CN110092285A - A kind of switching installation method of the strengthening steel crane girder part when not stopping production - Google Patents
A kind of switching installation method of the strengthening steel crane girder part when not stopping production Download PDFInfo
- Publication number
- CN110092285A CN110092285A CN201910430974.6A CN201910430974A CN110092285A CN 110092285 A CN110092285 A CN 110092285A CN 201910430974 A CN201910430974 A CN 201910430974A CN 110092285 A CN110092285 A CN 110092285A
- Authority
- CN
- China
- Prior art keywords
- reinforcing member
- jack
- crane
- operating platform
- wirerope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Abstract
A kind of switching installation method of the strengthening steel crane girder part when not stopping production.The technical field for belonging to ANALYSIS FOR STEEL CRANE GIRDERS reinforcing, installs the hanging apparatus made in advance, and temporary operating platform is installed on reinforcing member on T-type reinforcing member.Lifting lug is welded on crane girder top flange plate, uses wire rope hanging jack on lifting lug.Truck crane is connect by wirerope with the crane lifting hole of hanging apparatus on T-type reinforcing member, lifting T-type reinforcing member and temporary operating platform are hoisted to below crane beam sides, construction personnel enters temporary operating platform, jack suspension hook is connect by wirerope with the jack hole for hoist of hanging apparatus on T-type reinforcing member, truck crane back hook, reinforcing member and temporary operating platform are transferred to immediately below crane girder by jack, while promoting jack and reinforcing member is seated under crane girder bottom wing listrium.The advantage is that construction safety and quality has been effectively ensured, construction efficiency is improved.
Description
Technical field
The invention belongs to the technical fields that ANALYSIS FOR STEEL CRANE GIRDERS is reinforced, and in particular, provide one kind steel when not stopping production
The switching installation method of crane girder reinforcing member.
Background technique
ANALYSIS FOR STEEL CRANE GIRDERS is a kind of widely applied structure type, and user can occur in use process and require workshop
Production capacity dilatation prolongs the service life, and the outer dimension of original structure, bearing capacity, durability are not able to satisfy new make
With requiring.When encountering these situations, relate to carry out necessary strengthening construction to former crane girder.Crane girder reinforcing mostly uses under
The mode of reinforcing part on flange plate, truck crane can not directly lift reinforcing member in place, and the life in construction period workshop
Production. art equipment normally produces, and is the difficult point of reinforcement operation in place by reinforcing member installation.
Summary of the invention
The invention patent is designed to provide a kind of switching installation method of strengthening steel crane girder part when not stopping production,
It is in place to realize the installation that crane girder reinforcing member is transferred in the sky, construction period, which normally produces not, influences equipment operation, efficiently solves
Reinforcing member can not directly be lifted problem in place by truck crane of having determined, and easy to operate, ensure that safety, improve construction effect
Rate has accumulated construction experience for similar projects, with meeting the mesh of owner's unit steelmaking equipment dilatation volume increase, creates for owner's unit
Good economic benefit is made.
The present invention installs the hanging apparatus made in advance on T-type reinforcing member, and interim operation is installed on reinforcing member
Platform.Lifting lug is welded on crane girder top flange plate, uses wire rope hanging jack on lifting lug.Truck crane passes through wirerope and T
The crane lifting hole connection of hanging apparatus, lifts by crane T-type reinforcing member and temporary operating platform is hoisted to crane girder side on type reinforcing member
Below face, construction personnel enters temporary operating platform, and jack suspension hook is fallen by hanging apparatus on wirerope and T-type reinforcing member
The connection of chain hole for hoist, truck crane back hook, reinforcing member and temporary operating platform are transferred to immediately below crane girder by jack,
It promotes jack simultaneously reinforcing member is seated under crane girder bottom wing listrium.
The present invention makes temporary operating platform according to reinforcing member specification, and welds together, and provides for high-altitude switching installation
Safe and reliable operating space.Jack is hung in crane girder top flange plate setting lifting lug, realizes that aerial switching will with truck crane
Reinforcing member is mounted in place under crane girder bottom wing listrium.Specific step is as follows:
The first step, processing factory makes T-type reinforcing member (1), and the hanging apparatus made in advance (2) is installed to T-type and is added
On firmware (1), later according to T-type reinforcing member specification fabrication and installation temporary operating platform 3 (Fig. 1);
Second step welds the first lifting lug 5 on 4 top flange plate of steel crane beam, the second lifting lug 6, the first jack 9, second falls
Chain 10 connect (Fig. 2) with lifting lug the second lifting lug 6, the first lifting lug 5 by the first wirerope 7, the second wirerope 8 respectively;
Third step, truck crane 11 are connect with the crane lifting hole on hanging apparatus 2 respectively by third wirerope 12, are lifted by crane
T-type reinforcing member 1 and temporary operating platform 3 are hoisted to simultaneously below 4 side of steel crane beam (Fig. 3);
4th step, construction personnel enter temporary operating platform 3, and the suspension hook of the first jack 9, the second jack 10 is passed through respectively
4th wirerope 13, the 5th wirerope 14 are connect with the jack hole for hoist on hanging apparatus 2,11 back hook of truck crane, T-type reinforcing member
1 and temporary operating platform 3 be transferred to immediately below steel crane beam 4 (Fig. 4) by the first jack 9, the second jack 10;
5th step, while the first jack 9, the second jack 10 are promoted, T-type reinforcing member 1 is seated in 4 lower flange of steel crane beam
Under plate (Fig. 5).
It is an advantage of the current invention that realizing, the installation that crane girder reinforcing member is transferred in the sky is in place, and construction period is normal
Production does not influence equipment operation, and it is in place efficiently to solve the problems, such as that truck crane can not directly lift reinforcing member, reinforcing member and faces
When operating platform integration lift, construction safety and quality has been effectively ensured, has improved construction efficiency, it is right under the conditions of not stopping production
Crane girder strengthening construction is the objective economic benefit of owner's unit creativity.
Detailed description of the invention
Fig. 1 is T-type reinforcing member, hanging apparatus and temporary operating platform position view.
Fig. 2 is that crane girder hangs jack schematic diagram.
Fig. 3 is handling T-type reinforcing member and temporary operating platform figure.
Fig. 4 is truck crane and jack switching schematic diagram.
Fig. 5 is T-type reinforcing member schematic diagram in place.
In figure, T-type reinforcing member 1, hanging apparatus 2, temporary operating platform 3, steel crane beam 4, the first lifting lug 5, the second lifting lug
6, the first wirerope 7, the second wirerope 8, the first jack 9, the second jack 10, crane 11, third wirerope 12, the 4th wirerope
13, the 5th wirerope 14.
Specific embodiment
Fig. 1-Fig. 5 be originally be a kind of specific embodiment of the invention.Specific embodiment is as follows:
The first step, processing factory makes T-type reinforcing member (1), and the hanging apparatus made in advance (2) is installed to T-type and is added
On firmware (1), later according to T-type reinforcing member specification fabrication and installation temporary operating platform 3 (Fig. 1);
Second step welds the first lifting lug 5 on 4 top flange plate of steel crane beam, the second lifting lug 6, the first jack 9, second falls
Chain 10 connect (Fig. 2) with lifting lug the second lifting lug 6, the first lifting lug 5 by the first wirerope 7, the second wirerope 8 respectively;
Third step, truck crane 11 are connect with the crane lifting hole on hanging apparatus 2 respectively by third wirerope 12, are lifted by crane
T-type reinforcing member 1 and temporary operating platform 3 are hoisted to simultaneously below 4 side of steel crane beam (Fig. 3);
4th step, construction personnel enter temporary operating platform 3, and the suspension hook of the first jack 9, the second jack 10 is passed through respectively
4th wirerope 13, the 5th wirerope 14 are connect with the jack hole for hoist on hanging apparatus 2,11 back hook of truck crane, T-type reinforcing member
1 and temporary operating platform 3 be transferred to immediately below steel crane beam 4 (Fig. 4) by the first jack 9, the second jack 10;
5th step, while the first jack 9, the second jack 10 are promoted, T-type reinforcing member 1 is seated in 4 lower flange of steel crane beam
Under plate (Fig. 5).
Claims (1)
1. a kind of switching installation method of the strengthening steel crane girder part when not stopping production, which is characterized in that concrete operation step
It is as follows:
The first step, processing factory makes T-type reinforcing member (1), and the hanging apparatus made in advance (2) is installed to T-type reinforcing member
(1) on, later according to T-type reinforcing member specification fabrication and installation temporary operating platform (3);
Second step welds the first lifting lug (5), the second lifting lug (6), the first jack (9), on steel crane beam (4) top flange plate
Two jacks (10) are connected by the first wirerope (7), the second wirerope (8) and the second lifting lug of lifting lug (6), the first lifting lug (5) respectively
It connects;
Third step, truck crane (11) are connect with the crane lifting hole on hanging apparatus (2) respectively by third wirerope (12), are risen
It hangs T-type reinforcing member (1) and temporary operating platform (3) while being hoisted to below steel crane beam (4) side;
4th step, construction personnel enter temporary operating platform (3), and the suspension hook of the first jack (9), the second jack (10) is led to respectively
Cross the 4th wirerope (13), the 5th wirerope (14) is connect with the jack hole for hoist on hanging apparatus (2), truck crane (11) time
Hook, T-type reinforcing member (1) and temporary operating platform (3) are being transferred to steel crane beam (4) just by the first jack (9), the second jack (10)
Lower section;
5th step, while the first jack (9), the second jack (10) are promoted, T-type reinforcing member (1) is seated under steel crane beam (4)
Under flange plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910430974.6A CN110092285A (en) | 2019-05-22 | 2019-05-22 | A kind of switching installation method of the strengthening steel crane girder part when not stopping production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910430974.6A CN110092285A (en) | 2019-05-22 | 2019-05-22 | A kind of switching installation method of the strengthening steel crane girder part when not stopping production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110092285A true CN110092285A (en) | 2019-08-06 |
Family
ID=67448970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910430974.6A Pending CN110092285A (en) | 2019-05-22 | 2019-05-22 | A kind of switching installation method of the strengthening steel crane girder part when not stopping production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110092285A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114014159A (en) * | 2021-11-08 | 2022-02-08 | 中国能源建设集团山西电力建设有限公司 | Barb hoisting method for arranging obstacle beam in hoisting channel |
CN114807494A (en) * | 2022-04-28 | 2022-07-29 | 重庆钢铁股份有限公司 | Method for replacing crane beam of steel plant receiving span and refining span without stopping production |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3920806A1 (en) * | 1989-06-24 | 1991-01-10 | Dickertmann Ag | Transportable work platform for shaft inspection - can pass through small opening and then be extended to shaft wall by dropping hinged flaps |
CN102587676A (en) * | 2012-03-23 | 2012-07-18 | 中国核工业二三建设有限公司 | Method for mounting internal girder structure of nuclear island at nuclear power station |
CN203034779U (en) * | 2012-11-12 | 2013-07-03 | 中建钢构有限公司 | Self-lifting-type scaffold operating platform |
CN206016286U (en) * | 2016-08-26 | 2017-03-15 | 安徽鸿路钢结构(集团)股份有限公司 | A kind of ceiling board mounting platform |
CN207194421U (en) * | 2017-08-28 | 2018-04-06 | 中国一冶集团有限公司 | A kind of suspended-type movable operating platform for T-steel |
-
2019
- 2019-05-22 CN CN201910430974.6A patent/CN110092285A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3920806A1 (en) * | 1989-06-24 | 1991-01-10 | Dickertmann Ag | Transportable work platform for shaft inspection - can pass through small opening and then be extended to shaft wall by dropping hinged flaps |
CN102587676A (en) * | 2012-03-23 | 2012-07-18 | 中国核工业二三建设有限公司 | Method for mounting internal girder structure of nuclear island at nuclear power station |
CN203034779U (en) * | 2012-11-12 | 2013-07-03 | 中建钢构有限公司 | Self-lifting-type scaffold operating platform |
CN206016286U (en) * | 2016-08-26 | 2017-03-15 | 安徽鸿路钢结构(集团)股份有限公司 | A kind of ceiling board mounting platform |
CN207194421U (en) * | 2017-08-28 | 2018-04-06 | 中国一冶集团有限公司 | A kind of suspended-type movable operating platform for T-steel |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114014159A (en) * | 2021-11-08 | 2022-02-08 | 中国能源建设集团山西电力建设有限公司 | Barb hoisting method for arranging obstacle beam in hoisting channel |
CN114014159B (en) * | 2021-11-08 | 2023-12-01 | 中国能源建设集团山西电力建设有限公司 | Barb hoisting method with barrier beam in hoisting channel |
CN114807494A (en) * | 2022-04-28 | 2022-07-29 | 重庆钢铁股份有限公司 | Method for replacing crane beam of steel plant receiving span and refining span without stopping production |
CN114807494B (en) * | 2022-04-28 | 2024-01-23 | 重庆钢铁股份有限公司 | Method for replacing crane beam of receiving span and refining span of steel mill without stopping production |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106744257B (en) | A kind of kiloton adjustable combined sling, assemble method and the method for lifting caisson | |
CN110092285A (en) | A kind of switching installation method of the strengthening steel crane girder part when not stopping production | |
CN209988942U (en) | Assembled building superimposed sheet lifting device | |
CN103086276B (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
CN110407102A (en) | A kind of straight-arm lorry-mounted crane receives hook hydraulic system automatically | |
CN106315426A (en) | Block form tower crane mounting and jacking method for assembled building | |
CN205662256U (en) | High rises pergola side and hangs a semi -portal bridge crane | |
CN211687923U (en) | Automobile chassis hoisting device | |
CN204781892U (en) | Modular can promote elevartor shaft operation platform | |
CN204689351U (en) | A kind of H profile steel structural elements suspender | |
CN207209840U (en) | A kind of Multifunctional suspension bracket | |
CN201649667U (en) | Reinforcement cage immersion guide frame | |
CN208166404U (en) | A kind of power plant electric precipitation anode plate installation boom hoisting | |
CN205187694U (en) | Novel tower crane equipment | |
CN205170191U (en) | Steel construction main couple hoist and mount system | |
CN110407117A (en) | A kind of automatic receipts hook and antioverloading hydraulic system suitable for straight-arm lorry-mounted crane | |
CN111285229A (en) | Super high-rise power distribution room equipment hoisting engineering construction structure | |
CN105174077A (en) | Novel tower crane equipment | |
CN216889678U (en) | Rectangular steel reinforcement cage hoisting system | |
CN105084229B (en) | Roof crane and application to roof-midspan longitudinal steel beam hoisting | |
CN205419582U (en) | Floor hoist | |
CN109626208A (en) | A kind of encircling type single-beam operation trolley and application method | |
CN204057708U (en) | A kind of hoisting structure utilizing dual stage runway grider | |
CN203033635U (en) | Hoisting tool comprising three travelling cranes with different weights | |
CN205023729U (en) | Gallows frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190806 |