CN101539029A - Method for partitioning gas tunnels - Google Patents
Method for partitioning gas tunnels Download PDFInfo
- Publication number
- CN101539029A CN101539029A CN200910058843A CN200910058843A CN101539029A CN 101539029 A CN101539029 A CN 101539029A CN 200910058843 A CN200910058843 A CN 200910058843A CN 200910058843 A CN200910058843 A CN 200910058843A CN 101539029 A CN101539029 A CN 101539029A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- gas
- section
- coal
- work area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100588436A CN101539029B (en) | 2009-04-03 | 2009-04-03 | Method for partitioning gas tunnels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100588436A CN101539029B (en) | 2009-04-03 | 2009-04-03 | Method for partitioning gas tunnels |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101539029A true CN101539029A (en) | 2009-09-23 |
CN101539029B CN101539029B (en) | 2011-05-25 |
Family
ID=41122401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100588436A Active CN101539029B (en) | 2009-04-03 | 2009-04-03 | Method for partitioning gas tunnels |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101539029B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107656311A (en) * | 2017-09-11 | 2018-02-02 | 河南理工大学 | Coalbed gas geology fault network complexity evaluation method based on coalbed gas geology overall target |
CN109558607A (en) * | 2017-09-25 | 2019-04-02 | 中铁二院工程集团有限责任公司 | Railway tunnel gas level determines method |
CN110863858A (en) * | 2019-11-13 | 2020-03-06 | 中铁十局集团有限公司 | Outburst prevention control program and outburst prevention method for high-pressure harmful gas of non-coal-series stratum tunnel |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1693675B (en) * | 2005-06-06 | 2010-07-28 | 杨光良 | Full automatic coal mine gas prewarning explosion-proof system |
CN100387806C (en) * | 2005-08-05 | 2008-05-14 | 郑州煤炭工业(集团)有限责任公司 | Gas preventing and control navigation system for coal mine production mine |
-
2009
- 2009-04-03 CN CN2009100588436A patent/CN101539029B/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107656311A (en) * | 2017-09-11 | 2018-02-02 | 河南理工大学 | Coalbed gas geology fault network complexity evaluation method based on coalbed gas geology overall target |
CN109558607A (en) * | 2017-09-25 | 2019-04-02 | 中铁二院工程集团有限责任公司 | Railway tunnel gas level determines method |
CN110863858A (en) * | 2019-11-13 | 2020-03-06 | 中铁十局集团有限公司 | Outburst prevention control program and outburst prevention method for high-pressure harmful gas of non-coal-series stratum tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN101539029B (en) | 2011-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kun et al. | Influence of the fault zone in shallow tunneling: A case study of Izmir Metro Tunnel | |
CN103924975B (en) | A kind of for the water-retaining method in coal mining process | |
CN103323887B (en) | The appraisal procedure of a kind of Coal Exploitation Dynamic stability district coal-seam gas reserves and system | |
Lin et al. | Effectiveness analysis of water-sealing for underground LPG storage | |
CN106680894A (en) | Tunnel geology advanced prediction method based on C/S framework | |
CN110130990A (en) | Gas exceeding limit early warning system and method | |
CN104459808A (en) | Monitoring and forecasting method and device for water bursting hazards on roof and floor of coal working face | |
CN107436349A (en) | It is a kind of to be used for the appraisal procedure that husky danger is assessed of being burst to the gushing water of roof | |
CN101539029B (en) | Method for partitioning gas tunnels | |
CN114046178A (en) | Coal mine underground water prevention and control early warning system, method and application | |
AU2017410433B2 (en) | Water disaster prevention and treatment design method for mine taking coal bed as main aquifer | |
CN109578055B (en) | Method for preventing and treating coal and CO2 outburst accidents | |
CN107764323A (en) | A kind of multi-parameter enclosed area danger Monitoring and forecasting system in real-time method | |
Kværner et al. | Hydrogeological impacts of a railway tunnel in fractured Precambrian gneiss rocks (south-eastern Norway) | |
Kang et al. | Developing a risk assessment system for gas tunnel disasters in China | |
Blist'an et al. | Modelling environmental influence on the pipelines integrity | |
CN101561359A (en) | Grading method for gas tunnel | |
Neukomm et al. | Adapting tunnel construction to hydrogeological conditions in a karst region | |
Wang et al. | Permeability changes induced by excavation in fractured tuff | |
Wellman | Royal Commission on the Pike River Coal Mine Tragedy | |
Tonkin et al. | Geological Structures and Fault-infill in the Southern Coalfields and Implications for Groundwater Flow | |
Meistro et al. | Hydrogeological, environmental and logistical challenges for TBM excavation in the longest tunnel in the Italian territory | |
Adhikary et al. | 4 Subsidence impact on water systems | |
Khoo et al. | Geotechnical challenges and innovations in urban underground construction–The Klang Valley Mass Rapid Transit project | |
Wu et al. | Prediction of water inflow into tunnel crossing intersecting faults based on IDB seepage model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160104 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6 Patentee before: China Railway Erju Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20180816 Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee after: No.2 Engineering Co., Ltd. of China Railway Erju Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee after: No.2 Engineering Co., Ltd. of China Railway Erju Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee before: No.2 Engineering Co., Ltd. of China Railway Erju Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |