CN107559045B - Underground coal mine Face Pressure Early-Warning System and method - Google Patents

Underground coal mine Face Pressure Early-Warning System and method Download PDF

Info

Publication number
CN107559045B
CN107559045B CN201710733011.4A CN201710733011A CN107559045B CN 107559045 B CN107559045 B CN 107559045B CN 201710733011 A CN201710733011 A CN 201710733011A CN 107559045 B CN107559045 B CN 107559045B
Authority
CN
China
Prior art keywords
face
pressure
warning
working face
prediction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710733011.4A
Other languages
Chinese (zh)
Other versions
CN107559045A (en
Inventor
朱卫兵
许家林
鞠金峰
谢建林
齐祥瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710733011.4A priority Critical patent/CN107559045B/en
Publication of CN107559045A publication Critical patent/CN107559045A/en
Application granted granted Critical
Publication of CN107559045B publication Critical patent/CN107559045B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of underground coal mine Face Pressure Early-Warning System and method, belong to field of coal mining, mainly include monitoring modular and prediction and warning module.Its calculation formula and statistical law based on mine pressure correlation theory, working face relevant information collection processing to different periods, Face Pressure intensity and prediction are prejudged every time come the position pressed and intensity, preceding pressure early warning is adopted before realizing working face mining, early warning and instant early warning when long during working face mining, meanwhile it being based on backstage large database concept data, provide corresponding strong mine pressure diaster prevention and control countermeasure.The system realizes comprehensive mechanization working face to press all the period of time prediction of position and intensity, press dynamic early-warning, to Support selection, the pressure damage control of strong mine and administers and has directive significance, the safety and high efficiency in safeguard work face.

Description

Underground coal mine Face Pressure Early-Warning System and method
Technical field
The present invention is a kind of underground coal mine Face Pressure Early-Warning System and method, is particularly suitable for coal mining neck Comprehensive mechanization working face mining first weighting and periodic weighting ground pressure strength and come the anticipation early warning of pressing position in domain.
Technical background
In coal mine work recovery process, working face is to influence an important factor for safety of coal mines efficiently produces to press, in advance in advance Working face is known to press position and ground pressure strength that there is important directive significance to safe and efficient production.Although periodic weighting has one Fixed water component, but influenced by many factors, water component fluctuates in a certain range, and ground pressure strength also has difference It is different.Mechanization and the higher working face hydraulic prop equipment of intelligence degree is widely used in modernization coal-mining technique, has pressure Monitoring, pressure early warning and highly automated monitoring function, but it is more than setting value that its pressure early warning, which is only with regard to single poppet pressure, And provide, cannot reflect working face presses situation.
Underground coal mine face pressure early warning system and method theory and big data based on Judging key stratum mine Compressive Strength Statistical law brings the systems such as contracting amount under the full column information of surface drilling, working resistance of support, bracket upright post to work into The anticipation of face ground pressure strength and position, realize ground pressure strength early warning before adopting, it is long when early warning and instant early warning all the period of time early warning, together When, it can be pressed according to prediction as a result, transfer data bank information, provide corresponding control measure, realize that working face safety is high Effect exploitation.
Summary of the invention
Technical problem: being capable of comprehensive analysis the purpose of the present invention is aiming at the problems existing in the prior art, providing one kind The working face of contracting amount presses early warning system and method under overlying strata feature, operational parameter, working resistance of support and bracket upright post, predicts Information is pressed with forecast work face, to take corresponding measure in time.
Technical solution: underground coal mine Face Pressure Early-Warning System of the invention, including monitoring modular and prediction are in advance Alert module, the monitoring modular includes contracting under the pressure sensor and column being located on comprehensive mechanization working surface hydraulic support Measure monitor;To monitor contracting amount under hydraulic support working resistance and hydraulic support column, the prediction and warning module includes Input unit, processing unit, output unit, storage unit pass through cable network between each section and connect;
The processing unit carries out processing judgement by information of the computer programming to input, and judgment basis is based on key Shelf theory and correlation formula based on Judging key stratum mine Compressive Strength, meanwhile, it will judge that information and big data data bank carry out Match.
Using the underground coal mine Face Pressure prediction and warning method of above system, include the following steps:
A. before working face mining, the column data of all surface drillings of working face across pitch is collected, extremely by main mining coal seam The input of the essential information, physical and mechanical parameter and mining thickness input prediction warning module of the full column rock stratum of drilling of earth's surface Unit carries out position of key stratum differentiation to surface drilling column by processing unit, according to the differentiation of position of key stratum as a result, tying again It closes mining thickness, directly push up and the spaced position relationship of each key stratum preservation property, each key stratum and main mining coal seam, land in gully Key stratum is etched degree in landforms, coal column and lower working face of coal seam spacing and position corresponding relationship are left in upper coal seam, differentiates true Determine each key stratum of overlying strata the fracture form of cantilever beam or masonry beam is presented, influences the overlying strata critical altitude of Face Pressure and covers Rock is to the influence degree of Face Pressure, accordingly, prediction work face first weighting and periodic weighting position before working face mining And intensity, automatic realization working face adopts pressure prediction, while providing the conjunction of force piece under specific geology mining conditions Manage type selecting;
B. working face mining initial stage, input unit obtain the force piece working resistance curve of monitoring modular feedback in time Show situation with scene to press, be based on statistical law, analyzes the working resistance curve and water component feature of bracket, supplement and school Just adopt pressure early warning, position and dynamic load factor are pressed in prediction work face next time, when realizing long during working face extraction Early warning;
C. it during working face mining, monitoring modular and prediction and warning module Real-Time Sharing working resistance of support data and stands Contracting amount data under column;Processing unit compares under bracket upright post single cycle in real time between contracting amount, working resistance of support and setting value Relationship works when contracting amount is more than setting value X (mm) under continuous multiple bracket upright post single cycles, or more than 70% quantitative proportion When the working resistance of face bracket is greater than the set value Y (MPa), the output unit of prediction and warning module will be automatically with warning lamp and pressure What the form of report provided working face presses warning information, i.e. instant early warning during realization working face extraction;
D. according to the warning information of working face ground pressure strength, i.e. the pressure report early warning letter that is provided in step b and step c Breath, by transferring large database concept data, independently matches and provides face propulsion speed, supporting intensity, rational position etc. Pressure allow the strong mine pressure disaster such as pressure, explosion presplitting or the measure of hydrofracturing top plate, local reinforcement, partial stowage Preventing Countermeasures and build View, to take measures to carry out the voltage-controlled system of reasonable mine on site;
E. prediction and warning information each time is all stored in time by storage unit and is uploaded cloud, can transfer output at any time, Meanwhile information categorization to big data data bank with data bank of enriching constantly, to improve early warning accuracy.
The essential information of the full column rock stratum of drilling of the earth's surface inputted in the step a is required to represent exploited work The coating information that face is entirely moved towards copes with working face segmentation, input is bored respectively if exploitation working face geology condition changes greatly The full column information in hole, carry out working face adopts pressure prediction.
Scene in the step b is come to press situation include face roof, coal wall, both ends, stope drift active workings advance support section Feature is input to the input unit of prediction and warning module by staff.
Working face is judged come setting value whether pressure in the step c, i.e., the judgement of contracting amount is set under bracket upright post single cycle Definite value (x), bracket working face resistance judge setting value (Y) and increase the determination of resistance number of holders percentage to be to have adopted work by neighbouring Face actual conditions provide, and correct in this working face mining early period and recovery process.
The big data data bank is for Face Pressure feature under different mining areas different exploitation condition for many years and to press Situation data, while the statistics including corresponding strong mine pressure prevention and control measure, to match and instruct working face safe working.
The utility model has the advantages that by adopting the above-described technical solution, the invention has the following advantages over the prior art:
1. the system provides working face from different time sections to press warning information, instructs the Support selection of working face, provides Strong mine pressure damage control and control measures (such as supporting intensity and form, reinforcement supporting and interim measure);
2. adopting pressure to working face according to contracting amount realization under the full column that drills, working resistance of support and bracket upright post It is pressed when long in degree, recovery process and immediately come the comprehensive prediction anticipation pressed, more accurately and timely, powerful guarantee shaft production Safety.
Detailed description of the invention
Fig. 1 underground coal mine Face Pressure Early-Warning System and method structure chart;
Fig. 2 underground coal mine Face Pressure Early-Warning System and method work flow diagram.
Specific embodiment
One embodiment of the present of invention is further described with reference to the accompanying drawing:
As shown in Figure 1, underground coal mine Face Pressure Early-Warning System of the invention, mainly by monitoring modular and prediction Warning module is constituted, and the monitoring modular includes the pressure sensor being located on comprehensive mechanization working surface hydraulic support and stands Contracting amount monitor under column;To monitor contracting amount under hydraulic support working resistance and hydraulic support column, the prediction and warning mould Block includes input unit, processing unit, output unit, storage unit, is connected between each section by cable network;
The processing unit carries out processing judgement by information of the computer programming to input, and judgment basis is based on key Shelf theory and correlation formula based on Judging key stratum mine Compressive Strength, meanwhile, it will judge that information and big data data bank carry out Match.
As shown in Fig. 2, underground coal mine Face Pressure prediction and warning method of the invention, the specific steps are as follows:
A. before working face mining, the column data of all surface drillings of working face across pitch is collected, extremely by main mining coal seam The input of the essential information, physical and mechanical parameter and mining thickness input prediction warning module of the full column rock stratum of drilling of earth's surface Unit carries out position of key stratum differentiation to surface drilling column by processing unit, according to the differentiation of position of key stratum as a result, tying again It closes mining thickness, directly push up and the spaced position relationship of each key stratum preservation property, each key stratum and main mining coal seam, land in gully Key stratum is etched degree in landforms, coal column and lower working face of coal seam spacing and position corresponding relationship are left in upper coal seam, differentiates true Determine each key stratum of overlying strata the fracture form of cantilever beam or masonry beam is presented, influences the overlying strata critical altitude of Face Pressure and covers Rock is to the influence degree of Face Pressure, accordingly, prediction work face first weighting and periodic weighting position before working face mining And intensity, automatic realization working face adopts pressure prediction, while providing the conjunction of force piece under specific geology mining conditions Manage type selecting;The essential information of the full column rock stratum of surface drilling is required to represent the coating that exploited working face entirely moves towards Information copes with working face segmentation if exploitation working face geology condition changes greatly, respectively the full column information of input drilling, into Row working face adopts pressure prediction;
B. working face mining initial stage, input unit obtain the force piece working resistance curve of monitoring modular feedback in time Show situation with scene to press, be based on statistical law, analyzes the working resistance curve and water component feature of bracket, supplement and school Just adopt pressure early warning, position and dynamic load factor are pressed in prediction work face next time, when realizing long during working face extraction Early warning;To show situation include face roof, coal wall, both ends, stope drift active workings advance support section feature pressing at the scene, by work The input unit of prediction and warning module is input to as personnel;
C. it during working face mining, monitoring modular and prediction and warning module Real-Time Sharing working resistance of support data and stands Contracting amount data under column;Processing unit compares under bracket upright post single cycle in real time between contracting amount, working resistance of support and setting value Relationship works when contracting amount is more than setting value X (mm) under continuous multiple bracket upright post single cycles, or more than 70% quantitative proportion When the working resistance of face bracket is greater than the set value Y (MPa), the output unit of prediction and warning module will be automatically with warning lamp and pressure What the form of report provided working face presses warning information, i.e. instant early warning during realization working face extraction;The judgement Working face is come setting value whether pressure, i.e., contracting amount judges setting value (X), the judgement of bracket working face resistance under bracket upright post single cycle Setting value (Y) and the determination for increasing resistance number of holders percentage are provided by neighbouring mining face actual conditions, and in this work It is corrected in face exploitation early period and recovery process;
D. according to the warning information of working face ground pressure strength, i.e. the pressure report early warning letter that is provided in step b and step c Breath, by transferring large database concept data, independently matches and provides face propulsion speed, supporting intensity, rational position etc. Pressure allow the strong mine pressure disaster such as pressure, explosion presplitting or the measure of hydrofracturing top plate, local reinforcement, partial stowage Preventing Countermeasures and build View, to take measures to carry out the voltage-controlled system of reasonable mine on site;The big data data bank is that different mining areas are not for many years With Face Pressure feature under mining conditions and to press situation data, while the statistics money including corresponding strong mine pressure prevention and control measure Material, to match and instruct working face safe working;
E. prediction and warning information each time is all stored in time by storage unit and is uploaded cloud, can transfer output at any time, Meanwhile information categorization to big data data bank with data bank of enriching constantly, to improve early warning accuracy.
Embodiment 1,
Certain pit coal layer buried depth 500m, geological conditions is simple, and ocurrence of coal seam is stablized, average thickness 15m, using comprehensive mechanization Top coal caving technique back production, face width 200m.
Before working face mining, by working face trend one at the full column information input system of surface drilling, judge the coal seam There are five layers of key stratum in overlying strata, wherein pressing working face influential is following three layers of key stratum, prediction work face is come for the first time After pressing position and ground pressure strength early warning, it is proposed that select 15000kN or more hydraulic support stand face roof;
Working face mining early period, system show situation by analysis force piece resistance curve and scene to press, prejudge Working face each periodic weighting intensity with press position, provide working face it is long when early warning, determine ahead work face supporting distance It should be greater than 50m, stope drift active workings carry out advance support using four row's individual props;
Referring to mining area mining face actual conditions, contracting amount is come within 16mm under the normal single cycle of force piece Generally more than 20mm when pressure, it is more than 18mm that setting, which has contracting amount under 70% single cycle in the hydraulic support (more than continuous 10 frame) of statistics, To press early warning value;It is non-to recycle last resistance generally within 36MPa come force piece when pressing, last resistance is recycled come bracket when pressing More than 40MPa, at this point, having 70% working resistance in the hydraulic support (more than continuous 10 frame) of desirable statistics is more than that 38MPa makees To press early warning value.In exploitation working face early period and the concrete condition of this working face further adjusts relevant parameter It is whole, improve the accuracy of early warning.
Under the premise of obtaining in advance to press early warning, when working face takes reinforcement supporting and time shift frame to reduce empty top in time Between and working face quickly propel equal measures, safety in production is realized in the influence for reducing to press.

Claims (5)

1. a kind of underground coal mine Face Pressure prediction and warning method, the underground coal mine Face Pressure Early-Warning System used It include: monitoring modular and prediction and warning module, the monitoring modular includes being located on comprehensive mechanization working surface hydraulic support Pressure sensor and column under contracting amount monitor, to monitor contracting amount under hydraulic support working resistance and hydraulic support column; The prediction and warning module includes input unit, processing unit, output unit, storage unit, is passed through between each section wired Network connection;The processing unit carries out processing judgement by information of the computer programming to input, and judgment basis is based on closing Key shelf theory and correlation formula based on Judging key stratum mine Compressive Strength, at the same will judge information and big data data bank carry out Match;
It is characterized by comprising following steps:
A. before working face mining, the column data of all surface drillings of working face across pitch is collected, by main mining coal seam to earth's surface The essential information of the full column rock stratum of drilling, physical and mechanical parameter and mining thickness input prediction warning module input list Member, by processing unit to surface drilling column carry out position of key stratum differentiation, according to the differentiation of position of key stratum as a result, in conjunction with Mining thickness directly pushes up and each key stratum preservation property, the spaced position relationship of each key stratum and main mining coal seam, land in gully Key stratum is etched degree in looks, coal column and lower working face of coal seam spacing and position corresponding relationship are left in upper coal seam, differentiates and determines Each key stratum of overlying strata is presented the fracture form of cantilever beam or masonry beam, influences the overlying strata critical altitude and overlying strata of Face Pressure To the influence degree of Face Pressure, accordingly, before working face mining prediction work face first weighting and periodic weighting position and Intensity, it is automatic realize working face adopts pressure prediction, while providing the reasonable of force piece under specific geology mining conditions Type selecting;
B. working face mining initial stage, input unit obtain the force piece working resistance curve of monitoring modular feedback in time and show Field shows situation to press, and is based on statistical law, analyzes the working resistance curve and water component feature of bracket, and supplement and correction are adopted Come to press early warning, position and dynamic load factor are pressed in prediction work face next time, early warning when realizing long during working face extraction;
C. during working face mining, under monitoring modular and prediction and warning module Real-Time Sharing working resistance of support data and column Contracting amount data;Processing unit compares the relationship under bracket upright post single cycle between contracting amount, working resistance of support and setting value in real time, When contracting amount is more than setting value X (mm) under continuous multiple bracket upright post single cycles, or more than 70% quantitative proportion force piece Working resistance be greater than the set value Y(MPa) when, the output unit of prediction and warning module will be reported automatically with warning lamp and pressure What form provided working face presses warning information, i.e. instant early warning during realization working face extraction;
D. according to the warning information of working face ground pressure strength, i.e. the pressure report warning information provided in step b and step c is led to It crosses and transfers big data data bank data, independently match and provide the top including face propulsion speed, supporting intensity, rational position Plate be modified reduction measure, local reinforcement, strong mine pressure disaster Preventing Countermeasures and suggestion, so as to take measures to carry out on site rationally The voltage-controlled system of mine;
E. prediction and warning information each time is all stored in time by storage unit and is uploaded cloud, can transfer output at any time, meanwhile, Information categorization to big data data bank with data bank of enriching constantly, to improve early warning accuracy.
2. underground coal mine Face Pressure prediction and warning method according to claim 1, it is characterised in that: in the step a The full column rock stratum information requirements of the surface drilling of input can represent the coating information that exploited working face entirely moves towards, if exploitation Working face geology condition changes greatly, then copes with working face segmentation, and the full column information of input drilling, carries out adopting for working face respectively Come pressure prediction.
3. underground coal mine Face Pressure prediction and warning method according to claim 1, it is characterised in that: showing in the step b To show situation include face roof, coal wall, both ends, stope drift active workings advance support section feature pressing, and is inputted by staff To the input unit of prediction and warning module.
4. underground coal mine Face Pressure prediction and warning method according to claim 1, it is characterised in that: sentencing in the step c Disconnected working face is come setting value whether pressure, i.e., contracting amount judges that setting value (X), bracket working face resistance are sentenced under bracket upright post single cycle Disconnected setting value (Y) and the determination for increasing resistance number of holders percentage are by providing adjacent to mining face actual conditions, and in this work Make to correct in face exploitation early period and recovery process.
5. underground coal mine Face Pressure prediction and warning method according to claim 1, it is characterised in that: the big data data Library is Face Pressure feature and to press situation data under different mining areas different exploitation conditions for many years, while including corresponding strong Mine presses the statistics of prevention and control measure, to match and instruct working face safe working.
CN201710733011.4A 2017-08-24 2017-08-24 Underground coal mine Face Pressure Early-Warning System and method Active CN107559045B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710733011.4A CN107559045B (en) 2017-08-24 2017-08-24 Underground coal mine Face Pressure Early-Warning System and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710733011.4A CN107559045B (en) 2017-08-24 2017-08-24 Underground coal mine Face Pressure Early-Warning System and method

Publications (2)

Publication Number Publication Date
CN107559045A CN107559045A (en) 2018-01-09
CN107559045B true CN107559045B (en) 2019-08-13

Family

ID=60976772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710733011.4A Active CN107559045B (en) 2017-08-24 2017-08-24 Underground coal mine Face Pressure Early-Warning System and method

Country Status (1)

Country Link
CN (1) CN107559045B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109948268B (en) * 2019-01-21 2023-10-17 安迈智能(北京)矿山科技股份有限公司 Automatic recognition method for comprehensive risk of working face
CN110397475B (en) * 2019-08-09 2020-05-01 精英数智科技股份有限公司 Fully-mechanized mining face advance support and super-prop-drawing monitoring and early warning method, device and system
CN110889087A (en) * 2019-10-29 2020-03-17 青岛本末岩控技术有限公司 Mine pressure big data real-time prediction system and method based on fully mechanized coal mining face
CN111027687B (en) * 2019-12-29 2023-01-10 鄂尔多斯市伊化矿业资源有限责任公司 Mining pressure prediction treatment method and system during stoping period of coal mine working face
CN111219207B (en) * 2020-01-02 2021-11-05 神华神东煤炭集团有限责任公司 Fully mechanized mining face pressure step distance automatic measuring method and electronic equipment
CN111832150A (en) * 2020-03-03 2020-10-27 天地科技股份有限公司 Mine pressure prediction method and device and electronic equipment
CN111734492B (en) * 2020-07-02 2021-08-24 中国矿业大学 Intelligent working surface roof fall early warning method based on U-shaped area characteristic parameter extraction
CN111828095B (en) * 2020-07-09 2021-11-19 郑州普泽能源科技有限公司 Dynamic prediction method for top plate incoming pressure
CN112031839B (en) * 2020-07-20 2022-11-08 中煤科工开采研究院有限公司 Mine pressure space-time bi-periodic prediction method, device and equipment under limited data condition
CN114109506B (en) * 2021-11-26 2022-06-17 中国矿业大学 Coal mine earthquake risk assessment method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999030004A1 (en) * 1997-12-09 1999-06-17 The Government Of The United States Of America, As Represented By The Secretary Of The Department Of Health And Human Services Remote monitoring safety system
CN103362553B (en) * 2013-07-08 2015-06-10 中国矿业大学 Coal mine underground safety comprehensive monitoring system based on fiber grating sensors
CN104454010B (en) * 2014-12-10 2016-04-20 西安科技大学 A kind of deep-well tunnel tunneling construction dynamic comprehensive monitor and early warning system and method for early warning
CN105298543B (en) * 2015-11-18 2018-01-09 四川航天电液控制有限公司 A kind of Coal Mine presses analysis system

Also Published As

Publication number Publication date
CN107559045A (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN107559045B (en) Underground coal mine Face Pressure Early-Warning System and method
CN108194088B (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN107165676B (en) The Trinity monitoring method of CONTROL OF STRATA MOVEMENT
CN109611143B (en) Roof hydraulic fracturing multi-parameter comprehensive monitoring system and fracturing effect judging method
CN101967975B (en) Fully-mechanized caving mining process technology with large mining height in super-high seam (14-20m)
CN109577982A (en) Wall type Lian Cailian fills water protection mining and water resource migration monitoring, water damage method for early warning
Kuang et al. The impact of key strata movement on ground pressure behaviour in the Datong coalfield
CN209761499U (en) Roof hydraulic fracturing multi-parameter comprehensive monitoring system
CN101270666B (en) Tunnel influence geological condition section-expanding horizontal drilling estimation and prediction method
CN102337922B (en) Method for inspecting burst-preventing effect of areas
CN110130990A (en) Gas exceeding limit early warning system and method
CN103362540A (en) High gas coal seam pressure relief gas extraction method
CN110067592B (en) Roof gas cooperative control method based on hard roof ground fracturing
CN102852524B (en) Method for utilizing hydraulic support to improve bauxite recovery rate
CN110645040A (en) Outburst coal seam 'Wuding' gas treatment method based on directional drilling machine
CN106771066A (en) The analogue experiment installation and synergic monitoring method of mining overburden motion influence ore deposit pressure
CN104088638A (en) Steep coal seam long-wall large-mining height workface coal wall caving and roof caving control technique
CN111379562B (en) Water-controlled coal mining method and device under composite water body
CN109166633A (en) Inflow rate of mine water calculation method and device
Kazanin et al. High productive longwall mining of multiple gassy seams: Best practice and recommendations
CN110792450B (en) Method for determining advanced support of grouting anchor cable
CN101509378A (en) Shallow buried thin bedrock coal bed short wall continuous mining technology suitable condition classification method
CN108150171A (en) A kind of great burying thin bedrock area high seam longwall top coal caving pressure rack water-inrush prevention method
CN101956548A (en) Coal bed methane multi-branch horizontal well system and modification method thereof
CN105046409A (en) Coal seam group ascending mining feasibility comprehensive evaluation and technical support system establishment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant