CN102322273A - A kind of roadway floor anchor is annotated integrated reinforcement means - Google Patents
A kind of roadway floor anchor is annotated integrated reinforcement means Download PDFInfo
- Publication number
- CN102322273A CN102322273A CN201110137767A CN201110137767A CN102322273A CN 102322273 A CN102322273 A CN 102322273A CN 201110137767 A CN201110137767 A CN 201110137767A CN 201110137767 A CN201110137767 A CN 201110137767A CN 102322273 A CN102322273 A CN 102322273A
- Authority
- CN
- China
- Prior art keywords
- hole
- deep
- grouting
- anchor
- roadway floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The present invention relates to a kind of roadway floor anchor and annotate integrated reinforcement means; Be difficult to reinforcing, the unmanageable problem of pucking to geologic anomaly band, weak broken roadway floor deep; At first a large amount of the race starched or spillages when roadway floor construction terrace prevents slip casting, and the shutoff of shallow bore hole slip casting thereafter superficial part crack forms superficial part and ends the slurry layer; And the integrality of country rock is improved in the slip casting grouting behind shaft or drift lining scope, has solved the follow-up inlet well hole problem of collapsing; Grouting Pipe and anchor cable are installed in the deep hole grouting hole of constructing then, realize in the time of the grouting reinforcement deep rock mass adopting channel-section steel, i iron etc. that the monomer anchor cable is combined into the anchor cable beam by the anchor cable full length fastening at last, effectively control the roadway floor distortion.
Description
Technical field
The present invention relates to improvement, the reinforcing technique of coal mine roadway base plate, especially a kind of roadway floor anchor is annotated integrated reinforcement means.
Background technology
Tunnel pucking problem is comparatively general in coal mine roadway.At present; Both at home and abroad control tunnel pucking or the method and the technology that reduce the pucking amount have release to improve the floor rocks stress state to improve floor rocks intensity etc. with reinforcing, and concrete grammar comprises: the full section method of support such as U shaped steel collapsible timbering method of support, concrete arch and arc plate of band end arch, construction base plate anchor pole method, floor grouting method, the vertical grooving control of base plate pucking method, digging tunnel, base plate both sides destressing method, loosening blasting method and Strengthening Roof control tunnel pucking method etc. are carried out in base plate tunnel two base angles.
Wherein, the floor grouting method is to improve the better method of floor rocks intensity, control pucking.When the roadway floor country rock was complete, the injected hole hole quality was good, and deep wall rock can be constructed, reinforced to Grouting Pipe; Can control pucking preferably; Yet floor grouting effect extreme difference in geologic anomaly band, weak broken, argillization tunnel, the main difficulty of existence is: geologic anomaly band, weak broken, argillization roadway floor Completion of Drilling Hole are of poor quality, after drilling rod withdraws from; Only roadway floor superficial part Completion of Drilling Hole quality is better, the deep boring hole of then collapsing.Base plate anchor pole, Grouting Pipe only can be constructed, reinforced roadway base plate superficial part, and base plate deep anchor pole, Grouting Pipe can't be constructed, and the base plate deep wall rock can not get reinforcing.The base plate bore diameter is bigger, and Grouting Pipe, anchor cable equal diameter are then less, and bore diameter and Grouting Pipe diameter, anchor cable diameter do not match, and slip casting, anchorage cable anchoring effect are relatively poor.For these problems, also there is not effective solution both at home and abroad.
Summary of the invention
In order to solve the problem that roadway floor runs in reinforce administering, the present invention proposes a kind of roadway floor anchor and annotate integrated reinforcement means, this reinforcement means is simple, be prone to construction, effective, is applicable to the jacking of floor of soft-rock tunnel.
The technical solution adopted for the present invention to solve the technical problems is: the operating procedure that this a kind of roadway floor anchor is annotated integrated reinforcement means is following:
1. at the concrete floor of roadway floor construction 0.1~0.2m,, roadway floor ends the slurry layer for providing;
2. terrace fixed after, at the dark superficial part injected hole of roadway floor construction 1.5~2.0m, array pitch is 1.5m~3.0m between the hole; After the construction of superficial part injected hole is accomplished, in the hole, put into the shallow bore hole Grouting Pipe, adopt sealing of holes such as rapid setting cement, hole packer; After sealing of hole is accomplished; Carry out slip casting through the shallow bore hole Grouting Pipe, when grouting pressure reaches 1.0~2.0Mpa, stop slip casting behind voltage stabilizing 3~5min;
3. at the construct deep injected hole of dark 5.0~6.0m of roadway floor; Array pitch is 1.5m~3.0m between the hole; In the hole, successively put into long anchor cable of 4.5~5.5m and the long deep hole grouting pipe of 3.5~4.5m; Adopt sealing of holes such as rapid setting cement, hole packer, after sealing of hole is accomplished, inject the beautiful diffusing chemical grout that waits of horse through the deep hole grouting pipe; When grouting pressure reaches 5.0~6.0Mpa, stop slip casting behind voltage stabilizing 3~5min;
4. after the slurry consolidation of deep hole grouting, adopt channel-section steel, i iron etc. to be combined into one adjacent two anchor cables, go up little pallet, lockset stretch-draw anchor cable then, the anchor cable pretightning force is 15~25Mpa;
5. along with the advance of the face, repeat above-mentioned steps 1.~4., finish until the roadway floor strengthening construction.
The first shallow bore hole slip casting that this method adopted, effectively shutoff the superficial part crack, form superficial part and end the slurry layer, guaranteed the increase of deep hole grouting pressure, the integrality of country rock is improved in the slip casting grouting behind shaft or drift lining scope, has solved the follow-up inlet well hole problem of collapsing; Deep hole grouting has increased reinforcing scope; Anchor cable and deep hole grouting pipe are put into same boring successively; Realize the anchor cable full length fastening in the time of the grouting reinforcement fragmented rock body, solved base plate deep anchor pole (rope), Grouting Pipe can't be constructed, the problem that the base plate deep wall rock can not get reinforcing.
The diameter of said superficial part injected hole and shallow bore hole Grouting Pipe and deep injected hole and deep hole grouting pipe, anchor cable matees respectively each other.
The slurries that adopt when said shallow bore hole slip casting and deep hole grouting are the beautiful chemical grout such as diffusing of cement grout or horse.
The invention has the beneficial effects as follows: this roadway floor anchor is annotated integrated reinforcement means, has effectively reinforced geologic anomaly band, weak broken roadway floor, has controlled the pucking amount, has realized the long-term stability of roadway floor; Through the grouting method of deep hole behind the first shallow bore hole, improved the integrality of country rock in the range of grouting, solved the follow-up inlet well hole problem of collapsing; Solved base plate deep anchor pole (rope), Grouting Pipe can't be constructed, the problem that the base plate deep wall rock can not get reinforcing; Be that a kind of usage degree is wide, safety, efficiently, roadway floor reinforcement means easily.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
Accompanying drawing 1 is annotated the shallow bore hole slip casting sketch map of integrated reinforcement means for this a kind of roadway floor anchor.
Accompanying drawing 2 is annotated deep hole grouting, the anchor cable construction sketch map of integrated reinforcement means for this a kind of roadway floor anchor.
Among the figure, 1. tunnel, 2. terrace, 3. shallow bore hole Grouting Pipe, 4. superficial part injected hole, 5. deep hole grouting pipe, 6. anchor cable, 7. deep injected hole.
The specific embodiment
In the accompanying drawings, this a kind of roadway floor anchor operating procedure of annotating integrated reinforcement means is following:
1. the concrete floor 2 of 1 base plate construction, 0.1~0.2m in the tunnel ends the slurry layer for tunnel 1 base plate provides;
2. terrace 2 fixed after, the dark superficial part injected hole 4 of 1 base plate construction 1.5~2.0m in the tunnel, array pitch is 1.5m~3.0m between the hole; After 4 constructions of superficial part injected hole are accomplished, in the hole, put into shallow bore hole Grouting Pipe 3, adopt sealing of holes such as rapid setting cement, hole packer; After sealing of hole is accomplished; Carry out slip casting through shallow bore hole Grouting Pipe 3, when grouting pressure reaches 1.0~2.0Mpa, stop slip casting behind voltage stabilizing 3~5min;
3. the construct deep injected hole 7 of dark 5.0~6.0m of 1 base plate in the tunnel; Array pitch is 1.5m~3.0m between the hole; In the hole, successively put into long anchor cable 6 of 4.5~5.5m and the long deep hole grouting pipe 5 of 3.5~4.5m; Adopt sealing of holes such as rapid setting cement, hole packer, after sealing of hole is accomplished, inject the beautiful diffusing chemical grout that waits of horse through deep hole grouting pipe 5; When grouting pressure reaches 5.0~6.0Mpa, stop slip casting behind voltage stabilizing 3~5min;
4. after the slurry consolidation of deep hole grouting, adopt channel-section steel, i iron etc. to be combined into one adjacent two anchor cables 6, go up little pallet, lockset stretch-draw anchor cable then, anchor cable 6 pretightning forces are 15~25Mpa;
5. along with the advance of the face, repeat above-mentioned steps 1.~4., finish until the roadway floor strengthening construction.
The first shallow bore hole slip casting that this method adopted, effectively shutoff the superficial part crack, form superficial part and end the slurry layer, guaranteed the increase of deep hole grouting pressure, the integrality of country rock is improved in the slip casting grouting behind shaft or drift lining scope, has solved the follow-up inlet well hole problem of collapsing; Deep hole grouting has increased reinforcing scope; Anchor cable 6 is put into same boring successively with deep hole grouting pipe 5; Realize anchor cable 6 full length fastenings in the time of the grouting reinforcement fragmented rock body, solved base plate deep anchor pole (rope), Grouting Pipe can't be constructed, the problem that the base plate deep wall rock can not get reinforcing.
Said superficial part injected hole 4 matees respectively with the diameter of shallow bore hole Grouting Pipe 3 and deep injected hole 7 and deep hole grouting pipe 5, anchor cable 6 each other.
The slurries that adopt when said shallow bore hole slip casting and deep hole grouting are the beautiful chemical grout such as diffusing of cement grout or horse.
Claims (3)
1. a roadway floor anchor is annotated integrated reinforcement means, it is characterized in that: the operating procedure of this method is following:
1. the concrete floor (2) of (1) base plate construction 0.1~0.2m in the tunnel ends the slurry layer for tunnel (1) base plate provides;
2. terrace (2) fixed after, the dark superficial part injected hole (4) of (1) base plate construction 1.5~2.0m in the tunnel, array pitch is 1.5m~3.0m between the hole; After superficial part injected hole (4) construction is accomplished, in the hole, put into shallow bore hole Grouting Pipe (3), adopt sealing of holes such as rapid setting cement, hole packer; After sealing of hole is accomplished; Carry out slip casting through shallow bore hole Grouting Pipe (3), when grouting pressure reaches 1.0~2.0Mpa, stop slip casting behind voltage stabilizing 3~5min;
3. the construct deep injected hole (7) of dark 5.0~6.0m of (1) base plate in the tunnel; Array pitch is 1.5m~3.0m between the hole; In the hole, successively put into long anchor cable (6) of 4.5~5.5m and the long deep hole grouting pipe (5) of 3.5~4.5m; Adopt sealing of holes such as rapid setting cement, hole packer, after sealing of hole is accomplished, inject the beautiful diffusing chemical grout that waits of horse through deep hole grouting pipe (5); When grouting pressure reaches 5.0~6.0Mpa, stop slip casting behind voltage stabilizing 3~5min;
4. after the slurry consolidation of deep hole grouting, adopt channel-section steel, i iron etc. to be combined into one adjacent two anchor cables (6), go up little pallet, lockset stretch-draw anchor cable (6) then, anchor cable (6) pretightning force is 15~25Mpa;
5. along with the advance of the face, repeat above-mentioned steps 1.~4., finish until the construction of tunnel (1) jacking of floor.
2. annotate integrated reinforcement means according to the said a kind of roadway floor anchor of claim 1, it is characterized in that: the diameter of said superficial part injected hole (4) and shallow bore hole Grouting Pipe (3) and deep injected hole (7) and deep hole grouting pipe (5), anchor cable (6) matees respectively each other.
3. annotate integrated reinforcement means according to the said a kind of roadway floor anchor of claim 1, it is characterized in that: the slurries that adopt when said shallow bore hole slip casting and deep hole grouting are the beautiful chemical grout such as diffusing of cement grout or horse.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110137767A CN102322273A (en) | 2011-05-20 | 2011-05-20 | A kind of roadway floor anchor is annotated integrated reinforcement means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110137767A CN102322273A (en) | 2011-05-20 | 2011-05-20 | A kind of roadway floor anchor is annotated integrated reinforcement means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102322273A true CN102322273A (en) | 2012-01-18 |
Family
ID=45450090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110137767A Pending CN102322273A (en) | 2011-05-20 | 2011-05-20 | A kind of roadway floor anchor is annotated integrated reinforcement means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102322273A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102660948A (en) * | 2012-05-30 | 2012-09-12 | 甘肃省建设投资(控股)集团总公司 | Steel tube locked anchor rod construction method |
CN102900446A (en) * | 2012-10-23 | 2013-01-30 | 中国矿业大学 | Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium |
CN102926774A (en) * | 2012-11-20 | 2013-02-13 | 安徽理工大学 | Bolting and grouting process for governing roadway floor heave |
CN103089304A (en) * | 2012-12-21 | 2013-05-08 | 太原理工大学 | Heaving floor monitoring method |
CN103089276A (en) * | 2013-01-28 | 2013-05-08 | 中国矿业大学 | Deep-shallow hole and high-low pressure coupling grouting technology |
CN103557009A (en) * | 2013-11-15 | 2014-02-05 | 山东科技大学 | Row pile retaining and protecting method for preventing roadway floor heaving |
CN105756689A (en) * | 2016-04-21 | 2016-07-13 | 淮南矿业(集团)有限责任公司 | Roadway floor reinforcing system and construction method thereof |
CN106522243A (en) * | 2016-10-18 | 2017-03-22 | 中铁局集团有限公司 | Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method |
WO2017049783A1 (en) * | 2015-09-21 | 2017-03-30 | 中国矿业大学 | Silica sol slow infiltration reinforcing method for argillaceous soft rock |
CN106907170A (en) * | 2017-04-29 | 2017-06-30 | 陕西省建筑职工大学 | A kind of roadway floor supporting construction and construction method |
CN107965332A (en) * | 2017-12-08 | 2018-04-27 | 贵州理工学院 | The anti-pucking deformed bar method for protecting support of baseboard of coal mine roadway |
CN109505641A (en) * | 2018-12-25 | 2019-03-22 | 山东安科矿山支护技术有限公司 | A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method |
CN110017152A (en) * | 2019-03-23 | 2019-07-16 | 新汶矿业集团有限责任公司孙村煤矿 | A kind of underground engineering country rock substep grouting strengthening method smashed to pieces |
WO2021082410A1 (en) * | 2019-10-29 | 2021-05-06 | 中国矿业大学 | Supporting structure and supporting method for preventing roadway floor from heaving |
CN113153396A (en) * | 2021-04-19 | 2021-07-23 | 华北科技学院 | Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area |
CN113216969A (en) * | 2021-06-08 | 2021-08-06 | 陕西陕煤铜川矿业有限公司 | Roadway top and bottom plate bulging control method based on flowing water erosion geological environment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000130096A (en) * | 1998-10-21 | 2000-05-09 | Kumagai Gumi Co Ltd | Method for installing invert into batholith of existing mountain tunnel |
JP2000145390A (en) * | 1998-11-13 | 2000-05-26 | Kumagai Gumi Co Ltd | Invert-forming method and block in existing mountain tunnel |
CN1840856A (en) * | 2005-03-30 | 2006-10-04 | 中国矿业大学 | Bottom plate concealed type reverse-arc grouting construction method |
CN101839140A (en) * | 2010-03-31 | 2010-09-22 | 中国矿业大学 | Method for reinforcing roadway floor by grouting |
-
2011
- 2011-05-20 CN CN201110137767A patent/CN102322273A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000130096A (en) * | 1998-10-21 | 2000-05-09 | Kumagai Gumi Co Ltd | Method for installing invert into batholith of existing mountain tunnel |
JP2000145390A (en) * | 1998-11-13 | 2000-05-26 | Kumagai Gumi Co Ltd | Invert-forming method and block in existing mountain tunnel |
CN1840856A (en) * | 2005-03-30 | 2006-10-04 | 中国矿业大学 | Bottom plate concealed type reverse-arc grouting construction method |
CN101839140A (en) * | 2010-03-31 | 2010-09-22 | 中国矿业大学 | Method for reinforcing roadway floor by grouting |
Non-Patent Citations (1)
Title |
---|
孟凡平,马岩: "软岩底板注浆加固技术", 《能源技术与管理》, no. 1, 31 January 2009 (2009-01-31), pages 47 - 78 * |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102660948A (en) * | 2012-05-30 | 2012-09-12 | 甘肃省建设投资(控股)集团总公司 | Steel tube locked anchor rod construction method |
CN102900446B (en) * | 2012-10-23 | 2014-12-24 | 中国矿业大学 | Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium |
CN102900446A (en) * | 2012-10-23 | 2013-01-30 | 中国矿业大学 | Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium |
CN102926774A (en) * | 2012-11-20 | 2013-02-13 | 安徽理工大学 | Bolting and grouting process for governing roadway floor heave |
CN103089304A (en) * | 2012-12-21 | 2013-05-08 | 太原理工大学 | Heaving floor monitoring method |
CN103089304B (en) * | 2012-12-21 | 2015-03-25 | 太原理工大学 | Heaving floor monitoring method |
CN103089276A (en) * | 2013-01-28 | 2013-05-08 | 中国矿业大学 | Deep-shallow hole and high-low pressure coupling grouting technology |
CN103089276B (en) * | 2013-01-28 | 2015-04-29 | 中国矿业大学 | Deep-shallow hole and high-low pressure coupling grouting technology |
CN103557009A (en) * | 2013-11-15 | 2014-02-05 | 山东科技大学 | Row pile retaining and protecting method for preventing roadway floor heaving |
WO2017049783A1 (en) * | 2015-09-21 | 2017-03-30 | 中国矿业大学 | Silica sol slow infiltration reinforcing method for argillaceous soft rock |
CN105756689A (en) * | 2016-04-21 | 2016-07-13 | 淮南矿业(集团)有限责任公司 | Roadway floor reinforcing system and construction method thereof |
CN106522243A (en) * | 2016-10-18 | 2017-03-22 | 中铁局集团有限公司 | Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method |
CN106522243B (en) * | 2016-10-18 | 2018-10-09 | 中铁一局集团有限公司 | The stratum of ground containing crack prestress anchorage cable slip casting anchoring construction method |
CN106907170A (en) * | 2017-04-29 | 2017-06-30 | 陕西省建筑职工大学 | A kind of roadway floor supporting construction and construction method |
CN106907170B (en) * | 2017-04-29 | 2023-03-03 | 陕西省建筑职工大学 | Roadway bottom plate supporting structure and construction method |
CN107965332A (en) * | 2017-12-08 | 2018-04-27 | 贵州理工学院 | The anti-pucking deformed bar method for protecting support of baseboard of coal mine roadway |
CN107965332B (en) * | 2017-12-08 | 2019-05-24 | 贵州理工学院 | The anti-pucking deformed bar method for protecting support of baseboard of coal mine roadway |
CN109505641A (en) * | 2018-12-25 | 2019-03-22 | 山东安科矿山支护技术有限公司 | A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method |
CN110017152A (en) * | 2019-03-23 | 2019-07-16 | 新汶矿业集团有限责任公司孙村煤矿 | A kind of underground engineering country rock substep grouting strengthening method smashed to pieces |
CN110017152B (en) * | 2019-03-23 | 2021-08-31 | 新汶矿业集团有限责任公司孙村煤矿 | Underground engineering extremely-broken surrounding rock stepped grouting reinforcement method |
WO2021082410A1 (en) * | 2019-10-29 | 2021-05-06 | 中国矿业大学 | Supporting structure and supporting method for preventing roadway floor from heaving |
CN113153396A (en) * | 2021-04-19 | 2021-07-23 | 华北科技学院 | Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area |
CN113216969A (en) * | 2021-06-08 | 2021-08-06 | 陕西陕煤铜川矿业有限公司 | Roadway top and bottom plate bulging control method based on flowing water erosion geological environment |
CN113216969B (en) * | 2021-06-08 | 2023-05-02 | 陕西陕煤铜川矿业有限公司 | Roadway roof and floor bulging control method based on running water erosion geological environment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102322273A (en) | A kind of roadway floor anchor is annotated integrated reinforcement means | |
CN102230382B (en) | Progressive shielding booster-type grouting and reinforcing technology for baseboard | |
CN101967984B (en) | Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method | |
CN102900446B (en) | Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium | |
CN103161480B (en) | Initiatively support the method for roadside packing gob side entry retaining | |
CN104389628B (en) | Landslide location tunnel reinforcement device and reinforced construction method | |
CN102337903B (en) | Method of active coupling support in time and space for control of minimum deformation of surrounding rock of deep well roadway | |
CN106884655B (en) | A kind of two-way reinforcement means of gob side entry driving coal column | |
CN103485808B (en) | Electro-osmosis home position modified roadway anchoring method of underground swelling soft rock | |
CN111119935B (en) | Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure | |
CN101509383A (en) | Tunnel footing anchor pouring reinforcement anti bottom expanding method and construction technique | |
CN109441512B (en) | Reinforced concrete through anchor cable and construction method thereof | |
CN102418536A (en) | Large-aperture pretension base plate hollow grouting device | |
CN104594926A (en) | Rapid composite roof roadway support method for high-stress water guiding karst cave group | |
CN203742612U (en) | Rapid construction supporting system for deep coal mine roadway with weak and broken surrounding rock | |
CN101915108A (en) | Method for controlling floor heave of dynamic pressure tunnel | |
CN104612696A (en) | Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method | |
CN103362117A (en) | Full-section grouting method for grouting section | |
CN105422128A (en) | Method for preventing goaf gas leakage in deep shaft gob-side entry driving | |
CN102787855A (en) | Excavating and supporting method of roadway containing quicksand layer | |
CN108035742A (en) | A kind of passive harmonious method for protecting support of extreme rockburst tunnel master | |
CN103321235A (en) | Composite soil nailing wall slope support method | |
CN103573280B (en) | Method for supporting porous ooze invasion compound roof roadway | |
CN101967983A (en) | Method for over-dredging, anchoring, backfilling and controlling deep well rock roadway floor heave | |
CN201412163Y (en) | Circular tunnel lining structure for construction of open-type tunnel boring machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120118 |
|
WD01 | Invention patent application deemed withdrawn after publication |