CN205205886U - Underground factory building rock anchor beam reinforced structure - Google Patents

Underground factory building rock anchor beam reinforced structure Download PDF

Info

Publication number
CN205205886U
CN205205886U CN201520987902.9U CN201520987902U CN205205886U CN 205205886 U CN205205886 U CN 205205886U CN 201520987902 U CN201520987902 U CN 201520987902U CN 205205886 U CN205205886 U CN 205205886U
Authority
CN
China
Prior art keywords
rock
anchor beam
anchorage beam
rock anchor
mass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520987902.9U
Other languages
Chinese (zh)
Inventor
陈小东
后开祥
李社凤
杨曼
陈琰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201520987902.9U priority Critical patent/CN205205886U/en
Application granted granted Critical
Publication of CN205205886U publication Critical patent/CN205205886U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an underground factory building rock anchor beam reinforced structure belongs to hydraulic and hydroelectric engineering technical field, including rock mass and rock anchor beam, the rock anchor beam is located the tiltboard terrace of rock mass, is equipped with a plurality of mortar stocks between rock anchor beam and the rock mass, pre -buried in the rock anchor beam have a plurality of pre buried pipeline, pre buried pipeline runs through the rock anchor beam and meets with the rock mass. When the loss of anchor power appeared in the anchor stock of rock anchor beam, this technical scheme can keep under the unchangeable circumstances of rock anchor beam primary structure, punched to the rock mass that the pipeline connect through pre buried pipeline, and the new stock of increase is reinforced between rock mass and rock anchor beam, this reinforced structure construction degree of difficulty is less, consolidates effectually, and the hole shaping is convenient, and construction cost is lower, has ensured the safety and stability operation of rock anchor beam and the monolithic stability of rock anchor beam periphery rock mass.

Description

A kind of underground power house rock anchorage beam ruggedized construction
Technical field
The utility model belongs to Hydraulic and Hydro-Power Engineering technical field, relates to a kind of reinforcement measure of underground power house rock anchorage beam advance reservation, specifically relates to a kind of underground power house rock anchorage beam ruggedized construction.
Background technology
In hydraulic structure, underground power house generally adopts rock anchorage beam as the operating structure of bridge machine.Rock anchorage beam is as its name suggests and adopts grouting rock bolt to be anchored at by beam on the rock mass with skew wall, makes beam keep stable by the anchoring between anchor pole and rock mass and the frictional force between rock anchorage beam and crag.
Existing rock anchorage beam is not reserved logistics measure generally, only adopts grouting rock bolt as anchoring beam, once loss appears in the anchored force of rock anchorage beam, repair the cost just needing cost very high, even be difficult to repair, this will cause extreme loss to engineering, bring very large potential safety hazard simultaneously.
Utility model content
In order to solve the problem, the utility model provides a kind of underground power house rock anchorage beam ruggedized construction, when rock anchorage beam occurs loss due to the anchored force of grouting rock bolt, by simple and construct comparatively efficiently, realize the reinforcing of rock anchorage beam and guarantee the resistance to overturning of rock anchorage beam periphery rock mass.
The utility model is achieved by following technical solution.
A kind of underground power house rock anchorage beam ruggedized construction, comprise rock mass and rock anchorage beam, described rock anchorage beam is positioned at the tilting table terrace of rock mass, is provided with some grouting rock bolts between rock anchorage beam and rock mass, be embedded with some pre-buried pipelines in described rock anchorage beam, described pre-buried pipeline runs through rock anchorage beam and connects with rock mass.
Further, described pre-buried pipeline is between two laterally adjacent grouting rock bolts.
Further, described pre-buried pipeline is the decorative pattern steel pipe of atresia.
Further, the caliber of described pre-buried pipeline is 60 ~ 80mm.
The beneficial effects of the utility model are:
A kind of underground power house rock anchorage beam ruggedized construction described in the utility model, the later stage is used at rock anchorage beam, when there is anchoring load losses in the anchoring rod of rock anchorage beam, when keeping rock anchorage beam original structure constant, by pre-buried pipeline, the rock mass that pipeline connects is punched, between rock mass and rock anchorage beam, increase new anchor pole reinforce; This ruggedized construction difficulty of construction is less, and consolidation effect is good, hole convenient formation, and construction cost is lower, ensure that the safe and stable operation of rock anchorage beam and the monolithic stability of rock anchorage beam periphery rock mass, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is A cross section structure schematic diagram of the present utility model;
Fig. 2 is B cross section structure schematic diagram of the present utility model;
Fig. 3 is by structural representation that pre-buried pipeline is holed in the utility model.
In figure: 1-rock mass, 2-rock anchorage beam, the pre-buried pipeline of 3-, 4-grouting rock bolt, 5-reinforced hole.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1 and Figure 2, a kind of underground power house rock anchorage beam ruggedized construction described in the utility model, comprise rock mass 1 and rock anchorage beam 2, described rock anchorage beam 2 is positioned at the tilting table terrace of rock mass 1, some grouting rock bolts 4 are provided with between rock anchorage beam 2 and rock mass 1, be embedded with some pre-buried pipelines 3 in described rock anchorage beam 2, described pre-buried pipeline 3 runs through rock anchorage beam 2 and connects with rock mass 1; When anchoring load losses appears in the grouting rock bolt 4 of fixing rock anchorage beam 2, namely carry out drilling construction by 3 pairs, built-in pipe road rock mass 1, new anchor pole is set in this boring, realizes the reinforcing to rock anchorage beam 2.
Embodiment
Along with the increase of load-bearing time, may there is anchoring load losses and even lose anchored force in the mortar anchor pole 4 of rock anchorage beam 2 on rock mass 1.
Therefore need carry out in accordance with the following steps when rock anchorage beam 2 is built:
First, according to the layout pattern of rock anchorage beam 2 grouting rock bolt 4, determine position and the spacing of pre-buried pipeline 3; After completing the reinforcing bar binding of rock anchorage beam 2, in rock anchorage beam 2, pre-buried pipeline 3 is installed, pre-buried pipeline 3 is cast in the concrete of rock anchorage beam 2; Treat rock anchorage beam 2 concrete setting, remove assembling reinforcement.
As shown in Figure 3, when connecting the grouting rock bolt 4 of rock anchorage beam 2 with rock mass 1 and occurring anchoring load losses, by pre-buried pipeline 3 pairs of rock body drilled, when rock anchorage beam 2 does not bear crane load, in the reinforced hole 5 that rock mass 1 newly bores, new anchor pole is installed and slip casting.
Described embedded steel tube 3 is the decorative pattern steel pipe of atresia, caliber is 60 ~ 80mm, between two laterally adjacent grouting rock bolts 4, embedded steel tube 3 well can be combined with rock anchorage beam 2, and the anchor pole that the later stage increases newly after bored grouting on rock mass 1 also can be combined closely with rock anchorage beam 2.
Holed by pre-buried pipeline 3 pairs of rock mass 15 mode, rock anchorage beam 2 can be avoided to be subject to the destruction of rig, to ensure the monolithic stability of rock anchorage beam periphery rock mass.

Claims (4)

1. a underground power house rock anchorage beam ruggedized construction, comprise rock mass (1) and rock anchorage beam (2), described rock anchorage beam (2) is positioned at the tilting table terrace of rock mass (1), some grouting rock bolts (4) are provided with between rock anchorage beam (2) and rock mass (1), it is characterized in that: be embedded with some pre-buried pipelines (3) in described rock anchorage beam (2), described pre-buried pipeline (3) is run through rock anchorage beam (2) and is connected with rock mass (1).
2. a kind of underground power house rock anchorage beam ruggedized construction according to claim 1, is characterized in that: described pre-buried pipeline (3) is positioned between laterally adjacent two grouting rock bolts (4).
3. a kind of underground power house rock anchorage beam ruggedized construction according to claim 1, is characterized in that: the decorative pattern steel pipe that described pre-buried pipeline (3) is atresia.
4. a kind of underground power house rock anchorage beam ruggedized construction according to claim 1, is characterized in that: the caliber of described pre-buried pipeline (3) is 60 ~ 80mm.
CN201520987902.9U 2015-12-02 2015-12-02 Underground factory building rock anchor beam reinforced structure Active CN205205886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520987902.9U CN205205886U (en) 2015-12-02 2015-12-02 Underground factory building rock anchor beam reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520987902.9U CN205205886U (en) 2015-12-02 2015-12-02 Underground factory building rock anchor beam reinforced structure

Publications (1)

Publication Number Publication Date
CN205205886U true CN205205886U (en) 2016-05-04

Family

ID=55843614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520987902.9U Active CN205205886U (en) 2015-12-02 2015-12-02 Underground factory building rock anchor beam reinforced structure

Country Status (1)

Country Link
CN (1) CN205205886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130426A (en) * 2019-06-03 2019-08-16 国核电力规划设计研究院重庆有限公司 A kind of new steel structure factory building foundation reinforcing device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130426A (en) * 2019-06-03 2019-08-16 国核电力规划设计研究院重庆有限公司 A kind of new steel structure factory building foundation reinforcing device and method

Similar Documents

Publication Publication Date Title
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN205134308U (en) Revolve and twist piling bar that creeps into
CN2878511Y (en) Tensile compression combined self-anchored rock anchor rod
CN104074529B (en) A kind of cave continuous bivalve, lane, deep reinforcement means
CN103758123A (en) Method for constructing protecting wall lining of cast-in-place manual hole digging pile
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN105156114A (en) Enlarging repair and reinforcement method of roadways at crossing
CN105649073A (en) Static root drilling type construction method for planting piles
CN110761811A (en) Layered soft rock tunnel asymmetric supporting structure and construction method
CN203547753U (en) Profile steel concrete shaft wall base
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN104563147A (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN203361351U (en) Novel straight threaded sleeve type welding beam joint structure
CN103939115A (en) Semi-subsurface excavation method construction shed tunnel method and structure
CN205205886U (en) Underground factory building rock anchor beam reinforced structure
CN109811779A (en) A kind of prefabricated open caisson section of jurisdiction and open caisson construction method
CN203530974U (en) Anti-floating anchor rod
CN201077988Y (en) Hidden beam-column type prestressing force earth nail wall
CN211342952U (en) Asymmetric supporting construction in stratiform soft rock tunnel
CN204754945U (en) Mine method tunnel preliminary bracing lining cutting grid steel support make
CN204475536U (en) With the precast member for reinforcing bar concrete that rigid joint connects
CN205012333U (en) Recoverable FRP stock with enlarged footing
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN203924043U (en) A kind of bamboo concrete stake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant