CN110106979A - A kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit - Google Patents
A kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit Download PDFInfo
- Publication number
- CN110106979A CN110106979A CN201910418045.3A CN201910418045A CN110106979A CN 110106979 A CN110106979 A CN 110106979A CN 201910418045 A CN201910418045 A CN 201910418045A CN 110106979 A CN110106979 A CN 110106979A
- Authority
- CN
- China
- Prior art keywords
- steel
- girder
- concrete
- cased
- web
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 374
- 239000010959 steel Substances 0.000 title claims abstract description 374
- 239000004567 concrete Substances 0.000 title claims abstract description 142
- 210000003205 muscle Anatomy 0.000 claims description 48
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 22
- 238000010276 construction Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 15
- 229910052742 iron Inorganic materials 0.000 claims description 11
- 238000012423 maintenance Methods 0.000 claims description 8
- 230000008901 benefit Effects 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 2
- 238000005345 coagulation Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims 1
- 230000010354 integration Effects 0.000 abstract description 8
- 239000011150 reinforced concrete Substances 0.000 description 18
- 238000013461 design Methods 0.000 description 11
- 238000006073 displacement reaction Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 7
- 230000003014 reinforcing effect Effects 0.000 description 7
- 238000012360 testing method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000001514 detection method Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 4
- 238000011900 installation process Methods 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000011178 precast concrete Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 2
- 239000011888 foil Substances 0.000 description 2
- 206010003694 Atrophy Diseases 0.000 description 1
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 1
- 244000046052 Phaseolus vulgaris Species 0.000 description 1
- 230000037444 atrophy Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/30—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node units, belong to technical field of buildings and technical field of structural engineering.Half prefabricated mode is taken at the prefabricated profile steel concrete column of of the invention half-girder with rolled steel section en cased in concrete node unit node, then carries out integration and pours, strengthens the rigidity of node;Half prefabricated girder steel be bolted at upper lower flange and web with node unit and it is integrated pour, strengthen the rigidity of beam-ends;Intercolumniation connector and the concrete for being filled in intercolumniation strengthen the connection of intercolumniation, and globality is higher, can effectively reinforce the rigidity of each junction, each junction is made to have better stress performance and deformability.
Description
Technical field
The present invention relates to a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node units, belong to Building technology neck
Domain and technical field of structural engineering.
Background technique
During modernized society's development, reinforced concrete construction technology has the development of leap, cast-in-place concrete
Construction technology also has gradually developed.Since cast-in-place concrete is with good performance and superiority, various
It is widely used in civil engineering.But there is also some problems, such as curing concrete for cast-in-place concrete
Need that a large amount of template, workload at the construction field (site) are big, construction period is longer, it is a large amount of artificial to need and not green enough ring
It protects.In order to solve these problems, precast concrete also develops at the same time.
China for precast concrete explore with development start from the 1950s, until in the 1980s,
Good application is suffered from industry and civil buildings.After nineteen ninety, due to the influence of other factors, precast concrete knot
Structure in civil buildings using fewer and fewer, welcome the market of an atrophy.With the rapid advances of China's economy, to section
Can environmental protection requirement is higher and higher, continuous rise of labor cost, China is to prefabricated assembled concrete knot nearly ten years
The research of structure starts to increase.
Existing prefabricated assembled concrete structure still there is a problem of following very big:
The first, technique is backward, industrialization degree is low, product form is single, relatively backward compared to for developed country, mechanical
Chemical industry level is low, and defined quality standard is much not achieved in the component of production.Developed country, as the U.S., Canada, Japan
Deng, it is very extensive to the application of assembled architecture, up to 60 or more percent, in contrast, China is but not achieved 10%, this is just
The advantage for causing assembled architecture is difficult to play.
The second, connect difficulty, when installing at the scene because prefabricated components manufacture when tolerance, installation personnel it is skilled
Degree, connectivity problem caused by environmental factor at that time etc., there are also the difficulties for installing cross-brace beam, and precast construction is without image of Buddha steel
The such Fast Installation of frame.
Third, globality poor, fabricated globality is slightly lower compared with complete cast-in-place mode.It is mainly reflected in coupling part;
The rigidity of junction is than complete cast-in-place mode compared to lower.
Based on the above, being badly in need of designing the high precast construction system of a kind of strong globality, simple installation, rigidity.
Summary of the invention
[technical problem]
That there are techniques is backward for existing prefabricated assembled concrete structure, industrialization degree is low, globality poor, connection are tired
The problem of hardly possible, poor rigidity.
[technical solution]
In order to solve the above technical problems, the present invention provides a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete sections
Dot element takes half prefabricated side at the prefabricated profile steel concrete column of of the invention half-girder with rolled steel section en cased in concrete node unit node
Formula, then carry out integration and pour, strengthen the rigidity of node;Half prefabricated girder steel and node unit is at upper lower flange and web
It is bolted and integration pours, strengthen the rigidity of beam-ends;Intercolumniation connector and the concrete for being filled in intercolumniation strengthen
The connection of intercolumniation, globality are higher.
Specifically, present invention firstly provides a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit, packet
Containing H profile steel 1, it is filled in the first concrete 2 of H profile steel 1, several first vertical muscle 4 being built in inside the first concrete 2 and
One stirrup 5 is welded on end plate 7 and the overhanging semi-precast beam end of node of 1 upper and lower ends of H profile steel;The upper bottom wing of the H profile steel 1
Edge outer surface and web two sides are welded with four girder steels 3, and the girder steel 3 includes the first girder steel 301, the second girder steel 302, third steel
Beam 303 and the 4th girder steel 304, wherein the first girder steel 301 and third girder steel 303 be respectively welded at the web two sides of H profile steel 1 and its
Web is parallel with lower flange in H profile steel 1, and the second girder steel 302 and the 4th girder steel 304 are respectively welded at outside the upper lower flange of H profile steel 1
Surface and its web is coplanar or parallel with the web of H profile steel 1, four girder steels stretch out except the first concrete 2;The section
The overhanging semi-precast beam end of point includes two classes, and a kind of overhanging semi-precast beam end of node includes the second vertical muscle parallel with 1 web of H profile steel
15, the second stirrup 6, and the second girder steel 302 or the 4th girder steel 304, and it is filled in the third concrete 18 of above structure;It is another
The overhanging semi-precast beam end of class node includes that the third vertical with 1 web of H profile steel indulges muscle (16), third stirrup 17, with the first girder steel
301 or third girder steel 303, and it is filled in the second internal concrete 14;Top flange, lower flange and the web of the girder steel 3
On be respectively equipped with the first bolt hole 9.
In one embodiment of the invention, four girder steels 3 are mounted in same level.
In one embodiment of the invention, it is preferred that second stirrup 6 is hooked on the second vertical muscle 15, described
Third stirrup 17 is hooked on third and indulges on muscle 16.
In one embodiment of the invention, the end plate 7 is made of end steel plate 20 and four anchor bars 19, institute
It states anchor bar 19 to be anchored in concrete 2, the second bolt hole 21 is arranged on the end steel plate 20.
In one embodiment of the invention, it is equipped on the edge of the web of the girder steel 3 U-shaped recessed equipped with several
First angle steel 27 of slot, the U-shaped groove are located on the first angle steel 27 perpendicular on the angle steel side of the web of girder steel 3.
In one embodiment of the invention, when a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete section
It when dot element needs intercolumniation to connect, is connected by intercolumniation connector 25, the intercolumniation connector 25 is located at the end steel plate 20
On face far from anchor bar 19, including vertical cross steel plate 24 and be respectively welded at the adjacent top edge of cross steel plate 24 and
Eight transverse triangle shape steel plates 23 of adjacent lower edge, the transverse triangle shape steel plate 23 are equipped with several second bolts hole
21, the second bolt 22 passes through the second bolt hole 21 and intercolumniation connector 25 is connect with the end steel plate 20 of prepared screw-bolt hole.
In one embodiment of the invention, the vertical cross steel plate 10 refers to by vertical steel plate splicing (weldering
Connect) at cross steel plate.
In one embodiment of the invention, after intercolumniation connector 25 is connected to two earth pillar units up and down, with mixed
Solidifying soil carries out pouring filling, keeps it concordant with pole unit section.
In one embodiment of the invention, the size of the cross guiding principle plate 24 takes according to the size of end steel plate 20
Value, the length of the cross guiding principle plate 24 are less than cornerwise length of end steel plate 20.
In one embodiment of the invention, the size of the transverse triangle shape steel plate 23 is according to the ruler of cross guiding principle plate 24
Very little value.
In one embodiment of the invention, it is preferred that set that there are three the on each transverse triangle shape steel plate 23
Two bolts hole 21.
Second, the present invention provides a kind of above-mentioned half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit intercolumniations
The construction method of connection, the method are as follows: by intercolumniation connector 25 using the second bolt 22 by the second bolt hole 21 with it is following
Earth pillar end plate 7 in end steel plate 20 be connected, using same method by intercolumniation connector 25 and 7 phase of earth pillar end plate above
Even, finally the gap in intercolumniation connector 25 is filled using concrete.
Third, the present invention provides above-mentioned half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and fashioned iron are mixed
The connector of solidifying Tu Liang, the girder with rolled steel section en cased in concrete include the 4th concrete 31 and be embedded in inside the 4th concrete 31 in advance the 5th
Girder steel 13, several 4th vertical muscle 26, several 4th stirrups 32, wherein top flange, lower flange and the web of the 5th girder steel 13
Be equipped with several bolts hole, the top flange and lower flange of the girder steel 3 and the 5th girder steel 13 pass through trigonometric expression reinforcer 11 and
The connection of first bolt 10, the web of the girder steel 3 and the 5th girder steel 13 pass through trigonometric expression reinforcer 11, maintenance connector 12 and
First bolt 10, the third are indulged muscle 16 and the 4th vertical muscle 26 and are connected by sleeve 8.
In one embodiment of the invention, the maintenance connector 12 is passed through by the first angle steel 27 and the second angle steel 28
Straight screw rod 29 and nut 30 anchor, and second angle steel 28 is welded on the web of the 5th girder steel 13, and with the 5th steel
The angle steel face of the second vertical angle steel 28 of the web of beam 13 is equipped with bolt hole, and the straight screw rod 29 passes through bolt hole and is placed on
In the U-shaped groove of first angle steel 27.
In one embodiment of the invention, the quantity of the bolt hole, position are corresponding with U-shaped groove, and bolt
The size in hole is less than or equal to U-shaped groove so that straight screw rod 29 can pass through bolt hole and can put into U-shaped groove.
In one embodiment of the invention, the trigonometric expression reinforcer 11 by third angle steel and is welded on third angle steel
The vertical triangular steel plate at both ends forms, and the both sides of the vertical triangular steel plate are connected with two sides of third angle steel, described
The two sides of third angle steel is equipped with third bolt hole, passes through third bolt hole and third angle steel for the steel by the first bolt 10
Beam 3 is connected with the top flange of the 5th girder steel 13 and lower flange and the girder steel 3 with the web of the 5th girder steel 13.
In one embodiment of the invention, it is preferred that the 4th stirrup 32 is hooked on the 4th vertical muscle 26.
4th, the present invention provides above-mentioned half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and fashioned iron are mixed
Straight screw rod 29 is first passed through the second angle steel 28 on the 5th girder steel 13, and is anchored by the construction method of the connector of solidifying Tu Liang,
Then the U-shaped groove straight 29 other side of screw rod being shelved in the first angle steel 27 on girder steel 3, carries out again after being positioned
Anchoring;Secondly third muscle 16 and the 4th vertical muscle 26 is indulged to connect by sleeve 8;Pass through the first bolt 10 and trigonometric expression reinforcer again
11 are connected the girder steel 3 with the top flange of the 5th girder steel 13 and lower flange and the girder steel 3 with the web of the 5th girder steel 13,
Concrete one-time-concreting is finally used, so that half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and half prefabricated fashioned iron
Beams of concrete is connected as an entirety.
Advantages of the present invention and effect:
Optimization design through the invention, the half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit and one
As assembled steel reinforced concrete node compare, have the advantage that
(1) half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit that the present invention designs is pre- as one and half
Integral unit processed, industrialization, the degree of modularity are high, and connection can be realized accessory standardization between intercolumniation connection and beam, so that
The design is high-efficient in factory process, more meets the mode of building trade futurity industryization development.
(2) the half prefabricated profile steel concrete column node unit that the present invention designs is stuck in angle by straight screw rod when installing connection
Groove on steel can position girder steel, so that installation process is more stablized convenient and accelerates installation speed, by straight
The bolt of lower flange steel plate connects so that girder steel and node are formed is rigidly connected in the anchoring of screw rod both ends nut and girder steel,
The moment of flexure on girder steel is allowed preferably to be transmitted at node with shearing.The H profile steel of perforation strengthens connection stiffness, so that joint core
Area's shear resistance capacity increases, while can bear bigger axial compressive force.
(3) present invention design takes half prefabricated mode at node, and integration is taken after installation is in place at the scene
The mode poured;Reinforcement connector has been used and with Concrete Filled gap in intercolumniation connection;In beam-to-column joint, node
Locate overhanging semi-precast beam end and semi-precast beam end is bolted at top flange, lower flange and web, vertical muscle passes through sleeve
Connection, then integration pours, the globalities of half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints that the present invention designs compared with
It is good.
(4) half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit H profile steel that the present invention designs is in column
Perforation, and the difficulty due to installing cross-brace beam during the installation process, general precast construction are quick like that without image of Buddha steel frame
Installation.H profile steel can serve as anti-lateral displacement frame in the present invention, ensure that the sidesway in installation process is stablized, accelerate peace
Fill speed;It in intercolumniation, is bolted using the end plate use of prefabricated intercolumniation connector and upper and lower two column, because each column is vertical
Muscle ends and is welded on end plate, so not needing to carry out the sleeve connection between vertical muscle;In the section that girder steel and the present invention design
It is that girder steel provides a lay-down position and keeps installation process more convenient and stablize that lower junction steel plate is first installed when dot element connects.To sum up
The present invention embodies certain advantage during installation.
(5) half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit that the present invention designs is taken at node
Half prefabricated mode, then carry out integration and pour, strengthen the rigidity of node;Half prefabricated girder steel and node unit is in upper bottom wing
It is bolted at edge and web and integration pours, strengthen the rigidity of beam-ends;Intercolumniation connector and it is filled in the mixed of intercolumniation
Solidifying soil strengthens the connection of intercolumniation, and prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit that the present invention designs can have
The rigidity of each junction is reinforced on effect ground, and each junction is made to have better stress performance and deformability.
(6) half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit major part process that the present invention designs exists
Factory completes, and quality is guaranteed and convenient for construction, can be reduced the building waste of site operation generation.The present invention is suitable for industrialization
Production, meets the trend of current assembled architecture.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit of the invention.
Fig. 2 is that half prefabricated profile steel concrete column-Steel Reinforced Concrete Beam-column Joints unit of the invention is connect with half prefabricated girder steel
Schematic diagram.
Fig. 3 is end plate of the invention and intercolumniation connector schematic diagram.
Fig. 4 maintenance connector schematic diagram between beam of the invention.
Fig. 5 is fashioned iron arrangement schematic diagram of the invention.
In figure, 1-H profile steel;2-the first concrete;3-girder steels;301-the first girder steel;302-the second girder steel;303—
Third girder steel;304-the four girder steel;4-the first vertical muscle;5-the first stirrup;6-the second stirrup;7-end plates;8-sleeves;
9-the first bolt hole;10-the first bolt;11-trigonometric expression reinforcers;12-maintenance connectors;13-the five girder steel;14—
Second concrete;15-the second vertical muscle;16-thirds indulge muscle;17-third stirrups;18-third concrete;19-anchoring steel
Muscle;20-end steel plates;21-the second bolt hole;22-the second bolt;23-triangular steel plates;24-cross steel plates;25—
Intercolumniation connector;26-the four vertical muscle;27-the first angle steel;28-the second angle steel;29-straight screw rods;30-nuts;31-the
Four concrete;32-the four stirrup.
Specific embodiment
The technical solution of invention is described in detail with reference to the accompanying drawing:
In order to have clearer understanding to technical solution of the present invention, purpose and effect, now in conjunction with attached drawing and embodiment
The present invention will be further elaborated:
Normal concrete involved in following embodiments is C40 concrete, every 1m3In the concrete containing water 185kg,
Cement 420kg, sand 572kg, stone 1273kg.
Detection method involved in following embodiments is as follows:
Node calculation detection method:
Half-and-half prefabricated Steel Reinforced Concrete Beam-column Joints unit carries out Experiment Study on Ultimate, is loaded using Quintic system real
It tests.Column cap and suspension column are all made of planar hinge connection type simulation inflection point boundary condition.Using being mounted on the vertical of capital position
The precompressed of jack pair test specimen twice, then divides two-stage to apply vertical axis pressure to pre- constant load, respectively 0.5N, 1.0N.Every grade
After load applies, load 1min is kept, acquires data.Vertical predetermined axle power installs beam end support after applying again, really
Additional internal force will not be introduced by protecting beam-ends during applying axle power, and beam-ends also uses hinged connection type.Finally in styletable
Apply low cycling loads until test specimen fails, entire loading procedure center pillar apical axis power is kept constant.Load uses Bit andits control,
Displacement corner is 1/1000,1/800,1/500,1/400,1/300 every grade of circulation primary;Angle of displacement is 1/200,1/150,1/
100,1/75,1/50,1/35,1/30,1/25,1/20 when every grade recycle 3 times.
1 displacement meter is arranged in test specimen capital, to measure the displacement of styletable in loading procedure;Each vertical muscle of node region, stirrup
1 foil gauge is arranged along its length, and H profile steel and each side of girder steel are along 2 foil gauges are vertically and horizontally arranged, node surface is along right
3 strain rosettes are arranged in linea angulata direction.
A kind of embodiment 1: half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit
Such as Fig. 1, a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit includes H profile steel 1, is filled in H
First concrete 2 of fashioned iron 1, several first vertical muscle 4 and the first stirrup 5 being built in inside the first concrete 2, is welded on H
The overhanging semi-precast beam end of end plate 7 and node of 1 upper and lower ends of fashioned iron;The upper lower flange outer surface of the H profile steel 1 and web two
Side is welded with four girder steels 3, and the girder steel 3 includes the first girder steel 301, the second girder steel 302, third girder steel 303 and the 4th girder steel
304, wherein the first girder steel 301 and third girder steel 303 are respectively welded at the web two sides of H profile steel 1 and in its web and H profile steels 1
Lower flange is parallel, the second girder steel 302 and the 4th girder steel 304 be respectively welded at the upper lower flange outer surface of H profile steel 1 and its web with
The web of H profile steel 1 is coplanar or parallel, and four girder steels stretch out except the first concrete 2;The overhanging semi-precast beam of node
End includes two classes, and a kind of overhanging semi-precast beam end of node includes the second vertical muscle 15 parallel with 1 web of H profile steel, the second stirrup 6,
With the second girder steel 302 or the 4th girder steel 304, and it is filled in the third concrete 18 of above structure;Another kind of node overhanging half
Prefabricated beam-ends includes that the third vertical with 1 web of H profile steel indulges muscle (16), third stirrup 17, with the first girder steel 301 or third girder steel
303, and it is filled in the second internal concrete 14;First is respectively equipped on the top flange of the girder steel 3, lower flange and web
Bolt hole 9.
Preferably, four girder steels 3 are mounted in same level.
Preferably, the end plate 7 is made of end steel plate 20 and four anchor bars 19, and the anchor bar 19 is anchored at
In concrete 2, the second bolt hole 21 is arranged on the end steel plate 20.
Preferably, the first angle steel 27 equipped with several U-shaped grooves, institute are installed on the edge of the web of the girder steel 3
U-shaped groove is stated to be located on the first angle steel 27 perpendicular on the angle steel side of the web of girder steel 3.
Preferably, when a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit needs intercolumniation to connect
When, it is connected by intercolumniation connector 25, the intercolumniation connector 25 is located at the face of the end steel plate 20 far from anchor bar 19
On, including vertical cross steel plate 24 and it is respectively welded at eight of the adjacent top edge of cross steel plate 24 and adjacent lower edge
Transverse triangle shape steel plate 23, the transverse triangle shape steel plate 23 are equipped with several second bolts hole 21, and the second bolt 22 passes through
Second bolt hole 21 connect intercolumniation connector 25 with the end steel plate 20 of prepared screw-bolt hole.
Preferably, it after intercolumniation connector 25 is connected to two earth pillar units up and down, is carried out pouring filling with concrete, be made
It is concordant with pole unit section.
Preferably, the size of the cross guiding principle plate 24 is according to the size value of end steel plate 20, the cross guiding principle plate 24
Length is less than cornerwise length of end steel plate 20.
Preferably, the size of the transverse triangle shape steel plate 23 is according to the size value of cross guiding principle plate 24.
Preferably, the second bolt hole 21 there are three being set on each transverse triangle shape steel plate 23.
Embodiment 2: a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and half prefabricated steel reinforced concrete
The connector and its construction method of beam
Such as Fig. 2, half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit described in embodiment 1 and fashioned iron coagulation
The connector of Tu Liang, the girder with rolled steel section en cased in concrete include the 4th concrete 31 and the 5th steel that is embedded in inside the 4th concrete 31 in advance
Beam 13, several 4th vertical muscle 26, several 4th stirrups 32, wherein on the top flange of the 5th girder steel 13, lower flange and web
Equipped with several bolts hole, the top flange and lower flange of the girder steel 3 and the 5th girder steel 13 pass through trigonometric expression reinforcer 11 and the
The connection of one bolt 10, the web of the girder steel 3 and the 5th girder steel 13 pass through trigonometric expression reinforcer 11, maintenance connector 12 and the
One bolt 10, the third are indulged muscle 16 and the 4th vertical muscle 26 and are connected by sleeve 8.
Preferably, the maintenance connector 12 passes through straight screw rod 29 and nut 30 by the first angle steel 27 and the second angle steel 28
It anchors, second angle steel 28 is welded on the web of the 5th girder steel 13, and vertical with the web of the 5th girder steel 13
The angle steel face of two angle steel 28 is equipped with bolt hole, and the straight screw rod 29 passes through bolt hole and is placed on the U-shaped recessed of the first angle steel 27
In slot.
Preferably, the quantity of the bolt hole, position are corresponding with U-shaped groove, and the size of bolt hole is less than or equal to U-shaped
Groove is so that straight screw rod 29 can pass through bolt hole and can put into U-shaped groove.
Preferably, the trigonometric expression reinforcer 11 is by third angle steel and the vertical triangle steel for being welded on third angle steel both ends
Board group is at the both sides of the vertical triangular steel plate are connected with two sides of third angle steel, set on the two sides of the third angle steel
There is third bolt hole, third bolt hole and third angle steel are passed through for the girder steel 3 and the 5th girder steel 13 by the first bolt 10
Top flange and lower flange and the girder steel 3 are connected with the web of the 5th girder steel 13.
The construction party of the connector of above-mentioned half prefabricated Steel Reinforced Concrete Beam-column Joints unit and half prefabricated girder with rolled steel section en cased in concrete
Specific step is as follows for method: straight screw rod 29 is first passed through into the second angle steel 28 on the 5th girder steel 13, and is anchored, it then will be straight
29 other side of screw rod is shelved on the U-shaped groove in the first angle steel 27 on girder steel 3, is anchored again after being positioned;Its
It is secondary third is indulged into muscle 16 and the 4th vertical muscle 26 to be connected by sleeve 8;Pass through the first bolt 10 and trigonometric expression reinforcer 11 again for institute
It states girder steel 3 to be connected with the top flange of the 5th girder steel 13 and lower flange and the girder steel 3 with the web of the 5th girder steel 13, finally use
Concrete one-time-concreting, so that half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and half prefabricated steel reinforced concrete
Beam is connected as an entirety.
A kind of embodiment 3: construction method of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit intercolumniation connection
Such as Fig. 3, the specific steps are as follows:
The method are as follows: intercolumniation connector 25 is passed through into the second bolt hole 21 and following earth pillar end using the second bolt 22
End steel plate 20 in plate 7 is connected, and intercolumniation connector 25 is connected with earth pillar end plate 7 above using same method, finally
The gap in intercolumniation connector 25 is filled using concrete.
A kind of embodiment 4: detection of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit
Specific step is as follows:
Muscle is indulged in column and chooses the reinforcing bar that 12 diameters are 16mm, and vertical muscle selection is the steel of 2 20mm diameters up and down in beam
Muscle indulges muscle and uses HRB400 reinforcing bar, is arranged symmetrically;Stirrup uses diameter for the HPB235 of 6mm grade plain bar in column, between stirrup
Away from for 200mm, styletable encrypted area is 100mm;Stirrup uses diameter for the HPB235 of 6mm grade plain bar, stirrup spacing in beam
For 200mm, beam-ends encrypted area is 100mm, and stirrup bends up certain length according to vertical muscle diameter at upper longitudinal bar.End plate uses
Q345 steel plate, sectional dimension are 500mm × 500mm × 10mm.By embodiment 1, a kind of half prefabricated steel reinforced concrete is prepared
Bean column node cell height is 3000mm, and column cross-section size is 400mm × 400mm, and beam section size is 300mm × 400mm, H
The sectional dimension of fashioned iron is 300mm × 300mm × 10mm × 10mm, the sectional dimension of girder steel be 300mm × 280mm × 10mm ×
10mm.By embodiment 2, it is connected with half prefabricated girder with rolled steel section en cased in concrete.Concrete carries out integration using C40 normal concrete and pours
It builds.
It is tested, testing result are as follows: styletable ultimate bearing capacity is 141.2kN, extreme displacement 91.5mm.
Comparative example 1: the construction method and detection of existing Steel Reinforced Concrete Beam-column Joints
Specific step is as follows:
Factory process is prefabricated and precast beam, first arrange that default reinforcing bar and stirrup, reinforcing bar length will generally surpass in the factory
Column length a distance out uses for intercolumniation sleeve connection, then arranges template, pour, by prefabricated reinforced concrete column
Be transported to scene, later by the overhanging reinforcing bar of upper and lower shell of column by sleeve connection so that two columns are connected, if necessary to and beam phase
Even, then the vertical muscle of beam is hooked on the reinforcing bar of column outstanding, or by sleeve connection between the vertical muscle of opposite beam, then
(each vertical muscle junction) cast in situs is at an entirety at node.
Beam section size is 250mm × 400mm, and column cross-section size is 400mm × 400mm, indulges muscle and uses HRB400 grades of steel
Muscle, using symmetric reinforcement, arrangement of reinforcement is the reinforcing bar of 2 20mm diameters up and down in beam, and column middle section is the steel of 4 22mm diameters
Muscle.The sectional dimension of pre-buried i shaped steel is 340mm × 150mm × 8mm × 10mm in beam, column;Stirrup uses diameter in column
For the HPB235 grade plain bar of 6mm, stirrup spacing 200mm, styletable encrypted area is 100mm;In beam stirrup use diameter for
The HPB235 grade plain bar of 6mm, stirrup spacing 200mm, beam-ends encrypted area are 100mm, stirrup basis at upper longitudinal bar
Vertical muscle diameter bends up certain length.End plate uses Q345 steel plate, and sectional dimension is 500mm × 500mm × 10mm.Height of specimen is
3000mm, concrete use C40 normal concrete.
It is tested, testing result are as follows: node hysteresis loop load peak value is 125.3kN, displacement peak value is 85.6mm.
Although the present invention has been described by way of example and in terms of the preferred embodiments, it is not intended to limit the invention, any to be familiar with this skill
The people of art can do various change and modification, therefore protection model of the invention without departing from the spirit and scope of the present invention
Enclosing subject to the definition of the claims.
Claims (10)
1. a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit, which is characterized in that include H profile steel (1), fill out
The first concrete (2) in H profile steel (1) is filled, several internal first vertical muscle (4) and first of the first concrete (2) are built in
Stirrup (5) is welded on the end plate (7) and the overhanging semi-precast beam end of node of H profile steel (1) upper and lower ends;The H profile steel (1)
Upper lower flange outer surface and web two sides are welded with four girder steels (3), and the girder steel (3) includes the first girder steel (301), the second steel
Beam (302), third girder steel (303) and the 4th girder steel (304), wherein the first girder steel (301) and third girder steel (303) are respectively welded
H profile steel (1) web two sides and its web it is parallel with lower flange on H profile steel (1), the second girder steel (302) and the 4th girder steel
(304) it is respectively welded at the upper lower flange outer surface of H profile steel (1) and its web and the web of H profile steel (1) is coplanar or parallel,
Four girder steels stretch out except the first concrete (2);The overhanging semi-precast beam end of node includes two classes, and a kind of node is overhanging
Semi-precast beam end includes the second vertical muscle (15) parallel with H profile steel (1) web, the second stirrup (6), with the second girder steel (302) or
4th girder steel (304), and it is filled in the third concrete (18) of above structure;The another kind of overhanging semi-precast beam end of node includes
The third vertical with H profile steel (1) web indulges muscle (16), third stirrup (17), and the first girder steel (301) or third girder steel (303),
And it is filled in internal the second concrete (14);First is respectively equipped on the top flange of the girder steel (3), lower flange and web
Bolt hole (9).
2. a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit according to claim 1, feature exist
In the end plate (7) is made of end steel plate (20) and four anchor bars (19), and the anchor bar (19) is anchored at coagulation
In native (2), the second bolt hole (21) are arranged on the end steel plate (20).
3. a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit according to claim 1 or 2, special
Sign is, the first angle steel (27) equipped with several U-shaped grooves, institute are separately installed on the edge of the web of the girder steel (3)
U-shaped groove is stated to be located on the first angle steel (27) perpendicular on the angle steel side of the web of girder steel (3).
4. any a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit according to claim 1~3,
It is characterized in that, leading to when a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit needs intercolumniation to connect
Intercolumniation connector (25) connection is crossed, the intercolumniation connector (25) is located at the end steel plate (20) far from anchor bar (19)
On face, including vertical cross steel plate (24) and it is respectively welded at cross steel plate (24) adjacent top edge and adjacent lower edge
Eight transverse triangle shape steel plates (23), the transverse triangle shape steel plate (23) is equipped with several second bolts hole (21), the
Two bolts (22) pass through the second bolt hole (21) and intercolumniation connector (25) are connect with the end steel plate (20) of prepared screw-bolt hole.
5. a kind of construction of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit intercolumniation connection described in claim 4
Method, the method are as follows: intercolumniation connector (25) are passed through into the second bolt hole (21) and following soil using the second bolt (22)
End steel plate (20) in styletable plate (7) is connected, using same method by intercolumniation connector (25) and earth pillar end plate above
(7) it is connected, finally the gap in intercolumniation connector (25) is filled using concrete.
6. a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and girder with rolled steel section en cased in concrete connector, special
Sign is that the half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit is any section of Claims 1 to 4
Dot element, the girder with rolled steel section en cased in concrete include the 4th concrete (31) and are embedded in the 5th internal girder steel of the 4th concrete (31) in advance
(13), the several 4th vertical muscle (26), several 4th stirrups (32), wherein the top flange of the 5th girder steel (13), lower flange and
Web is equipped with several bolts hole, and the girder steel (3) is added with the top flange of the 5th girder steel (13) and lower flange by trigonometric expression
The web of strong part (11) and the first bolt (10) connection, the girder steel (3) and the 5th girder steel (13) passes through trigonometric expression reinforcer
(11), maintenance connector (12) and the first bolt (10), the third indulge muscle (16) and the 4th vertical muscle (26) and pass through sleeve (8)
Connection.
7. a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit according to claim 6 and fashioned iron are mixed
The connector of solidifying Tu Liang, which is characterized in that the maintenance connector (12) is passed through by the first angle steel (27) and the second angle steel (28)
Straight screw rod (29) and nut (30) anchor, and second angle steel (28) is welded on the web of the 5th girder steel (13), and
The angle steel face of second angle steel (28) vertical with the web of the 5th girder steel (13) is equipped with bolt hole, and the straight screw rod (29) passes through
It bolt hole and is placed in the U-shaped groove of the first angle steel (27).
8. a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit according to claim 6 or 7 and fashioned iron
The connector of beams of concrete, which is characterized in that the trigonometric expression reinforcer (11) is by third angle steel and is welded on third angle steel two
The vertical triangular steel plate composition at end, the both sides of the vertical triangular steel plate are connected with two sides of third angle steel, and described the
The two sides of triangular steel is equipped with third bolt hole, passes through third bolt hole and third angle steel for the steel by the first bolt (10)
Beam (3) is connected with the top flange of the 5th girder steel (13) and lower flange and the girder steel (3) with the web of the 5th girder steel (13).
9. claim 6~the 8 any a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit and fashioned iron
The construction method of the connector of beams of concrete, which is characterized in that straight screw rod (29) are first passed through to second on the 5th girder steel (13)
Angle steel (28), and anchored, the U being then shelved on straight screw rod (29) other side in the first angle steel (27) on girder steel (3)
Type groove, is anchored again after being positioned;Secondly third muscle (16) and the 4th vertical muscle (26) is indulged to connect by sleeve (8)
It connects;Again by the first bolt (10) and trigonometric expression reinforcer (11) by the top flange of the girder steel (3) and the 5th girder steel (13) and
Lower flange and the girder steel (3) are connected with the web of the 5th girder steel (13), concrete one-time-concreting are finally used, so that half is prefabricated
Profile steel concrete column-girder with rolled steel section en cased in concrete node unit and half prefabricated girder with rolled steel section en cased in concrete are connected as an entirety.
10. the claims 1 to 3 any a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit or power
Benefit requires 6~the 8 any a kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node units and girder with rolled steel section en cased in concrete
Connector building field application.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910418045.3A CN110106979A (en) | 2019-05-20 | 2019-05-20 | A kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910418045.3A CN110106979A (en) | 2019-05-20 | 2019-05-20 | A kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110106979A true CN110106979A (en) | 2019-08-09 |
Family
ID=67491065
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910418045.3A Pending CN110106979A (en) | 2019-05-20 | 2019-05-20 | A kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110106979A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565821A (en) * | 2019-09-12 | 2019-12-13 | 江南大学 | Semi-prefabricated section steel concrete column-section steel concrete beam mortise and tenon joint unit |
CN110952668A (en) * | 2019-12-17 | 2020-04-03 | 温岭市智营电子科技有限公司 | Beam-column connecting structure and construction method thereof |
CN111255073A (en) * | 2020-02-12 | 2020-06-09 | 黄淮学院 | Steel-concrete combined beam column anti-seismic connecting structure |
CN112982831A (en) * | 2021-03-23 | 2021-06-18 | 中船第九设计研究院工程有限公司 | Concrete filling method for connecting upper column section and lower column section of prefabricated steel concrete column |
CN114250912A (en) * | 2021-12-30 | 2022-03-29 | 扬州大学 | Prefabricated section steel concrete column and composite structure |
CN115030315A (en) * | 2022-06-14 | 2022-09-09 | 东南大学 | Semi-prefabricated angle steel framework type concrete column-beam column joint and construction method |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000234383A (en) * | 1998-12-18 | 2000-08-29 | Sumitomo Metal Ind Ltd | Column-beam junction and h-steel for column |
JP2001279819A (en) * | 2000-01-27 | 2001-10-10 | Sumitomo Metal Ind Ltd | Column beam connection part and wide flange shape for column |
KR101233693B1 (en) * | 2011-08-11 | 2013-02-18 | 이창남 | Seismic connection system of steel girders to the pre-fabricated src column composed of angle shapes |
CN204876059U (en) * | 2015-06-11 | 2015-12-16 | 宁波大学 | Prefabricated assembled shaped steel concrete frame structure system |
CN106245762A (en) * | 2016-08-28 | 2016-12-21 | 北京工业大学 | A kind of assembled corrugated web bean column node attachment means recovering function |
CN205976001U (en) * | 2016-08-28 | 2017-02-22 | 北京工业大学 | But recovery function's an assembled L shape nodal connection device |
CN108104273A (en) * | 2017-12-21 | 2018-06-01 | 青岛理工大学 | Assembled self-recovery steel pipe concrete combined node, installation method and structural system |
CN108589923A (en) * | 2018-04-18 | 2018-09-28 | 西京学院 | A kind of steel-frame structure of combination beam |
CN108678185A (en) * | 2018-06-04 | 2018-10-19 | 东北林业大学 | A kind of complete prefabricated detachable assembling type beam-column connection |
CN208733811U (en) * | 2018-08-01 | 2019-04-12 | 重庆致锐远交通工程技术咨询有限公司 | A kind of beam-to-column joint structure of assembly concrete frame |
CN210507799U (en) * | 2019-05-20 | 2020-05-12 | 江南大学 | Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam |
-
2019
- 2019-05-20 CN CN201910418045.3A patent/CN110106979A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000234383A (en) * | 1998-12-18 | 2000-08-29 | Sumitomo Metal Ind Ltd | Column-beam junction and h-steel for column |
JP2001279819A (en) * | 2000-01-27 | 2001-10-10 | Sumitomo Metal Ind Ltd | Column beam connection part and wide flange shape for column |
KR101233693B1 (en) * | 2011-08-11 | 2013-02-18 | 이창남 | Seismic connection system of steel girders to the pre-fabricated src column composed of angle shapes |
CN204876059U (en) * | 2015-06-11 | 2015-12-16 | 宁波大学 | Prefabricated assembled shaped steel concrete frame structure system |
CN106245762A (en) * | 2016-08-28 | 2016-12-21 | 北京工业大学 | A kind of assembled corrugated web bean column node attachment means recovering function |
CN205976001U (en) * | 2016-08-28 | 2017-02-22 | 北京工业大学 | But recovery function's an assembled L shape nodal connection device |
CN108104273A (en) * | 2017-12-21 | 2018-06-01 | 青岛理工大学 | Assembled self-recovery steel pipe concrete combined node, installation method and structural system |
CN108589923A (en) * | 2018-04-18 | 2018-09-28 | 西京学院 | A kind of steel-frame structure of combination beam |
CN108678185A (en) * | 2018-06-04 | 2018-10-19 | 东北林业大学 | A kind of complete prefabricated detachable assembling type beam-column connection |
CN208733811U (en) * | 2018-08-01 | 2019-04-12 | 重庆致锐远交通工程技术咨询有限公司 | A kind of beam-to-column joint structure of assembly concrete frame |
CN210507799U (en) * | 2019-05-20 | 2020-05-12 | 江南大学 | Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565821A (en) * | 2019-09-12 | 2019-12-13 | 江南大学 | Semi-prefabricated section steel concrete column-section steel concrete beam mortise and tenon joint unit |
CN110952668A (en) * | 2019-12-17 | 2020-04-03 | 温岭市智营电子科技有限公司 | Beam-column connecting structure and construction method thereof |
CN111255073A (en) * | 2020-02-12 | 2020-06-09 | 黄淮学院 | Steel-concrete combined beam column anti-seismic connecting structure |
CN111255073B (en) * | 2020-02-12 | 2021-05-04 | 黄淮学院 | Steel-concrete combined beam column anti-seismic connecting structure |
CN112982831A (en) * | 2021-03-23 | 2021-06-18 | 中船第九设计研究院工程有限公司 | Concrete filling method for connecting upper column section and lower column section of prefabricated steel concrete column |
CN114250912A (en) * | 2021-12-30 | 2022-03-29 | 扬州大学 | Prefabricated section steel concrete column and composite structure |
CN115030315A (en) * | 2022-06-14 | 2022-09-09 | 东南大学 | Semi-prefabricated angle steel framework type concrete column-beam column joint and construction method |
CN115030315B (en) * | 2022-06-14 | 2024-05-14 | 东南大学 | Semi-prefabricated angle steel skeleton type concrete column-beam column joint and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110106979A (en) | A kind of half prefabricated profile steel concrete column-girder with rolled steel section en cased in concrete node unit | |
CN107268424B (en) | Can fast leveling precast assembly bridge pier structure and its construction method | |
CN110106978A (en) | Half prefabricated reinforced concrete column node unit of one kind and its application | |
CN106120568B (en) | The construction method of cross a river Main Bridge bridge pier secondary locking temporary consolidation structure | |
CN111455859A (en) | Construction method for bracket of No. 0 and No. 1 steel bridge with high piers and continuous steel structure | |
CN104947603B (en) | A kind of rc beam bridge girder reinforcing construction and reinforcement means | |
CN101446067B (en) | Construction method for Y-shaped frame of large-span steel box basket arch bridge | |
CN110106972A (en) | Between a kind of prefabricated reinforced concrete column and earth pillar or the connection method of itself and girder steel | |
CN101984189A (en) | Construction method of large steel concrete composite multi-terrace slope skewback | |
JP3844743B2 (en) | Box girder bridge structure and its construction method | |
CN214833726U (en) | Prefabricated steel tube bundle shear wall | |
CN104831639A (en) | Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam | |
JP2006104747A (en) | Pier stud connection structure and pier stud connecting method | |
CN102704414B (en) | Construction method for jacking arched bridges | |
CN210658698U (en) | Connector of semi-prefabricated reinforced concrete column node unit and beam column | |
CN208981316U (en) | Variable-section steel pipe concrete column structure is connect on a kind of steel core concrete column | |
JP2008025221A (en) | Elevated structure constructed by jointing pier stud of pc structure and steel box girder together | |
CN213741571U (en) | Prefabricated column and beam column node for prefabricated concrete building structure reserved steel bar perforation | |
CN106193455A (en) | A kind of ultra-high performance concrete cylinder permanent template and preparation method thereof | |
CN210797872U (en) | Prefabricated reinforced concrete column | |
Burdette et al. | Tests of four highway bridges to failure | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN210684429U (en) | Bridge approach jacking system of large-span tied arch bridge | |
CN105839851B (en) | Using the construction method for the prefabricated frame trestle that segmentation connection is formed | |
CN210507799U (en) | Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190809 |