CN110130990A - Gas exceeding limit early warning system and method - Google Patents

Gas exceeding limit early warning system and method Download PDF

Info

Publication number
CN110130990A
CN110130990A CN201910467337.6A CN201910467337A CN110130990A CN 110130990 A CN110130990 A CN 110130990A CN 201910467337 A CN201910467337 A CN 201910467337A CN 110130990 A CN110130990 A CN 110130990A
Authority
CN
China
Prior art keywords
gas
early warning
exceeding limit
mine
gas exceeding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910467337.6A
Other languages
Chinese (zh)
Other versions
CN110130990B (en
Inventor
杨宏伟
曹垚林
钱志良
高宏
韩兵
马小敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Research Institute Co Ltd of CCTEG
Original Assignee
CCTEG China Coal Technology and Engineering Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG China Coal Technology and Engineering Group Corp filed Critical CCTEG China Coal Technology and Engineering Group Corp
Priority to CN201910467337.6A priority Critical patent/CN110130990B/en
Publication of CN110130990A publication Critical patent/CN110130990A/en
Application granted granted Critical
Publication of CN110130990B publication Critical patent/CN110130990B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention discloses a kind of gas exceeding limit early warning system and method.The gas exceeding limit early warning system analyzes gas density data and manual entry warning data by gas exceeding limit early warning comprehensive management platform in real time, early warning is calculated using Early-warning Model as a result, and issuing gas exceeding limit warning information by gas exceeding limit information issuing system.Gas exceeding limit early warning system and method through the invention, the influence factor that digging drilling depth, variation ofgas density and the driving of mine functional department, stope situation (ocurrence of coal seam, geological structure, ventilation, management factors) etc. can be may cause to gas exceeding limit carries out integrated management and comprehensive analysis, realize the real-time graded early warning of mine gas, coal mine gas, which is effectively reduced, to transfinite the probability of happening and safety management cost of accident, ensures the safety in production of mine.Using existing underground looped network and mining area local area network, gas exceeding limit early warning comprehensive server is connected with existing coal mine safety monitoring system, mine hand data collection system.

Description

Gas exceeding limit early warning system and method
Technical field
The present invention relates to technical field of mine safety, specifically a kind of gas exceeding limit early warning system and method.
Background technique
Gas Disaster is one of the disaster in Safety of Coal Mine Production.Wherein especially with coal and gas prominent and gas explosion It is the most serious.Coal and gas prominent be underground coal mine coal seam with gas in a very short period of time, to digging space inside coal wall The sufficiently complex dynamic phenomenon of a large amount of coals and gas is sprayed suddenly.It can in a short period of time, from coal and rock to tunnel or Stope is dished out a large amount of coal petrography and gas, and generation such as pushes over mine car, destroys bracket, air flow in laneway is caused to reverse dynamic effect, Underground facilities and equipment and ventilating system are often destroyed, and coal is be easy to cause to bury the wound such as personnel, gas asphyxiation, gas explosion Accident is died, brings and seriously threatens to Safety of Coal Mine Production.Mine gas explosion is substantially in certain density methane and air Oxygen interaction, generated under the action of certain temperature vigorous oxidation reaction.Once occurring, a large amount of people are not only resulted in Member's injures and deaths, but also mine facility can be seriously destroyed, cause production disruption;It even can also cause coal-dust explosion, mine fire etc. Second accident causes huge loss to aggravate disaster.In more than 11000 of China mine, 95% or more coal mine is used Pit mining, high methane and coal and gas outburst mine account for 50% or more, and it is quick-fried that gas asphyxiation, gas easily occur for highly gassy mine The mine safety accidents such as fried, coal and gas prominent, especially coal and gas prominent accident are big with destructiveness, complexity is high, can The features such as foresight is low is major safety problems urgently to be resolved during current coal production.Therefore, study and grasp mine It is particularly significant to ensure that the life security of miner has for mine safety production for gas accident occurrence cause and its Prevention Technique Meaning.
By the gas accident mechanism study and field practice of decades, China forms a set of collection outburst hazard prediction " quaternity " comprehensive outburst control measure technology body including forecast, outburst prevention measures, outburst prevention measures validity check, safety prevention measure System.In addition, comprehensive analysis causes the temperature, oxygen concentration and gas density three of mine gas explosion according to study of Accident-Causing Theories A primary condition obtains prevention and treatment mine gas explosion, should guard against underground coal mine methane accumulation first, avoids gas exceeding limit accident Generation.Wind place gas density is respectively used by implementation " quaternity " comprehensive outburst control system and stringent control underground, it is effectively anti- The generation of various Gas Disasters is controlled, but since the understanding to Gas Disaster mechanism is insufficient and the complexity of production scene, at present Still it can not prevent the generation of Gas Disaster completely.
Coal mine safety monitoring system and outburst hazard prediction be prevent and treat mine gas, coal and gas prominent it is important Technological means.Each operating location of mine is carried out currently, China's high methane, projecting mine rely primarily on coal mine safety monitoring system Monitoring, the forecast of gas density, predict the outburst hazard of subterranean zone, for dangerous by way of drilling to coal seam Region or working face take outburst prevention measures to eliminate outburst danger.But existing coal mine safety monitoring system, outburst hazard are pre- Survey method still has insufficient and place to be improved: 1. between gas concentration monitoring forecast and outburst hazard prediction index With opposite isolatism, comprehensive intelligent anticipation can not be carried out to face gas disaster;2. existing Gas Disaster monitoring system System usually can not be to the real time job situation of subterranean zone or working face, such as ocurrence of coal seam, geological structure, ventilation, drilling gas Situation of change carries out Real-time Feedback, is unfavorable for the real-time early warning of Gas Disaster;3. existing Gas Disaster prediction technique is most only Consider that objective gas exceeding limit index, outburst hazard prediction index carry out Gas Disaster forecast, ignores and play a decisive role The executive condition of mining management level and outburst prevention measures;4. existing Gas Disaster prediction technique is that simple utilize predicts to refer to mostly Prediction result is provided to mark absoluteness, under the Gas Disaster grade and various warning grade cumulative functions that cannot still segment working face First advance Gas Disaster occurrence tendency.
Currently, mainly there are German TF-200 gas monitoring system, Poland CMM- in foreign countries in terms of coal mine safety monitoring system 20 gas monitoring systems, U.S.'s SCADA gas monitoring system etc..The KJ90 safety of coal mines comprehensively monitoring system of domestic Chongqing Mei Ke institute System, world science and technology joint-stock company Changzhou automate the KJ95 Coalmine's Monitoring and Controlling System of branch company, the KJF338 of Shenyang Mei Ke institute Most of high watt in China of the systems such as mine safety production comprehensive monitoring system and the KJ4/KJ2000 of Beijing Rui Sai company This, projecting mine is widely applied.Its software and hardware function, system stability and reliability etc. represent China's coal-mine The technical level of monitoring and controlling system.Especially Mei Ke institute in Chongqing establishes digitlization on the basis of GIS-Geographic Information System (GIS) Mine database establishes coal and gas prominent risk warning index, carries out trending early warning to coal and gas prominent and faces calamity Early warning has established solid foundation for the further research of Gas Disaster early warning system.But in mine gas disaster alarm system In terms of mine working face real time data typing in system, early warning and alert index interaction relationship, early warning system framework, still need into One step research.
Summary of the invention
Aiming at the defects existing in the prior art, the technical problem to be solved in the present invention is to provide a kind of utilizations The gas density information and manual entry information obtained in real time carries out the method and system of gas exceeding limit early warning, to relevant safety Information carries out real-time monitoring, analysis and early warning, to take corresponding Gas Disaster control measure for mine, carries out Gas Disaster Prevention and treatment provides foundation.
Present invention technical solution used for the above purpose is: a kind of gas exceeding limit early warning system, comprising:
Gas exceeding limit early warning comprehensive management platform, gas density data and digging drilling depth, geology for obtaining mine are surveyed Amount, protrusion-dispelling index and working face in the pit coal-bed gas data, and the data that will acquire are uploaded to the comprehensive clothes of gas exceeding limit early warning Be engaged in device in gas exceeding limit warning data storehouse in, be also used to mine early warning Rulemaking, early warning result publication, early warning release, Methane prediction judgement is carried out according to early warning rule in gas exceeding limit warning data storehouse and will determine that result is pre- by gas exceeding limit Alert information issuing system publication;
Gas exceeding limit early warning comprehensive server, for establishing the gas exceeding limit warning data storehouse of mine;The gas exceeding limit Warning data storehouse is used to store the gas exceeding limit warning data of mine, is also used to the calculating and judgement of early warning result;
Gas exceeding limit information issuing system connects gas exceeding limit early warning comprehensive management platform, super for mine gas Limit the Web information issuance of comprehensive pre-warning result.
The gas exceeding limit early warning comprehensive management platform connection face gas gushes out behavioral characteristics management system, the work Make face Gas behavioral characteristics management system and monitoring system is connected by monitoring system interface software;The monitoring system is used for The gas density data of mine are read in real time, and face gas is uploaded to by the monitoring system interface software and gushes out dynamic In Features Management system.
The face gas is gushed out behavioral characteristics management system and is divided for being shown, being inquired to called data, dynamically Analysis, and the firedamp sensor of normal work and adjustment is managed, while modelling processing is carried out to data implicit information.
The gas exceeding limit warning data includes gas, geology, production, early warning rule and early warning result.
The gas exceeding limit early warning comprehensive management platform connection working face mining progress management system, working face geology measurement Management system, working face dynamic protrusion-dispelling management system and downhole data input terminal;
The working face mining progress management system, for the typing of working face extraction drilling depth daily paper, digging footage daily paper, Realize the dynamic management of coal mine excavation progress;
The working face geology measurement and management system is used for the new digging laneway of mine, stope management, and records in real time Enter geological structure, realizes the new old working of mine, working face and architectonic dynamic management;
The working face dynamic protrusion-dispelling management system, the real-time record for each face gas super-limit prewarning index of mine Enter, and generate full mine gas geologic map, realizes full mine gas information by locally to the dynamic management in region;
The downhole data input terminal, respectively tunnel for real-time typing underground, stope coal seam preservation, texture It makes, divulge information, the abnormal conditions of management factors and gas data, and it is flat by underground looped network to be transmitted to gas exceeding limit forewarning management The working face pre-warning management system of platform connection.
A kind of gas exceeding limit method for early warning, comprising the following steps:
Obtain gas density data and digging drilling depth, geological survey, protrusion-dispelling index and the working face in the pit coal seam watt of mine This data;
The data that will acquire are uploaded in the gas exceeding limit warning data storehouse in gas exceeding limit early warning comprehensive server;Institute Gas exceeding limit early warning comprehensive server is stated for establishing the gas exceeding limit warning data storehouse of mine;The gas exceeding limit warning data Library is used to store the gas exceeding limit warning data of mine;
The calculating and judgement of early warning result are realized according to early warning rule corresponding in gas exceeding limit warning data storehouse;
Network information hair is carried out to mine gas comprehensive pre-warning result by gas exceeding limit information issuing system Cloth.
The gas density data and digging drilling depth, geological survey, protrusion-dispelling index and working face in the pit coal for obtaining mine Layer gas data, include: in each mine
The gas density data of mine are read in real time;
Coal mine excavation drilling depth, geological survey, the live typing of protrusion-dispelling index and working face in the pit coal-bed gas data.
The calculating and judgement that early warning result is realized according to early warning rule corresponding in gas exceeding limit warning data storehouse, packet Include following steps:
Gush out each face gas outburst amount situation of change of behavioral characteristics management system analysis according to face gas, And according to preset gas exceeding limit rule, gas exceeding limit warning information is issued;
It is issued according to gas pressure, gas bearing capacity and gas-geologic map in dynamic protrusion-dispelling system according to gas exceeding limit index Gas exceeding limit warning information;
According to the seam contrast of the real-time typing of downhole data input terminal, geological structure, ventilation and management factors, knot Driving, the back production drilling depth data information for closing working face in mining progress management system, it is different with ocurrence of coal seam before judging working face just The relative distance in normal area, geological structural belt and gas exceptions area, and venting practice formulation and management factors are combined, carry out gas overpressure Limit gauge then determines, issues gas exceeding limit warning information.
The each face gas outburst amount for gushing out the analysis of behavioral characteristics management system according to face gas changes Situation, and according to preset gas exceeding limit rule, gas exceeding limit warning information is issued, specifically: it transfinites when gas density meets Gas density under the conditions of the same process in early warning rule " T1 >=1% ", " T2 >=0.7% ", " T7 maximum value >=1.6% " or one class Changing value >=0.3% carries out full mine gas yellow early warning immediately;When " T1 >=1.2% ", " T2 >=0.8% " or one class Variation ofgas density value >=0.4% under the conditions of interior the same process carries out full mine gas red early warning immediately;Wherein, T1 For face gas sensor values, T2 is air return lane firedamp sensor numerical value, and T7 is dedicated gas air draft lane sensor values;
It is described according to gas pressure, gas bearing capacity and gas-geologic map in dynamic protrusion-dispelling system, according to gas exceeding limit index, Gas exceeding limit warning information is issued, specifically: when gas pressure, gas bearing capacity value reach super-limit prewarning rule " 7.5≤W < 8m3/ t " or " 0.7≤P < 0.74MPa ", carry out full mine gas yellow early warning immediately;As " W >=8m3/ t " or " P >= 0.74MPa " carries out full mine gas red early warning immediately;Wherein, W is gas bearing capacity, and P is gas pressure;
It is described according to the seam contrast of the real-time typing of downhole data input terminal, geological structure, ventilation and management because Element is assigned before judging working face just with coal seam in conjunction with the driving of working face, back production drilling depth data information in mining progress management system The relative distance of exceptions area, geological structural belt and gas exceptions area is deposited, and combines venting practice formulation and management factors, progress watt This rule that transfinites determines, issues gas exceeding limit warning information, specifically: when driving, stope are located at geological structural belt 20m In range, within the scope of ground drilling or drilling 50m or when roof cracking, i.e. progress gas exceeding limit yellow early warning;Work as headwork The stratification disorder of face coal seam, bearing, the unexpected change dramatically in inclination angle or coal body Failure type become III class coal, IV from I, II class coal When class, V class coal, the early warning of gas exceeding limit yellow is issued immediately;When blowing-out, gentle breeze, inverted air current region or ventilation occurs in working face When section is less than design section 2/3, i.e. progress gas exceeding limit yellow early warning;In back production, driving face gas administration, when out Existing gas, geological structure are not reported extremely or when the problems such as ventilation equipment artificial damages, i.e. progress gas exceeding limit yellow early warning;When It was found that carrying out gas exceeding limit red early warning immediately when monitoring and controlling system stops transport or do not execute gas govenance.
Further include:
It realizes that the united multi objective of two or more pieces single index early warning is superimposed the early warning of gas exceeding limit comprehensive classification: only triggering one A face gas is generated when index to transfinite yellow early warning, when meeting two or more pieces yellow warning index simultaneously, two Item or a plurality of yellow early warning can upgrade to a gas exceeding limit red early warning.
The present invention makes full use of the information of the real-time gas density information and manual entry transferred to carry out early warning, in conjunction with newly opening The downhole data input terminal of hair (assigns in coal seam the digging drilling depth of mine each department, the variation of gas index and face condition Deposit, geological structure, ventilation, management factors) etc. the influence factor that may cause face gas and transfinite be managed and analyze, it is real The real-time graded early warning of existing mine gas, coal mine gas, which is effectively reduced, to transfinite the probability of happening of accident, ensures the peace of mine Full production.
Detailed description of the invention
Fig. 1 is gas exceeding limit early warning system structural schematic diagram;
Fig. 2 is the key index figure in gas exceeding limit method for early warning;
Fig. 3 is that the stope gas that transfinites with geological structure Two indices is superimposed grading forewarning system illustraton of model;
The position Fig. 4 methane prediction flow chart.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and embodiments.
As shown in Figure 1, the gas exceeding limit early warning system of the present embodiment includes:
Gas exceeding limit early warning comprehensive management platform 1 (copyright registration number: 2016SR055229), for safeguarding group company The gas exceeding limit real-time early warning data and early warning rule body in gas exceeding limit warning data storehouse in methane prediction comprehensive server System, and for managing mine early warning subsystem, for the specific early warning Rulemaking of mine, the publication of early warning result, early warning is released, and The gas exceeding limit warning data storehouse being uploaded in gas exceeding limit early warning comprehensive server;
Gas exceeding limit warning data storehouse 2, for storing mine data relevant to gas exceeding limit early warning;
Gas exceeding limit early warning comprehensive server 3, for establishing gas exceeding limit warning data storehouse;
Gas exceeding limit information issuing system 4 (copyright registration number: 2016SR087185) is used for mine gas The Web information issuance of comprehensive pre-warning result.
The monitoring system 5 includes:
Monitoring system 5 (KJ333 safety production monitoring of coal mine system pacifies standard card number: MFC070106), as gas exceeding limit The significant data source of Integrated Early Warning System, can read Mine Methane data in real time, and it is comprehensive to be uploaded to gas exceeding limit early warning Gas exceeding limit warning data storehouse in hop server;
Monitoring system interface software 6 is passed to work as the analysis software of monitoring system data, and by the data after parsing Face Gas behavioral characteristics management system;
Face gas gushes out behavioral characteristics management system 7 (copyright registration number: 2016SR053982), to called data It shown, inquired, dynamic analysis, and the firedamp sensor of normal work and adjustment is managed, while is implicit to data Information carries out modelling processing;
Due to 5 producer's disunity of coal mine safety monitoring system, data can not be directly acquired, using monitoring system interface software The mode indirectly getting data of 6 parsing data, gas density data of the monitoring system interface software 6 for reading mine in real time, And it is uploaded to face gas and gushes out in behavioral characteristics management system 7.
Working face mining progress management system 8, working face geology measurement and management system 9, working face dynamic protrusion-dispelling management system System 10 and downhole data input terminal 11 are used for coal mine excavation drilling depth, geological survey, protrusion-dispelling index and working face in the pit coal seam watt The live typing of this data, and the gas exceeding limit warning data storehouse being uploaded in gas exceeding limit early warning comprehensive server;Specific packet It includes:
Working face mining progress management system 10 (copyright registration number: 2016SR053394), for working face extraction into The dynamic management of coal mine excavation progress is realized in the typing of ruler daily paper, digging footage daily paper;
Working face geology measurement and management system 11 (copyright registration number: 2016SR053177), newly tunnels lane for mine Road, stope management, and the geological structures such as the tomography of typing in real time, karst collapse col umn, realize the new old working of mine, working face and ground The dynamic management that texture is made;
Working face dynamic protrusion-dispelling management system 12 (copyright registration number: 2016SR053401) is used for mine working face watt The real-time typing of this super-limit prewarning index, and full mine gas geologic map can be automatically generated;
Downhole data input terminal 13, for real-time typing underground driving, stope coal seam preservation, geological structure, The abnormal conditions of ventilation, management factors and gas data, and gas exceeding limit early warning integrated pipe is uploaded to by underground looped network in time Platform;
Early warning process as shown in figure 4, carry out data acquisition first, including monitoring system automatic collection and manual entry, it The judgement of early warning rule is carried out afterwards, exports early warning as a result, and carrying out early warning result publication.
Gas exceeding limit method for early warning specifically:
1) the data acquisition of mine gas data
Monitoring center personnel gush out behavioral characteristics by mining area local area network, by coal mine safety monitoring system and face gas Management system carries out information interconnection, automatic in real time to read Mine Methane real time data, and is passed according to gas in monitoring system The regular adjustment of the working condition of sensor, update, and the gas exceeding limit early warning number being uploaded in gas exceeding limit early warning comprehensive server According to library;
Production department manufacturing schedule administrative staff are taken by working face mining progress management system to gas exceeding limit early warning is comprehensive Typing driving, stope drilling depth and relevant information in gas exceeding limit warning data storehouse in business device, and it is responsible for maintenance digging Progress control system;
Di Ce section geological survey administrative staff are taken by working face geology measurement and management system to gas exceeding limit early warning is comprehensive It is engaged in typing mine ground measured data in the gas exceeding limit warning data storehouse in device, and is responsible for maintenance geological survey management system;
Ventilation section protrusion-dispelling team administrative staff are by working face dynamic protrusion-dispelling management system, to gas exceeding limit early warning integrated service The gas pressure and gas bearing capacity value of typing mine working face in gas exceeding limit warning data storehouse in device, with generating coal-bed gas Matter figure, and it is responsible for dynamic protrusion-dispelling management system;
Working face in the pit team, production department group technical staff is taken by downhole data typing terminal to gas exceeding limit early warning is comprehensive The data such as typing ocurrence of coal seam, geological structure, ventilation, management factors and gas in gas exceeding limit warning data storehouse in business device Abnormal conditions, and be responsible on well by electromechanical section, underground source of early warning and line upkeep.
2) mine gas real-time graded early warning
Ventilation section gas exceeding limit administrative staff are comprehensive to gas exceeding limit early warning by gas exceeding limit early warning comprehensive management platform Gas exceeding limit early warning rule is added in gas exceeding limit warning data storehouse in server, and supervises the operation of other early warning subsystems Situation, publication early warning result formulate responsive measures, and line trace of going forward side by side is implemented.Specifically comprise the following steps:
(1) gas exceeding limit early warning comprehensive management platform is according to the geological prospecting borehole in geological survey data, gas drainage Drilling and down-hole coal bed, geological structure, working face, tunnel measurement data spatial information and attribute information, generate be based on network The mine dynamic mining engineering plan of GIS-Geographic Information System, provides basic platform for mine gas forewarning management;
(2) gas exceeding limit early warning comprehensive management platform gushes out behavioral characteristics management system and working face by face gas Dynamic protrusion-dispelling management system surveys gas pressure, gas bearing capacity and gas emission according to working face in the pit, generates gas pressure Power, gas bearing capacity and gas emission isopleth and coal-bed gas geologic map generate the coal seam based on network geographic information system Gas-geologic map;
(3) to which mining influence caused by the abnormal, mining work activities according to gas emission, the prediction index that transfinites, underground are whole Ocurrence of coal seam, geological structure, ventilation and the management factors of typing are held, it is pre- to carry out the synthesis that single index early warning is superimposed with Two indices It is alert, issue gas exceeding limit grading forewarning system information;
Specific gas exceeding limit early warning process carries out in gas exceeding limit warning data storehouse 2, comprising:
1. gas exceeding limit early warning comprehensive management platform gushes out behavioral characteristics management system intellectual analysis according to face gas A face gas outburst amount situation of change issue gas exceeding limit warning information and according to preset gas exceeding limit rule;Tool For body, when gas density meet super-limit prewarning regular " T1 >=1.0% ", " T2 >=0.7% ", " T7 maximum value >=1.6% " or Variation ofgas density value >=0.3% under the conditions of the same process in one class, carries out full mine gas yellow early warning immediately;When Variation ofgas density value >=0.4% under the conditions of the same process in " T1 >=1.2% ", " T2 >=0.8% " or one class, carries out complete immediately Mine gas red early warning;
2. gas exceeding limit early warning comprehensive management platform is according to gas pressure, gas bearing capacity and gas in dynamic protrusion-dispelling system Matter figure issues gas exceeding limit warning information according to gas exceeding limit index;Specifically, when gas pressure, gas bearing capacity value reach Super-limit prewarning rule " 7.5≤W < 8m3/ t " or " 0.7≤P < 0.74MPa ", it is pre- to carry out full mine gas yellow immediately It is alert;As " W >=8m3/ t " or " P >=0.74MPa " carry out full mine gas red early warning immediately;
3. gas exceeding limit early warning comprehensive management platform according to the seam contrast of the real-time typing of downhole data input terminal, Geological structure, ventilation and management factors, in conjunction with the driving of working face, back production drilling depth data information in mining progress management system, Judge the just preceding relative distance with ocurrence of coal seam exceptions area, geological structural belt and gas exceptions area of working face, and is arranged in conjunction with ventilation Formulation and management factors are applied, the judgement of gas exceeding limit rule is carried out, issues gas exceeding limit warning information;
Specifically, when driving, stope be located within the scope of geological structural belt 20m, ground drilling or drill 50m model In enclosing or when roof cracking, i.e. progress gas exceeding limit yellow early warning;When the stratification disorder of driving face coal seam, bearing, incline When the right change dramatically of cornicult or coal body Failure type become III class coal, IV class, V class coal from I, II class coal, gas overpressure is issued immediately Limit yellow early warning;When working face occur blowing-out, gentle breeze, inverted air current region or ventilation section be less than design section 2/3 when, i.e., into Row gas exceeding limit yellow early warning;In back production, driving face gas administration, do not reported extremely when there is gas, geological structure Or when the problems such as ventilation equipment artificial damage, i.e. progress gas exceeding limit yellow early warning;When the stoppage in transit of discovery monitoring and controlling system or not When executing gas govenance, gas exceeding limit red early warning is carried out immediately;
4. gas exceeding limit early warning comprehensive management platform is realizing gas exceeding limit early warning according to the single index early warning rule Simultaneously, moreover it is possible to realize the united multi objective superposition gas exceeding limit comprehensive classification early warning of two or more pieces single index early warning.It is described more The gas exceeding limit comprehensive classification early warning of index adding up refers to that generating a face gas when only triggering an index transfinites yellow Early warning, when meeting two or more pieces yellow warning index simultaneously, the early warning of two or more pieces yellow can upgrade to a gas overpressure Limit red early warning.As shown in figure 3, when geological structure is abnormal and gas density exception triggers gas exceeding limit yellow early warning simultaneously, Two yellow early warning of transfiniting combine the risk that transfinite and sentence knowledge, issue gas exceeding limit red early warning.

Claims (10)

1. a kind of gas exceeding limit early warning system characterized by comprising
Gas exceeding limit early warning comprehensive management platform, for obtaining the gas density data of mine and digging drilling depth, geological survey, anti- Cam follower mark and working face in the pit coal-bed gas data, and the data that will acquire are uploaded in gas exceeding limit early warning comprehensive server Gas exceeding limit warning data storehouse in, be also used to mine early warning Rulemaking, early warning result publication, early warning release, in gas Methane prediction judgement is carried out according to early warning rule in super-limit prewarning database and will determine that result passes through gas exceeding limit warning information Delivery system publication;
Gas exceeding limit early warning comprehensive server, for establishing the gas exceeding limit warning data storehouse of mine;The gas exceeding limit early warning Database is used to store the gas exceeding limit warning data of mine, is also used to the calculating and judgement of early warning result;
Gas exceeding limit information issuing system connects gas exceeding limit early warning comprehensive management platform, comprehensive for mine gas Close the Web information issuance of early warning result.
2. a kind of gas exceeding limit early warning system according to claim 1, which is characterized in that the gas exceeding limit early warning is comprehensive Management platform connection face gas gushes out behavioral characteristics management system, and the face gas gushes out behavioral characteristics management system Monitoring system is connected by monitoring system interface software;Gas density data of the monitoring system for reading mine in real time, And face gas is uploaded to by the monitoring system interface software and is gushed out in behavioral characteristics management system.
3. a kind of gas exceeding limit early warning system according to claim 2, which is characterized in that the face gas is gushed out dynamic State Features Management system for called data is shown, is inquired, dynamic analysis, and to work normally and adjustment gas pass Sensor is managed, while carrying out modelling processing to data implicit information.
4. a kind of gas exceeding limit early warning system according to claim 1, which is characterized in that the gas exceeding limit warning data Including gas, geology, production, early warning rule and early warning result.
5. a kind of gas exceeding limit early warning system according to claim 1, which is characterized in that the gas exceeding limit early warning is comprehensive It manages platform and connects working face mining progress management system, working face geology measurement and management system, working face dynamic protrusion-dispelling management System and downhole data input terminal;
The working face mining progress management system is realized for the typing of working face extraction drilling depth daily paper, digging footage daily paper The dynamic management of coal mine excavation progress;
The working face geology measurement and management system, for the new digging laneway of mine, stope management, and typing in real time Texture is made, and realizes the new old working of mine, working face and architectonic dynamic management;
The working face dynamic protrusion-dispelling management system, for the real-time typing of each face gas super-limit prewarning index of mine, and Full mine gas geologic map is generated, realizes full mine gas information by locally to the dynamic management in region;
The downhole data input terminal, respectively tunnel for real-time typing underground, stope coal seam preservation, geological structure, The abnormal conditions of ventilation, management factors and gas data, and gas exceeding limit forewarning management sub-platform is transmitted to by underground looped network The working face pre-warning management system of connection.
6. a kind of gas exceeding limit method for early warning, which comprises the following steps:
Obtain the gas density data and digging drilling depth, geological survey, protrusion-dispelling index and working face in the pit coal-bed gas number of mine According to;
The data that will acquire are uploaded in the gas exceeding limit warning data storehouse in gas exceeding limit early warning comprehensive server;Described watt This super-limit prewarning comprehensive server is used to establish the gas exceeding limit warning data storehouse of mine;The gas exceeding limit warning data storehouse is used In the gas exceeding limit warning data of storage mine;
The calculating and judgement of early warning result are realized according to early warning rule corresponding in gas exceeding limit warning data storehouse;
Web information issuance is carried out to mine gas comprehensive pre-warning result by gas exceeding limit information issuing system.
7. gas exceeding limit method for early warning according to claim 6, which is characterized in that the gas density number for obtaining mine According to digging drilling depth, geological survey, protrusion-dispelling index and working face in the pit coal-bed gas data, include: in each mine
The gas density data of mine are read in real time;
Coal mine excavation drilling depth, geological survey, the live typing of protrusion-dispelling index and working face in the pit coal-bed gas data.
8. gas exceeding limit method for early warning according to claim 6, which is characterized in that described according to gas exceeding limit warning data Corresponding early warning rule realizes the calculating and judgement of early warning result in library, comprising the following steps:
According to face gas gush out behavioral characteristics management system analysis each face gas outburst amount situation of change, and according to According to preset gas exceeding limit rule, gas exceeding limit warning information is issued;
Gas is issued according to gas exceeding limit index according to gas pressure, gas bearing capacity and gas-geologic map in dynamic protrusion-dispelling system Super-limit prewarning information;
According to the seam contrast of the real-time typing of downhole data input terminal, geological structure, ventilation and management factors, in conjunction with adopting The driving of working face, back production drilling depth data information in driving degree management system, before judging working face just and ocurrence of coal seam exceptions area, The relative distance of geological structural belt and gas exceptions area, and venting practice formulation and management factors are combined, carry out gas overpressure limit gauge Then determine, issues gas exceeding limit warning information.
9. gas exceeding limit method for early warning according to claim 8, which is characterized in that
The each face gas outburst amount situation of change for gushing out the analysis of behavioral characteristics management system according to face gas, And according to preset gas exceeding limit rule, gas exceeding limit warning information is issued, specifically: when gas density meets super-limit prewarning rule Then variation ofgas density value under the conditions of the same process in " T1 >=1% ", " T2 >=0.7% ", " T7 maximum value >=1.6% " or one class >=0.3%, full mine gas yellow early warning is carried out immediately;When same in " T1 >=1.2% ", " T2 >=0.8% " or one class Variation ofgas density value >=0.4% under process conditions carries out full mine gas red early warning immediately;Wherein, T1 is work Face firedamp sensor numerical value, T2 are air return lane firedamp sensor numerical value, and T7 is dedicated gas air draft lane sensor values;
It is described to be issued according to gas pressure, gas bearing capacity and gas-geologic map in dynamic protrusion-dispelling system according to gas exceeding limit index Gas exceeding limit warning information, specifically: when gas pressure, gas bearing capacity value reach super-limit prewarning rule " 7.5≤W < 8m3/t” Or " 0.7≤P < 0.74MPa ", full mine gas yellow early warning is carried out immediately;As " W >=8m3/ t " or " P >= 0.74MPa " carries out full mine gas red early warning immediately;Wherein, W is gas bearing capacity, and P is gas pressure;
It is described according to the seam contrast of the real-time typing of downhole data input terminal, geological structure, ventilation and management factors, knot Driving, the back production drilling depth data information for closing working face in mining progress management system, it is different with ocurrence of coal seam before judging working face just The relative distance in normal area, geological structural belt and gas exceptions area, and venting practice formulation and management factors are combined, carry out gas overpressure Limit gauge then determines, issues gas exceeding limit warning information, specifically: when driving, stope are located at geological structural belt 20m range Interior, ground drilling drills within the scope of 50m or when roof cracking, i.e. progress gas exceeding limit yellow early warning;When driving face coal Manage layer by layer disorder, bearing, the unexpected change dramatically in inclination angle or coal body Failure type from I, II class coal become III class coal, IV class, When V class coal, the early warning of gas exceeding limit yellow is issued immediately;Break when blowing-out, gentle breeze, inverted air current region or ventilation occurs in working face When face is less than design section 2/3, i.e. progress gas exceeding limit yellow early warning;In back production, driving face gas administration, work as appearance Gas, geological structure are not reported extremely or when the problems such as ventilation equipment artificial damages, i.e. progress gas exceeding limit yellow early warning;Work as hair When existing monitoring and controlling system stops transport or do not execute gas govenance, gas exceeding limit red early warning is carried out immediately.
10. gas exceeding limit method for early warning according to claim 8, which is characterized in that further include:
It realizes that the united multi objective of two or more pieces single index early warning is superimposed the early warning of gas exceeding limit comprehensive classification: only triggering a finger A face gas is generated when mark to transfinite yellow early warning, when meeting two or more pieces yellow warning index simultaneously, two or A plurality of yellow early warning can upgrade to a gas exceeding limit red early warning.
CN201910467337.6A 2019-05-31 2019-05-31 Gas overrun early warning system and method Active CN110130990B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910467337.6A CN110130990B (en) 2019-05-31 2019-05-31 Gas overrun early warning system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910467337.6A CN110130990B (en) 2019-05-31 2019-05-31 Gas overrun early warning system and method

Publications (2)

Publication Number Publication Date
CN110130990A true CN110130990A (en) 2019-08-16
CN110130990B CN110130990B (en) 2021-01-15

Family

ID=67583379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910467337.6A Active CN110130990B (en) 2019-05-31 2019-05-31 Gas overrun early warning system and method

Country Status (1)

Country Link
CN (1) CN110130990B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485950A (en) * 2020-05-25 2020-08-04 合肥工大高科信息科技股份有限公司 Multi-platform alarm linkage method, system and alarm device for mine
CN113217083A (en) * 2021-05-31 2021-08-06 重庆工程职业技术学院 Gas treatment system for gas abnormal area of easily spontaneous combustion coal bed
CN113586150A (en) * 2021-06-30 2021-11-02 华北科技学院(中国煤矿安全技术培训中心) Coal and gas outburst early warning method
CN113605980A (en) * 2021-07-23 2021-11-05 上海德衡数据科技有限公司 Intelligent mine safety early warning method and system based on Internet of things
CN114885130A (en) * 2022-05-10 2022-08-09 中国矿业大学 Intelligent monitoring and early warning system and method for dust disasters of coal mine excavation face
CN114932762A (en) * 2022-03-03 2022-08-23 汇源印刷包装科技(天津)股份有限公司 Safety early warning system of full-automatic ink jet numbering machine
CN116241330A (en) * 2023-03-28 2023-06-09 黑龙江泰平隆矿业科技有限公司 Early warning method and device for gas danger in coal mine and electronic equipment
CN116838429A (en) * 2023-07-11 2023-10-03 四川芙蓉川南建设工程有限公司 Gas overrun early warning system and application
CN116877203A (en) * 2023-08-23 2023-10-13 河南理工大学 Coal and gas outburst monitoring and early warning device
CN116838429B (en) * 2023-07-11 2024-07-16 四川芙蓉川南建设工程有限公司 Gas overrun early warning system and application

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1715615A (en) * 2005-08-05 2006-01-04 郑州煤炭工业(集团)有限责任公司 Gas preventing and control navigation system for coal mine production mine
CN101550841A (en) * 2009-05-08 2009-10-07 煤炭科学研究总院重庆研究院 Coal and gas outburst hazard early warning system and early warning method
CN104899392A (en) * 2015-06-19 2015-09-09 贵州省矿山安全科学研究院 GIS-based intelligent analysis method for coal mine gas emission overrun prediction
CN106194263A (en) * 2016-08-29 2016-12-07 中煤科工集团重庆研究院有限公司 Coal mine gas disaster monitoring and early warning system and early warning method
CN106640194A (en) * 2016-09-27 2017-05-10 西安科技大学 Forewarning method for composite type coal rock gas dynamical disasters

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1715615A (en) * 2005-08-05 2006-01-04 郑州煤炭工业(集团)有限责任公司 Gas preventing and control navigation system for coal mine production mine
CN101550841A (en) * 2009-05-08 2009-10-07 煤炭科学研究总院重庆研究院 Coal and gas outburst hazard early warning system and early warning method
CN104899392A (en) * 2015-06-19 2015-09-09 贵州省矿山安全科学研究院 GIS-based intelligent analysis method for coal mine gas emission overrun prediction
CN106194263A (en) * 2016-08-29 2016-12-07 中煤科工集团重庆研究院有限公司 Coal mine gas disaster monitoring and early warning system and early warning method
CN106640194A (en) * 2016-09-27 2017-05-10 西安科技大学 Forewarning method for composite type coal rock gas dynamical disasters

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485950B (en) * 2020-05-25 2022-04-12 合肥工大高科信息科技股份有限公司 Multi-platform alarm linkage method, system and alarm device for mine
CN111485950A (en) * 2020-05-25 2020-08-04 合肥工大高科信息科技股份有限公司 Multi-platform alarm linkage method, system and alarm device for mine
CN113217083A (en) * 2021-05-31 2021-08-06 重庆工程职业技术学院 Gas treatment system for gas abnormal area of easily spontaneous combustion coal bed
CN113217083B (en) * 2021-05-31 2022-09-02 重庆工程职业技术学院 Gas treatment system for gas abnormal area of easily spontaneous combustion coal bed
CN113586150A (en) * 2021-06-30 2021-11-02 华北科技学院(中国煤矿安全技术培训中心) Coal and gas outburst early warning method
CN113605980B (en) * 2021-07-23 2024-03-29 上海德衡数据科技有限公司 Intelligent early warning mine safety method and system based on Internet of things
CN113605980A (en) * 2021-07-23 2021-11-05 上海德衡数据科技有限公司 Intelligent mine safety early warning method and system based on Internet of things
CN114932762A (en) * 2022-03-03 2022-08-23 汇源印刷包装科技(天津)股份有限公司 Safety early warning system of full-automatic ink jet numbering machine
CN114932762B (en) * 2022-03-03 2024-05-07 汇源印刷包装科技(天津)股份有限公司 Safety precaution system of full-automatic ink jet numbering machine
CN114885130A (en) * 2022-05-10 2022-08-09 中国矿业大学 Intelligent monitoring and early warning system and method for dust disasters of coal mine excavation face
CN116241330A (en) * 2023-03-28 2023-06-09 黑龙江泰平隆矿业科技有限公司 Early warning method and device for gas danger in coal mine and electronic equipment
CN116241330B (en) * 2023-03-28 2024-02-23 黑龙江泰平隆矿业科技有限公司 Early warning method and device for gas danger in coal mine and electronic equipment
CN116838429A (en) * 2023-07-11 2023-10-03 四川芙蓉川南建设工程有限公司 Gas overrun early warning system and application
CN116838429B (en) * 2023-07-11 2024-07-16 四川芙蓉川南建设工程有限公司 Gas overrun early warning system and application
CN116877203B (en) * 2023-08-23 2024-03-12 河南理工大学 Coal and gas outburst monitoring and early warning device
CN116877203A (en) * 2023-08-23 2023-10-13 河南理工大学 Coal and gas outburst monitoring and early warning device

Also Published As

Publication number Publication date
CN110130990B (en) 2021-01-15

Similar Documents

Publication Publication Date Title
CN110130990A (en) Gas exceeding limit early warning system and method
CN101550841B (en) Coal and gas outburst hazard early warning system and early warning method
CN100387806C (en) Gas preventing and control navigation system for coal mine production mine
CN107605536B (en) Coal and gas prominent real-time early warning device and method based on Multi-source Information Fusion
CN107559045B (en) Underground coal mine Face Pressure Early-Warning System and method
CN106194263A (en) Coal mine gas disaster monitoring and early warning system and early warning method
CN103899356A (en) Integrated information system for monitoring, early warning, management and control of mine water disasters
CN102628373A (en) Impact ground pressure split source comprehensive early-warning method of coal mine
CN106680894A (en) Tunnel geology advanced prediction method based on C/S framework
CN104881500A (en) Local area network system for dynamic prediction of coal mine gas geology and gas emission
CN104159087B (en) Field monitoring platform for drilling machine
CN102829331A (en) Efficient safety maintenance management method for oil and gas pipelines
CN103244186B (en) Identification and the tracking and early warning system of evolution is bred based on coal and gas prominent
CN112324506B (en) Dynamic early warning method for preventing rock burst of coal mine based on microseism
CN116950708A (en) Intelligent management and control platform for one-ventilation three-prevention of coal mine
CN110344830A (en) Continuous several times wear coal tunnel exposed coal protrusion-dispelling work flow under the conditions of a kind of complicated structure
CN106640194A (en) Forewarning method for composite type coal rock gas dynamical disasters
Zhao et al. Applications of online integrated system for coal and gas outburst prediction: A case study of Xinjing Mine in Shanxi, China
CN204013912U (en) Rig on-site supervision platform
CN104832213B (en) Coal illegal mining monitoring method based on personnel location system
CN101539029B (en) Method for partitioning gas tunnels
CN115614103A (en) Coal mine rock burst monitoring device and method based on GIS and MS technology
Zipf Jr et al. Ground control for highwall mining in the United States
Che Application of multi-source information intelligent early warning system for coal and gas outburst
Kumar Emerging tools and techniques for mine safety and disaster management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 113122 No.11 Binhe Road, Shenfu demonstration area, Fushun City, Liaoning Province

Patentee after: Shenyang Research Institute Co.,Ltd.

Address before: 113122 No. 11 Binhe Road, Fushun Economic Development Zone, Fushun City, Liaoning Province

Patentee before: CCTEG (China Coal Technology and Engineering Group Corp.)