CN205134308U - Revolve and twist piling bar that creeps into - Google Patents

Revolve and twist piling bar that creeps into Download PDF

Info

Publication number
CN205134308U
CN205134308U CN201520563246.XU CN201520563246U CN205134308U CN 205134308 U CN205134308 U CN 205134308U CN 201520563246 U CN201520563246 U CN 201520563246U CN 205134308 U CN205134308 U CN 205134308U
Authority
CN
China
Prior art keywords
extension rod
guide rod
helical blade
rod
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520563246.XU
Other languages
Chinese (zh)
Inventor
吴后山
白天然
代晓艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Han Chuan Foundation (beijing) Technology Co Ltd
Original Assignee
Han Chuan Foundation (beijing) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Han Chuan Foundation (beijing) Technology Co Ltd filed Critical Han Chuan Foundation (beijing) Technology Co Ltd
Priority to CN201520563246.XU priority Critical patent/CN205134308U/en
Application granted granted Critical
Publication of CN205134308U publication Critical patent/CN205134308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a revolve and twist piling bar that creeps into, by first guide arm (1), extension rod (2), helical blade (3) connecting device (4) component, the cross section of first guide arm (1) and extension rod (2) can weld helical blade (3) for pipe shape, square pipe shape, solid circular or solid square on first guide arm (1), and the interval of arbitrary two helical blade (3) is the integral multiple of helical blade (3) pitch, the stake point of elder generation guide arm (1) can be for to one side closed angle or taper shape, between elder generation guide arm (1) and extension rod (2), extension rod (2) and extension rod (2) be connected by connecting device (4). The utility model discloses an advantage is the precast pile, and the pile body quality is guaranteed, and the construction noiselessness does not have the casting, need not the maintenance, is fit for winter, remote districts, broken ground construction on water even, it is long to increase the stake through the extension rod, has reduced the requirement to the construction headroom, especially is fit for in indoor construction.

Description

A kind ofly screw the piling bar crept into
Technical field
The utility model belongs to field of civil engineering, especially belongs to the pile foundation in geotechnical engineering field.
Background technology
Pile foundation is a kind of foundation pattern that field of civil engineering is commonly used, and adopts pile foundation can bear the load of superstructure, and control settlement distortion is in allowed band.Conventional pile foundation has castinplace pile and preformed pile two class.The construction method of castinplace pile routine is first adopt large type drill pore-forming in ground, then in hole, places pre-processed reinforcing cage, then concreting maintenance pile.Filling pile construction operation is more, and speed of application is slow, and quality is wayward, and often relates to mud off and spoil disposal, is unfavorable for environmental protection.In addition because the maintenance of cast-in-place pile concrete has certain restriction to temperature, therefore often cannot construct in the winter of cold.Preformed pile is generally shaping in factory process, has concrete and steel two class from material point.The construction of preformed pile has hammering and static pressure two kinds of techniques.Adopt hammer-impact construction, can produce larger noise and vibration, affect surrounding enviroment, be generally forbidding in city.Static pressure method adopts large-scale pile press, and the large-tonnage counterweight relying on self to be equipped with provides counter-force to be pressed in soil by preformed pile.Although static pressure method can not produce noise and vibration as hammering method, but because its deadweight must be greater than the ultimate bearing capacity of oil and pile interaction generation, so pile press self is very huge, walking is heavy, only be adapted at spacious smooth field construction, and be only applicable to soft soil layer.Preformed pile belongs to Squeezing Soil Pile, because it mainly obtains bearing capacity by the friction between all external surfaces of stake and the soil body, thus stake footpath is general all larger, therefore no matter be Driven Piles or static pressed pile, its soil compaction effect clearly, all need certain convalescence after construction terminates, just can reach its design bearing capacity.
The construction of above-mentioned various pile-type has certain requirement to construction plant, all to meet the current requirement of construction equipment and the traffic requirements of construction material, therefore cannot construct at narrow and small construction space, soft soil layer is then needed to anticipate, to meet the current of construction equipment, then directly cannot construct especially in water, and need matching operation cofferdam.
Summary of the invention
The purpose of this utility model is that design a kind ofly screws the piling bar crept into, and belongs to preformed pile, comprises first guide rod and extension rod and linkage.First guide rod is welded with helical blade, and helical blade can be one or multiple tracks, and the bottom of first guide rod arranges pile top, and extension rod is connected on first guide rod upper end, is connected between itself and first guide rod or between extension rod with extension rod by linkage.One screws the piling bar crept into and can not have extension rod or have many interconnective extension rods as required.
What the utility model proposes screws the piling bar crept into, and its construction capital equipment is hydraulic power head, and hydraulic power head needs to install on board a dredger can on the equipment of output hydraulic pressure or crane is first-class.During construction, be first connected at the top of hydraulic power head with first guide rod, the moment of torsion exported by unit head drives piling bar to rotate, and piling bar relies on the snap-in force of helical blade and the soil body in the process rotated, produce descending power and pierce in soil.After guide's bar drill enters the soil body, unclamp the connection of unit head and pile body, by linkage, extension rod is connected to the top of first guide rod, the same with the method for the first guide rod of construction, then extension rod part is also pierced in soil.According to design needs, said method is adopted to connect second section extension rod again and construct, until foot is covered with in whole stake design needs.
Compared with the existing technology, the utility model has the advantage of:
(1) the utility model is preformed pile, and pile body makes in factory process, and pile quality is guaranteed, and on-site construction processes is simple, without the need to maintenance, can use, greatly can shorten the construction period after construction terminates;
(2) the vaned pitch of the utility model institute is all identical, and blade pitgh is the integral multiple of pitch, can guarantee like this to the utility model proposes to screw the piling bar crept into consistent at the advance track of drilling process Leaf, reduce blade to greatest extent to the cutting disturbance of the soil body;
(3) this is suitable for the novel mode by extension rod to increase stake long, reduces the requirement to headroom of constructing, is particluarly suitable for indoor construction;
(4) the novel problem not relating to maintenance of this construction, and creep into by certain thickness frozen soil layer by screwing, be therefore applicable to the winter construction of cold district;
(5) the utility model is screwed by hydraulic power head and creeps into, noiselessness, and friction does not relate to mud off and casting, also can accomplish minimum, environmental protection to the destruction on ground;
(6) main construction equipment of the present utility model is hydraulic power head, appearance and size is little, and (diameter is generally within 0.5m, height is within 1m), hydraulic pressure is commonly used excavator and is provided, therefore low to the requirement of construction plant and road, can boundary of works area be increased by increasing extension arm, being especially applicable to the engineering that construction plant is narrow and small and builder's road is soft, even can at subaqueous work;
(7) energy that the utility model construction consumes is only diesel oil, is therefore applicable to the remote districts not having electric power.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present utility model
Accompanying drawing 2 is the structural representation of the pin key type of attachment of linkage described in the utility model
Accompanying drawing 3 is the structural representation of the form that is welded to connect of linkage described in the utility model
Accompanying drawing 4 is the structural representation of the form that is threaded of linkage described in the utility model
Accompanying drawing 5 is the structural representation of the flange type of attachment of linkage described in the utility model
As accompanying drawing 1---shown in accompanying drawing 5, the utility model is made up of first guide rod (1), extension rod (2), helical blade (3) linkage (4), wherein the cross section of first guide rod (1) and extension rod (2) can be one of tubular, square-tube-shaped, solid circles or solid squares four kinds of shapes, the round diameter of its cross section or the scope of the square length of side are 50mm ~ 500mm, wall thickness 3mm ~ 50mm, first guide rod (1) is welded with helical blade (3), helical blade (3) is for one or more, helical blade (3) is plate-like, it can be disk, also can be the square plate of rounding, the round diameter of helical blade (3) or the scope of the square length of side are 100mm ~ 1200mm, wall thickness 3mm ~ the 50mm of helical blade (3), the profile of helical blade (3) is spiral camber, helical blade (3) vertical direction is by angle all in 90 ° between center arbitrarily angled section groove line and the axis of first guide rod (1), the pitch of all helical blades (3) is all identical, and the spacing of any two helical blades (3) is the integral multiple of helical blade (3) pitch, the pile top of first guide rod (1) can be mitered into wedge angle, and also can be made into taper shape, the length of first guide rod (1) is 2m-12m, and the length of extension rod (2) is 2m-12m, between first guide rod (1) and extension rod (2), be connected by linkage (4) between extension rod (2) with extension rod (2), wherein the connection of linkage (4) can be and be socketed in the upper end of first guide rod (1) or bottom extension rod (2) after oversleeve (5) cover is welded in the lower end of extension rod (2) after with pin key (6) cross-under have one or more perforation oversleeve (5) and have be socketed in the lower end of upper extension bar (2) after the first guide rod (1) of one or more correspondence perforation or extension rod (2) or oversleeve (5) cover are welded in the upper end of first guide rod (1) or bottom extension rod (2) after have the oversleeve (5) of one or more perforation with pin key (6) cross-under and have one or more corresponding extension rod (2) of boring a hole, the lower end of upper end and extension rod (2) that sleeve (7) is enclosed within first guide rod (1) or extension rod (2) is welded, the threaded sleeve (8) with one end internal thread does not have the inwall of female one end to be welded on first guide rod (1) or extension rod (2) upper end outer wall and another lower end has externally threaded extension rod (2) is screwed into the female one end of threaded sleeve (8) tool and is spirally connected, through being connected by bolt (10) with the flange (9) that another extension rod (2) lower end is welded respectively at first guide rod (1) or extension rod (2) upper end.According to engineering demand, one screws the piling bar crept into and can not have extension rod (2) or have many interconnective extension rods (2), extension rod (2) also equally with first guide rod (1) can be welded with helical blade (3).
Detailed description of the invention
Embodiment 1:
Screw the piling bar crept into, the length of first guide rod (1) is 4m, and shape is round tubular bar, and diameter of section and wall thickness adopt according to Structural strength calls, and diameter of section is 114mm, and thickness of steel pipe is 10mm.First guide rod (1) is welded with two road helical blades.Helical blade is discoid, and blade diameter is 400mm, wall thickness 16mm.The profile of helical blade is perfect spiral camber, and vertical direction is by all in 90 ° between center arbitrarily angled section groove line and axis.Vaned pitch homogeneous phase is all 150mm, and blade pitgh is 13 times of pitch, is 1950mm.First guide rod (1) end is pile top, and the pile top of first guide rod is mitered into wedge angle.
The described piling bar crept into that screws connects 3 extension rods on first guide rod.Every root extension rod length is 3m.The same with first guide rod, extension rod adopts round steel pipe, and diameter of section and wall thickness adopt according to Structural strength calls, and diameter of section is 114mm, and thickness of steel pipe is 10mm.Be connected by pin key between extension rod and first guide rod or between extension rod with extension rod.Specific implementation method is: in bottom, first guide rod and extension rod axis top are previously provided with two borings, at upper extension bar axis lower end outside weldings oversleeve, oversleeve is steel pipe, oversleeve arranges two borings, two borings that bore position pre-sets with guide rod first in bottom and extension rod axis top match, the first guide rod of upper extension bar and bottom or extension rod are socketed by oversleeve, adjustment mating holes position, position, insert pin key and fix.Pin key is high-strength bolt, is fixed by nut.
The described piling bar crept into that screws is screwed by hydraulic power head and pierces in soil.Hydraulic power head is installed on board a dredger, is connected with the hydraulic pressure output system of excavator.During construction, be first connected at the top of hydraulic power head with first guide rod, the moment of torsion exported by unit head drives piling bar to rotate, and piling bar relies on the snap-in force of helical blade and the soil body in the process rotated, produce descending power and pierce in soil.After guide's bar drill enters the soil body, unclamp the connection of unit head and pile body, by linkage, extension rod is connected to the top of first guide rod, the same with the method for the first guide rod of construction, then extension rod part is also pierced in soil.Adopt said method to construct again second section and Section of three extension rod, described in completing, screw the construction of the piling bar crept into.
Embodiment 2:
Screw the piling bar crept into, guide's pole length is 3m, and first guide rod axis adopts solid square bar, and the cross section length of side adopts according to Structural strength calls, and the cross section length of side is 100mm.First guide rod axis is welded with twice helical blade.Helical blade is the square plate shape of rounding, and the blade length of side is 300mm, wall thickness 20mm.The profile of helical blade is perfect spiral camber, and vertical direction is by all in 90 ° between center arbitrarily angled section groove line and axis.Vaned pitch homogeneous phase is all 130mm, and blade pitgh is 10 times of pitch, is 1300mm.Guide's boom end arranges pile top, and the pile top of first guide rod is mitered into wedge angle.
The described piling bar crept into that screws connects two extension rods on first guide rod.Every root extension rod length is 2m.The same with first guide rod, extension rod adopts solid square bar, and the cross section length of side adopts according to Structural strength calls, and the cross section length of side is 100mm.Be connected by flange between extension rod and first guide rod or between extension rod with extension rod.Specific implementation method is: at first guide rod axis top welding flange, also weld the flange of equivalent specifications in extension rod axis bottom, for the extension rod of centre, its axis top, two ends, the end all need welding flange.During connection, the position, hole on the alignment flange dish of adjustment position, adopts bolt to be fixed by upper lower flange.
The described piling bar crept into that screws is screwed by hydraulic power head and pierces in soil.Hydraulic power head is installed on board a dredger, is connected with the hydraulic pressure output system of excavator.During construction, be first connected at the top of hydraulic power head with first guide rod, the moment of torsion exported by unit head drives piling bar to rotate, and piling bar relies on the snap-in force of helical blade and the soil body in the process rotated, produce descending power and pierce in soil.After guide's bar drill enters the soil body, unclamp the connection of unit head and pile body, by linkage, extension rod is connected to the top of first guide rod, the same with the method for the first guide rod of construction, then extension rod part is also pierced in soil.Adopt said method to construct again second section extension rod, described in completing, screw the construction of the piling bar crept into.

Claims (1)

1. one kind screws the piling bar crept into, it is characterized in that, described piling bar is made up of first guide rod (1), extension rod (2), helical blade (3) linkage (4), wherein the cross section of first guide rod (1) and extension rod (2) can be one of tubular, square-tube-shaped, solid circles or solid squares four kinds of shapes, the round diameter of its cross section or the scope of the square length of side are 50mm ~ 500mm, wall thickness 3mm ~ 50mm, first guide rod (1) is welded with helical blade (3), helical blade (3) is for one or more, helical blade (3) is plate-like, it can be disk, also can be the square plate of rounding, the round diameter of helical blade (3) or the scope of the square length of side are 100mm ~ 1200mm, wall thickness 3mm ~ the 50mm of helical blade (3), the profile of helical blade (3) is spiral camber, helical blade (3) vertical direction is by angle all in 90 ° between center arbitrarily angled section groove line and the axis of first guide rod (1), the pitch of all helical blades (3) is all identical, and the spacing of any two helical blades (3) is the integral multiple of helical blade (3) pitch, the pile top of first guide rod (1) can be mitered into wedge angle, and also can be made into taper shape, the length of first guide rod (1) is 2m-12m, and the length of extension rod (2) is 2m-12m, between first guide rod (1) and extension rod (2), be connected by linkage (4) between extension rod (2) with extension rod (2), wherein the connection of linkage (4) can be and be socketed in the upper end of first guide rod (1) or bottom extension rod (2) after oversleeve (5) cover is welded in the lower end of extension rod (2) after with pin key (6) cross-under have one or more perforation oversleeve (5) and have be socketed in the lower end of upper extension bar (2) after the first guide rod (1) of one or more correspondence perforation or extension rod (2) or oversleeve (5) cover are welded in the upper end of first guide rod (1) or bottom extension rod (2) after have the oversleeve (5) of one or more perforation with pin key (6) cross-under and have one or more corresponding extension rod (2) of boring a hole, the lower end of upper end and extension rod (2) that sleeve (7) is enclosed within first guide rod (1) or extension rod (2) is welded, the threaded sleeve (8) with one end internal thread does not have the inwall of female one end to be welded on first guide rod (1) or extension rod (2) upper end outer wall and another lower end has externally threaded extension rod (2) is screwed into the female one end of threaded sleeve (8) tool and is spirally connected, through being connected by bolt (10) with the flange (9) that another extension rod (2) lower end is welded respectively at first guide rod (1) or extension rod (2) upper end, according to engineering demand, one screws the piling bar crept into and can not have extension rod (2) or have many interconnective extension rods (2), extension rod (2) also equally with first guide rod (1) can be welded with helical blade (3).
CN201520563246.XU 2015-07-31 2015-07-31 Revolve and twist piling bar that creeps into Active CN205134308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520563246.XU CN205134308U (en) 2015-07-31 2015-07-31 Revolve and twist piling bar that creeps into

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520563246.XU CN205134308U (en) 2015-07-31 2015-07-31 Revolve and twist piling bar that creeps into

Publications (1)

Publication Number Publication Date
CN205134308U true CN205134308U (en) 2016-04-06

Family

ID=55620115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520563246.XU Active CN205134308U (en) 2015-07-31 2015-07-31 Revolve and twist piling bar that creeps into

Country Status (1)

Country Link
CN (1) CN205134308U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284306A (en) * 2016-09-29 2017-01-04 固远晨通科技发展有限公司 Piling bar is strengthened in a kind of spliced spin without spoir
CN107012859A (en) * 2017-06-09 2017-08-04 希姆莱斯(大连)科技有限公司 Carbon steel coil stake
CN107268604A (en) * 2017-08-10 2017-10-20 中南大学 The construction system and construction method of a kind of hollow preformed pile
CN108411900A (en) * 2018-03-14 2018-08-17 佛山市亚科恒远科技有限公司 A kind of construction site building spud pile
WO2018214782A1 (en) * 2017-05-24 2018-11-29 希姆莱斯(大连)科技有限公司 Process for preparing spheroidal graphite cast iron screw pile and spheroidal graphite cast iron screw pile prepared using said process
CN110055953A (en) * 2019-04-24 2019-07-26 兰州理工大学 Miniature steel pipe pile and its construction method can be recycled in a kind of plural serial stage assembled
CN110067245A (en) * 2019-03-22 2019-07-30 西南交通大学 It is a kind of can expanding reinforcing spiral self-drilling type piling bar and its method of construction
CN111576404A (en) * 2020-06-09 2020-08-25 大连利旋电力工程技术有限公司 Nodular cast iron screw pile
WO2020233145A1 (en) * 2019-05-23 2020-11-26 上海长凯岩土工程有限公司 Construction method using inclined steel pipe combined structure to form force bearing body
CN112658534A (en) * 2020-11-27 2021-04-16 沪东中华造船(集团)有限公司 Welding straight-through sleeve for pipe section connection and use method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284306A (en) * 2016-09-29 2017-01-04 固远晨通科技发展有限公司 Piling bar is strengthened in a kind of spliced spin without spoir
WO2018214782A1 (en) * 2017-05-24 2018-11-29 希姆莱斯(大连)科技有限公司 Process for preparing spheroidal graphite cast iron screw pile and spheroidal graphite cast iron screw pile prepared using said process
CN107012859A (en) * 2017-06-09 2017-08-04 希姆莱斯(大连)科技有限公司 Carbon steel coil stake
CN107268604A (en) * 2017-08-10 2017-10-20 中南大学 The construction system and construction method of a kind of hollow preformed pile
CN107268604B (en) * 2017-08-10 2022-08-19 中南大学 Construction system and construction method of hollow precast pile
CN108411900A (en) * 2018-03-14 2018-08-17 佛山市亚科恒远科技有限公司 A kind of construction site building spud pile
CN110067245A (en) * 2019-03-22 2019-07-30 西南交通大学 It is a kind of can expanding reinforcing spiral self-drilling type piling bar and its method of construction
CN110055953A (en) * 2019-04-24 2019-07-26 兰州理工大学 Miniature steel pipe pile and its construction method can be recycled in a kind of plural serial stage assembled
CN110055953B (en) * 2019-04-24 2021-04-27 兰州理工大学 Multistage series-connection assembled type recyclable miniature steel pipe pile and construction method thereof
WO2020233145A1 (en) * 2019-05-23 2020-11-26 上海长凯岩土工程有限公司 Construction method using inclined steel pipe combined structure to form force bearing body
CN111576404A (en) * 2020-06-09 2020-08-25 大连利旋电力工程技术有限公司 Nodular cast iron screw pile
CN112658534A (en) * 2020-11-27 2021-04-16 沪东中华造船(集团)有限公司 Welding straight-through sleeve for pipe section connection and use method thereof

Similar Documents

Publication Publication Date Title
CN205134308U (en) Revolve and twist piling bar that creeps into
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN101914952A (en) Connecting joint between hollow steel tube concrete column and steel girder and construction method thereof
CN102021908B (en) Mechanical connection structure and construction method for splicing precast square piles
CN101173517A (en) Pile-pulling construction method
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN103243713A (en) Method for planting prestressed pipe pile at one step
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN102373705A (en) Pile sinking device and method for outer digging pre-stressed centrifugal pipe pile and square pile
CN105649073A (en) Static root drilling type construction method for planting piles
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN205329709U (en) Mountain region photovoltaic support foundation structure
CN102286982A (en) Deep foundation pit precast building enclosure for constructing in low environment
CN102808403B (en) Precast tubular pile and construction method thereof
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN104032764A (en) Press-in type sunk well reaction system
CN206668161U (en) A kind of boring drill bit device of reducing
CN103437493A (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN209603166U (en) A kind of shaft tower screw pile
CN205259175U (en) Lower part enlarges compound foundation pile of diameter section
CN210341918U (en) Novel vibration pile sinking device
CN205205886U (en) Underground factory building rock anchor beam reinforced structure
CN112049104A (en) Extensible soft soil area pile foundation structure and construction method thereof
CN111455980B (en) Prefabricated anti-floating pile structure suitable for underground engineering and construction method

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Wu Houshan

Document name: Notification of an Office Action

C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Wu Houshan

Document name: Notification of Passing Examination on Formalities