CN109505641A - A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method - Google Patents
A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method Download PDFInfo
- Publication number
- CN109505641A CN109505641A CN201811588260.XA CN201811588260A CN109505641A CN 109505641 A CN109505641 A CN 109505641A CN 201811588260 A CN201811588260 A CN 201811588260A CN 109505641 A CN109505641 A CN 109505641A
- Authority
- CN
- China
- Prior art keywords
- anchor
- bottom plate
- slip casting
- grouting
- grouting cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000011435 rock Substances 0.000 title claims abstract description 52
- 238000000034 method Methods 0.000 title claims abstract description 23
- 230000002787 reinforcement Effects 0.000 title claims abstract description 20
- 238000007569 slipcasting Methods 0.000 claims abstract description 59
- 238000005553 drilling Methods 0.000 claims description 24
- 239000000463 material Substances 0.000 claims description 24
- 229910000831 Steel Inorganic materials 0.000 claims description 22
- 239000010959 steel Substances 0.000 claims description 22
- 239000011440 grout Substances 0.000 claims description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 239000004568 cement Substances 0.000 claims description 6
- 239000000654 additive Substances 0.000 claims description 5
- 230000000996 additive effect Effects 0.000 claims description 5
- 238000007711 solidification Methods 0.000 claims description 5
- 230000008023 solidification Effects 0.000 claims description 5
- 239000003245 coal Substances 0.000 abstract description 5
- 230000007812 deficiency Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000004873 anchoring Methods 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 3
- 238000009792 diffusion process Methods 0.000 description 3
- 238000012856 packing Methods 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000003467 diminishing effect Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 229920002521 macromolecule Polymers 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000010454 slate Substances 0.000 description 1
- 210000004894 snout Anatomy 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0093—Accessories
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The present invention relates to a kind of soft-rock tunnel bottom plate anchor pouring reinforcement methods, the deeply slip casting duct to base slab stability rock stratum is opened up downwards on roadway floor surface, per slip casting unit of at least three adjacent slip casting ducts as roadway floor in same row's slip casting duct, grouting cable anchor beam is placed in slip casting unit, is carried out slip casting around the deep layer end anchor slip casting fixation and shallow-layer of roadway floor in each grouting cable anchor beam respectively and is fixed.The present invention overcomes the prior arts, and supporting range is small, intensity is low in the improvement of Deep Soft Rock Tunnel bottom plate, it is difficult to realize the deficiency that Deep Soft Rock Tunnel bottom plate coal and rock long-time stability require.
Description
Technical field
The present invention relates to mine timbering technical fields, and in particular to a kind of soft-rock tunnel bottom plate anchor pouring reinforcement method.
Background technique
Deep Soft Rock Tunnel is due to burying depth, and stress level is high, and Surrounding Rock Strength is low, and tunnel excavates rear surrouding rock stress will be again
To reach new balance, country rock is concentrated function influence by stress for adjustment, gradually loose broken from shallow to deep, back and two
Side takes anchor rete cord, anchor note or shed shoring measure, rock integrity and intensity to be maintained, and roadway deformation is controlled, but
Roadway floor, which is typically in, opens wide non-supporting state so that Deep Soft Rock Tunnel deformation failure is mostly since pucking, gradually to
Base angle, portion, side, top plate gradually extend, and eventually lead to tunnel globality supporting failure.
Short slab of the jacking of floor as Deep Soft Rock Tunnel supporting, the serious curtailment tunnel length of service, bottom plate, which is administered, to exist
Roadway repair engineering importance increasingly improves, at present in the tunnel section of pucking especially severe, existing Roadway Support Technology means
It is mainly the following method: (1) method of acting as a planted agent, directly removing pucking coal and rock.(2) method for strengthening is strong by improving floor rocks
Degree improves and carrys out floor lift control to the supporting power of floor rocks, including floor grouting, mounting base anchor pole or closed support, pours
It builds anti-bottom to dig earth with the snout the reinforcing such as level ground, (3) destressing method makes original continuous rock mass be in discrete state, makes bottom by engineering means
Slate body is in stress relaxed area, including excavates gas pressure relief slot, drilling or unloading pressure by blasting etc..Above-mentioned technological means is simple to operation,
But does not improve floor rocks fundamentally and be crushed status, solve the problems, such as that Floor Heave in Roadway country rock bearing strength is low, have and repair
Period is short, supporting range is small, the drawbacks such as steady in a long-term that are difficult to ensure tunnel, causes roadway surrounding rock to be crushed range and constantly increases, falls into
Enter the predicament of " the more repair the more bad, more bad more repair ".
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of soft-rock tunnel bottom plate anchor pouring reinforcement methods, overcome existing
Technology supporting range in the improvement of Deep Soft Rock Tunnel bottom plate is small, intensity is low, it is difficult to realize Deep Soft Rock Tunnel bottom plate coal and rock
The deficiency that long-time stability require.
The present invention is achieved through the following technical solutions:
A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method is provided, comprising the following steps:
(1) slip casting duct opens up: it drills in the bottom plate that roadway floor opens up deeply to base slab stability rock stratum, same row's bottom plate drilling
In at least two slip casting units of the drilling as roadway floor;
(2) grouting cable anchor beam is installed: a grouting cable anchor beam is correspondingly arranged in each slip casting unit, each grouting cable anchor beam includes
At least two grouting cable anchors, and being respectively placed in bottom plate drilling, wherein two grouting cable anchors be respectively hold anchor grouting cable anchor and
Grouting grouting cable anchor;
(3) slip casting: the slip casting in grouting cable anchor beam into each slip casting unit respectively, the first slip casting into end anchor grouting cable anchor, note
Pulp material flow out and diffuse to from the grout outlet between the flexible pipe and rigid rod of the grouting cable anchor base slab stability rockhole and
In circumferential crack;The slip casting into grouting grouting cable anchor again, injecting paste material is between the rigid pipe and flexible pipe of the grouting cable anchor
Grout outlet flow out and diffuse to bottom plate drilling and superficial part fragmented rock body.
In the present solution, the end anchor in grouting cable anchor beam is put into slip casting duct with grouting cable anchor, the injecting paste material of injection from
Deep stablizes the grout outlet pulp at rock stratum and realizes that the end anchoring in grouting cable anchor and roadway floor deep is fixed, in grouting cable anchor beam
Grouting grouting cable anchor is put into slip casting duct, and grout outlet pulp of the injecting paste material of injection from the fragmented rock body of superficial part is realized
The full packing of superficial part fragmented rock body and strong diffusion.
Preferably, grouting cable anchor beam further includes at least one steel strand wires, steel strand wires are filled in bottom plate bored grouting
Pulp material realizes full length fastening.
Steel strand wires can increase supporting intensity, be realized during grouting cable anchor slip casting by the filling of injecting paste material, solidification
The full anchor of steel strand wires strengthens roadway floor fastening strength.
Preferably, roadway floor after holding anchor grouting cable anchor slip casting, before grouting grouting cable anchor slip casting, passes through shield table
Part links into an integrated entity the grouting cable anchor in the unit of each slip casting duct, installs matched pallet and lockset, and to every slip casting
Anchor cable carries out tensioning of the pretightning force not less than 120KN and pre-tightens.
The grouting cable anchor beam in each slip casting unit is connected common stress by pallet lockset, to grouting cable anchor into
Row pre-tightens tensioning, improves grouting cable anchor beam to the supporting intensity of roadway floor, enhances whole structural strength.
Further, the pre- next laying on roadway floor of tensioning can strengthen the concrete floor of shield table.
Concrete floor can strengthen shield table intensity, further enhance consolidation effect.
Further, shield table part is one or more of channel steel, U-shaped steel and steel basketry net.
Preferably, the drilling depth in slip casting duct reaches base slab stability rock stratum 1m or more, hole depth is not less than 5m, and duct is straight
Diameter is not less than 70mm.
Preferably, the injecting paste material is the cement that solidification intensity is not less than 42.5MPa, and additive is added, water
The cement-water ratio of mud is not less than 2, and grouting pressure is not less than 10MPa.
The cement that high cement-water ratio is used to grouting cable anchor, the high-pressure slip-casting by grouting pressure not less than 10MPa are spread by force,
Country rock compactness and grout mixing are improved, guarantees slip casting effect.Its solidification intensity is not less than 42.5MPa, realizes that bottom plate bores
The full packing of hole and superficial part breaking surrounding rock and strong diffusion, guarantee anchor pouring reinforcement effect.
Further, hold in anchor grouting cable anchor flexible pipe and rigid pipe to connect firmly, flexible pipe and rigid rod there are
Grout outlet of the gap as end anchor grouting cable anchor;Rigid rod and flexible pipe are to connect firmly in grouting grouting cable anchor, flexible pipe with
Grout outlet of the rigid pipe there are gap as grouting grouting cable anchor.
Hold anchor grouting cable anchor no setting is required between middle flexible pipe and rigid pipe grout outlet, the rigidity of grouting grouting cable anchor
No setting is required between bar and flexible pipe grout outlet is all made of to be fixedly connected with enhancing structure intensity and be conducive to injecting paste material and flow.
Preferably, the length of the rigid rod of end anchor grouting cable anchor is 1-3m.
Rigid rod is fixed for the anchoring of slip casting rear end, and length is not less than 1m, is conducive to enhance end anchor fixed effect, guarantees to stablize
Property.
Beneficial effects of the present invention:
One, the multiply grouting cable anchor beam formed using grouting cable anchor and steel strand wires is carried out anchor note to Deep Soft Rock Tunnel bottom plate and added
Gu being able to satisfy the requirement of the supporting of Deep Soft Rock Tunnel bottom plate and reinforcing, shield table intensity height, convenient construction big with supporting range
The advantages of, improve bottom stress state and self, effective deformation controlling for rock surrounding gateways improves the tunnel length of service.
Two, multiply grouting cable anchor beam have higher supporting intensity, higher pretightning force can be provided, at the same reduce with
Bore diameter is poor, is conducive to hold anchor " three footpaths mate " principle, and each slip casting unit can construct grouting operation simultaneously, simplifies operation step
Suddenly, slip casting efficiency is improved.
Three, pre-tighten in advance, by grouting cable anchor end anchor act on and protect table material effect of contraction by superficial part breaking surrounding rock with
Deep stablizes rock stratum and forms entirety, inhibits pucking sustainable development.
Four, the compactness and grout mixing that injecting paste material fills breaking surrounding rock body can be improved in high-pressure slip-casting, has
It is integrated with breaking surrounding rock conducive to bottom plate prop, guarantee roadway floor integrated carrying strength and stiffness.
Five, it is drilled using the existing common drilling machine construction large aperture bottom plate of coal mine, had both met bottom plate fracture area reinforcing scope need
It wants, and is installed convenient for grouting cable anchor, improve site operation feasibility and convenience.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of grouting cable anchor beam in the present invention.
Fig. 2 is bottom plate anchor pouring reinforcement method sectional schematic diagram of the present invention.
Fig. 3 is bottom plate anchor pouring reinforcement method floor map of the present invention.
It is as shown in the figure:
1, steel strand wires, 2, end anchor grouting cable anchor, 3, grouting grouting cable anchor, 4, rigid rod, 5, end anchor grouting cable anchor pulp
Mouthful, 6, flexible pipe, 7, grouting grouting cable anchor grout outlet, 8, rigid pipe, 9, pallet, 10, rigging, 11, grouting port, 12, tunnel,
13, bottom plate drills, 14, superficial part fragmented rock body, 15, injecting paste material, 16, the stable rock stratum in deep, 17, channel steel, 18, concrete ground
Level ground.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method, comprising the following steps:
(1) slip casting duct opens up: in tunnel, 12 backplate surface opens up downwards the deeply bottom plate drilling 13 to base slab stability rock stratum 16,
Per slip casting unit of at least two adjacent slip casting ducts 13 as 12 bottom plate of tunnel in same row's bottom plate drilling 13;As this hair
A kind of bright embodiment, interior slip casting unit includes three slip casting ducts 13.Wherein, the existing common drilling machine of coal mine can be used in drilling
Large aperture bottom plate of constructing drills, and had not only met bottom plate fracture area reinforcing scope needs, but also install convenient for grouting cable anchor, and had improved scene
Feasibility of constructing and convenience, the drilling depth of bottom plate drilling 13 reach base slab stability rock stratum 1m or more, and hole depth is not less than 5m, hole
Road diameter is not less than 70mm.
(2) grouting cable anchor beam is installed: a grouting cable anchor beam, each grouting cable anchor beam are correspondingly arranged in each slip casting unit
It including at least two grouting cable anchors, and is respectively placed in bottom plate drilling 13, wherein grouting cable anchor is respectively to hold anchor grouting cable anchor
2 and grouting grouting cable anchor 3;To increase supporting intensity, grouting cable anchor beam of the invention further includes at least one steel strand wires 1, position
In the side of end anchor grouting cable anchor 2 and grouting grouting cable anchor 3, as shown in Figure 1, corresponding slip casting unit includes at least three
Bottom plate drilling 13.
Grouting cable anchor that the present invention uses and grouting cable anchor in the prior art are divided into three sections of pipeline sections, respectively rigid pipe 8,
Flexible pipe 6 and rigid rod 4, difference is: flexible pipe 6 is to connect firmly with rigid pipe 8 in end anchor grouting cable anchor 2 of the invention;Note
Rigid rod 4 is to connect firmly with flexible pipe 6 in slurry grouting cable anchor 3.To guarantee end anchor fixing intensity, the rigid of anchor grouting cable anchor 2 is held
Property bar 4 length be 1-3m.
(3) slip casting: the slip casting in grouting cable anchor beam into each slip casting unit respectively is first infused toward end anchor in grouting cable anchor 2
Slurry, injecting paste material 15 flow out from the grout outlet 5 between the flexible pipe 6 and rigid rod 4 of the grouting cable anchor and diffuse to base slab stability
In the drilling of rock stratum 16 and circumferential crack, solidified to injecting paste material 15,
Then the grouting cable anchor beam in each slip casting unit is linked into an integrated entity by shield table part, wherein shield table part be channel steel 17,
One or more of U-shaped steel and steel basketry net.As shown in figure 3, shield table part of the invention is channel steel 17.
Matched pallet 9 and lockset 10 are installed, and pre- not less than the tensioning of 120KN to grouting cable anchor Shu Jinhang pretightning force
Tightly.It can be laid with concrete floor 18 in roadway floor after the completion of pre-tightening to floor grouting anchorage cable stretching, protect table intensity to strengthen, to
After concrete floor 18 is fully cured, by 11 slip casting of grouting port of grouting grouting cable anchor 3, injecting paste material 15 is from the slip casting
Grout outlet 7 between the rigid pipe 8 and flexible pipe 6 of anchor cable flows out and diffuses to bottom plate drilling 13 and superficial part fragmented rock body 14, to
Injecting paste material 15 solidifies;It is directly injected into injecting paste material 15 in 1 place bottom plate of steel strand wires drilling 13, realizes the full anchoring of steel strand wires 1
It is fixed.
The injecting paste material 15 is the cement that solidification intensity is not less than 42.5MPa, and is added and has diminishing, enhancing, micro-
The additive of expansion improves injecting paste material consistency, pumping, and additive can be FDN, ACZ type slip casting additive, using water
The cement-water ratio of slurry liquid is not less than 2.Other macromolecule chemical materials such as resin can be used in certain injecting paste material 15, and grouting pressure is not
Lower than 10MPa, realizes bottom plate drilling and the full packing of superficial part fragmented rock body 14 and strong diffusion, guarantee anchor pouring reinforcement effect.
It is compared by site industrial, Deep Soft Rock Tunnel bottom plate is mud stone, and globality poor, intensity is low, and meets water
Argillization expansion, pucking is serious, and half a year pucking amount just can reach 1m, and part is up to nearly 2m, it has to act as a planted agent, top portion, side also with
Deformation failure.The grouted anchor bar used later is reinforced, and since bottom plate is acted as a planted agent for a long time, it is big to be crushed range, it is difficult to realize that deep is steady
Fixed to reinforce, bottom plate is heaved in globality.
It is operated through practice, after the technical program reinforcing soleplate 3 years, bottom plate does not occur obvious breakoff phenomenon, every slip casting
Up to more than 0.5 ton of cement, bottom plate globality and bearing capacity are enhanced unit grouting amount, and the deformation of top portion, side also improves therewith.
Certainly, above description is also not limited to the example above, technical characteristic of the present invention without description can by or
It is realized using the prior art, details are not described herein;Above embodiments and attached drawing are only used to illustrate the technical scheme of the present invention not
It is limitation of the present invention, is described the invention in detail referring to preferred embodiment, the ordinary skill people of this field
Member is it should be appreciated that variation, remodeling, the addition that those skilled in the art are made within the essential scope of the present invention
Or replacement also should belong to claims of the invention without departure from spirit of the invention.
Claims (9)
1. a kind of soft-rock tunnel bottom plate anchor pouring reinforcement method, it is characterised in that: the following steps are included:
(1) slip casting duct opens up: it drills in the bottom plate that roadway floor opens up deeply to base slab stability rock stratum, same row's bottom plate drilling
In every slip casting units of at least two drilling as roadway floor;
(2) grouting cable anchor beam is installed: a grouting cable anchor beam is correspondingly arranged in each slip casting unit, each grouting cable anchor beam includes
At least two grouting cable anchors, and being respectively placed in bottom plate drilling, wherein two grouting cable anchors be respectively hold anchor grouting cable anchor and
Grouting grouting cable anchor;
(3) slip casting: the slip casting in grouting cable anchor beam into each slip casting unit respectively, the first slip casting into end anchor grouting cable anchor, note
Pulp material flow out and diffuse to from the grout outlet between the flexible pipe and rigid rod of the grouting cable anchor base slab stability rockhole and
In circumferential crack, is solidified to injecting paste material and complete to reinforce;The slip casting into grouting grouting cable anchor again, injecting paste material is from the slip casting anchor
Grout outlet between the rigid pipe and flexible pipe of rope flows out and diffuses to bottom plate drilling and superficial part fragmented rock body.
2. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 1, it is characterised in that: grouting cable anchor beam further includes
At least one steel strand wires, steel strand wires can realize full length fastening in bottom plate bored grouting.
3. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 1, it is characterised in that: roadway floor is used in end anchor
After grouting cable anchor slip casting, before grouting grouting cable anchor slip casting, by protecting table part for the grouting cable anchor Shu Lian in each slip casting unit
It is connected into one, matched pallet and lockset are installed, and it is pre- not less than the tensioning of 120KN to carry out pretightning force to every grouting cable anchor
Tightly.
4. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 3, it is characterised in that: tensioning is pre- next in tunnel
The concrete floor that can strengthen shield table is laid on bottom plate.
5. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 3, it is characterised in that: shield table part is channel steel, U-shaped
One or more of steel and steel basketry net.
6. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 1, it is characterised in that: the drilling in slip casting duct is deep
Degree reaches base slab stability rock stratum 1m or more, and hole depth is not less than 5m, and channel diameter is not less than 70mm.
7. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 1, it is characterised in that: the injecting paste material is
Solidification intensity is not less than the cement of 42.5MPa, and additive is added, and the cement-water ratio of cement is not less than 2, and grouting pressure is not less than
10MPa。
8. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 1, it is characterised in that: in the anchor grouting cable anchor of end
Flexible pipe is to connect firmly with rigid pipe, the grout outlet of flexible pipe and rigid rod there are gap as end anchor grouting cable anchor;Slip casting
It is connected firmly with rigid rod in grouting cable anchor with flexible pipe, there are gaps as grouting grouting cable anchor for flexible pipe and rigid pipe
Grout outlet.
9. soft-rock tunnel bottom plate anchor pouring reinforcement method according to claim 1, it is characterised in that: end anchor grouting cable anchor
The length of rigid rod is 1-3m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811588260.XA CN109505641A (en) | 2018-12-25 | 2018-12-25 | A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811588260.XA CN109505641A (en) | 2018-12-25 | 2018-12-25 | A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109505641A true CN109505641A (en) | 2019-03-22 |
Family
ID=65754570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811588260.XA Withdrawn CN109505641A (en) | 2018-12-25 | 2018-12-25 | A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109505641A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130958A (en) * | 2019-05-16 | 2019-08-16 | 中国神华能源股份有限公司 | A kind of control method of gob side entry retaining pucking |
CN110470269A (en) * | 2019-08-21 | 2019-11-19 | 山东大学 | Reinforcing laneway prediction scheme is comprehensive to determine method |
CN111911197A (en) * | 2020-08-12 | 2020-11-10 | 华北科技学院 | Drainage slow-seepage grouting reinforcement device and method in strong water-rich soft surrounding rock |
CN113638756A (en) * | 2021-09-09 | 2021-11-12 | 辽宁工程技术大学 | Anchor cable supporting method for treating roadway floor heave and anchor cable |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2749068A1 (en) * | 1977-11-02 | 1979-05-03 | Gebirgssicherung Gmbh | Mine anchorage rod embedded in hardening resin - has flexible externally roughened inner plastics sleeve around glass fibre rods |
CN101871353A (en) * | 2010-06-22 | 2010-10-27 | 宋彦波 | Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support |
CN102230382A (en) * | 2011-05-20 | 2011-11-02 | 中国矿业大学 | Progressive shielding booster-type grouting and reinforcing technology for baseboard |
CN102322273A (en) * | 2011-05-20 | 2012-01-18 | 中国矿业大学 | A kind of roadway floor anchor is annotated integrated reinforcement means |
CN102900446A (en) * | 2012-10-23 | 2013-01-30 | 中国矿业大学 | Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium |
CN204783070U (en) * | 2015-06-12 | 2015-11-18 | 江西科技学院 | Prevent roof beam anchor integrated configuration of soft rock tunnel pucking |
CN205778903U (en) * | 2016-06-02 | 2016-12-07 | 江西科技学院 | A kind of soft-rock tunnel pucking preventing and treating device |
CN106321124A (en) * | 2016-11-20 | 2017-01-11 | 中国平煤神马能源化工集团有限责任公司 | Mine grouting anchor cable supporting method |
CN107747493A (en) * | 2017-12-08 | 2018-03-02 | 河南理工大学 | Roadway floor prestress anchorage cable group coordinates ruggedized construction and construction method with slip casting |
CN207686735U (en) * | 2017-12-08 | 2018-08-03 | 河南理工大学 | Baseboard of coal mine roadway deformed bar suspension device |
-
2018
- 2018-12-25 CN CN201811588260.XA patent/CN109505641A/en not_active Withdrawn
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2749068A1 (en) * | 1977-11-02 | 1979-05-03 | Gebirgssicherung Gmbh | Mine anchorage rod embedded in hardening resin - has flexible externally roughened inner plastics sleeve around glass fibre rods |
CN101871353A (en) * | 2010-06-22 | 2010-10-27 | 宋彦波 | Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support |
CN102230382A (en) * | 2011-05-20 | 2011-11-02 | 中国矿业大学 | Progressive shielding booster-type grouting and reinforcing technology for baseboard |
CN102322273A (en) * | 2011-05-20 | 2012-01-18 | 中国矿业大学 | A kind of roadway floor anchor is annotated integrated reinforcement means |
CN102900446A (en) * | 2012-10-23 | 2013-01-30 | 中国矿业大学 | Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium |
CN204783070U (en) * | 2015-06-12 | 2015-11-18 | 江西科技学院 | Prevent roof beam anchor integrated configuration of soft rock tunnel pucking |
CN205778903U (en) * | 2016-06-02 | 2016-12-07 | 江西科技学院 | A kind of soft-rock tunnel pucking preventing and treating device |
CN106321124A (en) * | 2016-11-20 | 2017-01-11 | 中国平煤神马能源化工集团有限责任公司 | Mine grouting anchor cable supporting method |
CN107747493A (en) * | 2017-12-08 | 2018-03-02 | 河南理工大学 | Roadway floor prestress anchorage cable group coordinates ruggedized construction and construction method with slip casting |
CN207686735U (en) * | 2017-12-08 | 2018-08-03 | 河南理工大学 | Baseboard of coal mine roadway deformed bar suspension device |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130958A (en) * | 2019-05-16 | 2019-08-16 | 中国神华能源股份有限公司 | A kind of control method of gob side entry retaining pucking |
CN110470269A (en) * | 2019-08-21 | 2019-11-19 | 山东大学 | Reinforcing laneway prediction scheme is comprehensive to determine method |
CN110470269B (en) * | 2019-08-21 | 2021-04-16 | 山东大学 | Comprehensive determination method for roadway reinforcement plan |
CN111911197A (en) * | 2020-08-12 | 2020-11-10 | 华北科技学院 | Drainage slow-seepage grouting reinforcement device and method in strong water-rich soft surrounding rock |
CN113638756A (en) * | 2021-09-09 | 2021-11-12 | 辽宁工程技术大学 | Anchor cable supporting method for treating roadway floor heave and anchor cable |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN109505641A (en) | A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method | |
CN106638673B (en) | A kind of construction method of compound retaining structure | |
CN103696784B (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN108087008B (en) | A kind of three-soft seam gob side entry method for protecting support | |
CN106930321B (en) | The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole | |
CN103603369B (en) | Construction method of anchor pile counterfort retaining wall | |
CN110629671A (en) | Suspension bridge anchorage and construction method thereof | |
CN107965325B (en) | A kind of small interval shallow tunnel just branch arch replacement construction method | |
CN107642041A (en) | The hollow clump of piles anchorage of super-large diameter | |
CN109798140A (en) | Km Deep Soft Rock fracture grouting support reinforcement method | |
CN104631440A (en) | Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method | |
CN110273436A (en) | Open trench tunnel utilizes support pile and bear down on one float Structure and its construction method of crown beam | |
CN101975074B (en) | Soft rock roadway anchored concrete filled steel tube anti-floor heave device and construction method thereof | |
CN207660614U (en) | Roadway floor prestress anchorage cable group coordinates ruggedized construction with slip casting | |
CN103321663A (en) | Roadway baseboard anchoring and top pouring type pre-stressed anchor cable strengthening device and construction method | |
CN108316328A (en) | A kind of pressurization sinking device and its construction method for open caisson construction | |
CN107165173A (en) | A kind of foundation pit supporting system and its construction method | |
CN107642040A (en) | The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter | |
CN102626946A (en) | Manufacture method for concrete irregular fender post | |
CN207484290U (en) | The hollow clump of piles anchorage of super-large diameter | |
CN109881683A (en) | A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique | |
KR102079563B1 (en) | Compression friction type anchor panel ground reinforcement system | |
CN203189049U (en) | Anchorage top-pouring pre-stressed anchor cable strengthening device of mine roadway bottom plate | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190322 |