipment releases prohibits operating state, recovers to normal operating interface.
The preferred embodiment of the present invention described in detail above.It should be appreciated that those of ordinary skill in the art without Need creative work just can make many modifications and variations according to the design of the present invention.Therefore, all technology in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical scheme, all should be in the protection domain being defined in the patent claims.

Claims (5)

1. the anti-misoperation system of a universal scattered control system, it is characterised in that: include device coding information storage number According to storehouse, operation order, work ticket code storage database, operator message authentication module, operator prohibits behaviour's module, warning function mould Block:
Described device coding information storage database, is used for collecting the coding needing repair apparatus in whole power plant, logging data The device coding of storehouse system uses KKS code;
Described operation order, work ticket code storage database, automatic to repair apparatus for storing by Power Plant Equipment Management System The operation order of generation, the coding of work ticket;
Described operator message authentication module, is used for including the name of whole power plant operations staff, the IP address of active station, behaviour Make the authority of title and the operation stood, it is stipulated that the operating right of operations staff is 4 grades, by operations staff according to responsibility to its stroke Fraction limits, and after overhaul of the equipments completes, operations staff by device reset according to authority, releases and prohibits operating state;
Described operator prohibits behaviour's module, when equipment needs maintenance, and operations staff's input operation ticket, the coding of work ticket After, the equipment in monitored picture is placed in taboo behaviour position by operations staff, and by the coded markings of the operation order in database, work ticket For inspecting state position, after maintenance completes, operations staff's input operation ticket, the coding of work ticket, the equipment that releases prohibits operating state, extensive Multiple normal condition;
Described warning function module, when equipment is in inspecting state, equipment occurs running status to change then in maintenance position Send out unit exception alarm prompt operations staff.
2. the anti-misoperation system of a kind of universal scattered control system according to claim 1, it is characterised in that: described Operation order, work ticket code storage database run with scattered control system and combine, and form the closed loop of overhaul of the equipments flow process Control.
3. the anti-misoperation system of a kind of universal scattered control system according to claim 2, it is characterised in that: first All devices in traversal scattered control system, and be stored in the KKS of all devices in database, in the dispersion control of whole power plant Equipment KKS in system processed is a line character string, and in operation order, work ticket code storage database, also the Chinese of storage device is said Bright.
4. the anti-misoperation system of a kind of universal scattered control system according to claim 1, it is characterised in that: to electricity Factory operations staff divides different safe classes, totally 3 safe classes, and each industrial grade arranges different passwords, really simultaneously Determining IP and the computer name of the operated work station of operations staff's input operation ticket, work ticket coding, these information records are behaviour Make ticket, in work ticket code storage database;
Wherein safe class 0: guest, anyone must not change scattered control system intrinsic parameter;
Safe class 1: operating personnel's authority, operating personnel can input operation ticket, work ticket coding, it is also possible to taboo is placed in equipment Behaviour position;
Safe class 2: engineer's authority, when the situation occurring operation order, work ticket to lose, engineer can release equipment Prohibit behaviour position;
Safe class 3: be worth long authority, is also highest weight limit, when locked equipment occurs in the coding of operations staff's input error, then It is artificially set to genetic state position by the highest password.
5. the method for preventing misoperation of a universal scattered control system, it is characterised in that: comprise the following steps,
Step one, when equipment needs maintenance, maintainer will output operation order and work ticket in equipment management system;
Step 2, maintainer takes operation order and work ticket to Control Room, transfers to be worth long approval, after operations staff confirms, After the password of the safe class 1 of input anti-misoperation system, the safe class of anti-misoperation system is 1 grade;
Step 3, after operations staff checks required repair apparatus, inputs two tickets in the pop-up window of monitoring of tools picture After coding, equipment state is placed in taboo behaviour, monitored picture can show taboo behaviour's mark simultaneously;
Step 4, the safe class of anti-misoperation system is set to 0 by operations staff;
Step 5, after overhaul of the equipments completes, the safe class of anti-misoperation system is set to 1 by operations staff again, simultaneously Inputting the coding of two tickets, equipment releases prohibits operating state, recovers to normal operating interface.
CN201610637595.0A 2016-08-04 2016-08-04 A kind of anti-misoperation system and its method of universal scattered control system Active CN106155023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610637595.0A CN106155023B (en) 2016-08-04 2016-08-04 A kind of anti-misoperation system and its method of universal scattered control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610637595.0A CN106155023B (en) 2016-08-04 2016-08-04 A kind of anti-misoperation system and its method of universal scattered control system

Publications (2)

Publication Number Publication Date
CN106155023A true CN106155023A (en) 2016-11-23
CN106155023B CN106155023B (en) 2018-10-30

Family

ID=57329214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610637595.0A Active CN106155023B (en) 2016-08-04 2016-08-04 A kind of anti-misoperation system and its method of universal scattered control system

Country Status (1)

Country Link
CN (1) CN106155023B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109167290A (en) * 2018-08-22 2019-01-08 中电投东北能源科技有限公司 Confined space operation prevents the braking error-proof device and control method of maloperation
CN109617230A (en) * 2018-12-06 2019-04-12 贵州电网有限责任公司 The implementation method of exchange system secure configuration management in a kind of electrical power services device
CN112381413A (en) * 2020-11-16 2021-02-19 安徽亦能电力科技有限公司 Two-ticket software system based on industrial internet and digitization technology
CN113434328A (en) * 2021-08-26 2021-09-24 西安热工研究院有限公司 Logic configuration compiling error correction method and system for distributed control system
CN115080945A (en) * 2022-07-27 2022-09-20 保利长大工程有限公司 Control method and control system of construction device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001195124A (en) * 2000-01-07 2001-07-19 Toshiba Corp Plant monitor and control equipment
CN1835147A (en) * 2005-11-07 2006-09-20 珠海市共创有限公司 Wired distributing error proof locking system of microcomputer
CN101206963A (en) * 2007-11-30 2008-06-25 上海市电力公司超高压输变电公司 '5-prevention' intelligent unlocking and non-intermittence maintenance system of distribution system
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
CN202940643U (en) * 2012-11-30 2013-05-15 安徽省电力公司淮南供电公司 Comprehensive anti-misoperation system for power distribution network
CN203630608U (en) * 2013-12-25 2014-06-04 南阳川光电力科技有限公司 Operation anti-misoperation system of remote visualized transformer station

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001195124A (en) * 2000-01-07 2001-07-19 Toshiba Corp Plant monitor and control equipment
CN1835147A (en) * 2005-11-07 2006-09-20 珠海市共创有限公司 Wired distributing error proof locking system of microcomputer
CN101206963A (en) * 2007-11-30 2008-06-25 上海市电力公司超高压输变电公司 '5-prevention' intelligent unlocking and non-intermittence maintenance system of distribution system
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
CN202940643U (en) * 2012-11-30 2013-05-15 安徽省电力公司淮南供电公司 Comprehensive anti-misoperation system for power distribution network
CN203630608U (en) * 2013-12-25 2014-06-04 南阳川光电力科技有限公司 Operation anti-misoperation system of remote visualized transformer station

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109167290A (en) * 2018-08-22 2019-01-08 中电投东北能源科技有限公司 Confined space operation prevents the braking error-proof device and control method of maloperation
CN109167290B (en) * 2018-08-22 2023-10-20 中电投东北能源科技有限公司 Brake error preventing device for preventing misoperation in limited space operation and control method
CN109617230A (en) * 2018-12-06 2019-04-12 贵州电网有限责任公司 The implementation method of exchange system secure configuration management in a kind of electrical power services device
CN112381413A (en) * 2020-11-16 2021-02-19 安徽亦能电力科技有限公司 Two-ticket software system based on industrial internet and digitization technology
CN113434328A (en) * 2021-08-26 2021-09-24 西安热工研究院有限公司 Logic configuration compiling error correction method and system for distributed control system
CN113434328B (en) * 2021-08-26 2021-11-30 西安热工研究院有限公司 Logic configuration compiling error correction method and system for distributed control system
CN115080945A (en) * 2022-07-27 2022-09-20 保利长大工程有限公司 Control method and control system of construction device
CN115080945B (en) * 2022-07-27 2022-11-08 保利长大工程有限公司 Control method and control system of construction device

Also Published As

Publication number Publication date
CN106155023B (en) 2018-10-30

Similar Documents

Publication Publication Date Title
CN106155023A (en) The anti-misoperation system of a kind of universal scattered control system and method thereof
CN106157167B (en) Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN106340818B (en) Intelligent substation relay protection device maintenance peace arranges assistant analysis method for early warning
CN107193375A (en) A kind of electric power safety production scene interaction systems based on virtual reality
TWI570324B (en) Method for configuring a wind energy installation, and wind energy installation
CN105159261B (en) The intelligent substation protection screen cabinet system of overhaul efficiency can be improved
CN107085759A (en) Risk management method and system for land based transportation systems
CN101887547A (en) Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment
CN103425916B (en) Take safety criterion as safe operating device and the method for workflow auditing standard
CN205787685U (en) Managing and control system for job safety
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN104240781B (en) Signal distribution method and signal distribution system of digital instrument control system (DCS) of nuclear power plant
CN104199854B (en) Petrochemical equipment risk register method
CN103995936A (en) Simulation system platform used for practical training of water supply and drainage pump operators
CN104700477A (en) Method and device for safety control of nuclear power plants
CN103208049A (en) Quick accident analysis method and system for abnormal alarm
CN106130986A (en) A kind of wind energy turbine set active safety defence method based on automated decision-making
CN1963846A (en) Electron supervisory system of secrecy-involved apparatus and supervisory method
CN106603489A (en) Network security management and control apparatus for transformer substation
CN105469186A (en) Risk monitoring system capable of realizing self-monitoring and self-monitoring method
CN108249240A (en) A kind of method that can detect record elevator status data automatically
CN102592341A (en) Filing cabinet control-based data processing method, equipment, server and system
CN103105843B (en) A kind of anti-error check module for supervisory system
CN204926242U (en) Entrance guard's security protection system
CN111741089B (en) Intelligent safety operation management and control system and method based on industrial Internet of things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 210032 Jiangsu province Nanjing city Pukou high tech Zone Huidalu No. 9

Applicant after: Nanjing Guodian Nanzi 710086 Automation Co. Ltd.

Address before: 210032 Jiangsu province Nanjing city Pukou high tech Zone Huidalu No. 9

Applicant before: Nanjing Guodian Nanzi Meizhuo Control System Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant