CN110130426A - A kind of new steel structure factory building foundation reinforcing device and method - Google Patents

A kind of new steel structure factory building foundation reinforcing device and method Download PDF

Info

Publication number
CN110130426A
CN110130426A CN201910475463.6A CN201910475463A CN110130426A CN 110130426 A CN110130426 A CN 110130426A CN 201910475463 A CN201910475463 A CN 201910475463A CN 110130426 A CN110130426 A CN 110130426A
Authority
CN
China
Prior art keywords
steel structure
factory building
structure factory
building foundation
new steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910475463.6A
Other languages
Chinese (zh)
Inventor
王恩来
李政民
周朝霖
孙明刚
张华宇
李东津
唐守志
聂川翔
李津津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Nuclear Electric Power Planning Design & Research Institute Chongqing Co ltd
Original Assignee
State Nuclear Electric Power Planning Design & Research Institute Chongqing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Nuclear Electric Power Planning Design & Research Institute Chongqing Co ltd filed Critical State Nuclear Electric Power Planning Design & Research Institute Chongqing Co ltd
Priority to CN201910475463.6A priority Critical patent/CN110130426A/en
Publication of CN110130426A publication Critical patent/CN110130426A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Abstract

The invention belongs to reinforcing grade beam technical fields, disclose a kind of new steel structure factory building foundation reinforcing device and method, steel column is mounted on basic short column, ground beam is poured in basic short column top side, it is substantially flush on the left of indoor reinforced concrete terrace close to basic short column, ground beam and top surface, ground beam waist location is equipped with anchor pole.More anchor poles are squeezed into the grade beam end on footing foundation top of the present invention, by the additional levels pulling force of anchor pole balanced basis, reduce bottom of foundation moment of flexure, meet the requirements basic stress;Anchor pole is seamless steel pipe or common joint bar grouting rock bolt.The present invention carries out bolt anchorage method and reinforces position, common joint bar grouting rock bolt, seamless steel pipe grouted anchor bar, the grade beam end punching on footing foundation top;It is easy for construction, simply;It is not required to excavation foundation just and can be carried out reinforcing.

Description

A kind of new steel structure factory building foundation reinforcing device and method
Technical field
The invention belongs to reinforcing grade beam technical field more particularly to a kind of new steel structure factory building foundation bracing means and Method.
Background technique
Currently, the immediate prior art: after workshop newly increased load, foundation bearing capacity is unsatisfactory for requiring, and general use adds Big bottom of foundation area method and grouting and reinforcing method increase bottom of foundation area method and need to excavate basis, again reinforcement, casting concrete. Construction time is long, and construction risk is big, and investment is high.Grouting and reinforcing method is with the compactness, permeability and compression strength that change soil layer Purpose increases soil layer under basis by caking property and compression strength, thus solid base, protection structures, but the expansion of this method slurries It is not easy to control to dissipate radius, reinforces groundwork bearing capacity and is not easy quantitative analysis, grouting process is complicated, and grouting amount is big, costly.
In conclusion problem of the existing technology is:
(1) prior art construction is cumbersome.It needs excavation foundation just and can be carried out reinforcing, cause time-consuming and laborious.
(2) consolidated subsoil effect is not easy to control, and project amount is big, costly.
Solve the difficulty of above-mentioned technical problem: duration, cost, quality are not easy to control.
It solves the problems, such as the meaning of above-mentioned technical problem: handling ground well, not only whether the built engineering of relationship is reliable, Er Qieguan It is the size of built construction investment;Ground problem is handled well with preferable economic benefit;Improving basement process level can guarantee Construction quality accelerates engineering construction speed, saves engineering construction investment.
Summary of the invention
In view of the problems of the existing technology, the present invention provides a kind of new steel structure factory building foundation bracing means and sides Method.
The invention is realized in this way a kind of new steel structure factory building foundation bracing means, the new steel structure workshop Strengthening of foundation device is provided with
Steel column is mounted on basic short column, and ground beam pours tight on the left of basic short column top side, indoor reinforced concrete terrace Adjacent basis short column, ground beam and top surface are substantially flush, and are equipped with anchor pole on ground beam waist location.
Another object of the present invention is to provide a kind of based on the novel of the new steel structure factory building foundation bracing means Steel-structure factory building strengthening of foundation method, the new steel structure factory building foundation reinforcement means include: the ground on footing foundation top Base beam-ends head squeezes into more anchor poles, passes through the additional levels pulling force of anchor pole balanced basis.
Further, anchor pole is seamless steel pipe or common joint bar grouting rock bolt.
The new steel structure factory building foundation reinforcement means further comprises:
The drilling of grade beam waist location, hole location avoid stirrup position, are put into reinforced anchor bolt, are in the milk, end sealing off and covering anchorage;
If the soil body is not easy pore-forming, using seamless steel pipe grouted rock bolt, steel pipe tube body opens quincunx injected hole, and steel pipe is in place Afterwards, pressure injection cement slurry is filled steel pipe is inside and outside, keeps steel pipe integral in conjunction with the soil body.
Implement the novel of the new steel structure factory building foundation reinforcement means another object of the present invention is to provide a kind of Steel-structure factory building.
In conclusion advantages of the present invention and good effect are as follows: the present invention carries out bolt anchorage method and reinforces position, general Logical joint bar grouting rock bolt, seamless steel pipe grouted anchor bar, the grade beam end punching on footing foundation top.It is easy for construction, simply; It is not required to excavation foundation just and can be carried out reinforcing.Consolidation effect is easy to control, short time limit, and expense is low.
The comparison of strengthening of foundation distinct methods
Reinforcement means Duration (day) Expense (member)
Increase bottom of foundation area method 20~30 1000~1500
Grouting and reinforcing method 15~20 600~1000
The method of the present invention 5~10 400~700
Detailed description of the invention
Fig. 1 is the structural schematic diagram of new steel structure factory building foundation bracing means provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of anchor pole provided in an embodiment of the present invention;
In figure: 1, steel column;2, indoor reinforced concrete terrace;3, basic short column;4, ground beam;5, anchor pole.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
In the prior art, after steel-structure factory building installation photovoltaic panel, foundation bearing capacity is unsatisfactory for requiring.Prior art construction is numerous It is trivial.It needs excavation foundation just and can be carried out reinforcing.It causes time-consuming and laborious.To solve the above problems, below with reference to concrete scheme to this hair It is bright to be described in detail.
As depicted in figs. 1 and 2, new steel structure factory building foundation bracing means provided in an embodiment of the present invention includes: steel column 1, indoor reinforced concrete terrace 2, basic short column 3, ground beam 4, anchor pole 5.
Steel column 1 is mounted on basic short column 3, and ground beam 4 is poured in basic 3 top side of short column, and indoor reinforced concrete terrace 2 is left Side is substantially flush close to basic short column 3, ground beam 4 and top surface, and 4 waist location of ground beam is equipped with anchor pole 5.
Certain single span steel-structure factory building, span 28m, column install photovoltaic panel load 0.15kN/ ㎡, footing foundation top additional away from 7m The grade beam end at end need to squeeze into the common joint bar anchor pole (14 reinforcing bar of diameter) of two 3m long, pass through the additional of anchor pole balanced basis Horizontal pull reduces bottom of foundation moment of flexure, meets the requirements basic stress.
The invention will be further described combined with specific embodiments below.
In new steel structure factory building foundation reinforcement means provided in an embodiment of the present invention, the drilling of grade beam waist location is bored Kong Qianxian uses Instrument measuring ground beam stirrup position, and hole location avoids stirrup position, is put into anchor pole (14 reinforcing bar of diameter), anchor pole is long 3m, grouting, end sealing off and covering anchorage.If geology is weak soil, it is not easy pore-forming, then uses long 3m diameter 50mm seamless steel pipe grouted anchor bar, steel Pipe tube body aperture diameterQuincuncial arrangement (pitch-row 100mm) injected hole, after steel pipe is in place, with the slip casing by pressure of 0.5MPa, water The mud ratio of mud is 0.5:1, fills steel pipe is inside and outside, keeps steel pipe integral in conjunction with the soil body.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (5)

1. a kind of new steel structure factory building foundation bracing means, which is characterized in that the new steel structure factory building foundation reinforces dress It sets and is provided with
Steel column is mounted on basic short column, and ground beam pours on the left of basic short column top side, indoor reinforced concrete terrace close to base Plinth short column, ground beam and top surface are substantially flush, and ground beam waist location is equipped with anchor pole.
2. a kind of new steel structure factory building foundation based on new steel structure factory building foundation bracing means described in claim 1 is reinforced Method, which is characterized in that the new steel structure factory building foundation reinforcement means includes: the grade beam end on footing foundation top More anchor poles are squeezed into, the additional levels pulling force of anchor pole balanced basis is passed through.
3. new steel structure factory building foundation reinforcement means as claimed in claim 2, which is characterized in that anchor pole be seamless steel pipe or Common joint bar grouting rock bolt.
4. new steel structure factory building foundation reinforcement means as claimed in claim 2, which is characterized in that the new steel structure factory Foundations plinth reinforcement means further comprises:
The drilling of grade beam waist location, hole location avoid stirrup position, are put into reinforced anchor bolt, are in the milk, end sealing off and covering anchorage;
If the soil body is not easy pore-forming, using seamless steel pipe grouted rock bolt, steel pipe tube body opens quincunx injected hole, after steel pipe is in place, pressure Power injects cement slurry, fills steel pipe is inside and outside, keeps steel pipe integral in conjunction with the soil body.
5. a kind of new steel structure for implementing new steel structure factory building foundation reinforcement means described in claim 2~4 any one Workshop.
CN201910475463.6A 2019-06-03 2019-06-03 A kind of new steel structure factory building foundation reinforcing device and method Pending CN110130426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910475463.6A CN110130426A (en) 2019-06-03 2019-06-03 A kind of new steel structure factory building foundation reinforcing device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910475463.6A CN110130426A (en) 2019-06-03 2019-06-03 A kind of new steel structure factory building foundation reinforcing device and method

Publications (1)

Publication Number Publication Date
CN110130426A true CN110130426A (en) 2019-08-16

Family

ID=67579861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910475463.6A Pending CN110130426A (en) 2019-06-03 2019-06-03 A kind of new steel structure factory building foundation reinforcing device and method

Country Status (1)

Country Link
CN (1) CN110130426A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD299388A7 (en) * 1990-08-01 1992-04-16 Schroeder,Karl,De ARRANGEMENT OF LOAD TRANSFER AND LOAD TAKE-UP ELEMENTS FOR BEGINNING AND INCREASING THE SAFETY OF EXISTING BUILDINGS
CN103147454A (en) * 2013-03-01 2013-06-12 江苏九鼎环球建设科技集团有限公司 Pre-fabricated foundation structure of steel structure factory building
CN205205886U (en) * 2015-12-02 2016-05-04 中国电建集团贵阳勘测设计研究院有限公司 Underground factory building rock anchor beam reinforced structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD299388A7 (en) * 1990-08-01 1992-04-16 Schroeder,Karl,De ARRANGEMENT OF LOAD TRANSFER AND LOAD TAKE-UP ELEMENTS FOR BEGINNING AND INCREASING THE SAFETY OF EXISTING BUILDINGS
CN103147454A (en) * 2013-03-01 2013-06-12 江苏九鼎环球建设科技集团有限公司 Pre-fabricated foundation structure of steel structure factory building
CN205205886U (en) * 2015-12-02 2016-05-04 中国电建集团贵阳勘测设计研究院有限公司 Underground factory building rock anchor beam reinforced structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柴维斯等: "条形基础新加固方法研究", 《广东工业大学学报》 *

Similar Documents

Publication Publication Date Title
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN104612696A (en) Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN109505641A (en) A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN205329709U (en) Mountain region photovoltaic support foundation structure
CN207959225U (en) One kind is certainly into the pull-type steel sheet pile supporting construction of churning anchor
CN102134861B (en) Method for testing precast pile in soil body
CN109944244A (en) A kind of anti-float anchor rod and its construction method
CN101691759A (en) Construction method for digging composite environmental protection base of anchorage bar adding rock
CN204112318U (en) A kind of technique device improving CFG guncreting pile bearing capacity
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN104047285A (en) Technical device and construction method for improving bearing capacity of CFG pressure pouring piles
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN101565955B (en) Micro-stress shelter pile foundation strengthening method for present pile foundation
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN105840209A (en) Construction method for controlling deformation of anchor piles at barrel segment of tunnel
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN110130426A (en) A kind of new steel structure factory building foundation reinforcing device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816